Gas Lift Optimization at BP-IndonesiaDual String Gas Lift WellWith Injection Pressure Operated ValveBy: Gatut WidianokoWeatherford Artificial Lift Systems
-
Abstract North West Java Oil (NWJO) field located offshore Indonesia is operated by BP. This mature oil field (discovered during 1970s) has approximately 950 wells, and ninety percent (90%) are produced with dual gas lift systems. In thirty (30) years of production, the reservoir pressure has decline to an average between 500 600 psig at the mid-perforation depth (ranging from 3000 - 4000 ft TVD). Discharge pressure of lift gas is 680 psig at compressor station(s).
In June 2001, BP-Indonesia management made a decision to focus on optimizing their gas lift wells. After significant discussion, it was decided to take a non-conventional approach with respect to gas lifting dual wells by using Injection Pressure Operated valves (IPOs).
Process Overview: create effective optimization organization design of dual gas lift utilizing IPO valves experiences and solutions for eliminating gas robbing.
-
Offshore Northwest Java Oil Field
-
Steps in Gas Lift OptimizationBP Management - focus on gas lift optimization90% of wells produced by dual gas lift Optimization Team selectedTeam reviews in-house (limited) gas lift expertise; decision made to contract gas lift services from Weatherford; GL engineer visits Jakarta office and NWJO field facilitiesOptimization Team reviews report; proposals submitted Weatherford; further discussions held regarding projectOptimization Team contracts three (3) positions for implementation of NWJO project for 6 month period (including clause for additional 6 month extension)Objectives determined and proper means of tracking or trending established; workable reportsResults of optimization reviewed weekly and monthly
-
Identify problem wells or common well problemsImproving oil production rateOptimizing gas injection Reviewing well performance Maximize overall potentialStabilize oil production and gas injectionGas Lift Optimization Team Objectives
-
Contracted Job TitlesOFFICE JOB Gas Lift EngineerGathering reservoir & production dataReviewing gas lift performance & current GL designGenerating recommendationsWORKSHOP JOB GLV TechnicianCalibration and repair all gas lift equipmentManage gas lift equipment inventory & inventory reportsFIELD JOB Gas Lift SpecialistInstalling, tuning & troubleshooting GL wellsTraining company field operators (personnel)Coordinate gas lift activities with field supervisor
-
Type of Recommendations
-
Number of Wells Reviewed Monthly
-
Oil Gain Contribution by FieldTotal oil gain = 3559 bopd
-
Well Case HistoryThree-Pen Static Pressure RecorderDaily Production RecordFlowing and Static Pressure SurveyFlowing and Static Temperature SurveyEcho Meter SurveyWell File (Drilling, Well Schematic)Latest GLV Design ReportSetting Pressure ReportWire Line Job ReportDiagnostic ToolsTo optimize gas dual lift well, complete information is required:
-
Well Review by TeamOld Oil Field with more than 30 years oldHigh FGOR with 1000 : 1 or moreLow PI with only about 1 3 blpd / psiLow Production with about 200 - 500 blpdLow Static Pressure with average ~ 600 psiLimited Casing Pressure with ~ 600 psi onlyFlowing Tubing Pressure is about 180 psiShallow well - reservoir depth ~ 3000 ft TVDLimited data (SBHP and PI is normally unknown)Old wells - may have leaking valve or tubingSome gas lift valves installed 5-10 years ago
-
Dual Gas Lift Design Lessons LearnedEnough Kick Off (KO) and Operating (OP) Pressure to reach deepest point of injection is requiredDifferential pressure between KO and OP is ~10% of casing pressure, (or at least 50psi) to cover all unloading valves of both strings are closed when surface casing pressure is set at OPUse graphical method to select best point of injection of both strings and best draw down (200-300 psi) of both stringsCalculate by computer setting pressure Ptro; select best port sizes and gas injection rate required All pressure settings (Ptro) of unloading valves for both strings must be selected according to surface closing pressureSurface closing pressure of both strings must be at least 20 psi above OP, and 10 psi less than KOAvoid gas robbing - depth point of injection of both strings must be close or equal; same thing in port size
-
UXA-4S/L Well SchematicREDESIGN WELLSince mandrels were installed in well, optimization on this will be done by redesign.
Main job is how to determine best point of injection of both strings for optimum drawdown and to avoiding robbing.
To perform this job, gatheringcomplete information of both strings is required.
Since SBHP data is old enough, and to ensure static pressure therefore SBHP survey is required to be performed.
-
UXA 4S/L Data
Data DescriptionUXA 4SUXA 4LSBHP1200 psi*1200 psiPI (Predicted)2 3 2 3W / C87 %85 %CHP650 psi650 psiFTP200 psi200 psiFGOR1300 : 11500 : 1B t m Temp.170 F178 FSurf. Temp100 F100 FC s g Size9 5/8 9 5/8T b g Size2 7/82 7/8
-
Graphical Method0500100010001500200030004000DEPTH
Ft
TVDPRESSURE (psi)FTPCHP1200 p s iCasing PressureUXA 4LMid PerforationTubing Pressure #1#2#3#70.45 p s i / ft0.1 p s I / ftFLFBHP
-
Existing Valve Installed
SPM #U X A 4SU X A 4L1DummyDummy2G l v, 1/8, 615 #G l v, 1/8, 620 #3G l v, 1/8, 600 #G l v, 3/16, 635 #4G l v, 3/16, 615 #S/O, 3/165G l v, 3/16, 600 #Dummy6G l v, 3/16, 590 #Dummy7S/O, 3/16Dummy
-
Computer Program Results (UXA 4L) NOTE: Third mandrel is designed with S/O, but existing #3 valve can not be pulled out, therefore #2 valve is opening and set with Ptro = 300 psi
