C + P Design I Consulting SUPPORTING C.U.P DOCUMENTS · 8/15/2018 · t i ce i s c-31357 a n i...
Transcript of C + P Design I Consulting SUPPORTING C.U.P DOCUMENTS · 8/15/2018 · t i ce i s c-31357 a n i...
SUPPORTING C.U.P DOCUMENTS
PROJECT No: 1808.00
05.30.2018
NOT FOR CONSTRUCTION
2924 WILSHIRE BOULEVARD, SANTA MONICA, CALIFORNIA 90403
TENANT IMPROVEMENT
BOARD 'N BRUSH
ASHLEY ISROW
12115 SAN VICENTE, UNIT 104
Client:
818.445.4406
LOS ANGELES, CA 90049
G000
COVER SHEET
COVER SHEET
ARCHITECTURAL
DEMO FLOOR PLAN & RCPA100
SITE
LOCATION
LOCATION MAP PROJECT DATA
CODE ANALYSIS
CERTIFICATION
DRAWING SCHEDULE
A101 FLOOR PLAN & RCP
AC + P Design I Consulting3300
90405
310.684.3883
ANTA
IRPORT AVE,
S CAONICA,M
SUITE 4
AS100 SITE PLAN
TC
ATS
OER
ETA
1
LCF/1 O.N
A3
I F O R N I91/
SY AN
L A NT
I EC
I S
C-31357
A NI
CRDE ANC H A EP
H TI
1. PROJECT ADDRESS:
2924 WILSHIRE BLVD.SANTA MONICA, CALIFORNIA 90403
2. CLIENT:
ASHLEY ISROW12115 SAN VICENTE, UNIT 104LOS ANGELES, CA 90049
(818) 445 - 4406
3. APN: 4267-004-015
3. NET PROPERTY AREA = 25,500 SQ/FT
1. THE PROJECT SHALL COMPLY WITH CODES, ORDINANCES, OR LAWS HAVINGJURISDICTIONS ON THE PROJECT, WHICH INCLUDE BUT ARE NOT LIMITED TO:
BUILDING CODE = 2016 CALIFORNIA BUILDING CODE
MECHANICAL CODE = 2016 CALIFORNIA MECHANICAL CODE
ELECTRICAL CODE = 2016 CALIFORNIA ELECTRICAL CODE
PLUMBING CODE = 2016 PLUMBING CODE
FIRE CODE = 2016 FIRE CODE
GREEN BUILDING = 2016 GREEN BUILDING STANDARDS CODE
BUILDING STANDARDS = 2016 CALIFORNIA BUILDING STANDARDS CODEAMERICANS WITH DISABILITIES ACT
1. C.E.C TITLE 24 AND DISABLE ACCESS COMPLIANCE:
THIS PROJECT SHALL COMPLY WITH C.E.C. TITLE 24 FOR ENERGYCOMPLIANCE AND DISABLED ACCESS REQUIREMENTS.
GOVERNING CODES
G100 GENERAL INFORMATION
1. EXISTING SPACE TO BE USED AS AN ART STUDIO
2. EXISTING USE:
B OCCUPANCY
OCCUPANCY = GROUP B
PREVIOUS USE = (B) OFFICEPROPOSED USE = (B) OFFICE
3. EXISTING BUILDING NUMBER OF FLOORS = TWO
05.30.2018
SUPPORTING C.U.P DOCUMENTS
SCALE:
