By: Gatut Widianoko Weatherford Artificial Lift Systems

22
Gas Lift Optimization Gas Lift Optimization at BP-Indonesia at BP-Indonesia Dual String Gas Lift Well Dual String Gas Lift Well With Injection Pressure Operated Valve With Injection Pressure Operated Valve By: Gatut Widianoko Weatherford Artificial Lift Systems

description

Gas Lift Optimization at BP-Indonesia Dual String Gas Lift Well With Injection Pressure Operated Valve. By: Gatut Widianoko Weatherford Artificial Lift Systems. Abstract. - PowerPoint PPT Presentation

Transcript of By: Gatut Widianoko Weatherford Artificial Lift Systems

  • Gas Lift Optimization at BP-IndonesiaDual String Gas Lift WellWith Injection Pressure Operated ValveBy: Gatut WidianokoWeatherford Artificial Lift Systems

  • Abstract North West Java Oil (NWJO) field located offshore Indonesia is operated by BP. This mature oil field (discovered during 1970s) has approximately 950 wells, and ninety percent (90%) are produced with dual gas lift systems. In thirty (30) years of production, the reservoir pressure has decline to an average between 500 600 psig at the mid-perforation depth (ranging from 3000 - 4000 ft TVD). Discharge pressure of lift gas is 680 psig at compressor station(s).

    In June 2001, BP-Indonesia management made a decision to focus on optimizing their gas lift wells. After significant discussion, it was decided to take a non-conventional approach with respect to gas lifting dual wells by using Injection Pressure Operated valves (IPOs).

    Process Overview: create effective optimization organization design of dual gas lift utilizing IPO valves experiences and solutions for eliminating gas robbing.

  • Offshore Northwest Java Oil Field

  • Steps in Gas Lift OptimizationBP Management - focus on gas lift optimization90% of wells produced by dual gas lift Optimization Team selectedTeam reviews in-house (limited) gas lift expertise; decision made to contract gas lift services from Weatherford; GL engineer visits Jakarta office and NWJO field facilitiesOptimization Team reviews report; proposals submitted Weatherford; further discussions held regarding projectOptimization Team contracts three (3) positions for implementation of NWJO project for 6 month period (including clause for additional 6 month extension)Objectives determined and proper means of tracking or trending established; workable reportsResults of optimization reviewed weekly and monthly

  • Identify problem wells or common well problemsImproving oil production rateOptimizing gas injection Reviewing well performance Maximize overall potentialStabilize oil production and gas injectionGas Lift Optimization Team Objectives

  • Contracted Job TitlesOFFICE JOB Gas Lift EngineerGathering reservoir & production dataReviewing gas lift performance & current GL designGenerating recommendationsWORKSHOP JOB GLV TechnicianCalibration and repair all gas lift equipmentManage gas lift equipment inventory & inventory reportsFIELD JOB Gas Lift SpecialistInstalling, tuning & troubleshooting GL wellsTraining company field operators (personnel)Coordinate gas lift activities with field supervisor

  • Type of Recommendations

  • Number of Wells Reviewed Monthly

  • Oil Gain Contribution by FieldTotal oil gain = 3559 bopd

  • Well Case HistoryThree-Pen Static Pressure RecorderDaily Production RecordFlowing and Static Pressure SurveyFlowing and Static Temperature SurveyEcho Meter SurveyWell File (Drilling, Well Schematic)Latest GLV Design ReportSetting Pressure ReportWire Line Job ReportDiagnostic ToolsTo optimize gas dual lift well, complete information is required:

  • Well Review by TeamOld Oil Field with more than 30 years oldHigh FGOR with 1000 : 1 or moreLow PI with only about 1 3 blpd / psiLow Production with about 200 - 500 blpdLow Static Pressure with average ~ 600 psiLimited Casing Pressure with ~ 600 psi onlyFlowing Tubing Pressure is about 180 psiShallow well - reservoir depth ~ 3000 ft TVDLimited data (SBHP and PI is normally unknown)Old wells - may have leaking valve or tubingSome gas lift valves installed 5-10 years ago

  • Dual Gas Lift Design Lessons LearnedEnough Kick Off (KO) and Operating (OP) Pressure to reach deepest point of injection is requiredDifferential pressure between KO and OP is ~10% of casing pressure, (or at least 50psi) to cover all unloading valves of both strings are closed when surface casing pressure is set at OPUse graphical method to select best point of injection of both strings and best draw down (200-300 psi) of both stringsCalculate by computer setting pressure Ptro; select best port sizes and gas injection rate required All pressure settings (Ptro) of unloading valves for both strings must be selected according to surface closing pressureSurface closing pressure of both strings must be at least 20 psi above OP, and 10 psi less than KOAvoid gas robbing - depth point of injection of both strings must be close or equal; same thing in port size

  • UXA-4S/L Well SchematicREDESIGN WELLSince mandrels were installed in well, optimization on this will be done by redesign.

    Main job is how to determine best point of injection of both strings for optimum drawdown and to avoiding robbing.

    To perform this job, gatheringcomplete information of both strings is required.

    Since SBHP data is old enough, and to ensure static pressure therefore SBHP survey is required to be performed.

  • UXA 4S/L Data

    Data DescriptionUXA 4SUXA 4LSBHP1200 psi*1200 psiPI (Predicted)2 3 2 3W / C87 %85 %CHP650 psi650 psiFTP200 psi200 psiFGOR1300 : 11500 : 1B t m Temp.170 F178 FSurf. Temp100 F100 FC s g Size9 5/8 9 5/8T b g Size2 7/82 7/8

  • Graphical Method0500100010001500200030004000DEPTH

    Ft

    TVDPRESSURE (psi)FTPCHP1200 p s iCasing PressureUXA 4LMid PerforationTubing Pressure #1#2#3#70.45 p s i / ft0.1 p s I / ftFLFBHP

  • Existing Valve Installed

    SPM #U X A 4SU X A 4L1DummyDummy2G l v, 1/8, 615 #G l v, 1/8, 620 #3G l v, 1/8, 600 #G l v, 3/16, 635 #4G l v, 3/16, 615 #S/O, 3/165G l v, 3/16, 600 #Dummy6G l v, 3/16, 590 #Dummy7S/O, 3/16Dummy

  • Computer Program Results (UXA 4L) NOTE: Third mandrel is designed with S/O, but existing #3 valve can not be pulled out, therefore #2 valve is opening and set with Ptro = 300 psi

    SPM #VALVEPORTPTROPCS1GLV1/85956462GLV1/8300OPEN3S/ONANA4DNANANA5DNANANA6DNANANA7DNANANA

  • Computer Program Results (UXA 4S)

    SPM #VALVEPORTPTROPCS1GLV1/85956462GLV1/85906423S/O3/16NANA4DNANANA5DNANANA6DNANANA7DNANANA

  • Gain Results After Gas Lift RedesignGas lift valves were calibrated in workshop, then installed; unloading of tubing strings was done with at least 650 psi as KO. After well unloaded, then gas injection rate was adjusted to maintain surface casing pressure at 640 psi, or OP. Following chart summarizes results after gas lift optimization: OPERATING PRESSURE: 640 psi

    UXA 4SBEFORE GL OPTIMIZATION( March 1996 )AFTER GL OPTIMIZATION( March 2002 )FLUID RATE413 BLPD1037 BLPDOIL RATE79 BOPD255 BOPDGAS IN864 MSCFD250 MSCFDGAS OUT2448 MSCFD550 MSCFD

  • Gain Results After Gas Lift RedesignWell had been shut in since March 1996, and back on line March 2002 after gas lift redesign.OPERATING PRESSURE: 640 psi

    UXA 4LBEFORE GL OPTIMIZATION(March 1996 )AFTER GL OPTIMIZATION (March 2002 )FLUID RATE670 BLPD1751 BLPDOIL RATE97 BOPD122 BOPDGAS IN621 MSCFD120 MSCFDGAS OUT748 MSCFD186 MSCFD

