C/- Cardno (Qld) Pty Ltd Level 11, 515 St Pauls Terrace Locked … - s334 Notice... ·...
Transcript of C/- Cardno (Qld) Pty Ltd Level 11, 515 St Pauls Terrace Locked … - s334 Notice... ·...
Page 1 Wide Bay – Burnett Region PO Box 979 BundabergQueensland 4670 AustraliaTelephone (07) 4331 5614Website www.dilgp.qld.gov.au
Our reference: SDA-0217-037198Your reference: 7640-74
24 April 2017
Cherbourg Aboriginal Shire CouncilC/- Cardno (Qld) Pty LtdLevel 11, 515 St Pauls TerraceLocked Bag 4006FORTITUDE VALLEY QLD [email protected]
Attention: Ms Tracey Hooper
Dear Ms Hooper
Notice of decisionCollins Road, Cherbourg – Lot 399 on SP280472(Given under Section 334 of the Sustainable Planning Act 2009)
The Department of Infrastructure, Local Government and Planning advises that the development application described below has been approved subject to conditions.
Applicant details
Applicant name: Cherbourg Aboriginal Shire Council
C/- Cardno (Qld) Pty Ltd
Site details
Lot on plan: Lot 399 on SP280472
Local government area: Cherbourg Aboriginal Shire Council
Application details
Proposed development: Development Permit for Operational Works (Waterway Barrier Works)
A decision notice for this application is attached.
SDA-0217-037198
Department of Infrastructure, Local Government and Planning Page. 2
Copies of the following documents are also attached: relevant appeal provisions in the Sustainable Planning Act 2009 any plans and specifications approved in relation to the decision notice.
If you require any further information, please contact Peter Mulcahy, Principal Planning Officer on (07) 4331 5614 or via email at [email protected] who will be pleased to assist.
Yours sincerely
Nathan RuleDirector, Southern Region
enc: Decision NoticeAttachment 1—Assessment manager conditionsAttachment 2—Reasons for decision to impose conditions Attachment 3—Further adviceAttachment 4—SPA appeal provisionsAttachment 5—Approved plans and specifications
SDA-0217-037198
Department of Infrastructure, Local Government and Planning Page. 3
Decision notice(Given under Section 334 of the Sustainable Planning Act 2009)
Applicant details
Applicant name: Cherbourg Aboriginal Shire Council
C/- Cardno (Qld) Pty Ltd
Applicant contact details: Level 11525 St Pauls Terrace
Locked Bag 4006FORTITUDE VALLEY QLD 4006 [email protected]
Application details
Level of assessment: Code Assessment
Properly made date: 10 February 2017
Site details
Street address: Collins Road, Cherbourg
Lot on plan: Lots 399 on SP280472
Name of owner: Cherbourg Aboriginal Shire Council
Decision
Date of decision: 24 April 2017
Decision details: Approved subject to conditions
This application is taken to have been approved under Section 331 of the Sustainable Planning Act 2009.
Referral agencies
There were no referral agencies for this application.
Conditions
This approval is subject to: the Assessment Manager conditions in Attachment 1 there are no Concurrence Agency conditions for this approval.
The Department has, for particular conditions of this approval, nominated an entity to be the assessing authority for that condition under Section 255D(3) of the Sustainable Planning Act 2009.
SDA-0217-037198
Department of Infrastructure, Local Government and Planning Page. 4
Aspects of development and development approval granted
Nature of Development
Approval Type
Brief Description of Proposal Level of Assessment
Operational Works Development Permit
Waterway Barrier Works Code Assessment
Properly made submissions
Not applicable—No part of the application required impact assessment.
Rights of appeal
The rights of applicants to appeal to the Planning and Environment Court against decisions about a development application are set out in Chapter 7, Part 1, Division 8 of the Sustainable Planning Act 2009. For particular applications, there may also be a right to appeal to the Building and Development Dispute Resolution Committee (see Chapter 7, Part 2 of the Act).
Copies of the relevant appeal provisions are attached.
Relevant period for the approval
This development approval will lapse if development is not started within the relevant periods stated in Section 341 of the Act, specifically two (2) years.
Approved plans and specifications
Copies of the following approved plans and specifications are attached:
Drawing/Report Title Prepared by Date Reference no. Version/IssueAspect of development: Development Permit for Operational Works (Waterway Barrier Works)Plan (Drainage Channel)
Cardno 21 February 2017
746074-CI-200 Revision B
Cross Sections (Drainage Channel 01)
Cardno 21 February 2017
746074-CI-203 Revision B
Cross Sections (Drainage Channel 01 & 02)
Cardno 21 February 2017
746074-CI-204 Revision A
Cross Sections (Drainage Channel 03 & 04)
Cardno 10 February 2017
746074-CI-205 Revision B
Landscaping, fencing and tree planting typical diversion channel section
Cardno 10 February 2017
746074-LA-105 Revision A
SDA-0217-037198
Department of Infrastructure, Local Government and Planning Page. 5
Our reference: SDA-0217-037198Your reference: 7640-74
Attachment 1—Assessment manager conditions
No. Conditions of development approval Condition timing
Development Permit for Operational Works (Waterway Barrier Works)
Schedule 6, Table 3, Item 11 of the Sustainable Planning Regulation 2009—Pursuant to Section 255D of the Sustainable Planning Act 2009, the chief executive administering the Act nominates the Director-General of the Department of Agriculture and Fisheries to be the assessing authority for the development to which this development approval relates for the administration and enforcement of any matter relating to the following conditions:
Constructing or raising waterway barrier works
1. This approval is for Operational Works (construction or raising waterway barrier works) that is a waterway diversion and seven sediment ponds within a tributary of Barambah Creek, East of Cherbourg and show in:
Plan (Drainage Channel) prepared by Cardno, Drawing No. 764074-CI-200, Revision B dated 21 February 2017
Cross Sections (Drainage Channel 01) prepared by Cardno, Drawing 764074-CI-203, Revision B dated 21 February 2017
Cross Sections (Drainage Channel 01 & 02) prepared by Cardno, Drawing 746074-CI-204, Revision A dated 21 February 2017
Cross Sections (Drainage Channel 03 & 04) prepared by Cardno, Drawing 746074-CI-205, Revision B dated 21 February 2017
Landscaping, fencing and tree planting typical diversion channel section prepared by Cardno, Drawing 764074-LA-105 Revision A dated 10 February 2017.
