Col Gregg Sparks
Director, C-17 LogisticsAugust 4, 2004
Col Gregg Sparks
Director, C-17 LogisticsAugust 4, 2004
C-17 SYSTEM PROGRAM OFFICEC-17 SYSTEM PROGRAM OFFICENINETEENTH QUARTERLYNINETEENTH QUARTERLY
REDUCTION IN TOTAL OWNERSHIP COSTREDUCTION IN TOTAL OWNERSHIP COST
(RTOC) FORUM(RTOC) FORUM
C-17 SYSTEM PROGRAM OFFICEC-17 SYSTEM PROGRAM OFFICENINETEENTH QUARTERLYNINETEENTH QUARTERLY
REDUCTION IN TOTAL OWNERSHIP COSTREDUCTION IN TOTAL OWNERSHIP COST
(RTOC) FORUM(RTOC) FORUM
8/8/2019 C-17 Aug 04 Rtoc Forum Edh
http://slidepdf.com/reader/full/c-17-aug-04-rtoc-forum-edh 2/32
2
OVERVIEW
• C-17 Aircraft and its Success
• Institutionalizing RTOC in the C-17• Globemaster III Sustainment
Partnership (GSP) Contract
• Summary
8/8/2019 C-17 Aug 04 Rtoc Forum Edh
http://slidepdf.com/reader/full/c-17-aug-04-rtoc-forum-edh 3/32
3
OVERVIEW
• C-17 Aircraft and its Success
• Institutionalizing RTOC in the C-17• Globemaster III Sustainment
Partnership (GSP) Contract
• Summary
8/8/2019 C-17 Aug 04 Rtoc Forum Edh
http://slidepdf.com/reader/full/c-17-aug-04-rtoc-forum-edh 4/32
Deliver & Sustain QualityC-17 Fleet
Improve C-17 Capabilityand Support
Lower C-17 Life Cycle Cost
Improve C-17 Readiness
C-17 SPO MISSION
8/8/2019 C-17 Aug 04 Rtoc Forum Edh
http://slidepdf.com/reader/full/c-17-aug-04-rtoc-forum-edh 5/32
COMBINES ATTRIBUTES OFSEVERAL AIRLIFTERS INTO ONE
Air Refueling
Air Refueling
GroundManeuverability
GroundManeuverability
Oversize/OutsizeCargo
Oversize/OutsizeCargo
Survivability
Survivability
Airdrop
Airdrop
Combat Offload
Combat Offload
Small Austere Airfields
Small Austere Airfields
Direct Delivery
Direct Delivery
Roll-On/Roll-Off
Roll-On/Roll-Off
8/8/2019 C-17 Aug 04 Rtoc Forum Edh
http://slidepdf.com/reader/full/c-17-aug-04-rtoc-forum-edh 6/32
8/8/2019 C-17 Aug 04 Rtoc Forum Edh
http://slidepdf.com/reader/full/c-17-aug-04-rtoc-forum-edh 7/327
OPERATION ENDURING FREEDOM (OEF)/OPERATION IRAQI FREEDOM (OIF)
Airmen from the 16th Special Operations Wing at
Hurlburt Field, Fla., offload a MH-53J Pave Low III
helicopter from a C-17A Globemaster III at an
Operation Enduring Freedom location. The C-17 can
carry nearly every type of Air Force and Army air-
transportable equipment.