  • UXA Platform Results After GL Optimization (March 2002)

    Chart1

    176672

    175668

    174662

    213712

    265766

    273820

    264782

    276824

    263780

    258764

    264784

    338763

    456775

    460783

    456783

    471799

    377615

    345609

    00

    00

    2272

    239879

    257931

    2471052

    2501086

    4701573

    8131597

    8051581

    6851576

    8051573

    8991907

    10032349

    10022351

    10012203

    9782240

    8411670

    8431584

    8651581

    8361602

    7642177

    7202183

    7632201

    6182181

    6742194

    6772199

    6752186

    6642127

    6322056

    6302050

    6082125

    6682076

    6722105

    6442142

    6792164

    6972215

    6992158

    Start GL OPtimization

    BOPD

    MCFD

    Date

    Production

    UXA P/F Production Profile

    Sheet1

    Atlantic Richfield Indonesia Inc.Date:13-MAY-2002 Page:1

    DAILYPRODUCTION REPORT

    FLOWSTATDATEP/FOILWATERFLUIDGASZONEZONE AVE-BSW LOST- API

    (BOPD)(BWPD) (BFPD)(MCFD)PRODSI% PRODUC GRAV

    UNIFORM1-Mar-02UXA17675192767224810030028-Mar-02

    2-Mar-02UXA17574592066824810030028-Mar-02

    3-Mar-02UXA17474191566224810030028-Mar-02

    4-Mar-02UXA213907112071233810030028-Mar-02

    5-Mar-02UXA2651129139476633810030028-Mar-02

    6-Mar-02UXA2731163143682033810030028-Mar-02

    7-Mar-02UXA2641128139278233810030028-Mar-02

    8-Mar-02UXA2761175145082433810030028-Mar-02

    9-Mar-02UXA2631121138478033810030028-Mar-02

    10-Mar-02UXA2581102136076433810030028-Mar-02

    11-Mar-02UXA2641128139278433810030028-Mar-02

    12-Mar-02UXA338718105676342680030028-Mar-02

    13-Mar-02UXA456968142477542680030028-Mar-02

    14-Mar-02UXA460977143778342680030028-Mar-02

    15-Mar-02UXA456969142578342680030028-Mar-02

    16-Mar-02UXA4711001147279942680030028-Mar-02

    17-Mar-02UXA377801117861533680030028-Mar-02

    18-Mar-02UXA345734107960942680030028-Mar-02

    20-Mar-02UXA00000600030028-Mar-02

    21-Mar-02UXA00000600030028-Mar-02

    22-Mar-02UXA2246687224680030028-Mar-02

    24-Mar-02UXA23971695587933750030028-Mar-02

    25-Mar-02UXA2571027128493133800030028-Mar-02

    26-Mar-02UXA24710541301105233810030028-Mar-02

    27-Mar-02UXA25010681318108633810030028-Mar-02

    28-Mar-02UXA47018782348157342800030028-Mar-02

    29-Mar-02UXA81332544067159742800030028-Mar-02

    30-Mar-02UXA80532224027158142800030028-Mar-02

    31-Mar-02UXA68533424027157642830030028-Mar-02

    1-Apr-02UXA80532184023157342800030028-Mar-02

    2-Apr-02UXA89935984497190752800030028-Mar-02

    3-Apr-02UXA100340105013234952800030028-Mar-02

    4-Apr-02UXA100240095011235152800030028-Mar-02

    5-Apr-02UXA100140065007220352800030028-Mar-02

    11-Apr-02UXA97830984076224052760030028-Mar-02

    12-Apr-02UXA84126653506167043760030028-Mar-02

    15-Apr-02UXA84326693512158443760030028-Mar-02

    16-Apr-02UXA86528973762158152770030028-Mar-02

    19-Apr-02UXA83629633799160252780030028-Mar-02

    26-Apr-02UXA76430563820217752800030028-Mar-02

    27-Apr-02UXA72028823602218352800030028-Mar-02

    28-Apr-02UXA76330513814220152800030028-Mar-02

    29-Apr-02UXA61824703088218152800030028-Mar-02

    30-Apr-02UXA67426973371219433800030028-Mar-02

    1-May-02UXA67727063383219933800030028-Mar-02

    2-May-02UXA67527013376218633800030028-Mar-02

    3-May-02UXA66426553319212733800030028-Mar-02

    4-May-02UXA63225273159205643800030028-Mar-02

    5-May-02UXA63025213151205033800030028-Mar-02

    6-May-02UXA60825933201212533810030028-Mar-02

    7-May-02UXA66825143182207633790030028-Mar-02

    8-May-02UXA67225293201210552790030028-Mar-02

    9-May-02UXA64425763220214252800030028-Mar-02

    10-May-02UXA67925563235216452790030028-Mar-02

    11-May-02UXA69726203317221552790030028-Mar-02

    12-May-02UXA69926293328215833790030028-Mar-02

    Erwin DD:first execution (UXA-4L put BOL after shut in since 1996)

    Erwin DD:UXA-UWA 12" MOL leak

    Sheet2

    244.9166666667749.75427.5694.8235294118

    Sheet3

  • Total Oil Gains After Well Work at BP-Indonesia NOTE: Gas lift is the biggest contributor (70%) of the well work jobs, which resulted in oil gain at NWJO; BP-Indonesia

    Chart1

    7501568

    15002475

    22503403

    30004308

    37505238

    45006207

    52507101

    60007173

    67508038

    75008781

    825037562

    900037592

    2002 Target Cum

    2002 Actual Cum

    BOPD

    2002 Well Work - Oil Rate Projection

    Dec-02

    2002 West Java Weekly Well Work Update:Date:13-Jan-03

    Oil Rate Adds

    Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOPD)

    Jan-027501568Actuals

    Feb-0215002475Actuals

    Mar-0222503403Actuals

    Apr-0230004308Actuals

    May-0237505238Actuals

    Jun-0245006207Actuals

    Jul-0252507101Actuals

    Aug-0260007173Actuals

    Sep-0267507559Actuals

    Oct-0275008781Estimate

    Nov-028250101031322

    Dec-029000

    48755811

    Gas Rate Adds

    Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOEPD)

    Jan-02320708Actuals

    Feb-026401076Actuals

    Mar-029601973Actuals

    Apr-0212802513Actuals

    May-0216003305Actuals

    Jun-0219206910Actuals

    Jul-0222407634Actuals

    Aug-0225608110Actuals

    Sep-02288014186Actuals

    Oct-02320014186Estimate

    Nov-02352014520334

    Dec-023840

    2080

    Monthly Job Summary:

    No.WellEnd DateTypeDesriptionOil Gain (BOPD)Gas Gain (MCFD)Jobs Completed To Date

    1FNB-21-DecWLGL Pack Off InstJobsGLVCOilGasSpend

    2LLB-1L10-DecWLDiagnostic & ZNCJan-022281582718$3.473

    3LLD-214-DecSeapupStimulation/ChemicalFeb-021510674293$0.386

    4LLD-317-DecSeapupMatrix-acidizingMar-021811882353$0.791

    5LLD-417-DecSeapupMatrix-acidizingApr-022010856757$1.011

    6LD-222-DecWLPack Off instMay-02155668274$0.262

    7FNB-222-DecWLGL Pack Off InstJun-02218119536399$0.879

    8LLD-223-DecSeapupStimulation/ChemicalJul-021374729149$0.133

    9LLD-822-DecSeapupwellbore clean outAug-021937586650$0.380

    10UB-6S23-DecWLGLV InstSep-02329130030314$0.720

    11LLD-527-DecSeapupAdd perfOct-0219632016888$0.284

    12Nov-0218813221762$0.516

    13Dec-02

    142128510028.9103557$8.835

    15

    16To Date

    17SI Wells Back On Line40

    18

    19GL Optimization85

    20

    21

    22Jobs Completed212

    23

    24

    Spend ($MM)8.8

    00

    Postponed job :