SPM #VALVEPORTPTROPCS1GLV1/85956462GLV1/8300OPEN3S/ONANA4DNANANA5DNANANA6DNANANA7DNANANA
-
Computer Program Results (UXA 4S)
SPM #VALVEPORTPTROPCS1GLV1/85956462GLV1/85906423S/O3/16NANA4DNANANA5DNANANA6DNANANA7DNANANA
-
Gain Results After Gas Lift RedesignGas lift valves were calibrated in workshop, then installed; unloading of tubing strings was done with at least 650 psi as KO. After well unloaded, then gas injection rate was adjusted to maintain surface casing pressure at 640 psi, or OP. Following chart summarizes results after gas lift optimization: OPERATING PRESSURE: 640 psi
UXA 4SBEFORE GL OPTIMIZATION( March 1996 )AFTER GL OPTIMIZATION( March 2002 )FLUID RATE413 BLPD1037 BLPDOIL RATE79 BOPD255 BOPDGAS IN864 MSCFD250 MSCFDGAS OUT2448 MSCFD550 MSCFD
-
Gain Results After Gas Lift RedesignWell had been shut in since March 1996, and back on line March 2002 after gas lift redesign.OPERATING PRESSURE: 640 psi
UXA 4LBEFORE GL OPTIMIZATION(March 1996 )AFTER GL OPTIMIZATION (March 2002 )FLUID RATE670 BLPD1751 BLPDOIL RATE97 BOPD122 BOPDGAS IN621 MSCFD120 MSCFDGAS OUT748 MSCFD186 MSCFD
-
UXA Platform Results After GL Optimization (March 2002)
Chart1
176672
175668
174662
213712
265766
273820
264782
276824
263780
258764
264784
338763
456775
460783
456783
471799
377615
345609
00
00
2272
239879
257931
2471052
2501086
4701573
8131597
8051581
6851576
8051573
8991907
10032349
10022351
10012203
9782240
8411670
8431584
8651581
8361602
7642177
7202183
7632201
6182181
6742194
6772199
6752186
6642127
6322056
6302050
6082125
6682076
6722105
6442142
6792164
6972215
6992158
Start GL OPtimization
BOPD
MCFD
Date
Production
UXA P/F Production Profile
Sheet1
Atlantic Richfield Indonesia Inc.Date:13-MAY-2002 Page:1
DAILYPRODUCTION REPORT
FLOWSTATDATEP/FOILWATERFLUIDGASZONEZONE AVE-BSW LOST- API
(BOPD)(BWPD) (BFPD)(MCFD)PRODSI% PRODUC GRAV
UNIFORM1-Mar-02UXA17675192767224810030028-Mar-02
2-Mar-02UXA17574592066824810030028-Mar-02
3-Mar-02UXA17474191566224810030028-Mar-02
4-Mar-02UXA213907112071233810030028-Mar-02
5-Mar-02UXA2651129139476633810030028-Mar-02
6-Mar-02UXA2731163143682033810030028-Mar-02
7-Mar-02UXA2641128139278233810030028-Mar-02
8-Mar-02UXA2761175145082433810030028-Mar-02
9-Mar-02UXA2631121138478033810030028-Mar-02
10-Mar-02UXA2581102136076433810030028-Mar-02
11-Mar-02UXA2641128139278433810030028-Mar-02
12-Mar-02UXA338718105676342680030028-Mar-02
13-Mar-02UXA456968142477542680030028-Mar-02
14-Mar-02UXA460977143778342680030028-Mar-02
15-Mar-02UXA456969142578342680030028-Mar-02
16-Mar-02UXA4711001147279942680030028-Mar-02
17-Mar-02UXA377801117861533680030028-Mar-02
18-Mar-02UXA345734107960942680030028-Mar-02
20-Mar-02UXA00000600030028-Mar-02
21-Mar-02UXA00000600030028-Mar-02
22-Mar-02UXA2246687224680030028-Mar-02
24-Mar-02UXA23971695587933750030028-Mar-02
25-Mar-02UXA2571027128493133800030028-Mar-02
26-Mar-02UXA24710541301105233810030028-Mar-02
27-Mar-02UXA25010681318108633810030028-Mar-02
28-Mar-02UXA47018782348157342800030028-Mar-02
29-Mar-02UXA81332544067159742800030028-Mar-02
30-Mar-02UXA80532224027158142800030028-Mar-02
31-Mar-02UXA68533424027157642830030028-Mar-02
1-Apr-02UXA80532184023157342800030028-Mar-02
2-Apr-02UXA89935984497190752800030028-Mar-02
3-Apr-02UXA100340105013234952800030028-Mar-02
4-Apr-02UXA100240095011235152800030028-Mar-02
5-Apr-02UXA100140065007220352800030028-Mar-02
11-Apr-02UXA97830984076224052760030028-Mar-02
12-Apr-02UXA84126653506167043760030028-Mar-02
15-Apr-02UXA84326693512158443760030028-Mar-02
16-Apr-02UXA86528973762158152770030028-Mar-02
19-Apr-02UXA83629633799160252780030028-Mar-02
26-Apr-02UXA76430563820217752800030028-Mar-02
27-Apr-02UXA72028823602218352800030028-Mar-02
28-Apr-02UXA76330513814220152800030028-Mar-02
29-Apr-02UXA61824703088218152800030028-Mar-02
30-Apr-02UXA67426973371219433800030028-Mar-02
1-May-02UXA67727063383219933800030028-Mar-02
2-May-02UXA67527013376218633800030028-Mar-02
3-May-02UXA66426553319212733800030028-Mar-02
4-May-02UXA63225273159205643800030028-Mar-02
5-May-02UXA63025213151205033800030028-Mar-02
6-May-02UXA60825933201212533810030028-Mar-02
7-May-02UXA66825143182207633790030028-Mar-02
8-May-02UXA67225293201210552790030028-Mar-02
9-May-02UXA64425763220214252800030028-Mar-02
10-May-02UXA67925563235216452790030028-Mar-02
11-May-02UXA69726203317221552790030028-Mar-02
12-May-02UXA69926293328215833790030028-Mar-02
Erwin DD:first execution (UXA-4L put BOL after shut in since 1996)
Erwin DD:UXA-UWA 12" MOL leak
Sheet2
244.9166666667749.75427.5694.8235294118
Sheet3
-
Total Oil Gains After Well Work at BP-Indonesia NOTE: Gas lift is the biggest contributor (70%) of the well work jobs, which resulted in oil gain at NWJO; BP-Indonesia
Chart1
7501568
15002475
22503403
30004308
37505238
45006207
52507101
60007173
67508038
75008781
825037562
900037592
2002 Target Cum
2002 Actual Cum
BOPD
2002 Well Work - Oil Rate Projection
Dec-02
2002 West Java Weekly Well Work Update:Date:13-Jan-03
Oil Rate Adds
Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOPD)
Jan-027501568Actuals
Feb-0215002475Actuals
Mar-0222503403Actuals
Apr-0230004308Actuals
May-0237505238Actuals
Jun-0245006207Actuals
Jul-0252507101Actuals
Aug-0260007173Actuals
Sep-0267507559Actuals
Oct-0275008781Estimate
Nov-028250101031322
Dec-029000
48755811
Gas Rate Adds
Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOEPD)
Jan-02320708Actuals
Feb-026401076Actuals
Mar-029601973Actuals
Apr-0212802513Actuals
May-0216003305Actuals
Jun-0219206910Actuals
Jul-0222407634Actuals
Aug-0225608110Actuals
