BVR Mall - Site Visit Report

9
BVR Mall - Soil Retention System DesignTree Service Consultants Pvt Ltd

Transcript of BVR Mall - Site Visit Report

Page 1: BVR Mall - Site Visit Report

BV

R M

all

- S

oil

Rete

nti

on

Syst

em

DesignTree Service Consultants Pvt Ltd

Page 2: BVR Mall - Site Visit Report

BV

R M

all

- S

oil

Rete

nti

on

Syst

em

DesignTree Service Consultants Pvt Ltd

Pile work at site has been inspected on 11/05 along with synergy team & our observations are as follows

1. Driving of piles on the sandy soil has created some vacuum at the bottom, which leading to loosen the adjacent earth & settlement cracks around the vicinity

2. Along MG road side, few settlement cracks are observed due to improper base compaction along the foot path

3. Few settlement cracks observed along the Jemmichettu road – advised to do 750 dia piles at alternate location

4. Cracks observed at the adjacent boundary wall towards north side – 750 dia piles to be eliminated & trench to be made to arrest the settlement

5. Settlement cracks along the college road – Piles to be completed as per drawings & road to be repaired later

6. Also, it has been instructed to drive the casing first & then the boring should be done to avoid creating vacuum

Following slides shows the detailed observations & suggestions

SITE OBSERVATION

Page 3: BVR Mall - Site Visit Report

BV

R M

all

- S

oil

Rete

nti

on

Syst

em

DesignTree Service Consultants Pvt Ltd

Site Observations – Settlement Cracks along College Road Side

Page 4: BVR Mall - Site Visit Report

BV

R M

all

- S

oil

Rete

nti

on

Syst

em

DesignTree Service Consultants Pvt Ltd

SUGGESTIONS

1. 100% Work should be completed with the provided designs & drawings for both 600 & 750 dia pile

2. After completion, adjacent road should be repaired & hand over to college

Page 5: BVR Mall - Site Visit Report

BV

R M

all

- S

oil

Rete

nti

on

Syst

em

DesignTree Service Consultants Pvt Ltd

Site Observations – Cracks along North Side ( adjacent building walls )

Page 6: BVR Mall - Site Visit Report

BV

R M

all

- S

oil

Rete

nti

on

Syst

em

DesignTree Service Consultants Pvt Ltd

SUGGESTIONS

1. 600 dia contagious pile to be driven at 150 mm spacing

2. 750 Dia piles to be eliminated

3. Trench of 1M width by 1.5 M depth to be made across the compound wall to arrest the settlement protruding to adjacent properties

Page 7: BVR Mall - Site Visit Report

BV

R M

all

- S

oil

Rete

nti

on

Syst

em

DesignTree Service Consultants Pvt Ltd

Site Observations – Settlement Cracks along Jemmichettu Road

Page 8: BVR Mall - Site Visit Report

BV

R M

all

- S

oil

Rete

nti

on

Syst

em

DesignTree Service Consultants Pvt Ltd

SUGGESTIONS

1. 600 dia contagious pile to be done as per drawing

2. 750 Dia piles – Every Alternate piles to be casted

Page 9: BVR Mall - Site Visit Report

BV

R M

all

- S

oil

Rete

nti

on

Syst

em

DesignTree Service Consultants Pvt Ltd