    1LLA-3SGas Lift Inst14-DecPostponed

    2

    3

    4

    5

    6

    Dec-02

    7501568

    15002475

    22503403

    30004308

    37505238

    45006207

    52507101

    60007173

    67508038

    75008781

    825037562

    900037592

    2002 Target Cum

    2002 Actual Cum

    BOPD

    2002 Well Work - Oil Rate Projection

    Nov-02

    320708

    6401076

    9601973

    12802513

    16003305

    19206910

    22407634

    25608110

    288014186

    320017423.4137931034

    352037562

    384037592

    2002 Target Cum

    2002 Actual Cum

    BOEPD

    2002 Well Work - Gas Rate Projection

    Oct-02

    2002 West Java Weekly Well Work Update:Date:13-Jan-03

    Oil Rate Adds

    Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOPD)

    Jan-027501568Actuals

    Feb-0215002475Actuals

    Mar-0222503403Actuals

    Apr-0230004308Actuals

    May-0237505238Actuals

    Jun-0245006207Actuals

    Jul-0252507101Actuals

    Aug-0260007173Actuals

    Sep-0267507559Actuals

    Oct-0275008781Estimate

    Nov-028250101031322

    Dec-029000

    48755811

    Gas Rate Adds

    Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOEPD)

    Jan-02320708Actuals

    Feb-026401076Actuals

    Mar-029601973Actuals

    Apr-0212802513Actuals

    May-0216003305Actuals

    Jun-0219206910Actuals

    Jul-0222407634Actuals

    Aug-0225608110Actuals

    Sep-02288014186Actuals

    Oct-02320014186Estimate

    Nov-02352014520334

    Dec-023840

    2080

    Monthly Job Summary:

    No.WellEnd DateTypeDesriptionOil Gain (BOPD)Gas Gain (MCFD)Jobs Completed To Date

    1MRA-1L2-NovWLGLV Redesign194171JobsGLVCOilGasSpend

    2BL-7L2-NovWLZNC0Jan-022281582718$3.473

    3MRA-2S3-NovWLGLV Redesign25598Feb-021510674293$0.386

    4LB-4ST7-NovSea PupStim3101076Mar-021811882353$0.791

    5LB-5L17-NovSea PupC/O Perf(unsuccess)Apr-022010856757$1.011

    6FG-58-NovWLGLV Redesign87May-02155668274$0.262

    7LB-3ST11-NovSeapupAdd Perf.476417Jun-02218119536399$0.879

    8BNA-2L15-NovWLGLV RedesignJul-021374729149$0.133

    9LESA-118-NovSeapupPerforationAug-021937586650$0.380

    10BH-2L20-NovWLZNC openSep-02329130030314$0.720

    11BH-4L22-NovWLGLV InstOct-0219632016888$0.284

    12EA-3L23-NovWLZNCNov-0218813221762$0.516

    13LESA-324-NovSeapupStimulationDec-02

    14UA-4S25-NovWLGLV Inst2128510028.9103557$8.835

    15LB-6STL27-NovWLGLV Inst

    16EA-1L28-NovWLPack off InstTo Date

    17BF-1S28-NovWLpre cement packer perfSI Wells Back On Line40

    18LB-5L30-NovWLGLV Inst

    19GL Optimization85

    20

    21

    22Jobs Completed212

    23

    24

    Spend ($MM)8.8

    13221762

    Postponed job :

    1FU-2L1-NovZNCpostponed

    2FU-2S5-NovTubing pack Off Instpostponed

    3BL-7L15-NovGLV Redesignpostponed

    4

    5

    6

    7

    8

    Oct-02

    7501568

    15002475

    22503403

    30004308

    37505238

    45006207

    52507101

    60007173

    67508038

    75008781

    825037562

    900037592

    2002 Target Cum

    2002 Actual Cum

    BOPD

    2002 Well Work - Oil Rate Projection

    Sept -02

    320708

    6401076

    9601973

    12802513

    16003305

    19206910

    22407634

    25608110

    288014186

    320017423.4137931034

    352037562

    384037592

    2002 Target Cum

    2002 Actual Cum

    BOEPD

    2002 Well Work - Gas Rate Projection

    Aug-02

    2002 West Java Weekly Well Work Update:Date:13-Jan-03

    Oil Rate Adds

    Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOPD)

    Jan-027501568Actuals

    Feb-0215002475Actuals

    Mar-0222503403Actuals

    Apr-0230004308Actuals

    May-0237505238Actuals

    Jun-0245006207Actuals

    Jul-0252507101Actuals

    Aug-0260007173Actuals

    Sep-0267508038Actuals

    Oct-0275008781743

    Nov-028250

    Dec-029000

    48755429

    Gas Rate Adds

    Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOEPD)

    Jan-02320708Actuals

    Feb-026401076Actuals

    Mar-029601973Actuals

    Apr-0212802513Actuals

    May-0216003305Actuals

    Jun-0219206910Actuals

    Jul-0222407634Actuals

    Aug-0225608110Actuals

    Sep-02288014186Actuals

    Oct-023200174233237Estimate

    Nov-023520

    Dec-023840

    2080

    Monthly Job Summary:

    No.WellEnd DateTypeDesriptionOil Gain (BOPD)Gas Gain (MCFD)Jobs Completed To Date

    1KLYA-31-OctSeapupAdd Perforations4670JobsGLVCOilGasSpend

    2EQD-1S3-OctWLGLV RedesignJan-022281582718$3.473

    3YA-24-OctSeapupStimulation -chemical1500Feb-021510674293$0.386

    4MQ-11S6-OctWLGLV Redesign100Mar-021811882353$0.791

    5LLF-27-OctSeapupPerforation and Zonal Isolation8500Apr-022010856757$1.011

    6ZUF-913-OctWLGL Pack Off InstMay-02155668274$0.262

    7AVSA-819-OctWLSet Mod H TypeJun-02218119536399$0.879

    8FU-2S20-OctWLZNCJul-021374729149$0.133

    9BTSA-3LWLGLV RedesignCancelledAug-021937586650$0.380

    10LE-412-OctWLZNCSep-02329122228650$0.720

    Oct-0219674317070$0.284

    11EZB-3L20-OctWLGLV RedesignCancelledNov-02

    12ZUG-622-OctCT BoatN2 Unloading00Dec-02

    13FU-2LWLZNC194779051.9100313$8.035

    14BQA-2L21-OctWLGLV Inst120

    15BQA-129-OctGLV Inst50To Date

    16EE-3S23-OctWLGLV InstSI Wells Back On Line40

    17LE-430-OctWLGLV Inst253182

    18EQC-2LWLZNCGL Optimization77

    19PB-130-OctWLZNC2202218

    21

    22Jobs Completed194

    23

    24

    Spend ($MM)8.0

    74317070

    Postponed job :

    1BH-2L1-OctZNC

    2FFB-2L4-OctGLV Redesign

    3BTSA-3L12-OctGLV Inst

    4AVSA-816-OctInstall CS H Type WLRSSSV

    5EC-1S16-OctPre squeeze Off & Perf

    6BQA-2L17-OctGLV Redesign

    7FNB-217-OctTIT & Tubing Pack Off

    8EC-1S17-OctPre squeeze Off & Perf

    9

    Aug-02

    7500

    15000

    22500

    30000

    37500

    45000

    52500

    60000

    67500

    75000

    82500

    90000

    2002 Target Cum

    2002 Actual Cum

    BOPD

    2002 Well Work - Oil Rate Projection

    July-02

    3200

    6400

    9600

    12800

    16000

    19200

    22400

    25600

    28800

    32000

    35200

    38400

    2002 Target Cum

    2002 Actual Cum

    BOEPD

    2002 Well Work - Gas Rate Projection

    June-02

    2002 West Java Weekly Well Work Update:Date:13-Jan-03

    Oil Rate Adds

    Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOPD)