Sep-02288014186Actuals
Oct-02320014186Estimate
Nov-02352014520334
Dec-023840
2080
Monthly Job Summary:
No.WellEnd DateTypeDesriptionOil Gain (BOPD)Gas Gain (MCFD)Jobs Completed To Date
1FNB-21-DecWLGL Pack Off InstJobsGLVCOilGasSpend
2LLB-1L10-DecWLDiagnostic & ZNCJan-022281582718$3.473
3LLD-214-DecSeapupStimulation/ChemicalFeb-021510674293$0.386
4LLD-317-DecSeapupMatrix-acidizingMar-021811882353$0.791
5LLD-417-DecSeapupMatrix-acidizingApr-022010856757$1.011
6LD-222-DecWLPack Off instMay-02155668274$0.262
7FNB-222-DecWLGL Pack Off InstJun-02218119536399$0.879
8LLD-223-DecSeapupStimulation/ChemicalJul-021374729149$0.133
9LLD-822-DecSeapupwellbore clean outAug-021937586650$0.380
10UB-6S23-DecWLGLV InstSep-02329130030314$0.720
11LLD-527-DecSeapupAdd perfOct-0219632016888$0.284
12Nov-0218813221762$0.516
13Dec-02
142128510028.9103557$8.835
15
16To Date
17SI Wells Back On Line40
18
19GL Optimization85
20
21
22Jobs Completed212
23
24
Spend ($MM)8.8
00
Postponed job :
1LLA-3SGas Lift Inst14-DecPostponed
2
3
4
5
6
Dec-02
7501568
15002475
22503403
30004308
37505238
45006207
52507101
60007173
67508038
75008781
825037562
900037592
2002 Target Cum
2002 Actual Cum
BOPD
2002 Well Work - Oil Rate Projection
Nov-02
320708
6401076
9601973
12802513
16003305
19206910
22407634
25608110
288014186
320017423.4137931034
352037562
384037592
2002 Target Cum
2002 Actual Cum
BOEPD
2002 Well Work - Gas Rate Projection
Oct-02
2002 West Java Weekly Well Work Update:Date:13-Jan-03
Oil Rate Adds
Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOPD)
Jan-027501568Actuals
Feb-0215002475Actuals
Mar-0222503403Actuals
Apr-0230004308Actuals
May-0237505238Actuals
Jun-0245006207Actuals
Jul-0252507101Actuals
Aug-0260007173Actuals
Sep-0267507559Actuals
Oct-0275008781Estimate
Nov-028250101031322
Dec-029000
48755811
Gas Rate Adds
Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOEPD)
Jan-02320708Actuals
Feb-026401076Actuals
Mar-029601973Actuals
Apr-0212802513Actuals
May-0216003305Actuals
Jun-0219206910Actuals
Jul-0222407634Actuals
Aug-0225608110Actuals
Sep-02288014186Actuals
Oct-02320014186Estimate
Nov-02352014520334
Dec-023840
2080
Monthly Job Summary:
No.WellEnd DateTypeDesriptionOil Gain (BOPD)Gas Gain (MCFD)Jobs Completed To Date
1MRA-1L2-NovWLGLV Redesign194171JobsGLVCOilGasSpend
2BL-7L2-NovWLZNC0Jan-022281582718$3.473
3MRA-2S3-NovWLGLV Redesign25598Feb-021510674293$0.386
4LB-4ST7-NovSea PupStim3101076Mar-021811882353$0.791
5LB-5L17-NovSea PupC/O Perf(unsuccess)Apr-022010856757$1.011
6FG-58-NovWLGLV Redesign87May-02155668274$0.262
7LB-3ST11-NovSeapupAdd Perf.476417Jun-02218119536399$0.879
8BNA-2L15-NovWLGLV RedesignJul-021374729149$0.133
9LESA-118-NovSeapupPerforationAug-021937586650$0.380
10BH-2L20-NovWLZNC openSep-02329130030314$0.720
11BH-4L22-NovWLGLV InstOct-0219632016888$0.284
12EA-3L23-NovWLZNCNov-0218813221762$0.516
13LESA-324-NovSeapupStimulationDec-02
14UA-4S25-NovWLGLV Inst2128510028.9103557$8.835
15LB-6STL27-NovWLGLV Inst
16EA-1L28-NovWLPack off InstTo Date
17BF-1S28-NovWLpre cement packer perfSI Wells Back On Line40
18LB-5L30-NovWLGLV Inst
19GL Optimization85
20
21
22Jobs Completed212
23
24
Spend ($MM)8.8
13221762
Postponed job :
1FU-2L1-NovZNCpostponed
2FU-2S5-NovTubing pack Off Instpostponed
3BL-7L15-NovGLV Redesignpostponed
4
5
6
7
8
Oct-02
7501568
15002475
22503403
30004308
37505238
45006207
52507101
60007173
67508038
75008781
825037562
900037592
2002 Target Cum
2002 Actual Cum
BOPD
2002 Well Work - Oil Rate Projection
Sept -02
320708
6401076
9601973
12802513
16003305
19206910
22407634
25608110
288014186
320017423.4137931034
352037562
384037592
2002 Target Cum
2002 Actual Cum
BOEPD
2002 Well Work - Gas Rate Projection
Aug-02
2002 West Java Weekly Well Work Update:Date:13-Jan-03
Oil Rate Adds
Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOPD)
Jan-027501568Actuals
Feb-0215002475Actuals
Mar-0222503403Actuals
Apr-0230004308Actuals
May-0237505238Actuals
Jun-0245006207Actuals
Jul-0252507101Actuals
Aug-0260007173Actuals
Sep-0267508038Actuals
Oct-0275008781743
Nov-028250
Dec-029000
48755429
Gas Rate Adds
Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOEPD)
Jan-02320708Actuals
Feb-026401076Actuals
Mar-029601973Actuals
Apr-0212802513Actuals
May-0216003305Actuals
Jun-0219206910Actuals
Jul-0222407634Actuals
Aug-0225608110Actuals
Sep-02288014186Actuals
Oct-023200174233237Estimate
Nov-023520
Dec-023840
2080
Monthly Job Summary:
No.WellEnd DateTypeDesriptionOil Gain (BOPD)Gas Gain (MCFD)Jobs Completed To Date
1KLYA-31-OctSeapupAdd Perforations4670JobsGLVCOilGasSpend
2EQD-1S3-OctWLGLV RedesignJan-022281582718$3.473
3YA-24-OctSeapupStimulation -chemical1500Feb-021510674293$0.386
4MQ-11S6-OctWLGLV Redesign100Mar-021811882353$0.791
5LLF-27-OctSeapupPerforation and Zonal Isolation8500Apr-022010856757$1.011
6ZUF-913-OctWLGL Pack Off InstMay-02155668274$0.262
7AVSA-819-OctWLSet Mod H TypeJun-02218119536399$0.879
8FU-2S20-OctWLZNCJul-021374729149$0.133
9BTSA-3LWLGLV RedesignCancelledAug-021937586650$0.380
10LE-412-OctWLZNCSep-02329122228650$0.720
Oct-0219674317070$0.284
11EZB-3L20-OctWLGLV RedesignCancelledNov-02
12ZUG-622-OctCT BoatN2 Unloading00Dec-02
13FU-2LWLZNC194779051.9100313$8.035
14BQA-2L21-OctWLGLV Inst120
15BQA-129-OctGLV Inst50To Date
16EE-3S23-OctWLGLV InstSI Wells Back On Line40
17LE-430-OctWLGLV Inst253182
18EQC-2LWLZNCGL Optimization77
19PB-130-OctWLZNC2202218
21
22Jobs Completed194
23
24
Spend ($MM)8.0
74317070
Postponed job :
1BH-2L1-OctZNC
2FFB-2L4-OctGLV Redesign
3BTSA-3L12-OctGLV Inst
4AVSA-816-OctInstall CS H Type WLRSSSV
5EC-1S16-OctPre squeeze Off & Perf