At all times
2. Provide written notice to [email protected], when the development authorised under this approval has started, and when it has been completed.
These notices must state this permit number, the location and the condition number under which the notice is being given.
The notice advising of the completion date must also include a report documenting the completed development works, including but not limited to:
photographs taken before, during and after the development works at specific photo-monitoring sites.
At least five (5) business days but not greater than twenty (20) business days prior to the commencement of fisheries development works.
And then, as to the notice advising of the completion date, within fifteen (15) business days of the completion of the fisheries development works.
SDA-0217-037198
Department of Infrastructure, Local Government and Planning Page. 6
No. Conditions of development approval Condition timing
Incorporation of fish ways
3. The effective operation of the fish passage aspects of the structure must be maintained for the life of the barrier. This maintenance must include regular, documented inspections of the structures (fish way, baffles, roughening etc.) especially after flood events, and prompt clearing of debris or rectifying any other failures, malfunctions, breakdowns or other impediments to fish movement.
At all times.
Construction
4. The construction, or raising, of the waterway barrier is to be performed in such a manner as to avoid or minimise direct or indirect disturbance to the bed and banks adjacent to the approved footprint of the works as shown on Plan (Drainage Channel) prepared by Cardno, Drawing No. 764074-CI-200, Revision B dated 21 February 2017.
At all times.
SDA-0217-037198
Department of Infrastructure, Local Government and Planning Page. 7
Our reference: SDA-0217-036841Your reference: 7640-74
Attachment 2—Reasons for decision to impose conditions
To ensure the development is carried out in the location and to the extent specified on the approved plans of development.
To facilitate the monitoring of the development work for compliance purposes. To ensure the fish way remains operational and a feasible and reliable solution providing
adequate fish passage for as long as the waterway barrier is in position. To ensure the development does not cause, or minimizes direct or indirect disturbance to the
bed and banks adjacent to the approved footprint of works.
SDA-0217-037198
Department of Infrastructure, Local Government and Planning Page. 8
Our reference: SDA-0217-037198Your reference: 7640-74
Attachment 3—Further Advice
Temporary Waterway Barrier Works
1. Temporary waterway barrier works (construction pad and silt curtains) associated with the permanent works are to be constructed in accordance with the Department of Agriculture and Fisheries (DAF) self-assessable code which can be found at the DAF website (https://www.daf.qld.gov.au/__data/assets/pdf_file/0004/64903/temporary-code-WWBW02.pdf).
SDA-0217-037198
Department of Infrastructure, Local Government and Planning Page. 9
Our reference: SDA-0217-037198Your reference: 7640-74
Attachment 4—SPA Appeal Provisions
Sustainable Planning Act 2009—Representation and appeal provisionsThe following relevant appeal provisions are provided in accordance with Section 336(a) of the Sustainable Planning Act 2009.
Chapter 6 Integrated development assessment system (IDAS)
Part 8 Dealing with decision notices and approvals
Division 1 Changing decision notices and approvals during applicant’s appeal period
360 Application of div 1This division applies only during the applicant’s appeal period.
361 Applicant may make representations about decision(1) The applicant may make written representations to the assessment manager about—
(a) a matter stated in the decision notice, other than a refusal or a matter about which a concurrence agency told the assessment manager under section 287(1) or (5); or
(b) the standard conditions applying to a deemed approval.(2) However, the applicant cannot make representations under subsection (1)(a) about a
condition attached to an approval under the direction of the Minister.
362 Assessment manager to consider representationsThe assessment manager must consider any representations made to the assessment manager under section 361.
363 Decision about representations(1) If the assessment manager agrees with any of the representations about a decision notice or
a deemed approval, the assessment manager must give a new decision notice (the negotiated decision notice) to—(a) the applicant; and(b) each principal submitter; and(c) each referral agency; and(d) if the assessment manager is not the local government and the development is in a local
government area—the local government.(2) Before the assessment manager agrees to a change under this section, the assessment
manager must consider the matters the assessment manager was required to consider in assessing the application, to the extent the matters are relevant.
(3) Only 1 negotiated decision notice may be given.(4) The negotiated decision notice—
(a) must be given within 5 business days after the day the assessment manager agrees with the representations; and
(b) must comply with section 335; and(c) must state the nature of the changes; and(d) replaces—
(i) the decision notice previously given; or(ii) if a decision notice was not previously given and the negotiated decision notice
relates to a deemed approval—the standard conditions applying to the deemed approval.
(5) If the assessment manager does not agree with any of the representations, the assessment manager must, within 5 business days after the day the assessment manager decides not to
SDA-0217-037198
Department of Infrastructure, Local Government and Planning Page. 10
agree with any of the representations, give written notice to the applicant stating the decision about the representations.
364 Giving new notice about charges for infrastructure(1) This section applies if the development approved by the negotiated decision notice is different
from the development approved in the decision notice or deemed approval in a way that affects the amount of an infrastructure charge, regulated infrastructure charge or adopted infrastructure charge.
(2) The local government may give the applicant a new infrastructure charges notice under section 633, regulated infrastructure charges notice under section 643 or adopted infrastructure charges notice under section 648F to replace the original notice.
366 Applicant may suspend applicant’s appeal period(1) If the applicant needs more time to make the representations, the applicant may, by written
notice given to the assessment manager, suspend the applicant’s appeal period.(2) The applicant may act under subsection (1) only once.(3) If the representations are not made within 20 business days after the day written notice was
given to the assessment manager, the balance of the applicant’s appeal period restarts.(4) If the representations are made within 20 business days after the day written notice was given
to the assessment manager—(a) if the applicant gives the assessment manager a notice withdrawing the notice under
subsection (1)—the balance of the applicant’s appeal period restarts the day after the assessment manager receives the notice of withdrawal; or
(b) if the assessment manager gives the applicant a notice under section 363(5)—the balance of the applicant’s appeal period restarts the day after the applicant receives the notice; or
(c) if the assessment manager gives the applicant a negotiated decision notice—the applicant’s appeal.