    Jan-027501568Actuals

    Feb-0215002357Actuals

    Mar-0222503405Actuals

    Apr-0230004517Actuals

    May-0237505291Actuals

    Jun-0245006392Actuals

    Jul-0252506696Actuals

    Aug-0260006738Actuals

    Sep-02675080381300Estimate

    Oct-027500

    Nov-028250

    Dec-029000

    4875

    Gas Rate Adds

    Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOEPD)

    Jan-02320708Actuals

    Feb-026401103Actuals

    Mar-029601964Actuals

    Apr-0212802538Actuals

    May-0216003263Actuals

    Jun-0219207046Actuals

    Jul-0222407945Actuals

    Aug-0225608437Actuals

    Sep-022880141865749Estimate

    Oct-023200

    Nov-023520

    Dec-023840

    2080

    Monthly Job Summary:

    No.WellEnd DateTypeDesriptionOil Gain (BOPD)Gas Gain (MCFD)Jobs Completed To Date

    1LLB-3S1-SepChoke Adj357JobsGLVCOilGasSpend

    2EB-6L3-SepWLSSSV RepJan-022281582718$3.473

    3LB-6ST5-SepWLGLVCFeb-021510674293$0.386

    4ZUC-35-SepCT/boatCT/Stim190650Mar-021811882353$0.791

    5ZUC-68-SepCT/boatCT/Stim224Apr-022010856757$1.011

    6EQA-3S8-SepWLGLV0700May-02155668274$0.262

    7EQA-5S12-SepWLGLV Redesign0500Jun-02218119536399$0.879

    8BM-313-SepWLGLV198Jul-021374729149$0.133

    9ZUG-216-SepCT/boatCT/StimAug-021937586650$0.380

    10KLXA-319-SepSea PupPerf/Stim-1093Sep-02329130030314$0.720

    11KLXA-220-SepSea PupPerf/Stim-1359Oct-02

    12LB-121-SepWLGLV63Nov-02

    13EQC-2L22-SepWLZone ChangeDec-02

    14EA-5L23-SepCT/boatFill C/O175718386.984907$8.04

    15EA-5S21-MayCT/boatScale C/O

    16KLYB-121-SepSea PupPerf/Stim-528To Date

    17KLXB-125-SepSea PupPerf/Stim7536SI Wells Back On Line40

    18KLXB-226-SepSea PupPerf/Stim4704

    19KLXB-327-SepSea PupPerf/Stim7392GL Optimization71

    20KLYA-330-SepSea PupPerf/Stim6574

    21EA-1L29-SepCT/boatFill C/OInjector

    22BH-4S28-SepWLGLV100Jobs Completed175

    23BL-5S29-SepWLGLV90

    24EQA-3L30-SepWLGLV

    25EQA-1S16-SepWLZNC78

    26EZB-3L20-SepWLGLV Redesign

    27ZUF-924-SepWLTubing punch

    28ZUG-625-SepWLTubing clearance & Tag F/L

    29AAC-418-SepWLZNC

    30EQD-1L13-SepWLZNC

    31LE-424-SepWLZNC

    32KLYA-230-SepSea PupPerf/Stimulation5238

    130030314Spend ($MM)8.0

    Postponed job :

    1AAC-47-SepWLZNC

    2EQD-1L13-SepWLZNC

    3EZB-3L20-SepWLGLV redesign

    4EZC-4L24-SepWLSBHP & ZNC

    5LE-424-SepWLDiagnostic & ZNC

    June-02

    7500

    15000

    22500

    30000

    37500

    45000

    52500

    60000

    67500

    75000

    82500

    90000

    2002 Target Cum

    2002 Actual Cum

    BOPD

    2002 Well Work - Oil Rate Projection

    May-02

    3200

    6400

    9600

    12800

    16000

    19200

    22400

    25600

    28800

    32000

    35200

    38400

    2002 Target Cum

    2002 Actual Cum

    BOEPD

    2002 Well Work - Gas Rate Projection

    Apr-02

    2002 West Java Weekly Well Work Update:Date:13-Jan-03

    Oil Rate Adds

    Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOPD)

    Jan-027501568Actuals

    Feb-0215002357Actuals

    Mar-0222503405Actuals

    Apr-0230004517Actuals

    May-0237505291Actuals

    Jun-0245006392Actuals

    Jul-0252506696Actuals

    Aug-026000

    Sep-026750

    Oct-027500

    Nov-028250

    Dec-029000

    4875

    Gas Rate Adds

    Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOEPD)

    Jan-02320708Actuals

    Feb-026401103Actuals

    Mar-029601964Actuals

    Apr-0212802538Actuals

    May-0216003263Actuals

    Jun-0219207046Actuals

    Jul-0222407945Actuals

    Aug-022560

    Sep-022880

    Oct-023200

    Nov-023520

    Dec-023840

    2080

    Monthly Job Summary:

    No.WellEnd DateTypeDesriptionOil Gain (BOPD)Gas Gain (MCFD)Jobs Completed To Date

    1LD-42-AugWLGLVCest50JobsGLVCOilGasSpend ($MM)

    2KA-4ST3-AugWLZNCJan-0222815827183.473

    3BZZA-98-AugWLZNCblowing gas indicationFeb-0215106742930.386

    4EZB-3L7-AugWLZNC15Mar-0218118823530.791

    5KA-3ST11-AugWLZNCApr-0220108567571.011

    6ETA-3L18-AugWLGLVC00May-021556682740.262

    7ZUF-1011-AugCT/BoatStim00Jun-022181195363990.879

    8ZUF-118-AugCT/BoatStim222500Jul-0213747291490.133

    9ZUF-95-AugCT/BoatStim00Aug-0219375866500.380

    10ZUF-322-AugCT/BoatStim112500Sep-02

    11ZUC-525-AugCT/BoatStimOct-02

    12LD-6L18-AugWLPull out plugest70Nov-02

    13LLD-511-AugWLSSCSV replct.est3501650Dec-02

    14LD-227-AugWLPack off instest100143627086.9545937.3153

    15ETA-1L14-AugWLSSCSV200

    16EZC-526-AugWLGLVR1200To DateYr Target

    17EQB-3Lin progWLGLVR250SI Wells Back On Line4060

    18KLB-729-AugWLZNC & Pre perforation

    19ZUC-131-AugCT/BoatStimulationGL Optimization6280

    20

    21

    Jobs Completed143200

    10086650Spend ($MM)7.318

    Postponed job :

    1

    2

    3

    4

    5

    Apr-02

    7501568

    15002357

    22503405

    30004517

    37505291

    45006392

    52506696

    600037470

    675037501

    750037531

    825037562

    900037592

    2002 Target Cum

    2002 Actual Cum

    BOPD

    2002 Well Work - Oil Rate Projection

    Mar-02

    320708

    6401103

    9601964

    12802538

    16003263

    19207046

    22407945

    256037470

    288037501

    320037531

    352037562

    384037592

    2002 Target Cum

    2002 Actual Cum

    BOEPD

    2002 Well Work - Gas Rate Projection

    Feb-02

    2002 West Java Weekly Well Work Update:Date:13-Jan-03

    Oil Rate Adds

    Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOPD)

    Jan-027501568Actuals

    Feb-0215002357Actuals

    Mar-0222503405Actuals

    Apr-0230004517Actuals

    May-0237505291Actuals

    Jun-0245006392Actuals

    Jul-0252506696Actuals

    Aug-026000

    Sep-026750

    Oct-027500

    Nov-028250

    Dec-029000

    4875

    Gas Rate Adds

    Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOEPD)

    Jan-02320708Actuals

    Feb-026401103Actuals

    Mar-029601964Actuals

    Apr-0212802538Actuals

    May-0216003263Actuals

    Jun-0219207046Actuals

    Jul-0222407945Actuals

    Aug-022560

    Sep-022880

    Oct-023200

    Nov-023520

    Dec-023840

    2080

    Monthly Job Summary:

    No.WellEnd DateTypeDesriptionOil Gain (BOPD)Gas Gain (MCFD)Jobs Completed To Date