6BQA-2L17-OctGLV Redesign
7FNB-217-OctTIT & Tubing Pack Off
8EC-1S17-OctPre squeeze Off & Perf
9
Aug-02
7500
15000
22500
30000
37500
45000
52500
60000
67500
75000
82500
90000
2002 Target Cum
2002 Actual Cum
BOPD
2002 Well Work - Oil Rate Projection
July-02
3200
6400
9600
12800
16000
19200
22400
25600
28800
32000
35200
38400
2002 Target Cum
2002 Actual Cum
BOEPD
2002 Well Work - Gas Rate Projection
June-02
2002 West Java Weekly Well Work Update:Date:13-Jan-03
Oil Rate Adds
Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOPD)
Jan-027501568Actuals
Feb-0215002357Actuals
Mar-0222503405Actuals
Apr-0230004517Actuals
May-0237505291Actuals
Jun-0245006392Actuals
Jul-0252506696Actuals
Aug-0260006738Actuals
Sep-02675080381300Estimate
Oct-027500
Nov-028250
Dec-029000
4875
Gas Rate Adds
Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOEPD)
Jan-02320708Actuals
Feb-026401103Actuals
Mar-029601964Actuals
Apr-0212802538Actuals
May-0216003263Actuals
Jun-0219207046Actuals
Jul-0222407945Actuals
Aug-0225608437Actuals
Sep-022880141865749Estimate
Oct-023200
Nov-023520
Dec-023840
2080
Monthly Job Summary:
No.WellEnd DateTypeDesriptionOil Gain (BOPD)Gas Gain (MCFD)Jobs Completed To Date
1LLB-3S1-SepChoke Adj357JobsGLVCOilGasSpend
2EB-6L3-SepWLSSSV RepJan-022281582718$3.473
3LB-6ST5-SepWLGLVCFeb-021510674293$0.386
4ZUC-35-SepCT/boatCT/Stim190650Mar-021811882353$0.791
5ZUC-68-SepCT/boatCT/Stim224Apr-022010856757$1.011
6EQA-3S8-SepWLGLV0700May-02155668274$0.262
7EQA-5S12-SepWLGLV Redesign0500Jun-02218119536399$0.879
8BM-313-SepWLGLV198Jul-021374729149$0.133
9ZUG-216-SepCT/boatCT/StimAug-021937586650$0.380
10KLXA-319-SepSea PupPerf/Stim-1093Sep-02329130030314$0.720
11KLXA-220-SepSea PupPerf/Stim-1359Oct-02
12LB-121-SepWLGLV63Nov-02
13EQC-2L22-SepWLZone ChangeDec-02
14EA-5L23-SepCT/boatFill C/O175718386.984907$8.04
15EA-5S21-MayCT/boatScale C/O
16KLYB-121-SepSea PupPerf/Stim-528To Date
17KLXB-125-SepSea PupPerf/Stim7536SI Wells Back On Line40
18KLXB-226-SepSea PupPerf/Stim4704
19KLXB-327-SepSea PupPerf/Stim7392GL Optimization71
20KLYA-330-SepSea PupPerf/Stim6574
21EA-1L29-SepCT/boatFill C/OInjector
22BH-4S28-SepWLGLV100Jobs Completed175
23BL-5S29-SepWLGLV90
24EQA-3L30-SepWLGLV
25EQA-1S16-SepWLZNC78
26EZB-3L20-SepWLGLV Redesign
27ZUF-924-SepWLTubing punch
28ZUG-625-SepWLTubing clearance & Tag F/L
29AAC-418-SepWLZNC
30EQD-1L13-SepWLZNC
31LE-424-SepWLZNC
32KLYA-230-SepSea PupPerf/Stimulation5238
130030314Spend ($MM)8.0
Postponed job :
1AAC-47-SepWLZNC
2EQD-1L13-SepWLZNC
3EZB-3L20-SepWLGLV redesign
4EZC-4L24-SepWLSBHP & ZNC
5LE-424-SepWLDiagnostic & ZNC
June-02
7500
15000
22500
30000
37500
45000
52500
60000
67500
75000
82500
90000
2002 Target Cum
2002 Actual Cum
BOPD
2002 Well Work - Oil Rate Projection
May-02
3200
6400
9600
12800
16000
19200
22400
25600
28800
32000
35200
38400
2002 Target Cum
2002 Actual Cum
BOEPD
2002 Well Work - Gas Rate Projection
Apr-02
2002 West Java Weekly Well Work Update:Date:13-Jan-03
Oil Rate Adds
Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOPD)
Jan-027501568Actuals
Feb-0215002357Actuals
Mar-0222503405Actuals
Apr-0230004517Actuals
May-0237505291Actuals
Jun-0245006392Actuals
Jul-0252506696Actuals
Aug-026000
Sep-026750
Oct-027500
Nov-028250
Dec-029000
4875
Gas Rate Adds
Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOEPD)
Jan-02320708Actuals
Feb-026401103Actuals
Mar-029601964Actuals
Apr-0212802538Actuals
May-0216003263Actuals
Jun-0219207046Actuals
Jul-0222407945Actuals
Aug-022560
Sep-022880
Oct-023200
Nov-023520
Dec-023840
2080
Monthly Job Summary:
No.WellEnd DateTypeDesriptionOil Gain (BOPD)Gas Gain (MCFD)Jobs Completed To Date
1LD-42-AugWLGLVCest50JobsGLVCOilGasSpend ($MM)
2KA-4ST3-AugWLZNCJan-0222815827183.473
3BZZA-98-AugWLZNCblowing gas indicationFeb-0215106742930.386
4EZB-3L7-AugWLZNC15Mar-0218118823530.791
5KA-3ST11-AugWLZNCApr-0220108567571.011
6ETA-3L18-AugWLGLVC00May-021556682740.262
7ZUF-1011-AugCT/BoatStim00Jun-022181195363990.879
8ZUF-118-AugCT/BoatStim222500Jul-0213747291490.133
9ZUF-95-AugCT/BoatStim00Aug-0219375866500.380
10ZUF-322-AugCT/BoatStim112500Sep-02
11ZUC-525-AugCT/BoatStimOct-02
12LD-6L18-AugWLPull out plugest70Nov-02
13LLD-511-AugWLSSCSV replct.est3501650Dec-02
14LD-227-AugWLPack off instest100143627086.9545937.3153
15ETA-1L14-AugWLSSCSV200
16EZC-526-AugWLGLVR1200To DateYr Target
17EQB-3Lin progWLGLVR250SI Wells Back On Line4060
18KLB-729-AugWLZNC & Pre perforation
19ZUC-131-AugCT/BoatStimulationGL Optimization6280
20
21
Jobs Completed143200
10086650Spend ($MM)7.318
Postponed job :
1
2
3
4
5
Apr-02
7501568
15002357
22503405
30004517
37505291
45006392
52506696
600037470
675037501
750037531
825037562
900037592
2002 Target Cum
2002 Actual Cum
BOPD
2002 Well Work - Oil Rate Projection
Mar-02
320708
6401103
9601964
12802538
16003263
19207046
22407945
256037470
288037501
320037531
352037562
384037592
2002 Target Cum
2002 Actual Cum
BOEPD
2002 Well Work - Gas Rate Projection
Feb-02
2002 West Java Weekly Well Work Update:Date:13-Jan-03
Oil Rate Adds
Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOPD)
Jan-027501568Actuals
Feb-0215002357Actuals
Mar-0222503405Actuals
Apr-0230004517Actuals
May-0237505291Actuals
Jun-0245006392Actuals
Jul-0252506696Actuals
Aug-026000
Sep-026750
Oct-027500
Nov-028250
Dec-029000
4875
Gas Rate Adds
Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOEPD)
Jan-02320708Actuals
Feb-026401103Actuals
Mar-029601964Actuals
Apr-0212802538Actuals
May-0216003263Actuals
Jun-0219207046Actuals
Jul-0222407945Actuals
Aug-022560
Sep-022880
Oct-023200
Nov-023520
Dec-023840
2080