Chapter 7 Appeals, offences and enforcement
Part 1 Planning and Environment Court
Division 8 Appeals to court relating to development applications and approvals
461 Appeals by applicants(1) An applicant for a development application may appeal to the court against any of the
following—(a) the refusal, or the refusal in part, of the development application;(b) any condition of a development approval, another matter stated in a development
approval and the identification or inclusion of a code under section 242;(c) the decision to give a preliminary approval when a development permit was applied for;(d) the length of a period mentioned in section 341;(e) a deemed refusal of the development application.
(2) An appeal under subsection (1)(a), (b), (c) or (d) must be started within 20 business days (the applicant’s appeal period) after—(a) if a decision notice or negotiated decision notice is given—the day the decision notice or
negotiated decision notice is given to the applicant; or(b) otherwise—the day a decision notice was required to be given to the applicant.
(3) An appeal under subsection (1)(e) may be started at any time after the last day a decision on the matter should have been made.
462 Appeals by submitters—general(1) A submitter for a development application may appeal to the court only against—
(a) the part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or
(b) the part of the approval relating to the assessment manager’s decision under section 327.
(2) To the extent an appeal may be made under subsection (1), the appeal may be against 1 or more of the following—
SDA-0217-037198
Department of Infrastructure, Local Government and Planning Page. 11
(a) the giving of a development approval;(b) any provision of the approval including—
(i) a condition of, or lack of condition for, the approval; or(ii) the length of a period mentioned in section 341 for the approval.
(3) However, a submitter may not appeal if the submitter—(a) withdraws the submission before the application is decided; or(b) has given the assessment manager a notice under section 339(1)(b)(ii).
(4) The appeal must be started within 20 business days (the submitter’s appeal period) after the decision notice or negotiated decision notice is given to the submitter.
463 Additional and extended appeal rights for submitters for particular development applications
(1) This section applies to a development application to which chapter 9, part 7 applies.(2) A submitter of a properly made submission for the application may appeal to the court about a
referral agency’s response made by a concurrence agency for the application.(3) However, the submitter may only appeal against a referral agency’s response to the extent it
relates to—(a) development for an aquacultural ERA; or(b) development that is—
(i) a material change of use of premises for aquaculture; or(ii) operational work that is the removal, damage or destruction of a marine plant.
(4) Despite section 462(1), the submitter may appeal against the following matters for the application even if the matters relate to code assessment—
i. a decision about a matter mentioned in section 462(2) if it is a decision of the chief executive;
ii. a referral agency’s response mentioned in subsection (2).
464 Appeals by advice agency submitters(1) Subsection (2) applies if an advice agency, in its response for an application, told the
assessment manager to treat the response as a properly made submission.(2) The advice agency may, within the limits of its jurisdiction, appeal to the court about—
(a) any part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or
(b) any part of the approval relating to the assessment manager’s decision under section 327.
(3) The appeal must be started within 20 business days after the day the decision notice or negotiated decision notice is given to the advice agency as a submitter.
(4) However, if the advice agency has given the assessment manager a notice under section 339(1)(b)(ii), the advice agency may not appeal the decision.
465 Appeals about decisions relating to extensions for approvals(1) For a development approval given for a development application, a person to whom a notice
is given under section 389, other than a notice for a decision under section 386(2), may appeal to the court against the decision in the notice.
(2) The appeal must be started within 20 business days after the day the notice of the decision is given to the person.
(3) Also, a person who has made a request under section 383 may appeal to the court against a deemed refusal of the request.
(4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made.
466 Appeals about decisions relating to permissible changes(1) For a development approval given for a development application, the following persons may
appeal to the court against a decision on a request to make a permissible change to the approval—(a) if the responsible entity for making the change is the assessment manager for the
application—(i) the person who made the request; or(ii) an entity that gave a notice under section 373 or a pre-request response notice
about the request;
SDA-0217-037198
Department of Infrastructure, Local Government and Planning Page. 12
(b) if the responsible entity for making the change is a concurrence agency for the application—the person who made the request.
(2) The appeal must be started within 20 business days after the day the person is given notice of the decision on the request under section 376.
(3) Also, a person who has made a request under section 369 may appeal to the court against a deemed refusal of the request.
(4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made.
467 Appeals about changing or cancelling conditions imposed by assessment manager or concurrence agency
(1) A person to whom a notice under section 378(9)(b) giving a decision to change or cancel a condition of a development approval has been given may appeal to the court against the decision in the notice.
(2) The appeal must be started within 20 business days after the day the notice of the decision is given to the person.
Division 11 Making and appeal to Court
481 How appeals to the court are started(1) An appeal is started by lodging written notice of appeal with the registrar of the court.(2) The notice of appeal must state the grounds of the appeal.(3) The person starting the appeal must also comply with the rules of the court applying to the
appeal.(4) However, the court may hear and decide an appeal even if the person has not complied with
subsection (3).
482 Notice of appeal to other parties—development applications and approvals(1) An appellant under division 8 must give written notice of the appeal to—
(a) if the appellant is an applicant—(i) the chief executive; and(ii) the assessment manager; and(iii) any concurrence agency; and(iv) any principal submitter whose submission has not been withdrawn; and(v) any advice agency treated as a submitter whose submission has not been
withdrawn; or(b) if the appellant is a submitter or an advice agency whose response to the development
application is treated as a submission for an appeal—(i) the chief executive; and(ii) the assessment manager; and(iii) any referral agency; and(iv) the applicant; or
(c) if the appellant is a person to whom a notice mentioned in section 465(1) has been given—(i) the chief executive; and(b) the assessment manager for the development application to which the notice relates;
and(c) any entity that was a concurrence agency for the development application to which
the notice relates; and(d) the person who made the request under section 383 to which the notice relates, if the
person is not the appellant; or(d) if the appellant is a person mentioned in section 466(1)—
(i) the chief executive; and(ii) the responsible entity for making the change to which the appeal relates; and(iii) the person who made the request to which the appeal relates under section 369, if
the person is not the appellant; and(iv) if the responsible entity is the assessment manager—any entity that was a
concurrence agency for the development application to which the notice of the decision on the request relates; or
SDA-0217-037198
Department of Infrastructure, Local Government and Planning Page. 13
(e) if the appellant is a person to whom a notice mentioned in section 467 has been given—the entity that gave the notice.
