Construct 10membankment(approx.1.0m high) across hole.
Construct 150m newpathway on raisedembankment.
Construct 30mboardwalk.
Sw
amp H
en L
nSw
amp H
en L
nSw
amp H
en L
nSw
amp H
en L
nSw
amp H
en L
nSw
amp H
en L
nSw
amp H
en L
nSw
amp H
en L
nSw
amp H
en L
n
yyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyy
Develop small trailhead(parking area) and installtrailhead signage.
Connection toBroadwater NorthTrail (see Plan 7b).
Construct 320m newpathway on raisedembankment.
Construct 1,470m new pathway betweenFairway Drive and Swamp Hen Lane.
Hadfield AveHadfield AveHadfield AveHadfield AveHadfield AveHadfield AveHadfield AveHadfield AveHadfield Ave
Bee
don S
tree
tBee
don S
tree
tBee
don S
tree
tBee
don S
tree
tBee
don S
tree
tBee
don S
tree
tBee
don S
tree
tBee
don S
tree
tBee
don S
tree
tInstall trailhead sign "chevrons"at intersection of Bussell Hwyand Beedon Street.
Construct 65mboardwalk.
Construct 60 metre new pathwayon raised embankment across wetland vegetation.
Construct 20m new pathway on raisedembankment and construct viewingplatform (with interpretive panels).
Solid line indicatesexisting pathway.
Centurion WayCenturion WayCenturion WayCenturion WayCenturion WayCenturion WayCenturion WayCenturion WayCenturion Way
Bign
ell D
rive
Bign
ell D
rive
Bign
ell D
rive
Bign
ell D
rive
Bign
ell D
rive
Bign
ell D
rive
Bign
ell D
rive
Bign
ell D
rive
Bign
ell D
rive
Install trail 'directional' signageevery 100-150 metres alongpath and at turns.
yyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyy
yyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyy
yyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyy
Construct 10m new pathway on raisedembankment and construct viewingplatform (with interpretive panel).
Install sign reminding trailusers to respect privacyof adjoining residents.
Fairw
ay D
rive
Fairw
ay D
rive
Fairw
ay D
rive
Fairw
ay D
rive
Fairw
ay D
rive
Fairw
ay D
rive
Fairw
ay D
rive
Fairw
ay D
rive
Fairw
ay D
rive
Install trail 'directional' signageevery 100-150 metres alongpath and at turns.