SET UP A 150-TPH CRUSHER PLANT
09/25/9862G1@BCL@24010A59
C-I-1
SECTION I. ADMINISTRATIVE DATA
All Courses COURSE NUMBER(S) COURSE TITLE(S)
Including this
Lesson713-62G10 Quarry Specialist Course
Task(s) Taught TASK NUMBER (S) TASK TITLE (S)
or Supported 051-251-XXXX Set Up a 150-TPH Crusher Plant
Reinforced TASK NUMBER (S) TASK TITLE (S)
Task(s) None
Academic The academic hours required to teach this lesson are as follows:
Hours
Peacetime Mobilization IDT ADT DL
Hrs Meth Hrs Meth Hrs Meth Hrs Meth Hrs Meth
2.0 CO 2.0 CO 00.0 2.0 CO 00.03.0 DM 3.0 DM 00.0 3.0 DM 00.06.0 PE1 6.0 PE1 00.0 6.0 PE1 00.02.0 PE2 2.0 PE2 00.0 2.0 PE2 00.0
Test 6.0 TE1 6.0 TE1 00.0 6.0 TE1 00.0
2.0 TE2 2.0 TE2 00.0 2.0 TE2 00.0
Total Hours 21.0 21.0 00.0 21.0 00.0
Test Lesson
Number
Refer to Appendix C, Test and Test Solutions
-
7/27/2019 C02S1
2/4
SET UP A 150-TPH CRUSHER PLANT
09/25/9862G1@BCL@24010A59
C-I-2
Prerequisite LESSON NUMBER(S) LESSON TITLE(S)
Lesson(s)051-62G1-B01 Introduction to Course
051-62G1-B02 Introduction to Safety
051-62G1-B03 Introduction to Environmental Stewardship
051-62G1-B04 Utilize The Army Maintenance Management System(TAMMS)
051-62G1-C01 Introduction to Rock Crushing Operations
Clearance
and Access
Unclassified
References
Required Number Title Date
Additional
Information
*TM 5-332 Pits and Quarries Dec 67
TM 5-3820-255-12&P Operation, Model M150 Jun 97
TM 5-3820-256-14&P Primary Crusher Unit, Model M3042 Jun 97
TM 5-3820-257-14&P Portable Surge Bin Feeder, Model PSF-12 Jun 97
TM 5-3820-258-14&P Secondary Crusher and Screening Unit,Model M1313
Jun 97
TM 5-3820-259-14&P Tertiary Crusher Unit, Model MC45 Jun 97
TM 5-3820-260-14&P Washing and Screening Unit , Model M1122 Jun 97TM 5-3820-262-14&P Product Conveyor, Model PC1245 Jun 97
TM 5-3820-263-14&P Water Pump Unit, Model GB2060 Jun 97
Instructor
Requirements
Two ITC certified instructors
Additional
Support
Personnel
Requirements
Assign alternate instructors as needed.
-
7/27/2019 C02S1
3/4
SET UP A 150-TPH CRUSHER PLANT
09/25/9862G1@BCL@24010A59
C-I-3
* This reference is currently being revised as a Field Manual.
Equipment
Required
150-TPH crusher plant
General mechanics tool kit drive set with sockets
18 pipe wrench
24 adjustable wrench
12 ruler
Replacement screens
Cone and jaw adjustment pump
Grease gun
Materials Instructor Materials Student Materials
Required
TM 5-3820-255-12&P TM 5-3820-255-12&P
TM 5-3820-256-14&P TM 5-3820-256-14&P
TM 5-3820-257-14&P TM 5-3820-257-14&P
TM 5-3820-258-14&P TM 5-3820-258-14&P
TM 5-3820-259-14&P TM 5-3820-259-14&P
TM 5-3820-260-14&P TM 5-3820-260-14&P
TM 5-3820-262-14&P TM 5-3820-262-14&P
TM 5-3820-263-14&P TM 5-3820-263-14&P
Job specifications Job specifications
C02 TSP Equipment records folder
Equipment records folder Student guides Coveralls Coveralls
Safety boots Safety boots
Goggles Goggles
Gloves Gloves
Double hearing protection Double hearing protection
Hard hat Hard hats
Pencils
Paper
Classroom,
Training Area,
and Range
Requirements
NOTE: Refer to the Facilities Summary of the POI.
Ammunition
Requirements
None
-
7/27/2019 C02S1
4/4
SET UP A 150-TPH CRUSHER PLANT
09/25/9862G1@BCL@24010A59
C-I-4
Instructional
Guidance
Before presenting this lesson,
a. Ensure classroom is available and ready for training
b. Ensure overhead projector, screen, and VGTs are on hand
c. Ensure all materials are on hand and in quantities needed.
d. Read and understand C02 TSP prior to conducting training.
e. Ensure equipment is available and on site.
Proponent Name Rank Position Date
Lesson Plan
Approvals