(2) The notice must be given within—(a) if the appellant is a submitter or advice agency whose response to the development
application is treated as a submission for an appeal—2 business days after the appeal is started; or
(b) otherwise—10 business days after the appeal is started.(3) The notice must state—
(a) the grounds of the appeal; and(b) if the person given the notice is not the respondent or a co-respondent under section
485—that the person may, within 10 business days after the notice is given, elect to become a co-respondent to the appeal by filing in the court a notice of election in the approved form.
485 Respondent and co-respondents for appeals under div 8(1) Subsections (2) to (8) apply for appeals under sections 461 to 464.(2) The assessment manager is the respondent for the appeal.(3) If the appeal is started by a submitter, the applicant is a co-respondent for the appeal.(4) Any submitter may elect to become a co-respondent for the appeal.(5) If the appeal is about a concurrence agency’s response, the concurrence agency is a co-
respondent for the appeal.(6) If the appeal is only about a concurrence agency’s response, the assessment manager may
apply to the court to withdraw from the appeal.(7) The respondent and any co-respondents for an appeal are entitled to be heard in the appeal
as a party to the appeal.(8) A person to whom a notice of appeal is required to be given under section 482 and who is
not the respondent or a co-respondent for the appeal may elect to be a co-respondent.(9) For an appeal under section 465—
i. the assessment manager is the respondent; andii. if the appeal is started by a concurrence agency that gave the assessment manager a
notice under section 385—the person asking for the extension the subject of the appeal is a co-respondent; and
iii. any other person given notice of the appeal may elect to become a co-respondent.(10) For an appeal under section 466—
(a) the responsible entity for making the change to which the appeal relates is the respondent; and
(b) if the responsible entity is the assessment manager—(i) if the appeal is started by a person who gave a notice under section 373 or a pre-
request response notice—the person who made the request for the change is a co-respondent; and
(ii) any other person given notice of the appeal may elect to become a co-respondent.(11) For an appeal under section 467, the respondent is the entity given notice of the appeal.
488 How an entity may elect to be a co-respondentAn entity that is entitled to elect to be a co-respondent to an appeal may do so, within 10 business days after notice of the appeal is given to the entity, by following the rules of court for the election.
490 Lodging appeal stops particular actions(1) If an appeal, other than an appeal under section 465, 466 or 467, is started under division 8,
the development must not be started until the appeal is decided or withdrawn.(2) If an appeal is about a condition imposed on a compliance permit, the development must
not be started until the appeal is decided or withdrawn.(3) Despite subsections (1) and (2), if the court is satisfied the outcome of the appeal would not
be affected if the development or part of the development is started before the appeal is decided, the court may allow the development or part of the development to start before the appeal is decided.
SDA-0217-037198
Department of Infrastructure, Local Government and Planning Page. 14
Our reference: SDA-0217-037198Your reference: 7640-74
Attachment 5—Approved plans and specifications
SR
SR
SR
SR
SR
SR
SRSR
SRSR
SR
SR
SR
SR
SRSR
SRSR
SR
SR
SR
SR
SR
SR
SR
SR
SRSR
SRSR
SRSR
SR
EW
EW
POND
6PO
ND 7
POND
5
POND
4PO
ND 3
POND
2
POND
1
DIVE
RSIO
N DR
AIN
GRAD
ED T
O CH
ANNE
L 4US
IL 30
2.00
DSIL
299.9
L=63
m
DIVE
RSIO
N DR
AIN
GRAD
ED T
O CH
ANNE
L 1US
IL 30
2.0DS
IL 30
0.87
L=12
6m
DIVE
RSIO
N DR
AIN
GRAD
EDTO
OVE
RLAN
D FL
OWUS
IL 30
4.30
DSIL
303.4
7L=
44m
DIVE
RSIO
N DR
AIN
GRAD
ED T
O CH
ANNE
L 3US
IL 30
4.30
DSIL
303.0
4L=
37m
SETO
UT P
OINT
S CH
ANNE
L 1PT
No.
EAST
ING
NORT
HING
RL.
139
4909
.158
7091
596.5
5129
4.714
239
4905
.561
7091
598.3
0129
4.714
339
4904
.556
7091
586.5
9029
4.908
439
4900
.681
7091
588.3
4229
4.910
539
4900
.243
7091
578.3
5229
5.067
639
4896
.426
7091
580.6
5429
5.068
739
4895
.184
7091
570.6
7129
5.225
839
4891
.402
7091
573.4
0229
5.227
939
4854
.133
7091
514.7
1229
6.357
1039
4849
.094
7091
518.4
1129
6.358
1139
4849
.104
7091
508.4
3229
6.469
1239
4844
.271
7091
512.6
6129
6.470
1339
4843
.541
7091
502.5
8929
6.577
1439
4838
.937
7091
507.3
2329
6.580
1539
4745
.551
7091
408.2
7329
8.135
1639
4738
.791
7091
415.2
4629
8.137
1739
4694
.402
7091
360.9
6729
8.862
1839
4687
.677
7091
368.2
5029
8.862
1939
4687
.573
7091
355.5
6029
8.938
2039
4680
.466
7091
351.1
4429
9.011
2139
4666
.605
7091
343.8
2829
9.162
2239
4661
.937
7091
353.7
8229
9.162
2339
4658
.395
7091
339.4
9129
9.250
2439
4652
.888
7091
349.5
0729
9.257
SETO
UT P
OINT
S CH
ANNE
L 1PT
No.
EAST
ING
NORT
HING
RL.