    1KLYB-21-JulSeapupAcid5000JobsGLVCOilGasSpend ($MM)

    2LE-4S3-JulWLGLVCJan-0222815827183.473

    3KKNA-24-JulSeapupH type903200Feb-0215106742930.386

    4LB-6STS6-JulWLGLVCMar-0218118823530.791

    5EQA-99-JulWLZNC400Apr-0220108567571.011

    6FK-1L9-JulWLTubing pack off322449May-021556682740.262

    7ZUF-314-JulWLPerf/AcidizingJun-022181301378990.879

    8KLA-1415-JulWLGLVCJul-0216747291490.133

    9BG-6L22-JulWLGLVC60500Aug-02

    10EJ-528-JulWLZNC50Sep-02

    11KLA-328-JulWLGLVCOct-02

    12KA-2L29-JulWLGLVC219Nov-02

    13KLA-830-JulWLGLVCDec-02

    14EJ-2S26-JulWLSBHP & ZNC127596434.9494436.9353

    15EQA-3L8-JulWLZNC00

    16EZE-52-JulWLGas in Tuning100300To DateYr Target

    17SI Wells Back On Line4060

    18

    19GL Optimization5980

    20

    21

    Jobs Completed127200

    8819449Spend ($MM)6.918

    Postponed job :

    1BZZA-917-JulWLZNC,postponed,

    2FNB-422-JulWLPack off inst, postponed,after leaking point could not be found yet

    3FZA-316-JulWLsand/gun debris bailing, postponed after complete bailing about 100 ltr of sand

    4

    5

    Feb-02

    7501568

    15002357

    22503405

    30004517

    37505291

    45006392

    52506696

    600037470

    675037501

    750037531

    825037562

    900037592

    2002 Target Cum

    2002 Actual Cum

    BOPD

    2002 Well Work - Oil Rate Projection

    Jan-02

    320708

    6401103

    9601964

    12802538

    16003263

    19207046

    22407945

    256037470

    288037501

    320037531

    352037562

    384037592

    2002 Target Cum

    2002 Actual Cum

    BOEPD

    2002 Well Work - Gas Rate Projection

    Job Summary

    2002 West Java Weekly Well Work Update:Date:13-Jan-03

    Oil Rate Adds

    Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOPD)

    Jan-027501568Actuals

    Feb-0215002357Actuals

    Mar-0222503405Actuals

    Apr-0230004517Actuals

    May-0237505291Actuals

    Jun-0245006392Actuals

    Jul-0252506696Actuals

    Aug-026000

    Sep-026750

    Oct-027500

    Nov-028250

    Dec-029000

    4875

    Gas Rate Adds

    Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOEPD)

    Jan-02320708Actuals

    Feb-026401103Actuals

    Mar-029601964Actuals

    Apr-0212802538Actuals

    May-0216003263Actuals

    Jun-0219207046Actuals

    Jul-0222407945Actuals

    Aug-022560

    Sep-022880

    Oct-023200

    Nov-023520

    Dec-023840

    2080

    Monthly Job Summary:

    No.WellEnd DateTypeDesriptionOil Gain (BOPD)Gas Gain (MCFD)Jobs Completed To Date

    1KLB-931-MayWLZNC01000JobsGLVCOilGasSpend ($MM)

    2EQA-4L31-MayWLZNC (candidate for cement packer)00Jan-0222815827183.473

    3UYA-4S3-JunChokeChoke2412555Feb-0215106742930.386

    4MRA-1L6-JunWLGLVC2260Mar-0218118823530.791

    5UA-3L7-JunWLZNC46681Apr-0220108567571.011

    6KKNA-1L8-JunChokeChoke1501400

    7LE-5L10-JunWLGLVC00May-021556682740.262

    8LD-2WLPack/Off00Jun-02218130137899

    9BE-311-JunWLGLVC500Jul-02

    10BQA-2S11-JunSea PupAcidizing01200Aug-02

    11EJ-112-JunWLGLVC (still increase gradually)60Sep-02

    12FNA-112-JunWLPoroplus (estimated 50% of exp. Gain)50500Oct-02

    13KLXA-112-JunSea PupAcid10000Nov-02

    14EQA-714-JunBimaW/O (Proposed MPLT w/o execution)00Dec-02

    15HZEA-416-JunW/LGLVC482263111525962.9402945.923

    16LESA-216-JunSea PupPerforation20000

    17BL-95-JunWLGLV redesign00To DateYr Target

    18AVA-8ST20-JunWLZNC00SI Wells Back On Line4060

    19EQC-2L2-JunWLZNC0300

    20EQA-725-JunWLGLV Inst (part of EQA-07 WO)GL Optimization5280

    21BE-6L28-JunWLGLV inst500

    Jobs Completed111200

    130137899

    Postponed job :Spend ($MM)5.918

    1EQC-2SFishing

    2UA-3LGLV Redesign

    3AAC-4ZNC

    4EZC-2SGLV redesign,due to the sand problem

    5FZA-1LTubing pack off, postponed, problem with rubber element

    Job Summary

    7500

    15000

    22500

    30000

    37500

    45000

    52500

    60000

    67500

    75000

    82500

    90000

    2002 Target Cum

    2002 Actual Cum

    BOPD

    2002 Well Work - Oil Rate Projection

    Re-Activated

    3200

    6400

    9600

    12800

    16000

    19200

    22400

    25600

    28800

    32000

    35200

    38400

    2002 Target Cum

    2002 Actual Cum

    BOEPD

    2002 Well Work - Gas Rate Projection

    2002 West Java Weekly Well Work Update:Date:13-Jan-03

    Oil Rate Adds

    Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOPD)

    Jan-027501582Actuals

    Feb-0215002193Actuals

    Mar-0222503000Actuals

    Apr-0230003480Actuals

    May-0237504206726

    Jun-024500

    Jul-025250

    Aug-026000

    Sep-026750

    Oct-027500

    Nov-028250

    Dec-029000

    4875

    Gas Rate Adds

    Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOEPD)

    Jan-02320718Actuals

    Feb-026401108Actuals

    Mar-029602024Actuals

    Apr-0212802520Actuals

    May-0216002794274

    Jun-021920

    Jul-022240

    Aug-022560

    Sep-022880

    Oct-023200

    Nov-023520

    Dec-023840

    2080

    Monthly Job Summary:

    No.WellEnd DateTypeDescriptionOil Gain (BOPD)Gas Gain (MCFD)Jobs Completed To Date

    1EJ-11-MayOpsgas in tuning00JobsGLVCOilGasSpend ($MM)

    2EJ-3S1-MayOpsGas in TuningJan-0222815827183.473

    3EQC-1L4-MayWLFishing78266Feb-0215106742930.386

    4FZA-1S9-MaySea PupCmt Packer & Perf1500 (est)Mar-0218118823530.791

    5LD-210-MayW/LGLV Installation,completed,still blowing gasApr-0220108567571.011

    6BZZA-911-MayW/LGLV InstallationMay-02115726274

    7KLC-312-MaySea PupStart up procedureJun-02

    8BQA-116-MayW/LGLV inst50Jul-02

    9LB-4L17-MayWLGLV inst590997Aug-02

    10EJ-518-MaySea PupTbg Co (sand)250Sep-02

    11EQA-1L20-MayWLZone change (Still SI for Bima Rig EQA-07 WO)Oct-02

    12BQA-2L20-MayWLGLV instNov-02

    13EJ-3S21-MayWLZone change470Dec-02

    14UXA-1L22-MayWLStraddle tool inst7886405.661

    15LB-6L28-MayOpsGas lift tuning100

    16EQA-4L31-MayWLZNC0180

    17KLB-931-MayWLZNCTo DateYr Target

    REMAKSHZEA-4WLGLV inst postponed w/o wellhead integrity & last welltestSI Wells Back On Line3160

    BTSA-3LWLGLV inst postponed no gas lift line

    EZB-1LWLSBHP & zone Change, postponedGL Optimization4080

    EQA-3LWLZone change & SBHP, postponed

    BE-2SWLGLV inst, postponedJobs Completed86200

    9681443

    Spend ($MM)5.718

    Work Outstanding

    1) AVSA ESP's - 7 wells on line at AVSA and AVA (8 at Zulu). Production at Zelda 490 BOPD (7 day moving average).