2924 WILSHIRE BLVD.
DRAWING TITLE:
PROJECT No: 1808.00
SANTA MONICA, CALIFORNIA 90403
PROJECT TITLE:
KEY PLAN
1 05.30.18 ISSUED FOR SUPPORTING C.U.P DOCUMENTS
DATENO. REVISION
SEAL
ASHLEY ISROW
LOS ANGELES, CA 90049
12115 SAN VICENTE, UNIT 104
Client:
BOARD 'N BRUSH
A3300
ANTA
IRPORT AVE,
S CAONICA,M
SUITE 4
310.684.3883
C + P Design I Consulting
90405
TC
ATS
OER
ETA
1
LCF/1 O.N
A3
I F O R N I91/
SY AN
L A NT
I EC
I S
C-31357
A NI
CRDE ANC H A EP
H TI
818.445.4406
G100
GENERAL INFORMATION
VARIES
A1
--1" = 200'-0"
VICINITY MAP 500' RADIUS
G11
----
ALCOHOL ESTABLISHMENTS LIST
17'-0
"1'-
7"4'-
4"65
'-1"
13'-0
"4'-
0"13
'-0"
16'-0
"13
'-0"
2'-6"
2'-1"
4'-0"
4'-0"
15'-0" 5'-10" 13'-0" 26'-3" 4'-7" 15'-10"
4'-0"
4'-0"
4'-0"
4'-0"
19'-3" 7'-6" 19'-1" 10'-2" 13'-1" 20'-5"
170'-0"
65'-1
"
2'-1"
2'-1"
2'-1"
2'-1"
2'-1"
2'-1"
2'-0"
4'-0"
4'-0"
2'-1"
2'-1"
30'-0
"
EXISTING 2-STORY OFFICEBUILDING
2924FIRST FLOOR
TENANTIMPROVEMENT
EXISTING 2-STORY OFFICEBUILDING
30
5'-0"
20'-0
"20
'-0"
29
7'-9"15'-6"
8'-6"
282726252423222120191817
15'-6"
31323334353637383940414243
120.0°
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
STREET PARKING STREET PARKING STREET PARKING STREET PARKING STREET PARKING STREET PARKING
44
84'-1
1"
2'-5"
24'-0
"22
'-6"
24'-0
"12
'-0"
WILSHIRE BLVD
STAN
FORD
ST
STRE
ET P
ARKI
NGST
REET
PAR
KING
STRE
ET P
ARKI
NG
CURB
CUT
CURB
CUT
AISL
EAI
SLE
150'-
0"12
'-4"
170'-0" 10'-4"
CROSSWALK
CROS
SWAL
K
2
1 1 1 1 1 1 5
32 4
1
1
6
7
PROP
ERTY
LINE
PL
CMU
WAL
L HEI
GHT
VARI
ES
CMU WALL HEIGHT VARIESPROPERTY LINE PL
TRASH RECYCLE
PROPERTY LINE PL
PROP
ERTY
LINE
PL
SIDEWALK
SIDE
WAL
K
8 8 8 810" DIA 20" DIA 14" DIA 12" DIA
14'-4"
4'-4"
2'-1"
3
9
45 ON-GRADE PARKING SPACES+ 1 H.C. SPACES = 46 SPACES
45 46
8'-6"
1. SEE LANDSCAPE DRAWINGS FOR ALL PAVING LAYOUTS. BOLLARD LIGHT FIXTURELOCATIONS TO ALIGN WITH PAVING JOINTS LINES.
2. SEE ELECTRICAL DRAWINGS FOR SITE POWER AND LIGHTING INFORMATION.
3. USE THIS DRAWING FOR GENERAL REFERENCE AND COORDINATION SHOWING SITE CIVIL,LANDSCAPE ARCHITECTURAL, AND SITE LIGHTING ELEMENTS.
4. PLANTERS & HARDSCAPE SHOWN ARE SCHEMATIC. REFER TO LANDSCAPE PLANS FORCOMPLETE INFORMATION.
5. DATUM ELEVATION OF 0'-0" SET AT PROPOSED FINISH FLOOR AT GROUND LEVEL. SEE FLOORPLAN FOR BUILDING LOCATION AND LAYOUT.