2539
4640
.659
7091
330.4
6929
9.434
2639
4634
.470
7091
343.2
8529
9.437
2739
4575
.167
7091
321.9
5729
9.975
2839
4580
.792
7091
342.5
7729
9.969
2939
4518
.772
7091
358.8
5530
0.529
3039
4536
.242
7091
372.2
2830
0.528
3139
4502
.910
7091
379.5
7930
0.806
3239
4520
.379
7091
392.9
5130
0.806
3339
4497
.977
7091
384.0
1330
1.028
3439
4516
.614
7091
397.2
0430
0.852
3539
4513
.236
7091
400.1
6430
0.888
3639
4491
.531
7091
387.0
3030
1.067
3739
4502
.018
7091
406.8
5230
1.005
3839
4490
.459
7091
408.7
9530
1.126
3939
4479
.181
7091
406.0
0330
1.301
4039
4460
.579
7091
391.0
8130
1.822
4139
4460
.447
7091
398.8
6130
1.786
4239
4453
.027
7091
390.5
4130
2.063
4339
4453
.613
7091
395.4
7630
1.982
4439
4427
.324
7091
379.2
7130
3.096
4539
4461
.056
7091
395.2
4430
1.786
4639
4473
.498
7091
398.8
9630
1.339
4739
4474
.837
7091
399.2
9730
1.290
4839
4523
.600
7091
380.1
5830
0.473
SETO
UT P
OINT
S CH
ANNE
L 1PT
No.
EAST
ING
NORT
HING
RL.
4939
4538
.464
7091
354.8
9130
0.181
5039
4564
.452
7091
333.1
9029
9.886
5139
4647
.060
7091
341.2
8529
9.139
5239
4663
.642
7091
349.4
9029
8.965
5339
4673
.644
7091
352.6
7529
8.864
5439
4689
.811
7091
361.3
5729
8.691
5539
4699
.996
7091
371.5
4929
8.547
5639
4715
.106
7091
385.8
4529
8.331
5739
4737
.136
7091
406.4
3629
8.013
5839
4759
.261
7091
427.2
7229
7.692
5939
4777
.213
7091
444.1
2229
7.433
6039
4799
.635
7091
467.0
7629
7.089
6139
4820
.022
7091
485.1
8529
6.763
6239
4833
.803
7091
498.0
8929
6.517
6339
4842
.665
7091
504.6
6729
6.367
6439
4851
.141
7091
514.2
2529
6.188
6539
4859
.984
7091
528.0
0829
5.945
6639
4876
.137
7091
548.0
9129
5.533
6739
4885
.424
7091
560.0
1129
5.278
6839
4888
.780
7091
565.1
0629
5.172
6939
4902
.538
7091
585.8
2529
4.735
7039
4906
.692
7091
597.7
5029
4.588
SETO
UT P
OINT
S CH
ANNE
L 2PT
No.
EAST
ING
NORT
HING
RL.
139
4554
.515
7091
329.4
8430
0.148
239
4534
.515
7091
342.4
8130
0.304
339
4526
.164
7091
329.4
9130
0.523
439
4534
.955
7091
316.0
4030
0.637
539
4522
.280
7091
319.4
7930
0.655
639
4531
.002
7091
309.7
8430
0.773
739
4530
.180
7091
299.9
3430
0.978
839
4531
.483
7091
292.6
6230
1.106
939
4526
.918
7091
290.6
2230
1.106
SETO
UT P
OINT
S CH
ANNE
L 3PT
No.
EAST
ING
NORT
HING
RL.
139
4521
.559
7091
305.9
3030
0.836
239
4523
.935
7091
297.2
9630
0.975
339
4517
.565
7091
300.4
4630
1.333
439
4513
.003
7091
296.2
9430
1.559
539
4515
.951
7091
289.9
1930
1.581
639
4506
.532
7091
286.8
9030
1.825
739
4505
.756
7091
293.8
4730
1.827
839
4460
.501
7091
282.1
0930
2.870
939
4459
.861
7091
289.0
8030
2.868
1039
4453
.131
7091
282.0
2430
3.012
1139
4452
.880
7091
287.8
9230
3.003
1239
4439
.504
7091
274.6
4230
3.262
1339
4436
.904
7091
276.0
0230
3.262
1439
4433
.556
7091
264.0
7330
3.379
1539
4432
.643
7091
264.4
8030
3.379
1639
4417
.587
7091
232.5
4730
3.713
1739
4416
.723
7091
233.0
5030
3.713
1839
4399
.920
7091
205.6
3130
4.017
1939
4399
.115
7091
206.2
2430
4.017
2039
4389
.732
7091
191.7
8630
4.173
2139
4388
.884
7091
192.3
2230
4.174
2239
4373
.123
7091
169.2
0630
4.515
2339
4372
.317
7091
169.7
9930
4.515
2439
4360
.204
7091
152.8
6230
4.917
2539
4359
.441
7091
153.5
0830
4.917
2639
4352
.271
7091
144.2
84EX
ISTI
NG
SETO
UT P
OINT
S CH
ANNE
L 4PT
No.
EAST
ING
NORT
HING
RL.
139
4682
.799
7091
364.3
3129
8.948
239
4680
.842
7091
363.0
3429
8.972
339
4671
.379
7091
364.3
9029
9.080
439
4671
.749
7091
365.3
2029
9.080
539
4664
.266
7091
369.1
3029
9.176
639
4665
.020
7091
369.7
8029
9.176
739
4639
.558
7091
394.4
5129
9.885
839
4640
.274
7091
395.1
4929
9.885
939
4631
.535
7091
403.3
89EX
ISTI
NG
PROP
OSED
PON
DS
PROP
OSED
TOP
OF
BATT
ER
PROP
OSED
BAT
TER
MARK
STO
P
BOTT
OM
1.00
PROP
OSED
ACC
ESS
TRAC
KS
LEGE
ND
SR
SR
PROP
OSED
SEW
ER R
ISIN
G MA
INPR
OPOS
ED B
OTTO
M OF
BAT
TER
EXIS
TING
SUR
FACE
MIN
OR C
ONTO
URS
(1.0m
)EX
ISTI
NG S
URFA
CE M
AJOR
CON
TOUR
S (5
.0m)
PROP
OSED
DRA
INAG
E CH
ANNE
LS
PROP
OSED
DIV
ERSI
ON C
HANN
ELS
SPR
OPOS
ED S
EWER
MAI
NEX
CLUS
ION
ZONE
Date
Rev.
Verif.
Appd
.