SUCCESSES• Highest Operational C-17 Airdrop
• High Altitude Airdrop of 2.4MHumanitarian Rations
• First Air Land Delivery of Combat
Loaded M1A1 Main Battle Tank• First C-17 Combat Personnel Airdrop
• Opened Northern Front, Inaccessible by Land
• Largest C-17 Combat Formation Ever Flown
• Assembled a Complete Brigade in Just Under 1 Week
• Flown 214,000 hours delivering253,000 pax and 338,000 STONs(as of 30 Jun 04)
8/8/2019 C-17 Aug 04 Rtoc Forum Edh
http://slidepdf.com/reader/full/c-17-aug-04-rtoc-forum-edh 8/328
CURRENT AND FUTURE C-17BASING CONCEPT
• March AFB 0 of 8
C-17 SPOHQ AMC
WR-ALC
McChord AFB,WA48 of 44
UK
4 of 4
Altus AFB,OK 10 of 15
Charleston AFB,SC
53 of 50
Edwards AFB,CA T-1
March AFB,CA8 (Jun 05)
Travis AFB, CA13 (Jun 06)
Elmendorf AFB,
AK 8 (Apr 07)
McGuire AFB, NJ13 (Sep 04)
Dover AFB, DE13 (Jul 07)
Hickam AFB, HI
8 (Dec 05) New Bases
Existing Bases
Jackson, MS
8 of 8
As of: 30 Jun 04
8/8/2019 C-17 Aug 04 Rtoc Forum Edh
http://slidepdf.com/reader/full/c-17-aug-04-rtoc-forum-edh 9/329
AIRCRAFT DELIVERY PROFILE
12 13 8
4
16 17 11
5
15 16 15 9
6
15 15 6
MYI: P-120 delivers May 04
MYII: P-180 delivers Apr 08+42 : P-222 delivers Jan 2011
8/8/2019 C-17 Aug 04 Rtoc Forum Edh
http://slidepdf.com/reader/full/c-17-aug-04-rtoc-forum-edh 10/3210
OVERVIEW
• C-17 Aircraft and its Success
•Institutionalizing RTOC in the C-17
• Globemaster III SustainmentPartnership (GSP) Contract
• Summary
8/8/2019 C-17 Aug 04 Rtoc Forum Edh
http://slidepdf.com/reader/full/c-17-aug-04-rtoc-forum-edh 11/3211
C-17 RTOC Activity Before 1999
PRODUCTION AFFORDABILITY PROGRAM
• Affordability program has become a way of life for C-17aircraft cost reductioninitiatives:1) Omnibus Investments (‘94/‘95)
$101M Gov’t and Boeing fundsunder Omnibus Agreement
2) Affordability (‘95)$249M Gov’t funds to reduce unit costunder FPI production contract
3) Economic Order Quantity (EOQ) (‘96)$300M Gov’t funds to perform aircraft cost reductionefforts, savings factored into MYP I contract
4) Must Cost (‘99)$212M Gov’t funds with purpose of reducing futureaircraft MYP II procurement costs
5) Affordability 180 (‘01/‘02)Boeing funds to ensure 60 aircraft follow-on costtargets can be achieved
$PerUnit
Aircraft Unit
OmnibusInves
tments
Affordability‘95
EOQ
MustCost
Affordability180
‘94
‘07
8/8/2019 C-17 Aug 04 Rtoc Forum Edh
http://slidepdf.com/reader/full/c-17-aug-04-rtoc-forum-edh 12/3212
Lot 8 and Beyond
Lot 8 and Beyond
Lot 9 and Beyond
Should CostBaseline Single Year
7 Year Multi-year
$208MAvg Unit Price
$268MAvg Unit Price
$229MAvg Unit Price
$178MAvg Unit Price
Warranty,Aggressive
Omnibus (PICRP)Afford 95, NEAT
Lot 8 and Beyond
Should CostBuy Profile
Should CostBuy Profile
Should CostBuy Profile
ADMBuy Profile
Should CostReductions
Multi-Year Reductions
Affordability 180
$163M
60 AircraftFollow-on
Must Cost
Avg Unit Price
OVERALL C-17 ACQUISITIONAIRFRAME PRICE STORY (TY$)
Should CostMigrated
8/8/2019 C-17 Aug 04 Rtoc Forum Edh
http://slidepdf.com/reader/full/c-17-aug-04-rtoc-forum-edh 13/32
C-17 RTOC Activity Before 1999
C-17 AVERAGE UNIT FLYAWAY COST
P1-P40 P41-P120 P121-P180 P181-P222
AVERAGE UNIT COST AVERAGE UNIT COST AVERAGE UNIT COST AVERAGE UNIT COST
TY$ 289.6 TY$ 204.9 TY$ 196.8 TY$ ???BY96$ 296.5 BY96$ 191.1 BY96$ 171.3 BY96$ ???
C-17 AVERAGE UNIT FLYAWAY COST
150
170
190
210
230
250
270
290
P1-P40 P41-P120 P121-P180
( $ M )
150
170
190
210
230
250
270
290
BY96$
TY$
8/8/2019 C-17 Aug 04 Rtoc Forum Edh
http://slidepdf.com/reader/full/c-17-aug-04-rtoc-forum-edh 14/3214
Institutionalizing RTOC in C-17 PROJECTED RTOC SAVINGS
RTOC Approved Business Case Analyses (BCA)
BCA (TY$ M)
FY02/
Prior FY03 FY04 FY05
FY06 to
Completion
Multi-Year Procurement $390.4 $88.0 $0.0 $0.0 $0.
