Business Consulting Bureau Project Financing Overview © BCB 2009 The Palm Sports Stadium Burj...

9
Business Consulting Bureau Project Financi © BCB 2009 The Palm Sports Stadium Burj Infrastructu re Engineering Construction Procurement Design BCB Can make it happen.

Transcript of Business Consulting Bureau Project Financing Overview © BCB 2009 The Palm Sports Stadium Burj...

Page 1: Business Consulting Bureau Project Financing Overview © BCB 2009 The Palm Sports Stadium Burj InfrastructureEngineering Construction Procurement Design.

Business Consulting Bureau Project Financing Overview

© BCB 2009

The Palm

Sports Stadium

Burj

InfrastructureEngineering

Construction

Procurement

Design

BCB Can make it happen.

Page 2: Business Consulting Bureau Project Financing Overview © BCB 2009 The Palm Sports Stadium Burj InfrastructureEngineering Construction Procurement Design.

2

BCB PROFILE

Business Consulting Bureau offers highly personalized service to navigate through the

red tape that is often involved in securing equity/debt investments for specialized

projects, and our investment resources provide the flexibility needed to accomplish your

financial needs for a wide variety of Proof of Funds for industrial, commercial and real estate projects. BCB's investors can provide funding for various needs, and we are continually adjusting

our investment portfolio to provide the best cost-of-capital and terms available to meet your

Proof of Funds requirements.

We help you convert opportunities into revenue, and fuel success.

Page 3: Business Consulting Bureau Project Financing Overview © BCB 2009 The Palm Sports Stadium Burj InfrastructureEngineering Construction Procurement Design.

3

We have formed several partnerships and consortium with major developers and global EPC companies that has given us opportunities to successfully bid/execute various construction projects. Some of our partnerships are listed below:

Client Project Location Relationship Market Penetration*

Tameer Al Salam City Nominated & approved Civil Contractor > AED 500 million

Emirates Road Al Salam City Currently negotiating a MEP contract for > AED 200 millionContracting (“ERC”) AED 83 million for 60 sub-station

plus Al Rajhi Group

Veolia Water Dubai, Umm Al-Quwain Jointly bid with Veolia civil/MEP works of approx. > AED 100 million(“Veolia”) (UAQ) and other Emirates AED 50 million for sewerage & water treatment plants.

UAQ Municipality UAQ, Dubai & Abu Dhabi MAS/Metro are nominated Civil & MEP > AED 100 millionFEWA, DEWA, ContractorADEWA, etc.

Pact Environmental UAE Nominated Civil Contractor to carry out civil works > AED 70 millionTechnologies for PACT’s water treatment plants in UAE(“PACT”).

Exchange rate: 1USD=3.68 AED

PROJECTS UNDER EVALUATION

Page 5: Business Consulting Bureau Project Financing Overview © BCB 2009 The Palm Sports Stadium Burj InfrastructureEngineering Construction Procurement Design.

EMERGENCY RESPONSE WATER TREATMENT SYSTEM

Screening/Filtration(Capture large debris and remove

Solids and fine particles in the water) Plasma Reactor

(Disinfection)

Final Filter(Carbon)

Control Panel(Diesel Generator/RF/DC

power distribution; pH/ORP Control; Flow meters;

Valve control;

Self Cleaning System

Wa

ter S

upp

ly (ri

ve

r, la

ke e

tc.)

Pump

Main Power (Diesel Generator

Uninterruptible Power Supply)

RF/DC Power Supplies

Dri

nkin

g W

ate

r O

ut

Reverse Osmosis*

Mobile Emergency Response Water System

Oce

an*

De

salin

atio

nS

yste

m*

* - option

Page 6: Business Consulting Bureau Project Financing Overview © BCB 2009 The Palm Sports Stadium Burj InfrastructureEngineering Construction Procurement Design.

TYPICAL WASTE WATER TREATMENT SYSTEM

INCOMINGSEWAGE

DIGESTER

CHLORINATION

HEADWORKS

Bar Screens: Remove wood,Plastics and rags

SEDIMENTATIONCapture sand and

solids

PRIMARY TREATMENT

coagulationWater Sludge

Remove organic materials:

OXYGEN REACTOR

OzoneFiltration

Biology

Clear W

ater

UV TreatmentBacteria Inactivation

Settling/ClarifyingClear water

Methane

De-Watering

Re-u

sed B

io-so

lids

ENERGY RECOVERY

Water Re-Use

PLASMA SYSTEMAnti-bacterial treatment, pH Control

Page 7: Business Consulting Bureau Project Financing Overview © BCB 2009 The Palm Sports Stadium Burj InfrastructureEngineering Construction Procurement Design.

Work in Progress

Page 8: Business Consulting Bureau Project Financing Overview © BCB 2009 The Palm Sports Stadium Burj InfrastructureEngineering Construction Procurement Design.

Separation andConcentration

Ag/Au/PGM PowderMixture

Head OreAg/Au/PGM = 0.1 Oz/ton

MineRock Milling

Classification Powder (-100 Mesh)

Drying

Gas/PowderRefiningof

Au/Ag/PGM

PRECIOUS ORE PROCESSING SYSTEM

RF Plasma System Specification1. Plasma Power – 300 kW2. Powder Rate – 100 lbs/Hr3. Particle size – 75 -150 microns4. Plasma Gas – Air; Air/O2; Ar,

N2;NH35. Gas Flow - 25 – 45 m3/hr

10:1: 100:1

1 – 25 micronsPGM: 100 Oz/ton

PGM: 1-10 Oz/ton

(250) 250 750

1,250 1,750 2,250 2,750

Expected revenue and profit for one module(production flow rate – 200 lbs/Hr)

Revenue,k$

Page 9: Business Consulting Bureau Project Financing Overview © BCB 2009 The Palm Sports Stadium Burj InfrastructureEngineering Construction Procurement Design.

Ken Siddiqui, PresidentBusiness Consulting Bureau

9

Thank you for your interest!

USA Toll Free:877-541-4500

Texas, California, New York, Philadelphia, Ontario and Dubai