Monthly Job Summary:
No.WellEnd DateTypeDesriptionOil Gain (BOPD)Gas Gain (MCFD)Jobs Completed To Date
1KLYB-21-JulSeapupAcid5000JobsGLVCOilGasSpend ($MM)
2LE-4S3-JulWLGLVCJan-0222815827183.473
3KKNA-24-JulSeapupH type903200Feb-0215106742930.386
4LB-6STS6-JulWLGLVCMar-0218118823530.791
5EQA-99-JulWLZNC400Apr-0220108567571.011
6FK-1L9-JulWLTubing pack off322449May-021556682740.262
7ZUF-314-JulWLPerf/AcidizingJun-022181301378990.879
8KLA-1415-JulWLGLVCJul-0216747291490.133
9BG-6L22-JulWLGLVC60500Aug-02
10EJ-528-JulWLZNC50Sep-02
11KLA-328-JulWLGLVCOct-02
12KA-2L29-JulWLGLVC219Nov-02
13KLA-830-JulWLGLVCDec-02
14EJ-2S26-JulWLSBHP & ZNC127596434.9494436.9353
15EQA-3L8-JulWLZNC00
16EZE-52-JulWLGas in Tuning100300To DateYr Target
17SI Wells Back On Line4060
18
19GL Optimization5980
20
21
Jobs Completed127200
8819449Spend ($MM)6.918
Postponed job :
1BZZA-917-JulWLZNC,postponed,
2FNB-422-JulWLPack off inst, postponed,after leaking point could not be found yet
3FZA-316-JulWLsand/gun debris bailing, postponed after complete bailing about 100 ltr of sand
4
5
Feb-02
7501568
15002357
22503405
30004517
37505291
45006392
52506696
600037470
675037501
750037531
825037562
900037592
2002 Target Cum
2002 Actual Cum
BOPD
2002 Well Work - Oil Rate Projection
Jan-02
320708
6401103
9601964
12802538
16003263
19207046
22407945
256037470
288037501
320037531
352037562
384037592
2002 Target Cum
2002 Actual Cum
BOEPD
2002 Well Work - Gas Rate Projection
Job Summary
2002 West Java Weekly Well Work Update:Date:13-Jan-03
Oil Rate Adds
Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOPD)
Jan-027501568Actuals
Feb-0215002357Actuals
Mar-0222503405Actuals
Apr-0230004517Actuals
May-0237505291Actuals
Jun-0245006392Actuals
Jul-0252506696Actuals
Aug-026000
Sep-026750
Oct-027500
Nov-028250
Dec-029000
4875
Gas Rate Adds
Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOEPD)
Jan-02320708Actuals
Feb-026401103Actuals
Mar-029601964Actuals
Apr-0212802538Actuals
May-0216003263Actuals
Jun-0219207046Actuals
Jul-0222407945Actuals
Aug-022560
Sep-022880
Oct-023200
Nov-023520
Dec-023840
2080
Monthly Job Summary:
No.WellEnd DateTypeDesriptionOil Gain (BOPD)Gas Gain (MCFD)Jobs Completed To Date
1KLB-931-MayWLZNC01000JobsGLVCOilGasSpend ($MM)
2EQA-4L31-MayWLZNC (candidate for cement packer)00Jan-0222815827183.473
3UYA-4S3-JunChokeChoke2412555Feb-0215106742930.386
4MRA-1L6-JunWLGLVC2260Mar-0218118823530.791
5UA-3L7-JunWLZNC46681Apr-0220108567571.011
6KKNA-1L8-JunChokeChoke1501400
7LE-5L10-JunWLGLVC00May-021556682740.262
8LD-2WLPack/Off00Jun-02218130137899
9BE-311-JunWLGLVC500Jul-02
10BQA-2S11-JunSea PupAcidizing01200Aug-02
11EJ-112-JunWLGLVC (still increase gradually)60Sep-02
12FNA-112-JunWLPoroplus (estimated 50% of exp. Gain)50500Oct-02
13KLXA-112-JunSea PupAcid10000Nov-02
14EQA-714-JunBimaW/O (Proposed MPLT w/o execution)00Dec-02
15HZEA-416-JunW/LGLVC482263111525962.9402945.923
16LESA-216-JunSea PupPerforation20000
17BL-95-JunWLGLV redesign00To DateYr Target
18AVA-8ST20-JunWLZNC00SI Wells Back On Line4060
19EQC-2L2-JunWLZNC0300
20EQA-725-JunWLGLV Inst (part of EQA-07 WO)GL Optimization5280
21BE-6L28-JunWLGLV inst500
Jobs Completed111200
130137899
Postponed job :Spend ($MM)5.918
1EQC-2SFishing
2UA-3LGLV Redesign
3AAC-4ZNC
4EZC-2SGLV redesign,due to the sand problem
5FZA-1LTubing pack off, postponed, problem with rubber element
Job Summary
7500
15000
22500
30000
37500
45000
52500
60000
67500
75000
82500
90000
2002 Target Cum
2002 Actual Cum
BOPD
2002 Well Work - Oil Rate Projection
Re-Activated
3200
6400
9600
12800
16000
19200
22400
25600
28800
32000
35200
38400
2002 Target Cum
2002 Actual Cum
BOEPD
2002 Well Work - Gas Rate Projection
2002 West Java Weekly Well Work Update:Date:13-Jan-03
Oil Rate Adds
Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOPD)
Jan-027501582Actuals
Feb-0215002193Actuals
Mar-0222503000Actuals
Apr-0230003480Actuals
May-0237504206726
Jun-024500
Jul-025250
Aug-026000
Sep-026750
Oct-027500
Nov-028250
Dec-029000
4875
Gas Rate Adds
Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOEPD)
Jan-02320718Actuals
Feb-026401108Actuals
Mar-029602024Actuals
Apr-0212802520Actuals
May-0216002794274
Jun-021920
Jul-022240
Aug-022560
Sep-022880
Oct-023200
Nov-023520
Dec-023840
2080
Monthly Job Summary:
No.WellEnd DateTypeDescriptionOil Gain (BOPD)Gas Gain (MCFD)Jobs Completed To Date
1EJ-11-MayOpsgas in tuning00JobsGLVCOilGasSpend ($MM)
2EJ-3S1-MayOpsGas in TuningJan-0222815827183.473
3EQC-1L4-MayWLFishing78266Feb-0215106742930.386
4FZA-1S9-MaySea PupCmt Packer & Perf1500 (est)Mar-0218118823530.791
5LD-210-MayW/LGLV Installation,completed,still blowing gasApr-0220108567571.011
6BZZA-911-MayW/LGLV InstallationMay-02115726274
7KLC-312-MaySea PupStart up procedureJun-02
8BQA-116-MayW/LGLV inst50Jul-02
9LB-4L17-MayWLGLV inst590997Aug-02
10EJ-518-MaySea PupTbg Co (sand)250Sep-02
11EQA-1L20-MayWLZone change (Still SI for Bima Rig EQA-07 WO)Oct-02
12BQA-2L20-MayWLGLV instNov-02
13EJ-3S21-MayWLZone change470Dec-02
14UXA-1L22-MayWLStraddle tool inst7886405.661
15LB-6L28-MayOpsGas lift tuning100
16EQA-4L31-MayWLZNC0180
17KLB-931-MayWLZNCTo DateYr Target
REMAKSHZEA-4WLGLV inst postponed w/o wellhead integrity & last welltestSI Wells Back On Line3160
BTSA-3LWLGLV inst postponed no gas lift line
EZB-1LWLSBHP & zone Change, postponedGL Optimization4080
EQA-3LWLZone change & SBHP, postponed
BE-2SWLGLV inst, postponedJobs Completed86200
9681443
Spend ($MM)5.718
Work Outstanding
1) AVSA ESP's - 7 wells on line at AVSA and AVA (8 at Zulu). Production at Zelda 490 BOPD (7 day moving average).