Scale
Statu
s
Clien
t
XREF's: XR_764074-DSGN STRS; XR_764074-SURVEY; XR-764074 GoogleImage; XR_764074-DSGN ADDD; XR_764074-PSTN-SITE; XR_764074-PIPEWORK; XR_764074-DGE CTRL; XR_764074-NTRL SURF CONTS
Draw
ing N
umbe
rRe
vision
DATE PLOTTED: 21 February 2017 4:35 PM BY : GAVIN HARRIS
Des.
Size
Proje
ct
Title
Draw
nDa
te
Chec
ked
Date
Date
Date
Verifi
ed
Appr
oved
Desc
riptio
n
A1
CAD File: M:\7640-74 - Cherbourg WWTP\_Project material\ACAD\764074-CI-200.dwg
DEPA
RTME
NT O
F IN
FRAS
TRUC
TURE
, LOC
AL G
OVER
NMEN
T AN
D PL
ANNI
NGCH
ERBO
URG
WW
TP
DRAI
NAGE
CHA
NNEL
PLAN
DATU
M AHD
AS S
HOW
N
7640
74-C
I-200
B
G.H.
3/02/2
017
C.L.
9/02/2
017
G.H.
3/02/2
017
C.LA
MB10
/02/20
17
R.SH
ELTO
N10
/02/20
17
Desig
ned
© Ca
rdno
Limi
ted A
ll Righ
ts Re
serve
d.Th
is do
cume
nt is
prod
uced
by C
ardn
o Lim
ited s
olely
for th
ebe
nefit
of an
d use
by th
e clie
nt in
acco
rdan
ce w
ith th
eter
ms of
the r
etaine
r. Ca
rdno
Limi
ted do
es no
t and
shall
not
assu
me an
y res
pons
ibility
or lia
bility
wha
tsoev
er to
any t
hird
party
arisi
ng ou
t of a
ny us
e or r
elian
ce by
third
party
on th
eco
ntent
of thi
s doc
umen
t.
®
Card
no (Q
ld) P
ty Ltd
| ABN
57 05
1 074
992
Leve
l 11,
515 S
t Pau
l’s T
erra
ce
Fortit
ude V
alley
, QLD
4006
Tel: 0
7 336
9 982
2 F
ax: 0
7 336
9 972
2W
eb: w
ww.ca
rdno
.com.
auA
10/02
/2017
ISSU
E FO
R TE
NDER
G.H.
C.L.
R.S.
B21
/02/20
17DR
AINA
GE C
HANN
EL 01
AME
NDED
G.H.
C.L.
R.S.
FOR
TEND
ER O
NLY
NOT
TO B
E US
ED F
OR C
ONST
RUCT
ION
PURP
OSES
030
2010
SCAL
E 1:5
00
4050
m
@A1
NORTH
JOINS MIDDLE LEFT
B
B
"NO
GO" E
XCLU
SION
ZON
E
"NO
GO" E
XCLU
SION
ZON
E
DESI
GN S
URFA
CE
EXIS
TING
SUR
FACE
DRAI
NAGE
CHA
NNEL
1
Date
Rev.
Verif.
Appd
.
Scale
Statu
s
Clien
t
XREF's: XR_764074-DGE-LS01_; XR_764074-DGE-LS03_; XR_764074-XSEC-DGE011; XR_764074-XSEC-DGE012; XR_764074-XSEC-DGE041; XR_764074-XSEC-DGE031; XR_764074-XSEC-DGE021; XR_764074-DGE-LS02_; XR_764074-DGE-LS04_
Draw
ing N
umbe
rRe
vision
DATE PLOTTED: 21 February 2017 4:41 PM BY : GAVIN HARRIS
Des.
Size
Proje
ct
Title
Draw
nDa
te
Chec
ked
Date
Date
Date
Verifi
ed
Appr
oved
Desc
riptio
n
A1
CAD File: M:\7640-74 - Cherbourg WWTP\_Project material\ACAD\764074-CI-201.dwg
DEPA
RTME
NT O
F IN
FRAS
TRUC
TURE
, LOC
AL G
OVER
NMEN
T AN
D PL
ANNI
NGCH
ERBO
URG
WW
TP
DRAI
NAGE
CHA
NNEL
01CR
OSS
SECT
IONS
DATU
M AHD
AS S
HOW
N
7640
74-C
I-203
B
G.H.
3/02/2
017
C.L.
9/02/2
017
G.H.
3/02/2
017
C.LA
MB10
/02/20
17
R.SH
ELTO
N10
/02/20
17
Desig
ned
© Ca
rdno
Limi
ted A
ll Righ
ts Re
serve
d.Th
is do
cume
nt is
prod
uced
by C
ardn
o Lim
ited s
olely
for th
ebe
nefit
of an
d use
by th
e clie
nt in
acco
rdan
ce w
ith th
eter
ms of
the r
etaine
r. Ca
rdno
Limi
ted do
es no
t and
shall
not
assu
me an
y res
pons
ibility
or lia
bility
wha
tsoev
er to
any t
hird
party
arisi
ng ou
t of a
ny us
e or r
elian
ce by
third
party
on th
eco
ntent
of thi
s doc
umen
t.
®
Card
no (Q
ld) P
ty Ltd
| ABN
57 05
1 074
992
Leve
l 11,
515 S
t Pau
l’s T
erra
ce
Fortit
ude V
alley
, QLD
4006
Tel: 0
7 336
9 982
2 F
ax: 0
7 336
9 972
2W
eb: w
ww.ca
rdno
.com.
auA
10/02
/2017
ISSU
E FO
R TE
NDER
G.H.
C.L.
R.S.
B21
/02/20
17DR
AINA
GE C
HANN
EL 01
AME
NDED
G.H.
C.L.
R.S.
FOR
TEND
ER O
NLY
NOT
TO B
E US
ED F
OR C
ONST
RUCT
ION
PURP
OSES
510
1520
m0 SC
ALE:
1:20
0@
A1
MEAN
DERI
NG LO
W F
LOW
CHAN
NEL 2
00mm
DEE
P
EXIS
TING
SUR
FACE
DESI
GN S
URFA
CE
EXIS
TING
SUR
FACE
DESI
GN S
URFA
CE
DRAI
NAGE
CHA
NNEL
1DR
AINA
GE C
HANN
EL 2
Date
Rev.