    2) ZULU ESP's - Decided to defer all ESP work in Zulu. Will perform higher potential workovers.

    3) BIMA Schedule- FNB-1, EQA-3

    5) KLX/KLY - Issued Programs for KLXA-1 and KLYB-1 to perform N2 unloading & perforation/reperforation

    6) SEA PUP - Completing Integrity work on KLC. Will move next to BL-9 SCO or KLX/KLY

    7500

    15000

    22500

    30000

    37500

    45000

    52500

    60000

    67500

    75000

    82500

    90000

    2002 Target Cum

    2002 Actual Cum

    BOPD

    2002 Well Work - Oil Rate Projection

    3200

    6400

    9600

    12800

    16000

    19200

    22400

    25600

    28800

    32000

    35200

    38400

    2002 Target Cum

    2002 Actual Cum

    BOEPD

    2002 Well Work - Gas Rate Projection

    2002 West Java Weekly Well Work Update:Date:13-Jan-03

    Oil Rate Adds

    Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOPD)

    Jan-027501582Actuals

    Feb-0215002193Actuals

    Mar-0222503000Actuals

    Apr-02300041641164

    May-023750

    Jun-024500

    Jul-025250

    Aug-026000

    Sep-026750

    Oct-027500

    Nov-028250

    Dec-029000

    4875

    Gas Rate Adds

    Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOEPD)

    Jan-02320718Actuals

    Feb-026401108Actuals

    Mar-029602024Actuals

    Apr-02128031001076

    May-021600

    Jun-021920

    Jul-022240

    Aug-022560

    Sep-022880

    Oct-023200

    Nov-023520

    Dec-023840

    2080

    Monthly Job Summary:

    No.WellEnd DateTypeDescriptionOil Gain (BOPD)Gas Gain (MCFD)Jobs Completed To Date

    1ESTA-41-AprW/LGLVC400JobsGLVCOilGasSpend ($MM)

    2KLB-32-AprW/LGLVC63519Jan-0222815827183.473

    3BL-94-AprSea PupSCO-19Feb-0215106742930.386

    4KLXA-18-AprSea PupN2 and Perforation00Mar-0218118823530.791

    5EZA-1L8-AprW/LGLVCApr-022010116410761.011

    6KLYB-111-AprSea PupN2 and Perforation01100May-02

    7FNB-0112-AprBIMARIG W/O/ GLVC5200Jun-02

    8UXA-4L16-AprW/LGLVC6799Jul-02

    9ESTA-3L12-AprW/LGLVCAug-02

    10MRA-5L15-AprSea PupWax Clean Out4Sep-02

    11MRA-5S16-AprSea PupWax Clean Out230Oct-02

    12MRA-2S17-AprSea PupWax C/O / GLVC237Nov-02

    13FZA-223-AprW/LGLVC200 (estimation)Dec-02

    14LNA-3MB23-AprW/LGLVC12361675405.661

    15ESTA-3L24-AprSea PupTbg CO - Sand

    16BH-6L25-AprW/LGLVC0To DateYr Target

    17BZZA-3L27-AprW/LPack off rep.15SI Wells Back On Line2160

    18HZEA-228-AprW/LGLVC & pack off95137

    19FZA-1L30-AprSea PupPerforation100 (est)150(est)GL Optimization4080

    20BA-7L12-AprOprtGas in tuning136

    21UXA -1L17-AprOpsGas in tuning104378Jobs Completed75200

    14557534

    Spend ($MM)5.718

    Work Outstanding

    1) AVSA ESP's - 7 wells on line at AVSA and AVA (8 at Zulu). Production at Zelda 490 BOPD (7 day moving average).

    2) ZULU ESP's - Decided to defer all ESP work in Zulu. Will perform higher potential workovers.

    3) BIMA Schedule- FNB-1, EQA-3

    5) KLX/KLY - Issued Programs for KLXA-1 and KLYB-1 to perform N2 unloading & perforation/reperforation

    6) SEA PUP - Completing Integrity work on KLC. Will move next to BL-9 SCO or KLX/KLY

    7500

    15000

    22500

    30000

    37500

    45000

    52500

    60000

    67500

    75000

    82500

    90000

    2002 Target Cum

    2002 Actual Cum

    BOPD

    2002 Well Work - Oil Rate Projection

    3200

    6400

    9600

    12800

    16000

    19200

    22400

    25600

    28800

    32000

    35200

    38400

    2002 Target Cum

    2002 Actual Cum

    BOEPD

    2002 Well Work - Gas Rate Projection

    2002 West Java Weekly Well Work Update:Date:13-Jan-03

    Oil Rate Adds

    Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOPD)

    Jan-027501582Actuals

    Feb-0215002193Actuals

    Mar-0222503000Actuals

    Apr-023000

    May-023750

    Jun-024500

    Jul-025250

    Aug-026000

    Sep-026750

    Oct-027500

    Nov-028250

    Dec-029000

    4875

    Gas Rate Adds

    Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOEPD)

    Jan-02320718Actuals

    Feb-026401108Actuals

    Mar-029602024Actuals

    Apr-021280

    May-021600

    Jun-021920

    Jul-022240

    Aug-022560

    Sep-022880

    Oct-023200

    Nov-023520

    Dec-023840

    Monthly Job Summary:

    No.WellEnd DateTypeDescriptionOil Gain (BOPD)Gas Gain (MCFD)Jobs Completed To Date

    1UXA-4L1-MarW/LGLVC85JobsOilGasSpend ($MM)

    2HZEA-19-MarW/LGLVC2300Jan-022215827183.473

    3LB-4S10-MarW/LGLVCFeb-02156742930.386

    4BHA-6L10-MarSea PupSand C/O, PerfMar-02189912900.791

    5EA-611-MarW/LGLVC5870Apr-02

    6UXA-4S12-MarW/LGLVC80May-02

    7KA-2S12-MarW/LGLVCJun-02

    8EZA-2L18-MarW/LGLVC40800Jul-02

    9BA-7L16-MarSea PupSand C/O, PerfAug-02

    10EQC-3S18-MarW/LGLVC (SI since 99)140700Sep-02

    11EZC-2S20-MarSea PupSand C/O77600Oct-02

    12LA-5ST23-MarSea PupSand C/OProduced Sand After JobNov-02

    13BA-7L21-MarE/LPerfGood Indication After PerfDec-02

    14KB-1S25-MarE/LZone Change554.650

    15LB-6ST26-MarE/LGLVC

    16LB-4ST28-MarW/LGLVCTo DateYr Target

    17KA-2S30-MarW/LGLVC

    18FFB-2S1-MarWLGLVC00SI Wells Back On Line2160

    12392100GL Optimization2980

    Jobs Completed55200

    Spend ($MM)4.718

    Work Outstanding

    1) AVSA ESP's - 7 wells on line at AVSA and AVA (8 at Zulu). Production at Zelda 112 BOPD (7 day moving average).

    2) ZULU ESP's - Decided to defer all ESP work in Zulu. Will perform higher potential workovers.