6. SEE SHEETS G127 AND G128 FOR ACCESSIBLE PARKING DETAILS.
GENERAL SITE PLAN NOTES
PARKING METER
ACCESSIBLE PATH OF TRAVEL FOR PUBLIC TRANSPORTATION
FIRELANE CURB PAINTING
SITE PLAN LEGEND
SITE PLAN KEY NOTES
DECORATIVE POLE LIGHT
WALL LIGHT
BOLLARD
UP-LIGHT
SPOT LIGHT
RECESSED WALL LIGHT
LINEAR LED
PATH LIGHT
ACCESSIBLE PATH OF TRAVEL
PARKING COUNT
1
GAS UTILITIES2
STREET LIGHT VAULT3
WATER METER4
STREET LIGHT5
POWER POLE6
STORM DRAIN7
TREE IN 4'X4' WELL8
FIRE HYDRANT9
ACCESSIBLE = 1
STANDARD = 45
EXISTING PARKING SUMMARY
AS100
EXISTING
SITE PLAN
VARIES
A13
----
GENERAL INFORMATION
1808.00A-NOTES SITE PLAN
A1
--1" = 10'-0"
SITE PLAN
--
05.30.2018
SUPPORTING C.U.P DOCUMENTS
SCALE:
2924 WILSHIRE BLVD.
DRAWING TITLE:
PROJECT No: 1808.00
SANTA MONICA, CALIFORNIA 90403
PROJECT TITLE:
KEY PLAN
1 05.30.18 ISSUED FOR SUPPORTING C.U.P DOCUMENTS
DATENO. REVISION
SEAL
ASHLEY ISROW
LOS ANGELES, CA 90049
12115 SAN VICENTE, UNIT 104
Client:
BOARD 'N BRUSH
A3300
ANTA
IRPORT AVE,
S CAONICA,M
SUITE 4
310.684.3883
C + P Design I Consulting
90405
TC
ATS
OER
ETA
1
LCF/1 O.N
A3
I F O R N I91/
SY AN
L A NT
I EC
I S
C-31357
A NI
CRDE ANC H A EP
H TI
818.445.4406
TRUE NORTH
1. DO NOT SCALE FROM DRAWINGS !
2. ALL PLAN DIMENSIONS ARE TO FINISHED SURFACES, UNO.
3. ANY INCONSISTENCIES OR UNFORESEEN CONDITIONS ARE TO BE BROUGHT TO THEATTENTION OF THE ARCHITECT AND ARE TO BE REVIEWED BY THE ARCHITECT PRIOR TOPROCEEDING WITH CONSTRUCTION
4. CONTRACTOR SHALL PROVIDE ADEQUATE WEATHER PROTECTION FOR THE BUILDING ANDITS CONTENTS DURING THE COURSE OF THE WORK.
DEMO PLAN NOTES
REMOVE (E) WALL1
REMOVE (E) GLAZING AND FRAME2
REMOVE (E) BASE MILLWORK
REMOVE (E) DOOR, FRAME AND TRIM
EXISTING CONSTRUCTION TO REMAIN
EXISTING DOOR AND FRAME TO REMAIN
DEMO PLAN LEGEND
DEMO PLAN KEY NOTES
EXISTING DOOR AND FRAME TO BE REMOVED
EXISTING CONSTRUCTION TO BE REMOVED
PROVIDE FLOOR CORE SEE POWER PLAN FOR LOCATIONS
3
REMOVE (E) EXTERIOR GLAZING4
5
REMOVE (E) WATER CLOSET6
REMOVE (E) VANITY & SINK7
REMOVE (E) CARPET15
REMOVE (E) VCT16
REMOVE (E) WALL BASE17
(E) COLUMN TO REMAIN8
REMOVE (E) SHELVING9
REMOVE (E) CLOSET11
(E) ELECTRICAL PANEL TO BE RELOCATED12
REMOVE (E) DISPLAY SHELVING10
FINISH PLAN KEY NOTES
REFLECTED CEILING PLAN KEY NOTES
REMOVE (E) CEILING GRID18
REMOVE (E) LIGHT FIXTURE19
REMOVE (E) DRYWALL CEILING20
(E) WINDOW TO REMAIN13
(E) DOOR AND FRAME TO REMAIN14
(E) CEILING TO REMAIN21
(E) MECHANICAL UNIT22
2
138
101RETAIL DISPLAY AREA
102
BACK OF HOUSE 01
104
EXISTINGRESTROOM
102
BACK OF HOUSE 02
8
15
4 43
1
1
1
1
1
112
3
7
9
11
9
1
10
16 17
5
15 17
16 17
131314
16 17
6
9'-7 1/2"
11'-11"8'-0"
8'-5"
8'-9"
9'-7 1/2"
18 19
18 19
19
19
20
2221
20
19
A100
DEMO
FLOOR PLAN
REFLECTED CEILING PLAN
1/4" = 1-0"
A13
----
GENERAL INFORMATION
1808.00A-NOTES DEMO PLAN
A1
--1/4" = 1'-0"
DEMO FLOOR PLAN
1808.00A-DP00
05.30.2018
SUPPORTING C.U.P DOCUMENTS
SCALE:
2924 WILSHIRE BLVD.
DRAWING TITLE:
PROJECT No: 1808.00
SANTA MONICA, CALIFORNIA 90403
PROJECT TITLE:
KEY PLAN
1 05.30.18 ISSUED FOR SUPPORTING C.U.P DOCUMENTS
DATENO. REVISION
SEAL
ASHLEY ISROW
LOS ANGELES, CA 90049
12115 SAN VICENTE, UNIT 104
Client:
BOARD 'N BRUSH
A3300
ANTA
IRPORT AVE,
S CAONICA,M
SUITE 4
310.684.3883
C + P Design I Consulting
90405
TC
ATS
OER
ETA
1
LCF/1 O.N
A3
I F O R N I91/
SY AN
L A NT
I EC
I S
C-31357
A NI
CRDE ANC H A EP
H TI
818.445.4406
A7
--1/4" = 1'-0"
DEMO REFLECTED CEILING PLAN
1808.00A-DCP01
1. DO NOT SCALE FROM DRAWINGS !
2. ALL PLAN DIMENSIONS ARE TO FINISHED SURFACES, UNO.
3. ALL CASEWORK DIMENSIONS ARE TO FACE OF FINISH, UNO.
4. ANY INCONSISTENCIES OR UNFORESEEN CONDITIONS ARE TO BE BROUGHT TO THEATTENTION OF THE ARCHITECT AND ARE TO BE REVIEWED BY THE ARCHITECT PRIOR TOPROCEEDING WITH CONSTRUCTION
5. ALL WET WALLS TO BE SHEATHED WITH WATER RESISTANT GYPSUM WALLBOARD.
6. CONTRACTOR SHALL PROVIDE ADEQUATE WEATHER PROTECTION FOR THE BUILDING ANDITS CONTENTS DURING THE COURSE OF THE WORK.
7. REFER TO FURNITURE PLAN AND COORDINATE WORK ON ALL PLANS.
8. BUILDING MUST BE EQUIPPED WITH AN AUTOMATIC FIRE EXTINGUISHING SYSTEM,COMPLYING WITH (NFPA-13/ NFPA-13R); THE SPRINKLER SYSTEM SHALL BE APPROVED BYPLUMBING DIV. PRIOR TO INSTALLATION.
9. EXIT PATH SHALL BE IDENTIFIED BY EXIT SIGNS CONFORMING TO THE REQUIREMENTS OFSECTION 1011. EXIT SIGNS SHALL BE READILY VISIBLE FROM ANY DIRECTION OF APPROACH.EXIT SIGNS SHALL BE LOCATED AS NECESSARY TO CLEARLY INDICATE THE DIRECTION OFEGRESS TRAVEL. NO POINT SHALL BE MORE THAN 100 FEET FROM THE NEAREST VISIBLESIGN.
10. EXISTING COLUMNS, JOISTS, BEAMS, & TRUSSES TO REMAIN UNO.
11. COORDINATE ALL CONSULTANT DRAWINGS WITH PLAN. IDENTIFY CONFLICTS WITHARCHITECT PRIOR TO PROCEEDING.
12. VERIFY LOCATIONS OF ALL ACCESS PANELS WITH ARCHITECT PRIOR TO CONSTRUCTION.
13. COORDINATE NEW PARTITIONS AND NEW WORK WITH EXISTING PLUMBING, ELECTRICAL,AND CONDITIONS IN FIELD. COORDINATE DISCREPANCIES WITH ARCHITECT PRIOR TOCONSTRUCTION.