Verif.
Appd
.
Scale
Statu
s
Clien
t
XREF's: XR_764074-DGE-LS01_; XR_764074-DGE-LS03_; XR_764074-XSEC-DGE011; XR_764074-XSEC-DGE012; XR_764074-XSEC-DGE041; XR_764074-XSEC-DGE031; XR_764074-XSEC-DGE021; XR_764074-DGE-LS02_; XR_764074-DGE-LS04_
Draw
ing N
umbe
rRe
vision
DATE PLOTTED: 21 February 2017 4:41 PM BY : GAVIN HARRIS
Des.
Size
Proje
ct
Title
Draw
nDa
te
Chec
ked
Date
Date
Date
Verifi
ed
Appr
oved
Desc
riptio
n
A1
CAD File: M:\7640-74 - Cherbourg WWTP\_Project material\ACAD\764074-CI-201.dwg
DEPA
RTME
NT O
F IN
FRAS
TRUC
TURE
, LOC
AL G
OVER
NMEN
T AN
D PL
ANNI
NGCH
ERBO
URG
WW
TP
DRAI
NAGE
CHA
NNEL
01 &
02CR
OSS
SECT
IONS
DATU
M AHD
AS S
HOW
N
7640
74-C
I-204
B
G.H.
3/02/2
017
C.L.
9/02/2
017
G.H.
3/02/2
017
C.LA
MB10
/02/20
17
R.SH
ELTO
N10
/02/20
17
Desig
ned
© Ca
rdno
Limi
ted A
ll Righ
ts Re
serve
d.Th
is do
cume
nt is
prod
uced
by C
ardn
o Lim
ited s
olely
for th
ebe
nefit
of an
d use
by th
e clie
nt in
acco
rdan
ce w
ith th
eter
ms of
the r
etaine
r. Ca
rdno
Limi
ted do
es no
t and
shall
not
assu
me an
y res
pons
ibility
or lia
bility
wha
tsoev
er to
any t
hird
party
arisi
ng ou
t of a
ny us
e or r
elian
ce by
third
party
on th
eco
ntent
of thi
s doc
umen
t.
®
Card
no (Q
ld) P
ty Ltd
| ABN
57 05
1 074
992
Leve
l 11,
515 S
t Pau
l’s T
erra
ce
Fortit
ude V
alley
, QLD
4006
Tel: 0
7 336
9 982
2 F
ax: 0
7 336
9 972
2W
eb: w
ww.ca
rdno
.com.
auA
10/02
/2017
ISSU
E FO
R TE
NDER
G.H.
C.L.
R.S.
B21
/02/20
17DR
AINA
GE C
HANN
EL 01
AME
NDED
G.H.
C.L.
R.S.
FOR
TEND
ER O
NLY
NOT
TO B
E US
ED F
OR C
ONST
RUCT
ION
PURP
OSES
510
1520
m0 SC
ALE:
1:20
0@
A1
MEAN
DERI
NG LO
W F
LOW
CHAN
NEL 2
00mm
DEE
P
EXIS
TING
SUR
FACE
DESI
GN S
URFA
CE
EXIS
TING
SUR
FACE
DESI
GN S
URFA
CE
DRAI
NAGE
CHA
NNEL
3DR
AINA
GE C
HANN
EL 4
Date
Rev.
Verif.
Appd
.
Scale
Statu
s
Clien
t
XREF's: XR_764074-DGE-LS01_; XR_764074-DGE-LS03_; XR_764074-XSEC-DGE011; XR_764074-XSEC-DGE012; XR_764074-XSEC-DGE041; XR_764074-XSEC-DGE031; XR_764074-XSEC-DGE021; XR_764074-DGE-LS02_; XR_764074-DGE-LS04_
Draw
ing N
umbe
rRe
vision
DATE PLOTTED: 10 February 2017 4:26 PM BY : GAVIN HARRIS
Des.
Size
Proje
ct
Title
Draw
nDa
te
Chec
ked
Date
Date
Date
Verifi
ed
Appr
oved
Desc
riptio
n
A1
CAD File: M:\7640-74 - Cherbourg WWTP\_Project material\ACAD\764074-CI-201.dwg
DEPA
RTME
NT O
F IN
FRAS
TRUC
TURE
, LOC
AL G
OVER
NMEN
T AN
D PL
ANNI
NGCH
ERBO
URG
WW
TP
DRAI
NAGE
CHA
NNEL
03 &
04CR
OSS
SECT
IONS
DATU
M AHD
AS S
HOW
N
7640
74-C
I-205
A
G.H.
3/02/2
017
C.L.
9/02/2
017
G.H.
3/02/2
017
C.LA
MB10
/02/20
17
R.SH
ELTO
N10
/02/20
17
Desig
ned
© Ca
rdno
Limi
ted A
ll Righ
ts Re
serve
d.Th
is do
cume
nt is
prod
uced
by C
ardn
o Lim
ited s
olely
for th
ebe
nefit
of an
d use
by th
e clie
nt in
acco
rdan
ce w
ith th
eter
ms of
the r
etaine
r. Ca
rdno
Limi
ted do
es no
t and
shall
not
assu
me an
y res
pons
ibility
or lia
bility
wha
tsoev
er to
any t
hird
party
arisi
ng ou
t of a
ny us
e or r
elian
ce by
third
party
on th
eco
ntent
of thi
s doc
umen
t.
®
Card
no (Q
ld) P
ty Ltd
| ABN
57 05
1 074
992
Leve
l 11,
515 S
t Pau
l’s T
erra
ce
Fortit
ude V
alley
, QLD
4006
Tel: 0
7 336
9 982
2 F
ax: 0
7 336
9 972
2W
eb: w
ww.ca
rdno
.com.
auA
10/02
/2017
ISSU
E FO
R TE
NDER
G.H.
C.L.
R.S.
