C02S2

4
SET UP A 150-TPH CRUSHER PLANT 09/25/98 62G1@BCL@2401FF68 C-II-1 SECTION II. INTRODUCTION AC RC Method of CO Conference 2.0 2.0 Instruction DM Demonstration 3.0 3.0 PE1 Practical Exerci se (hardware oriented) 6.0 6.0 PE2 Practical Exerci se (nonhardware oriented) 2.0 2.0 TE1 Test (hardware oriented) 6.0 6.0 TE2 Test (nonhardware oriented) 2.0 2.0 Time of instruction: 21.0 21.0 NOTE: Allo w one t o two mi nutes for the l esson int roduct ion . NOTE: Introduce yoursel f as t he instructor . NOTE: Show VGT #1 Motivator The purpose of the 150-TPH crusher plant training is to provide you with the skills and knowledge required to perform 150-TPH crusher plant setup operations that you, as a quarry specialist, must perform in a combat and peacetime environment. NOTE: Show VGTs #2 and #3 Terminal Learning Objective NOTE: Inform the stu dents of the termin al learni ng objectiv e action, conditions, and standards.

Transcript of C02S2

Page 1: C02S2

7/27/2019 C02S2

http://slidepdf.com/reader/full/c02s2 1/3

SET UP A 150-TPH CRUSHER PLANT

09/25/9862G1@BCL@2401FF68

C-II-1

SECTION II. INTRODUCTION

AC RC

Method of  CO Conference 2.0 2.0

Instruction DM Demonstration 3.0 3.0

PE1 Practical Exercise(hardware oriented)

6.0 6.0

PE2 Practical Exercise(nonhardware oriented)

2.0 2.0

TE1 Test (hardware oriented) 6.0 6.0

TE2 Test (nonhardwareoriented)

2.0 2.0

Time of instruction: 21.0 21.0

NOTE: Allow one to two minutes for the lesson introduction.

NOTE: Introduce yourself as the instructor.

NOTE: Show VGT #1

Motivator  The purpose of the 150-TPH crusher plant training is to provide you with the skillsand knowledge required to perform 150-TPH crusher plant setup operations that you,as a quarry specialist, must perform in a combat and peacetime environment.

NOTE: Show VGTs #2 and #3

Terminal

Learning

Objective

NOTE: Inform the students of the terminal learning objective action,

conditions, and standards.

Page 2: C02S2

7/27/2019 C02S2

http://slidepdf.com/reader/full/c02s2 2/3

SET UP A 150-TPH CRUSHER PLANT

09/25/9862G1@BCL@2401FF68

C-II-2

Action: Set up a 150-TPH crusher plant.

Condition: In a classroom and at a training site, given a 150-TPH crusher plant, job specifications, TM 5-332, TM 5-3820-255-14&P,TM 5-3820-256-14&P, TM 5-3820-257-14&P,TM 5-3820-258-14&P, TM 5-3820-259-14&P,TM 5-3820-260-14&P, TM 5-3820-262-14&P,TM 5-3820-263-14&P, a general mechanic's tool kit, a ¾” driveset with sockets, an 18” pipe wrench, a 24” adjustable wrench, a12” ruler, replacement screens, a cone and jaw adjustment pump,a grease gun, petroleum, oil, lubricants, penetrating oil, rags,appropriate maintenance forms, an equipment records folder,goggles, gloves, double hearing protection, a hard hat, coveralls,safety boots, paper, and a pencil

Standards: Identify the setup procedures and calibrate a 150-TPH crusher plant in accordance with (IAW) job specifications,TM 5-3820-255-14&P, TM 5-332, TM 5-3820-256-14&P,TM 5-3820-257-14&P, TM 5-3820-258-14&P,TM 5-3820-259-14&P, TM 5-3820-260-14&P,TM 5-3820-262-14&P, and TM 5-3820-263-14&P, withoutdamage to equipment or the environment and without injury topersonnel.

NOTE: Show VGTs #4 and #5

NOTE: Briefly review the general safety requirements, risk assessment level, and

environmental considerations associated with this lesson.

Safety

Requirements

Hard hats must be worn at all times. Hearing protection must be worn whileequipment is running. Eye protection, gloves, and proper foot protection must beworn when operating tools. Use three points of contact when mounting or dismounting equipment. Remove all jewelry. Use caution around moving parts.

Risk

Assessment

Level

Low

Environmental

Considerations

 Avoid unnecessary stripping and damage to vegetation and waterways. Control dustconditions and limit water erosion by dressing area at the end of each day. Avoidunnecessary equipment usage and follow established procedures for cleanup of fluidleaks. Restore site and surrounding areas as close as possible to the originalecological condition.

Page 3: C02S2

7/27/2019 C02S2

http://slidepdf.com/reader/full/c02s2 3/3

SET UP A 150-TPH CRUSHER PLANT

09/25/9862G1@BCL@2401FF68

C-II-3

Evaluation Written examination and performance evaluation

Instructional

Lead-In

NOTE: Show VGT #6

NOTE: Introduce the lessons contained in this TSP.

1. Identify the Setup Procedures for a 150-TPH Crusher Plant

2. Calibrate a 150-TPH Crusher Plant