2) ZULU ESP's - Decided to defer all ESP work in Zulu. Will perform higher potential workovers.
3) BIMA Schedule- FNB-1, EQA-3
5) KLX/KLY - Issued Programs for KLXA-1 and KLYB-1 to perform N2 unloading & perforation/reperforation
6) SEA PUP - Completing Integrity work on KLC. Will move next to BL-9 SCO or KLX/KLY
7500
15000
22500
30000
37500
45000
52500
60000
67500
75000
82500
90000
2002 Target Cum
2002 Actual Cum
BOPD
2002 Well Work - Oil Rate Projection
3200
6400
9600
12800
16000
19200
22400
25600
28800
32000
35200
38400
2002 Target Cum
2002 Actual Cum
BOEPD
2002 Well Work - Gas Rate Projection
2002 West Java Weekly Well Work Update:Date:13-Jan-03
Oil Rate Adds
Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOPD)
Jan-027501582Actuals
Feb-0215002193Actuals
Mar-0222503000Actuals
Apr-02300041641164
May-023750
Jun-024500
Jul-025250
Aug-026000
Sep-026750
Oct-027500
Nov-028250
Dec-029000
4875
Gas Rate Adds
Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOEPD)
Jan-02320718Actuals
Feb-026401108Actuals
Mar-029602024Actuals
Apr-02128031001076
May-021600
Jun-021920
Jul-022240
Aug-022560
Sep-022880
Oct-023200
Nov-023520
Dec-023840
2080
Monthly Job Summary:
No.WellEnd DateTypeDescriptionOil Gain (BOPD)Gas Gain (MCFD)Jobs Completed To Date
1ESTA-41-AprW/LGLVC400JobsGLVCOilGasSpend ($MM)
2KLB-32-AprW/LGLVC63519Jan-0222815827183.473
3BL-94-AprSea PupSCO-19Feb-0215106742930.386
4KLXA-18-AprSea PupN2 and Perforation00Mar-0218118823530.791
5EZA-1L8-AprW/LGLVCApr-022010116410761.011
6KLYB-111-AprSea PupN2 and Perforation01100May-02
7FNB-0112-AprBIMARIG W/O/ GLVC5200Jun-02
8UXA-4L16-AprW/LGLVC6799Jul-02
9ESTA-3L12-AprW/LGLVCAug-02
10MRA-5L15-AprSea PupWax Clean Out4Sep-02
11MRA-5S16-AprSea PupWax Clean Out230Oct-02
12MRA-2S17-AprSea PupWax C/O / GLVC237Nov-02
13FZA-223-AprW/LGLVC200 (estimation)Dec-02
14LNA-3MB23-AprW/LGLVC12361675405.661
15ESTA-3L24-AprSea PupTbg CO - Sand
16BH-6L25-AprW/LGLVC0To DateYr Target
17BZZA-3L27-AprW/LPack off rep.15SI Wells Back On Line2160
18HZEA-228-AprW/LGLVC & pack off95137
19FZA-1L30-AprSea PupPerforation100 (est)150(est)GL Optimization4080
20BA-7L12-AprOprtGas in tuning136
21UXA -1L17-AprOpsGas in tuning104378Jobs Completed75200
14557534
Spend ($MM)5.718
Work Outstanding
1) AVSA ESP's - 7 wells on line at AVSA and AVA (8 at Zulu). Production at Zelda 490 BOPD (7 day moving average).
2) ZULU ESP's - Decided to defer all ESP work in Zulu. Will perform higher potential workovers.
3) BIMA Schedule- FNB-1, EQA-3
5) KLX/KLY - Issued Programs for KLXA-1 and KLYB-1 to perform N2 unloading & perforation/reperforation
6) SEA PUP - Completing Integrity work on KLC. Will move next to BL-9 SCO or KLX/KLY
7500
15000
22500
30000
37500
45000
52500
60000
67500
75000
82500
90000
2002 Target Cum
2002 Actual Cum
BOPD
2002 Well Work - Oil Rate Projection
3200
6400
9600
12800
16000
19200
22400
25600
28800
32000
35200
38400
2002 Target Cum
2002 Actual Cum
BOEPD
2002 Well Work - Gas Rate Projection
2002 West Java Weekly Well Work Update:Date:13-Jan-03
Oil Rate Adds
Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOPD)
Jan-027501582Actuals
Feb-0215002193Actuals
Mar-0222503000Actuals
Apr-023000
May-023750
Jun-024500
Jul-025250
Aug-026000
Sep-026750
Oct-027500
Nov-028250
Dec-029000
4875
Gas Rate Adds
Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOEPD)
Jan-02320718Actuals
Feb-026401108Actuals
Mar-029602024Actuals
Apr-021280
May-021600
Jun-021920
Jul-022240
Aug-022560
Sep-022880
Oct-023200
Nov-023520
Dec-023840
Monthly Job Summary:
No.WellEnd DateTypeDescriptionOil Gain (BOPD)Gas Gain (MCFD)Jobs Completed To Date
1UXA-4L1-MarW/LGLVC85JobsOilGasSpend ($MM)
2HZEA-19-MarW/LGLVC2300Jan-022215827183.473
3LB-4S10-MarW/LGLVCFeb-02156742930.386
4BHA-6L10-MarSea PupSand C/O, PerfMar-02189912900.791
5EA-611-MarW/LGLVC5870Apr-02
6UXA-4S12-MarW/LGLVC80May-02
7KA-2S12-MarW/LGLVCJun-02
8EZA-2L18-MarW/LGLVC40800Jul-02
9BA-7L16-MarSea PupSand C/O, PerfAug-02
10EQC-3S18-MarW/LGLVC (SI since 99)140700Sep-02
11EZC-2S20-MarSea PupSand C/O77600Oct-02
12LA-5ST23-MarSea PupSand C/OProduced Sand After JobNov-02
13BA-7L21-MarE/LPerfGood Indication After PerfDec-02
14KB-1S25-MarE/LZone Change554.650
15LB-6ST26-MarE/LGLVC
16LB-4ST28-MarW/LGLVCTo DateYr Target
17KA-2S30-MarW/LGLVC
18FFB-2S1-MarWLGLVC00SI Wells Back On Line2160
12392100GL Optimization2980
Jobs Completed55200
Spend ($MM)4.718
Work Outstanding
1) AVSA ESP's - 7 wells on line at AVSA and AVA (8 at Zulu). Production at Zelda 112 BOPD (7 day moving average).
2) ZULU ESP's - Decided to defer all ESP work in Zulu. Will perform higher potential workovers.