14. SEE DEMOLITION SHEET FOR EXISTING INFORMATION
A1
GENERAL PLAN NOTES
RENTABLE SQUARE FOOTAGE = 905 SQ/FT
PROVIDE NEW WALL1
PROVIDE NEW MILLWORK2
PROVIDE NEW EXTERIOR GLAZING AND DOOR3
PROVIDE NEW SINK AND FAUCET4
PROVIDE NEW SEALED CONCRETE FLOORING5
6 PROVIDE NEW ELECTRICAL PANEL
DASHED LINE DENOTES CONSTRUCTION ABOVE
EXISTING CONCRETE CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO REMAIN
NEW WALL CONSTRUCTION
EXISTING DEMISING WALL CONSTRUCTION TO REMAIN
PARTITION TYPE - ALL PARTITION TYPES TO BE A1 UNO. - SEE SHEET A000
NEW DOOR AND FRAME
EXISTING DOOR AND FRAME
SQUARE FOOTAGE
FLOOR PLAN LEGEND
FLOOR PLAN KEY NOTES
7 PROVIDE NEW WALL BASE
8 PROVIDE NEW WALL TILE 4'-0" ABOVE FINISHED FLOOR
9 PROVIDE NEW MIRROR
10 PROVIDE NEW TOILET ACCESSORIES
11 PAINT EXISTING CEILING
12 PROVIDE NEW ACT GRID AND TILE
ONE HOUR FIRE RATED PARTITION. SEE A000 FOR ADDITIONAL INFO.
PAINT TO PAINT SQUARE FOOTAGE = 870 SQ/FT
CUSTOMER SQUARE FOOTAGE SEATING 240 SQ/FT
SERVING AREA 28 SQ/FT
SUPPORT SPACES 246 SQ/FT
TOTAL NUMBER OF SEATS 24 SEATS
13 PROVIDE NEW LIGHTINING
C L
1'-6"
C L
1'-6"
103RESTROOM
100CHECK IN
101OPEN STUDIO
DISP
LAY
PAIN
TST
ORAG
E
UTILI
TYSI
NK
DISP
LAY
SERV
ING
TOOL
STOR
AGE
DISP
LAY
EXISTINGPLANTER
102WORKROOM
104OFFICE
8'-1"
14'-4"
41'-9
"10
'-4"
18'-0
"
7'-0"
7'-4"
7 8 9
10 11 12
1 2 3
4 5 5
13 14 15
16 17 18
19 20 21
22 23 24
8'-0"
4'-0"
4'-0"
9'-6"
9'-6"
3'-6"3'-10"
60'-2
"
3
2
2
1 1
1
1
6
2
7
7
7
8
1
4 9
F1
F5
F2
F2
F2
F2
F2
F2
F2
F4
F4
F4
F4
F3
F3
F3
F3
F1
F1
F1
11 13
12 13
12 13
12 13
A101
FLOOR PLAN
REFLECTED CEILING PLAN
1/4" = 1-0"
A13
----
GENERAL INFORMATION
1808.00A-NOTES FLOOR PLAN
A1
--1/4" = 1'-0"
FLOOR PLAN
1808.00A-P01
05.30.2018
SUPPORTING C.U.P DOCUMENTS
SCALE:
2924 WILSHIRE BLVD.
DRAWING TITLE:
PROJECT No: 1808.00
SANTA MONICA, CALIFORNIA 90403
PROJECT TITLE:
KEY PLAN
1 05.30.18 ISSUED FOR SUPPORTING C.U.P DOCUMENTS
DATENO. REVISION
SEAL
ASHLEY ISROW
LOS ANGELES, CA 90049
12115 SAN VICENTE, UNIT 104
Client:
BOARD 'N BRUSH
A3300
ANTA
IRPORT AVE,
S CAONICA,M
SUITE 4
310.684.3883
C + P Design I Consulting
90405
TC
ATS
OER
ETA
1
LCF/1 O.N
A3
I F O R N I91/
SY AN
L A NT
I EC
I S
C-31357
A NI
CRDE ANC H A EP
H TI
818.445.4406
A7
--1/4" = 1'-0"
REFLECTED CEILING PLAN
1808.00A-CP01