Follow-On MYP P121-P180 $13.5 -$133.9 $129.1 $254.9 $1,239.8Combustion Engine Exit Temp. Kit $6.3 $19.3 $26.4 $26.4 $633.
Optical Quick Access Recorder $5.2 $1.1 $1.4 $1.5 $38.Modern Int Level Test Station $4.9 $4.9 $4.9 $4.9 $98.
OBIGGS 1.1 $2.0 $9.6 $477.
Pitot Tube Probe Redesign $0.3 $0.3 $14.
MLG Improvements < .1 < .1 $3.9 $756.
Imp Position/Navigation Light < .1 $0.1 $1.
Loadmaster Printer Removal < .1 $0.2 $9.
Total Projected Savings $581.8 -$20.6 $164.1 $301.8 $3,269.2
8/8/2019 C-17 Aug 04 Rtoc Forum Edh
http://slidepdf.com/reader/full/c-17-aug-04-rtoc-forum-edh 15/3215
Institutionalizing RTOC in C-17 C-17 SUPPORTABILITY MODEL
• Prioritizes Projects for the Material ImprovementProgram (MIP)
• Aircraft deficiencies are submitted from the field
• Root causes are evaluated, solutions identified
• Resources are applied to resolve the problem• Supportability Model rank orders the Deficiency Reports/MIPs
• The Model rank orders DRs/MIPs based on OSS&E, MissionCapable Rate and Real Hazard Index
• Results are presented to AMC and highest priority MIPS are
elevated to “fenced funding” category
• 52 FY04 MIP projects to raise MC rate 0.8 % providinga value of nearly $400M over the 30 year life of theprogram
8/8/2019 C-17 Aug 04 Rtoc Forum Edh
http://slidepdf.com/reader/full/c-17-aug-04-rtoc-forum-edh 16/3216
Institutionalizing RTOC in C-17 RTOC O&M BASELINE
C-17 Program is improving capability andreducing O&M cost per aircraft
* FY04 is Baseline Year
$1,600
$1,650
$1,700
$1,750
$1,800
$1,850
$1,900
$1,950
$2,000
$9
$10
$11
$12
$13
$14
$15
$16
Total O&M ($M ) O&M per A/C ($M
FY04117
FY05132
FY06148
FY07163
FY08179
FY09180
8/8/2019 C-17 Aug 04 Rtoc Forum Edh
http://slidepdf.com/reader/full/c-17-aug-04-rtoc-forum-edh 17/3217
OVERVIEW
• C-17 Aircraft and its Success
• Institutionalizing RTOC in the C-17
• Globemaster III SustainmentPartnership (GSP) Contract
• Summary
8/8/2019 C-17 Aug 04 Rtoc Forum Edh
http://slidepdf.com/reader/full/c-17-aug-04-rtoc-forum-edh 18/32
18
GSP OVERVIEW
GSP Introduction
New Features and Incentives
Contract Metrics
Summary
8/8/2019 C-17 Aug 04 Rtoc Forum Edh
http://slidepdf.com/reader/full/c-17-aug-04-rtoc-forum-edh 19/32
19
GSP Introduction
• Covers all the labor and material support provided by thesuccessful Flexible Sustainment Contract
• In addition to covering all the requirements of the previousFlex Contract, the new GSP Contract:
– Doubles the number of supported bases (5 to 10 MOBs)
– Supports 30% more aircraft (covers 185 C-17s)
– Includes support for three new customers (ANG, AFR, and PACAF)
– Expands an already successful depot strategy
– Incorporates new innovations for engineering and supply practices(MIP, PBL…)
– Guarantees of increased fleet availability in yearly increments
– Increases the standard for issue effectiveness – Increased TSSR responsibility for contingency and Depot planning
– Growing logistics partnership
Builds upon a successful history of superior contract supportBuilds upon a successful history of superior contract supportBuilds upon a successful history of superior contract supportBuilds upon a successful history of superior contract support
8/8/2019 C-17 Aug 04 Rtoc Forum Edh
http://slidepdf.com/reader/full/c-17-aug-04-rtoc-forum-edh 20/32
20
GSP Introduction (Cont)
• 5-year Contract valued at $4.94B
• Contract Type – FFP/AF (65%) includes P&W engine subcontract and agreed
upon labor hours – CPIF (35%) includes inter-department Boeing hours and all
material support – procurement and component repair – T&M efforts include MIP, UK safety investigations and O&A
• Boeing Investment in Air Logistics Centers – $62M, primarily in form of capital equipment