3) BIMA Schedule- 3 Workovers in ????, Back Up for Seap Pup Drt Dock
5) KLX/KLY - Wating on Well Tests after KLXA-1 nad KLYB-1
6) SEA PUP - Completing Integrity work on KLC. Will move next to BL-9 SCO or KLX/KLY
7500
15000
22500
30000
37500
45000
52500
60000
67500
75000
82500
90000
2002 Target Cum
2002 Actual Cum
BOPD
2002 Well Work - Oil Rate Projection
3200
6400
9600
12800
16000
19200
22400
25600
28800
32000
35200
38400
2002 Target Cum
2002 Actual Cum
BOEPD
2002 Well Work - Gas Rate Projection
2002 West Java Weekly Well Work Update:Date:13-Jan-03
Oil Rate Adds
Month2002 Target Cum2002 Actual Cum2002 WETS Actual Monthly Incremental (BOPD)2002 Monthly Incremental By Test (BOPD)
Jan-02750163920492049
Feb-0215002618978978
Mar-02225026180
Apr-023000
May-023750
Jun-024500
Jul-025250
Aug-026000
Sep-026750
Oct-027500
Nov-028250
Dec-029000
Gas Rate Adds
Month2002 Target Cum2002 Actual Cum2002 WETS Actual Monthly Incremental (BOPD)2002 Estimate By Test (BOEPD)
Jan-02320768960960
Feb-026401224.1206896552456456
Mar-02960
Apr-021280
May-021600
Jun-021920
Jul-022240
Aug-022560
Sep-022880
Oct-023200
Nov-023520
Dec-023840
Monthly Job Summary:
No.WellDateTypeDescriptionOil Gain (BOPD)Gas Gain (MCFD)Jobs Completed To Date
LB-4ST25-JanEnsco 50S/T4001000JobsOilGasSpend ($MM)
1ED-3ST1-FebW/LGLVC00Jan-02222049.59603.449
2FG-52-FebSea PupPerforation-3040Feb-02159784560.401
3LB-4S6-FebW/LGL Redesign14400Mar-0270
4FG-3L10-FebSea PupScale C/O43105Apr-02
5KB-6S13-FebW/LGLVC256160May-02
6AAC-613-FebW/LSet Pack Off150Jun-02
7EZA-2L14-FebW/LZone change00Jul-02
8EQC-3S15-FebW/LWax CO00Aug-02
9LB-6L16-FebW/LGLVC80700Sep-02
10KC-415-FebSea PupTbng CleanOct-02
11KLB-923-FebSea PupSand C/ONov-02
12KLB-2L18-FebW/LGLVCDec-02
13BE-620-FebW/LGLVC194
14BZZA-2L21-FebW/LGLVC
15BE-7ST24-FebW/LGLVC116
16LLD-824-FebW/LGLVCBlowing GasTo DateYear Target
17KLA-1124-FebSea PupScale C/OSI Wells Back On Line1960
18UXA-1S28-FebW/LGLVC
12232405GL Optimization2180
Jobs Completed44200
Spend ($MM)3.818
Sea Pup Work Efficiency
W/L Work Efficiency
Work Outstanding
1) AVSA ESP's - 6 wells on line at AVSA and AVA. Two wells remaining to be put BOL at AAC. Monthly avergae production at Zelda 780 BOPD.
2) ZULU ESP's - Developing forward plan for 10 new ESP wells. Decision on this week.
3) BIMA Workovers- Budget Issues ($4.2 MM shortfall) - Meeting his PM to discuss
4) KLX/KLY - Data collection, low reservoir pressures, low draw downs, need to look at dropping WHP, stims may not be effective
5) SEA PUP - Completed KLYB, KLYA integrity & pressure survey work. On BH-6L for cmt squeeze and reperf
00
00
00
00
00
00
00
00
00
00
00
00
2002 Target Cum
2002 Actual Cum
BOPD
2002 Well Work - Oil Rate Projection
00
00
00
00
00
00
00
00
00
00
00
00
2002 Target Cum
2002 Actual Cum
BOEPD
2002 Well Work - Gas Rate Projection
2002 Weekly Well Work Update:Date:13-Jan-03
Oil Rate Adds
Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOPD)
Jan-027502050
Feb-021500
Mar-022250
Apr-023000
May-023750
Jun-024500
Jul-025250
Aug-026000
Sep-026750
Oct-027500
Nov-028250
Dec-029000
Gas Rate Adds
Month2002 Target Cum2002 Actual Cum2002 Estimate By Test (BOEPD)
Jan-02320960
Feb-02640
Mar-02960
Apr-021280
May-021600
Jun-021920
Jul-022240
Aug-022560
Sep-022880
Oct-023200
Nov-023520
Dec-023840
Monthly Job Summary:
No.WellDateTypeDescriptionOil Gain (BOPD)Gas Gain (MCFD)Jobs Completed To Date
1KNA-2S16-JanW/LGLVC293JobsOilGasSpend ($MM)
2MRA-1S12-JanW/LGLVC3271180Jan-02212049.59603.449
3BE-4W/LGLVC350Feb-02
4EJ-3S19-JanW/LGLVC105Mar-02
5LE-5S11-JanW/LGLVC218272Apr-02
6BG-7ST11-JanSea PupTubing Wash0May-02
7EQC-4L12-JanW/LZone Change24200Jun-02
8LNA-313-JanW/LGLVC2930Jul-02
9BZZA-423-JanW/LZone Change00Aug-02
10MQ-11L25-JanSea PupGLVC93Sep-02
11LLB-6S25-JanW/LRecover Fish and Plug7053388Oct-02
12BZZA-925-JanW/LZone Change0Nov-02
13BTSA-4LIn ProgE/LAdd Perfs0Dec-02
14KLA-1114-JanwlZone Change0
15KKNA-1L20-JanSea PupZone Change137
16MQ-1L26-JanwlGLVC0
17EQC-1L37265WLFishing0To DateYear Target
18BG-3ST37264WLFishing0SI Wells Back On Line1560
19KB-6SOpsTbg CO142
20UA-1SOpsChk opt184107GL Optimization880
21UA-1LOpsChk opt6178
Total25625325Jobs Completed25200
Note:AVSA-4Brought on line on Feb 1, 2002. Initial rate 150 BOPD.
LLD-13L tested over the weekend at 1450 BOPD, Job completed in DecemberSpend ($MM)0.24920??
Work Outstanding
Sea Pup Work Efficiency
1) AVSA ESP's - AVSA - 4 on Line (150 BOPD)
2) ZULU ESP's - Snubbing scheduled to move to ZUD on Feb 6W/L Work Efficiency
3) BIMA Workovers- Arrival in 3rd week Feb - FNB-01 (AFE Approved), EQA-7 (AFE Approved), LE-6 (working on AFE Approval)
4) Geoservice Tank Should will be available by next week - Sea Pup to start Sand C/O jobs.