    3) BIMA Schedule- 3 Workovers in ????, Back Up for Seap Pup Drt Dock

    5) KLX/KLY - Wating on Well Tests after KLXA-1 nad KLYB-1

    6) SEA PUP - Completing Integrity work on KLC. Will move next to BL-9 SCO or KLX/KLY

    7500

    15000

    22500

    30000

    37500

    45000

    52500

    60000

    67500

    75000

    82500

    90000

    2002 Target Cum

    2002 Actual Cum

    BOPD

    2002 Well Work - Oil Rate Projection

    3200

    6400

    9600

    12800

    16000

    19200

    22400

    25600

    28800

    32000

    35200

    38400

    2002 Target Cum

    2002 Actual Cum

    BOEPD

    2002 Well Work - Gas Rate Projection

    2002 West Java Weekly Well Work Update:Date:13-Jan-03

    Oil Rate Adds

    Month2002 Target Cum2002 Actual Cum2002 WETS Actual Monthly Incremental (BOPD)2002 Monthly Incremental By Test (BOPD)

    Jan-02750163920492049

    Feb-0215002618978978

    Mar-02225026180

    Apr-023000

    May-023750

    Jun-024500

    Jul-025250

    Aug-026000

    Sep-026750

    Oct-027500

    Nov-028250

    Dec-029000

    Gas Rate Adds

    Month2002 Target Cum2002 Actual Cum2002 WETS Actual Monthly Incremental (BOPD)2002 Estimate By Test (BOEPD)

    Jan-02320768960960

    Feb-026401224.1206896552456456

    Mar-02960

    Apr-021280

    May-021600

    Jun-021920

    Jul-022240

    Aug-022560

    Sep-022880

    Oct-023200

    Nov-023520

    Dec-023840

    Monthly Job Summary:

    No.WellDateTypeDescriptionOil Gain (BOPD)Gas Gain (MCFD)Jobs Completed To Date

    LB-4ST25-JanEnsco 50S/T4001000JobsOilGasSpend ($MM)

    1ED-3ST1-FebW/LGLVC00Jan-02222049.59603.449

    2FG-52-FebSea PupPerforation-3040Feb-02159784560.401

    3LB-4S6-FebW/LGL Redesign14400Mar-0270

    4FG-3L10-FebSea PupScale C/O43105Apr-02

    5KB-6S13-FebW/LGLVC256160May-02

    6AAC-613-FebW/LSet Pack Off150Jun-02

    7EZA-2L14-FebW/LZone change00Jul-02

    8EQC-3S15-FebW/LWax CO00Aug-02

    9LB-6L16-FebW/LGLVC80700Sep-02

    10KC-415-FebSea PupTbng CleanOct-02

    11KLB-923-FebSea PupSand C/ONov-02

    12KLB-2L18-FebW/LGLVCDec-02

    13BE-620-FebW/LGLVC194

    14BZZA-2L21-FebW/LGLVC

    15BE-7ST24-FebW/LGLVC116

    16LLD-824-FebW/LGLVCBlowing GasTo DateYear Target

    17KLA-1124-FebSea PupScale C/OSI Wells Back On Line1960

    18UXA-1S28-FebW/LGLVC

    12232405GL Optimization2180

    Jobs Completed44200

    Spend ($MM)3.818

    Sea Pup Work Efficiency

    W/L Work Efficiency

    Work Outstanding

    1) AVSA ESP's - 6 wells on line at AVSA and AVA. Two wells remaining to be put BOL at AAC. Monthly avergae production at Zelda 780 BOPD.

    2) ZULU ESP's - Developing forward plan for 10 new ESP wells. Decision on this week.

    3) BIMA Workovers- Budget Issues ($4.2 MM shortfall) - Meeting his PM to discuss

    4) KLX/KLY - Data collection, low reservoir pressures, low draw downs, need to look at dropping WHP, stims may not be effective

    5) SEA PUP - Completed KLYB, KLYA integrity & pressure survey work. On BH-6L for cmt squeeze and reperf

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    2002 Target Cum

    2002 Actual Cum

    BOPD

    2002 Well Work - Oil Rate Projection

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    00

    2002 Target Cum

    2002 Actual Cum

    BOEPD

    2002 Well Work - Gas Rate Projection

    2002 Weekly Well Work Update:Date:13-Jan-03

    Oil Rate Adds

    Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOPD)

    Jan-027502050

    Feb-021500

    Mar-022250

    Apr-023000

    May-023750

    Jun-024500

    Jul-025250

    Aug-026000

    Sep-026750

    Oct-027500

    Nov-028250

    Dec-029000

    Gas Rate Adds

    Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOEPD)

    Jan-02320960

    Feb-02640

    Mar-02960

    Apr-021280

    May-021600

    Jun-021920

    Jul-022240

    Aug-022560

    Sep-022880

    Oct-023200

    Nov-023520

    Dec-023840

    Monthly Job Summary:

    No.WellDateTypeDescriptionOil Gain (BOPD)Gas Gain (MCFD)Jobs Completed To Date

    1KNA-2S16-JanW/LGLVC293JobsOilGasSpend ($MM)

    2MRA-1S12-JanW/LGLVC3271180Jan-02212049.59603.449

    3BE-4W/LGLVC350Feb-02

    4EJ-3S19-JanW/LGLVC105Mar-02

    5LE-5S11-JanW/LGLVC218272Apr-02

    6BG-7ST11-JanSea PupTubing Wash0May-02

    7EQC-4L12-JanW/LZone Change24200Jun-02

    8LNA-313-JanW/LGLVC2930Jul-02

    9BZZA-423-JanW/LZone Change00Aug-02

    10MQ-11L25-JanSea PupGLVC93Sep-02

    11LLB-6S25-JanW/LRecover Fish and Plug7053388Oct-02

    12BZZA-925-JanW/LZone Change0Nov-02

    13BTSA-4LIn ProgE/LAdd Perfs0Dec-02

    14KLA-1114-JanwlZone Change0

    15KKNA-1L20-JanSea PupZone Change137

    16MQ-1L26-JanwlGLVC0

    17EQC-1L37265WLFishing0To DateYear Target

    18BG-3ST37264WLFishing0SI Wells Back On Line1560

    19KB-6SOpsTbg CO142

    20UA-1SOpsChk opt184107GL Optimization880

    21UA-1LOpsChk opt6178

    Total25625325Jobs Completed25200

    Note:AVSA-4Brought on line on Feb 1, 2002. Initial rate 150 BOPD.

    LLD-13L tested over the weekend at 1450 BOPD, Job completed in DecemberSpend ($MM)0.24920??

    Work Outstanding

    Sea Pup Work Efficiency

    1) AVSA ESP's - AVSA - 4 on Line (150 BOPD)

    2) ZULU ESP's - Snubbing scheduled to move to ZUD on Feb 6W/L Work Efficiency

    3) BIMA Workovers- Arrival in 3rd week Feb - FNB-01 (AFE Approved), EQA-7 (AFE Approved), LE-6 (working on AFE Approval)

    4) Geoservice Tank Should will be available by next week - Sea Pup to start Sand C/O jobs.

    000

    000

    000

    000

    000

    000

    000

    000

    000

    000

    000

    000

    2002 Target Cum

    2002 Actual Cum

    2002 Estimate By Test (BOPD)

    BOPD

    2002 Well Work - Oil Rate Projection

    000

    000

    000

    000

    000

    000

    000

    000

    000

    000

    000

    000

    2002 Target Cum

    2002 Actual Cum

    2002 Estimate By Test (BOEPD)

    BOEPD

    2002 Well Work - Gas Rate Projection

    Monthly Job Summary:

    No.WellDateTypeDescriptionOil Gain (BOPD)Gas Gain (MCFD)13BTSA-4LIn ProgE/LAdd Perfs0Job TypeOilGas

    1KNA-2S16-JanW/LGLVC29320UA-1SOpsChk opt184107Rig W/O400100

    2MRA-1S12-JanW/LGLVC327118021UA-1LOpsChk opt6178Choke Opt190285

    3BE-4W/LGLVC350No.WellDateTypeDescriptionOil Gain (BOPD)Gas Gain (MCFD)GL26112712