– Invest in all 3 ALCs at no increased price to sustainmentcontract – Supplement to the $94M AF investments in ALCs
• Contract signed 22 Jul 04
8/8/2019 C-17 Aug 04 Rtoc Forum Edh
http://slidepdf.com/reader/full/c-17-aug-04-rtoc-forum-edh 21/32
21
FFP New Featuresand Incentives
• The award fee - 5% of FFP pool
• The profit rate is 13%
• Customer satisfaction has an increased emphasis
– Two Award Fee metrics
- Non-empirical: 15% Customer Satisfaction
- Empirical: 85% Aircraft Availability
• Twice a year feedback and award fee determination
– Mid Year pool is 35% (70% of 50%) – End Year Award fee pool is the remaining 65% plus any
unawarded pool from the mid year review
User influence & increased performanceUser influence & increased performanceUser influence & increased performanceUser influence & increased performance
8/8/2019 C-17 Aug 04 Rtoc Forum Edh
http://slidepdf.com/reader/full/c-17-aug-04-rtoc-forum-edh 22/32
22
Other Featuresand Incentives
• Opportunity for faster execution of T&M and Class II
requirements – Attempting to bake in a ceiling for MIP and UK airworthiness – Without RFP, Boeing can submit cost volumes for class II
changes
• Hub and Spoke support to USAF bases to reducepersonnel footprint
• Expanded Total System Support Responsibilities – More latitude to respond to USAF contingency
- RSP and HPMSK spares kits support
- More Field Teams – More Site Activation program management – Recurring Enroute and BASC spares procurement planning – More Latitude for Engineering and supply cost saving initiatives
8/8/2019 C-17 Aug 04 Rtoc Forum Edh
http://slidepdf.com/reader/full/c-17-aug-04-rtoc-forum-edh 23/32
23
Six contract performance metrics
Continuously raised benchmark levels
Boeing granted TSSR while committing to performance guarantees
GSP isPerformance Based Logistics
Support To UK and USAF Users Is ParamountSupport To UK and USAF Users Is ParamountSupport To UK and USAF Users Is ParamountSupport To UK and USAF Users Is Paramount
Boeing’s TSSR role includes C-17 item management and depot-
level repair of C-17 airframe and sub-components
8/8/2019 C-17 Aug 04 Rtoc Forum Edh
http://slidepdf.com/reader/full/c-17-aug-04-rtoc-forum-edh 24/32
24
GSP Summary
• Contract signed 22 Jul 04• Builds on a successful sustainment contract history by
adding more requirements, more incentives, moreresponsibility, and more performance
• More user feedback and influence on award fee• Challenges will require constant user feedback and agile
contract processes
8/8/2019 C-17 Aug 04 Rtoc Forum Edh
http://slidepdf.com/reader/full/c-17-aug-04-rtoc-forum-edh 25/32
25
• C-17 Aircraft and its Success
• Institutionalizing RTOC in the C-17
• Globemaster III SustainmentPartnership (GSP) Contract
• Summary
OVERVIEW
8/8/2019 C-17 Aug 04 Rtoc Forum Edh
http://slidepdf.com/reader/full/c-17-aug-04-rtoc-forum-edh 26/32
26
SUMMARY
C-17 SPO achieving itsmission
• Deliver & Sustain QualityC-17 Fleet
• Improve C-17 Capabilityand Support
• Lower C-17 Life Cycle Cost
• Improve C-17 ReadinessMarines from the 26th Marine Expeditionary Unit
line up to board a C-17A Globemaster III at anoperating location in support of Operation
Enduring Freedom
8/8/2019 C-17 Aug 04 Rtoc Forum Edh
http://slidepdf.com/reader/full/c-17-aug-04-rtoc-forum-edh 27/32
Backup
8/8/2019 C-17 Aug 04 Rtoc Forum Edh
http://slidepdf.com/reader/full/c-17-aug-04-rtoc-forum-edh 28/32
28
DR Reporting Timeliness
TCTO Processing
Provisioning
SparesStockage Effictiveness
MICAPServices
Engine RFI
ROR TAT MXSchedEffectiveness
Foundation Metrics
NMCB DEPOT
PROGRAM MGMTCOST
TRADE OFFS
SPARESMGMT COST
Cost As An Independent VariableCost As An Independent Variable
TransitionMetrics
SUSTAININGENGINEERINGCOST
MAINTENANCECOST
Cost Per
Flying Hour