FOR
TEND
ER O
NLY
NOT
TO B
E US
ED F
OR C
ONST
RUCT
ION
PURP
OSES
510
1520
m0 SC
ALE:
1:20
0@
A1
DIVE
RSIO
N CH
ANNE
L
TWL
EGL
SLOP
E SU
RFAC
E TO
BE
SEED
ED(G
RASS
ES) A
ND P
LANT
ED W
ITH
LOMA
NDRA
& S
EDGE
SSE
WER
PON
D
3000
1000
1000
TYPI
CAL S
ECTI
ON T
HROU
GH D
IVER
SION
CHA
NNEL
SCAL
E 1:1
00LO
W F
LOW
CHA
NNEL
REIN
STAT
EEX
ISTI
NGGR
ASSE
S
TWL
EGL
SEW
ER P
OND
3000
1000
1000
DIVE
RSIO
N CH
ANNE
L
TWL
EGLSE
WER
PON
D
3000
1000
1000
CHAN
NEL P
LANT
ING
TO IN
CLUD
E TR
EEPL
ANTI
NG A
T SP
ACIN
GS A
PPRO
XIMA
TELY
5m
TYPI
CAL S
ECTI
ON T
HROU
GH D
IVER
SION
CHA
NNEL
SCAL
E 1:1
00
LOW
FLO
W C
HANN
EL
SLOP
E SU
RFAC
E TO
BE
SEED
ED(G
RASS
ES) A
ND P
LANT
ED W
ITH
LOMA
NDRA
& S
EDGE
SSL
OPE
SURF
ACE
TO B
E SE
EDED
(GRA
SSES
) AND
PLA
NTED
WIT
HLO
MAND
RA &
SED
GES
DEPA
RTME
NT O
F IN
FRAS
TRUC
TURE
, LOC
AL G
OVER
NMEN
T AN
D PL
ANNI
NGCH
ERBO
URG
WW
TP
SEW
AGE
POND
SYS
TEM
LAND
SCAP
ING,
FEN
CING
& T
REE
PLAN
TING
TYPI
CAL D
IVER
SION
CHA
NNEL
SEC
TION
DATU
M AHD
AS S
HOW
N
7640
74-L
A-10
5A
D.G.
24/03
/2017
A.D.
M.24
/03/20
17
A.M.
24/03
/2017
A.MA
SSIG
NANI
24/03
/2017
R.SH
ELTO
N24
/03/20
17
Desig
ned
A10
/02/20
17IS
SUE
FOR
TEND
ERD.
G.A.
D.M.
R.S.
FOR
TEND
ER O
NLY
NOT
TO B
E US
ED F
OR C
ONST
RUCT
ION
PURP
OSES
Date
Rev.
Verif.
Appd
.
Scale
Statu
s
Clien
t
XREF's: XR_764074_A1SHEET
Draw
ing N
umbe
rRe
vision
DATE PLOTTED: 24 March 2017 3:08 PM BY : DAVID GRAY
Des.
Size
Proje
ct
Title
Draw
nDa
te
Chec
ked
Date
Date
Date
Verifi
ed
Appr
oved
Desc
riptio
n
A1
CAD File: M:\7640-74 - Cherbourg WWTP\_Project material\ACAD\764074-LA-105.dwg
© Ca
rdno
Limi
ted A
ll Righ
ts Re
serve
d.Th
is do
cume
nt is
prod
uced
by C
ardn
o Lim
ited s
olely
for th
ebe
nefit
of an
d use
by th
e clie
nt in
acco
rdan
ce w
ith th
eterms
of the reta
iner. Ca
rdno Limited
does no
t and sh
all no
tas
sume
any r
espo
nsibi
lity or
liabil
ity w
hatso
ever
to an
y thir
dpa
rty ar
ising
out o
f any
use o
r reli
ance
by th
ird pa
rty on
the
conte
nt of
this d
ocum
ent.
®
Card
no (Q
ld) P
ty Ltd
| ABN
57 05
1 074
992
Level 11, 515 S
t Paul’s Terrace
Fortit
ude V
alley
, QLD
4006
Tel: 0
7 336
9 982
2 F
ax: 0
7 336
9 972
2W
eb: w
ww.ca
rdno
.com.
au
2000
SCAL
E 1:1
00
4000
6000
8000
1000
0mm
010
00
@A1
IN A
DDIT
ION
TO T
HE P
LANT
ING
OF T
HE A
BOVE
SPE
CIES
IT IS
PRO
POSE
D,W
HERE
PRA
CTIC
ABLE
, THE
CON
TRAC
TOR
SHAL
L SAL
VAGE
EXI
STIN
GGR
ASS SO
DS NO SM
ALLE
R TH
AN 1M
², FR
OM ARE
AS TO BE
DISTU
RBED
AND
ON C
OMPL
ETIO
N OF
EAR
THW
ORKS
TRA
NSPL
ANT
TO T
HOSE
PAR
TSOF
THE
NEW
CHA
NNEL
WHE
RE T
HE N
ATUR
AL G
RASS
COV
ER H
AS B
EEN
IMPA
CTED
. THI
S TR
ANSP
LANT
ING
WILL
BE
SUPP
LEME
NTED
THR
OUGH
THE
USE
OF D
IREC
T SE
EDIN
G W
ITH
HYDR
O-MU
LCH
OR S
IMILA
R.
TYPE
A -
POND
EMB
ANKM
ENT
PLAN
TING
TO
BE LO
MAND
RAAN
D SE
DGES
- (TOT
AL ARE
A = 12920m
²)TY
PE B
- CH
ANNE
L PLA
NTIN
G TO
INCL
UDE
TREE
PLA
NTIN
GAT
A
RATE
BEL
OW (T
OTAL
371 T
REES
PER
HEC
TARE
AT
SPAC
ING
OF AP
PROX
IMAT
ELY 5m
) - (T
OTAL
ARE
A = 20000m
²)
SEDG
ES A
ND
GRA
SSES
FO
R BA
TTER
SDI
ANEL
LA L
ON
GIFO
LIA
DIAN
ELLA
REV
OLU
TALO
MAN
DRA
LON
GIFO
LIA
LOM
ANDR
A HY
STRI
XIM
PERA
TA C
YLIN
DRIC
AHE
TERO
POGO
N C
ON
TORT
US
THEM
EDA
TRIA
NDR
A
AT 0
.5M
TO
1M
CEN
TRES