    4EJ-3S19-JanW/LGLVC10517EQC-1L37265WLFishing0Perforation00

    5LE-5S11-JanW/LGLVC21827218BG-3ST37264WLFishing0Fishing7053388

    6BG-7ST11-JanSea PupTubing Wash03LB-4S6-FebW/LGL Redesign14400W/L Other1500

    7EQC-4L12-JanW/LZone Change242001KNA-2S16-JanW/LGLVC293SCO1420

    8LNA-313-JanW/LGLVC29302MRA-1S12-JanW/LGLVC3271180Zone Change161200

    9BZZA-423-JanW/LZone Change003BE-4W/LGLVC350

    10MQ-11L25-JanSea PupGLVC934EJ-3S19-JanW/LGLVC105

    11LLB-6S25-JanW/LRecover Fish and Plug70533885LE-5S11-JanW/LGLVC218272

    12BZZA-925-JanW/LZone Change08LNA-313-JanW/LGLVC2930

    13BTSA-4LIn ProgE/LAdd Perfs010MQ-11L25-JanSea PupGLVC93

    14KLA-1114-JanwlZone Change016MQ-1L26-JanwlGLVC0

    15KKNA-1L20-JanSea PupZone Change1371ED-3ST1-FebW/LGLVC

    16MQ-1L26-JanwlGLVC05KB-6S13-FebW/LGLVC256160

    17EQC-1L37265WLFishing07LB-6L16-FebW/LGLVC80700

    18BG-3ST37264WLFishing010KLB-2L18-FebW/LGLVC

    19KB-6SOpsTbg CO14211BE-620-FebW/LGLVC194

    20UA-1SOpsChk opt18410712BZZA-2L21-FebW/LGLVC

    21UA-1LOpsChk opt617813BE-7ST24-FebW/LGLVC116

    LB-4ST25-JanEnsco 50S/T400100014LLD-824-FebW/LGLVCBlowing Gas

    1ED-3ST1-FebW/LGLVC16UXA-1S28-FebW/LGLVC

    2FG-52-FebSea PupPerforation1UXA-4L1-MarW/LGLVC

    3LB-4S6-FebW/LGL Redesign144002HZEA-19-MarW/LGLVC

    4FG-3L10-FebSea PupScale C/O3LB-4S10-MarW/LGLVC

    5KB-6S13-FebW/LGLVC2561605EA-610-MarW/LGLVC587

    6AAC-613-FebW/LSet Pack Off1506UXA-4S12-MarW/LGLVC

    7LB-6L16-FebW/LGLVC807007KA-2S12-MarW/LGLVC

    8KC-415-FebSea PupTbng Clean2FG-52-FebSea PupPerforation

    9KLB-923-FebSea PupSand C/O11LLB-6S25-JanW/LRecover Fish and Plug7053388

    10KLB-2L18-FebW/LGLVCLB-4ST25-JanEnsco 50S/T4001000

    11BE-620-FebW/LGLVC1949KLB-923-FebSea PupSand C/O

    12BZZA-2L21-FebW/LGLVC4BHA-6L10-MarSea PupSand C/O, Perf

    13BE-7ST24-FebW/LGLVC1164FG-3L10-FebSea PupScale C/O

    14LLD-824-FebW/LGLVCBlowing Gas15KLA-1124-FebSea PupScale C/O

    15KLA-1124-FebSea PupScale C/O6AAC-613-FebW/LSet Pack Off150

    16UXA-1S28-FebW/LGLVC19KB-6SOpsTbg CO142

    1UXA-4L1-MarW/LGLVC8KC-415-FebSea PupTbng Clean

    2HZEA-19-MarW/LGLVC6BG-7ST11-JanSea PupTubing Wash0

    3LB-4S10-MarW/LGLVC7EQC-4L12-JanW/LZone Change24200

    4BHA-6L10-MarSea PupSand C/O, Perf9BZZA-423-JanW/LZone Change00

    5EA-610-MarW/LGLVC58712BZZA-925-JanW/LZone Change0

    6UXA-4S12-MarW/LGLVC14KLA-1114-JanwlZone Change0

    7KA-2S12-MarW/LGLVC15KKNA-1L20-JanSea PupZone Change137

    00

    00

    00

    00

    00

    00

    00

    00

    Oil

    Gas

    Oil

    0

    0

    0

    0

    0

    0

    0

    0

    Gas

    Gas

    REACTIVATED SI WELLS 2002

    P/FWELLSDESCRIPTIONACTION DATEOIL GAIN (BOPD)GAS GAIN(MCFD)REMARKSORIGINATOR

    PREPOSTPREPOST

    AVSA1AVSA-4ESP Change Out4431476last well test, June 6Kukuh

    2AVSA-3ESP Change Out1301308last well test, June 3Kukuh

    3AVA-2ESP Change Out1005794last well test, June 3Kukuh

    4AVA-3ESP Change Out146-last well test May 5Kukuh

    5AVA-4ESP Change Out127-last well test, Feb 27Kukuh

    W6AVA-6ESP Change Out14-last well test feb 24Kukuh

    E7AAC-6ESP Change Out387-last well test March 25Kukuh

    S8AAC-8ESP Change Out52-last well test May 14Kukuh

    TZULU9ZUA-1Reactivate ESP10913Last well test May 21Kukuh

    10ZUA-3Reactivate ESP---Kukuh

    A11ZUA-7Reactivate ESP21615Last well test May 21Kukuh

    R12ZUA-9Reactivate ESP1915Last well test may 21Kukuh

    E13ZUD-3Reactivate ESP68-Last well test May 6Kukuh

    A14ZUD-6Reactivate ESP1-Last well test March 28Kukuh

    15ZUD-7Reactivate ESP65-Last well test May 7Kukuh

    16ZUD-8Reactivate ESP47-Last well test May 6Kukuh

    17ZUD-9Reactivate ESP17-Last well test May 7Kukuh

    PAPA18PE-9SRocking by productiion1200Robby

    19PB-1Rocking by productiion2300Robby

    MM20MQ-11 LH type change out & GLV redesigncan't be testedRobby

    21MRA-1SGas Lift redesignJan 20023271100Robby&Dudi

    LIMA22LA-5STSand clean outNo tested yetBudhira

    23LLD-13 LAdd perforation13002100Robby O

    24LNA-3Gas Lift Installation293-Robby O

    25LB-6SGas Lift InstallationNo tested yetBudhira

    26LLB-6LFishing toolsJanuary 26,20027052195Dudi D

    KLA27KKNA-1LZone changeFeb-02803400open KK-35A &Anda

    KK-35B

    28KLB-3Gas Lift RedesignApr-0277500Anda

    P/FWELLSDESCRIPTIONACTION DATEOIL GAINGAS GAINREMARKSORIGINATOR

    PREPOSTPREPOST

    BRAVOnone

    UNIFORM29UXA-4Sshut in since 1996, and reactivated28-Mar-02255312Erwin D

    through gas lift redesign

    E30UXA-4Lshut in since 1996, and reactivated through gas lift redesign28-Mar-0273Could not be optimum, fish LIH (broken old GLV)Erwin D

    31UA-3LZNC under monitoring for GLVR7-Jun-0246681Erwin D

    TKILO32KB-1SShut in since 1996,due to high waterApr 27, 2002100Sari

    cut (ZNC program)

    A33KB-6SGas Lift RedesignJan 19, 2002136237Sari

    R

    EECHO34EZA-2LGas Lift Inst20-Mar-02100 BOPD-High water cutAgus S

    A35EZC-2SSand & scale clean out by CTU18-Mar-02113 BOPD199Shut in May 27,2002,suspected GLV mulfunctionAgus S

    36EQC-1LFishing still left in hole -set F collar4-May-0278266Herry S

    stop & BOL

    37EQC-3SWL wax CO & GLVR18-Mar-02140700SRP June 28, 1999Herry S

    FOXTROT38FNB-1Workover to produce gas above top24-Mar-025200Eko

    packer

    39FZA-2GLV Inst after there is a gas source21-Apr-02Eko

    from FZA-1S

    40FZA-1LPerforation new zone; gas flow w/29-Apr-02The well is shutEko

    700 psi FTPin,waiting on

    tubing pack off

    TOTAL665518612