OPS / MX Performance Cost Performance
AWP
AIRFRAMECOST
ENGINE COST
POS COST
RSPCOST
ACICOST
PAINT/DEPAINT COST
MOD COST
TECH ORDERCOST
SUPPORTEQUIPMENT COST
ProposalsforNon-TransitionedSpares
SupportLevelsof the MRSP& IRSP Changesto Newor ExistingTOs
ED for TO UpdateEDfor NMCM Aircraft
Fleet ConfigMgmt Status
SkyhookResponse
Engine RFI
MXSchedEffectiveness
Technical Order Timeliness
NMCS O&I SkyhookResponse
Fleet ConfigMgmt Status
Engineering Disposition
FY 01-05 Metrics
Cost Control
Engine RFI
Supply Support MXSchedEffectiveness
FleetConfigMgmtS tatus
FleetFleetAvailabilityAvailability
FlyingHours Achievable
ForwardSup ply Location
Issue Effectiveness
MICAPServices
Depot Scheduling
• Globemaster Sustainment Aircraft Availability (GSAA) – health of the fleet
• Depot Maintenance Scheduling Effect
– depot level maintenance
• Flying Hours Achievable (FHA) – wartime preparedness
• Issue Effectiveness
–
peacetime and wartime supply support
• MICAP Service Effectiveness
–
critical parts shortages
• Customer Satisfaction
Contract Compliance
Metrics Strategy
A few hard hitting Metrics part of long term strategyA few hard hitting Metrics part of long term strategyA few hard hitting Metrics part of long term strategyA few hard hitting Metrics part of long term strategy
CP N F t
8/8/2019 C-17 Aug 04 Rtoc Forum Edh
http://slidepdf.com/reader/full/c-17-aug-04-rtoc-forum-edh 29/32
29
CP New Featuresand Incentives
• Incentivizes costs control from the negotiated target cost using a 70/30
share ratio
• Should Boeing demonstrate a cost savings of 14% in FY04 and FY05, theCPIF contract converts to FFP in FY07 and FY08 at a lower cost togovernment ($134M) and higher profit to Boeing (13% with 5% award fee)
Incentivizes Cost Control per flying hour and BASC EventsIncentivizes Cost Control per flying hour and BASC EventsIncentivizes Cost Control per flying hour and BASC EventsIncentivizes Cost Control per flying hour and BASC Events
$1,326
$1,572
$1,781
$-
$50
$100
$150
$200
$250
COST($M)
F E E
(
FEE $215.36 $141.48 $78.60
$1,326 $1,572 $1,781
Low Cost Estimate (LCE) $ 1,325M 15.65% cost underrun
High Cost Estimate (HCE) $ 1,781M 13.32% cost overrun
Target Fee 9.0% Target cost
Max Fee 13.7% 15.65% cost underrun or less
Min Fee 5.0% 13.32% cost overrun or more
8/8/2019 C-17 Aug 04 Rtoc Forum Edh
http://slidepdf.com/reader/full/c-17-aug-04-rtoc-forum-edh 30/32
98 99 00 01 02 03 05 06
14014042424242 5454 6666 7575 9292 109109 125125 156156
07 0804 09
??180180171171
Sustainment Timeline
Contractor assumes
responsibility,risk, and higher
performancerequirements
Incrementaltransition of government
responsibilities
ContractAward
Travis
Transition Proof of Concept Implementation
Assess-ment
We Are Here
McChord
ContractAward
Contractor continues TotalSystem Support Responsibility, meets
more challenging requirements per ORDobjective and partners with the ALCs
FY04-11 Contract Award(FY09-11 Unpriced Options)
JacksonMcGuire
MarchHickam Elmendorf
Dover
Number of AircraftNumber of Aircraft
8/8/2019 C-17 Aug 04 Rtoc Forum Edh
http://slidepdf.com/reader/full/c-17-aug-04-rtoc-forum-edh 31/32
31
GSP Relationships
GSP Contract
BOEINGBOEING
TSSR
C-17 PROGRAMC-17 PROGRAM
• Program Management• Asset Repair • Depot Maintenance• Technical Orders• Support Equipment• Supply Management• Sustaining Engineering• Engine Management
• Program Management• Asset Repair • Depot Maintenance• Technical Orders• Support Equipment• Supply Management• Sustaining Engineering• Engine Management
Boeing / VendorsBoeing / VendorsALCsALCs
SubcontractsDirect Sales Partnering
Agreement
DSPA signed/coordinated with AFMC/CC Nov 02
8/8/2019 C-17 Aug 04 Rtoc Forum Edh
http://slidepdf.com/reader/full/c-17-aug-04-rtoc-forum-edh 32/32