000
000
000
000
000
000
000
000
000
000
000
000
2002 Target Cum
2002 Actual Cum
2002 Estimate By Test (BOPD)
BOPD
2002 Well Work - Oil Rate Projection
000
000
000
000
000
000
000
000
000
000
000
000
2002 Target Cum
2002 Actual Cum
2002 Estimate By Test (BOEPD)
BOEPD
2002 Well Work - Gas Rate Projection
Monthly Job Summary:
No.WellDateTypeDescriptionOil Gain (BOPD)Gas Gain (MCFD)13BTSA-4LIn ProgE/LAdd Perfs0Job TypeOilGas
1KNA-2S16-JanW/LGLVC29320UA-1SOpsChk opt184107Rig W/O400100
2MRA-1S12-JanW/LGLVC327118021UA-1LOpsChk opt6178Choke Opt190285
3BE-4W/LGLVC350No.WellDateTypeDescriptionOil Gain (BOPD)Gas Gain (MCFD)GL26112712
4EJ-3S19-JanW/LGLVC10517EQC-1L37265WLFishing0Perforation00
5LE-5S11-JanW/LGLVC21827218BG-3ST37264WLFishing0Fishing7053388
6BG-7ST11-JanSea PupTubing Wash03LB-4S6-FebW/LGL Redesign14400W/L Other1500
7EQC-4L12-JanW/LZone Change242001KNA-2S16-JanW/LGLVC293SCO1420
8LNA-313-JanW/LGLVC29302MRA-1S12-JanW/LGLVC3271180Zone Change161200
9BZZA-423-JanW/LZone Change003BE-4W/LGLVC350
10MQ-11L25-JanSea PupGLVC934EJ-3S19-JanW/LGLVC105
11LLB-6S25-JanW/LRecover Fish and Plug70533885LE-5S11-JanW/LGLVC218272
12BZZA-925-JanW/LZone Change08LNA-313-JanW/LGLVC2930
13BTSA-4LIn ProgE/LAdd Perfs010MQ-11L25-JanSea PupGLVC93
14KLA-1114-JanwlZone Change016MQ-1L26-JanwlGLVC0
15KKNA-1L20-JanSea PupZone Change1371ED-3ST1-FebW/LGLVC
16MQ-1L26-JanwlGLVC05KB-6S13-FebW/LGLVC256160
17EQC-1L37265WLFishing07LB-6L16-FebW/LGLVC80700
18BG-3ST37264WLFishing010KLB-2L18-FebW/LGLVC
19KB-6SOpsTbg CO14211BE-620-FebW/LGLVC194
20UA-1SOpsChk opt18410712BZZA-2L21-FebW/LGLVC
21UA-1LOpsChk opt617813BE-7ST24-FebW/LGLVC116
LB-4ST25-JanEnsco 50S/T400100014LLD-824-FebW/LGLVCBlowing Gas
1ED-3ST1-FebW/LGLVC16UXA-1S28-FebW/LGLVC
2FG-52-FebSea PupPerforation1UXA-4L1-MarW/LGLVC
3LB-4S6-FebW/LGL Redesign144002HZEA-19-MarW/LGLVC
4FG-3L10-FebSea PupScale C/O3LB-4S10-MarW/LGLVC
5KB-6S13-FebW/LGLVC2561605EA-610-MarW/LGLVC587
6AAC-613-FebW/LSet Pack Off1506UXA-4S12-MarW/LGLVC
7LB-6L16-FebW/LGLVC807007KA-2S12-MarW/LGLVC
8KC-415-FebSea PupTbng Clean2FG-52-FebSea PupPerforation
9KLB-923-FebSea PupSand C/O11LLB-6S25-JanW/LRecover Fish and Plug7053388
10KLB-2L18-FebW/LGLVCLB-4ST25-JanEnsco 50S/T4001000
11BE-620-FebW/LGLVC1949KLB-923-FebSea PupSand C/O
12BZZA-2L21-FebW/LGLVC4BHA-6L10-MarSea PupSand C/O, Perf
13BE-7ST24-FebW/LGLVC1164FG-3L10-FebSea PupScale C/O
14LLD-824-FebW/LGLVCBlowing Gas15KLA-1124-FebSea PupScale C/O
15KLA-1124-FebSea PupScale C/O6AAC-613-FebW/LSet Pack Off150
16UXA-1S28-FebW/LGLVC19KB-6SOpsTbg CO142
1UXA-4L1-MarW/LGLVC8KC-415-FebSea PupTbng Clean
2HZEA-19-MarW/LGLVC6BG-7ST11-JanSea PupTubing Wash0
3LB-4S10-MarW/LGLVC7EQC-4L12-JanW/LZone Change24200
4BHA-6L10-MarSea PupSand C/O, Perf9BZZA-423-JanW/LZone Change00
5EA-610-MarW/LGLVC58712BZZA-925-JanW/LZone Change0
6UXA-4S12-MarW/LGLVC14KLA-1114-JanwlZone Change0
7KA-2S12-MarW/LGLVC15KKNA-1L20-JanSea PupZone Change137
00
00
00
00
00
00
00
00
Oil
Gas
Oil
0
0
0
0
0
0
0
0
Gas
Gas
REACTIVATED SI WELLS 2002
P/FWELLSDESCRIPTIONACTION DATEOIL GAIN (BOPD)GAS GAIN(MCFD)REMARKSORIGINATOR
PREPOSTPREPOST
AVSA1AVSA-4ESP Change Out4431476last well test, June 6Kukuh
2AVSA-3ESP Change Out1301308last well test, June 3Kukuh
3AVA-2ESP Change Out1005794last well test, June 3Kukuh
4AVA-3ESP Change Out146-last well test May 5Kukuh
5AVA-4ESP Change Out127-last well test, Feb 27Kukuh
W6AVA-6ESP Change Out14-last well test feb 24Kukuh
E7AAC-6ESP Change Out387-last well test March 25Kukuh
S8AAC-8ESP Change Out52-last well test May 14Kukuh
TZULU9ZUA-1Reactivate ESP10913Last well test May 21Kukuh
10ZUA-3Reactivate ESP---Kukuh
A11ZUA-7Reactivate ESP21615Last well test May 21Kukuh
R12ZUA-9Reactivate ESP1915Last well test may 21Kukuh
E13ZUD-3Reactivate ESP68-Last well test May 6Kukuh
A14ZUD-6Reactivate ESP1-Last well test March 28Kukuh
15ZUD-7Reactivate ESP65-Last well test May 7Kukuh
16ZUD-8Reactivate ESP47-Last well test May 6Kukuh
17ZUD-9Reactivate ESP17-Last well test May 7Kukuh
PAPA18PE-9SRocking by productiion1200Robby
19PB-1Rocking by productiion2300Robby
MM20MQ-11 LH type change out & GLV redesigncan't be testedRobby
21MRA-1SGas Lift redesignJan 20023271100Robby&Dudi
LIMA22LA-5STSand clean outNo tested yetBudhira
23LLD-13 LAdd perforation13002100Robby O
24LNA-3Gas Lift Installation293-Robby O
25LB-6SGas Lift InstallationNo tested yetBudhira
26LLB-6LFishing toolsJanuary 26,20027052195Dudi D
KLA27KKNA-1LZone changeFeb-02803400open KK-35A &Anda
KK-35B
28KLB-3Gas Lift RedesignApr-0277500Anda
P/FWELLSDESCRIPTIONACTION DATEOIL GAINGAS GAINREMARKSORIGINATOR
PREPOSTPREPOST
BRAVOnone
UNIFORM29UXA-4Sshut in since 1996, and reactivated28-Mar-02255312Erwin D
through gas lift redesign
E30UXA-4Lshut in since 1996, and reactivated through gas lift redesign28-Mar-0273Could not be optimum, fish LIH (broken old GLV)Erwin D
31UA-3LZNC under monitoring for GLVR7-Jun-0246681Erwin D
TKILO32KB-1SShut in since 1996,due to high waterApr 27, 2002100Sari
cut (ZNC program)
A33KB-6SGas Lift RedesignJan 19, 2002136237Sari
R
EECHO34EZA-2LGas Lift Inst20-Mar-02100 BOPD-High water cutAgus S
A35EZC-2SSand & scale clean out by CTU18-Mar-02113 BOPD199Shut in May 27,2002,suspected GLV mulfunctionAgus S
36EQC-1LFishing still left in hole -set F collar4-May-0278266Herry S
stop & BOL
37EQC-3SWL wax CO & GLVR18-Mar-02140700SRP June 28, 1999Herry S
FOXTROT38FNB-1Workover to produce gas above top24-Mar-025200Eko
packer
39FZA-2GLV Inst after there is a gas source21-Apr-02Eko
from FZA-1S
40FZA-1LPerforation new zone; gas flow w/29-Apr-02The well is shutEko
700 psi FTPin,waiting on
tubing pack off
TOTAL665518612