HYDROPOWERB U

L E T

T I N

MONTHLY REPORT

Jl Amil Gedung No 7, Warung Buncit, Jakarta Selatan 12740, Telp 021- 7990218, Fax 021-7985164, 021-7981007Websites : www.indonesiahydropower.com, Email : [email protected]

March 2007

Page 2: Bulletin Hydro Power 032007

This Bulletin as monthly report includes a description and the status of our hydropower programs. All statements in this publication concerning project features and financial highlights are subject to change without notice. They are not to be regarded as offers to contract, but this shall be useful for preliminary information.

The Hydropower Group has identified at least 133 potentials of hydropower especially run off river type in Sulawesi and Sumatera and has been surveying at least 8 potentials since January 2007. The management has set the goal for the group to obtain new 20 projects in 2007.

The scope of the above work includes:

1. Conducting survey of the prospect hydro energy (reconnaissance).2. Preparing feasibility study.3. Preparing environmental impact assessment document.4. Obtaining Principal Permit from Head of Regency in the regional concerned.5. Obtaining MoU with prospect users.6. Obtaining Permit of Electricity Utilization for Public (IUKU) from Government.7. Obtaining Head of Agreement (HoA) and Power Purchase Agreement (PPA) from prospect users.8. Assist the Management to obtain financial supports from Banks and other financial institution for the projects.

To implement the above duties, the group has employed 16 persons from different disciplines (civil/construction engineers, estimators, hydrologist, geologist, mechanical/electrical engineers, geodetic, financial analyst, and administration supports).

Director

Preface

DIRECTOR Heru Husaini, PROJECT FEATURES Iman Naluri, Sumawoto, Dhani Irwanto, Hariati Oktiviana, Yayat Hendrayana, Oke Arifin, Imam Slamet RiyadiRuslan Soleh, Kaswanto, Wagimin, Irma Suriani, Drajad, Asmar Surgawi, Ardy Mardiansyah, FINANCIAL ANALYST Dafirman, ADMINISTRATOR Melligen, SUPPORT Yusup, Hakim, Dwi, ARTS & DESIGN Kas, Dindy

Page 3: Bulletin Hydro Power 032007

Pamona HEPP Kabupaten Poso, Sulawesi Tengah

I N D O N E S I A

Project Features

Proposed Tariff 5.88 cent USD/kWh or Rp 540.96/kWhRevenue per Year USD 59,481,847 or Rp 547,232,994,000 Investment Costs USD 136,897,848 or Rp 1,259,460,205,000Interest During const USD 18,158,350 or Rp 167,056,817,000Total Cost of Project USD 155,056.198 or Rp 1,426,517,022,000Loan (65%) USD 100,786,529 or Rp. 927,236,064,000Equity (35%) USD 54,269,669 or Rp. 499,280,958,000Grace Period 2 Years or 2 TahunLoan Period 7 Years or 7 TahunRepayment Period 5 Years or 5 TahunInterest Rate 14 %IRR 26.05 %NPV USD 80,432,206 or Rp. 739,976,291,000Payback Ratio 3 Years and 8 tmonthsROE 32,25 %Project Life Time 30 YearsExchange Rate Rp 9200 /USDStatus of Formalities Principal Permit, UPL-UKL, IUKU, PMDN, FS, HOA

Projected Financial Highlights

Owner PT Poso EnergyAddress Jl Amil No Gedung No 7, Wr. Buncit, Jakarta 12740Phone/Fax 021-7990218/021-7985164Website www.indonesiahydropower.comEmail [email protected] Person Director

Contact

Name of Hydropower Pamona-2Location Poso River, Sulewana Village, North Pamona District,

Poso Regency, Central of Sulawesi ProvinceHead 150 MetreAveraged Annual Flow 130 m3/secDependable Flow 129 m3/secAveraged Power Production 1.011 GWh/YearWaterway Open channel; 108 x 30 x 5 mPenstock Steel Pipe 3.05 OD x 4 x 786 mPower House Semi UndergroundTurbine 4 x 65 MW/Francis/Vertical Shaft/250 rpmGenerator 4 x 72.2 MVA/11 kV/50 HzRated Capacity 4 x 66.66 MWProgress On goingCommercial Operation Date End of 2008

PAMONA HYDROPOWER PROJECT1

Page 4: Bulletin Hydro Power 032007

MALEA 1 HYDROPOWER PROJECTS

KERINCI HEPPKabupaten Kerinci, Jambi

I N D O N E S I A

Name Of Hydropower Kerinci 1 Kerinci 2Location Merangin River, Kerinci Regency, Jambi Province Merangin River, Kerinci Regency, Jambi ProvinceHead 191.31 metre 183.04 metreAveraged Annual Flow 59.3 m3/sec 59.3 m3/sDependable Flow 55.4 m3/sec 55.4 m3/secAveraged Power Production 596 GWh/Year 566 GWh/YearWaterway Tunnel; Dia 4.7 m, Length ; 3300 m

Open channel; trapesium, bottom width 5.1mHeight 4.00 m, Length 3200 m

Open channel; trapesium, bottom width 5.1mHeight 4.00 m, Length 5200m

Penstock Steel pipe; 300 m length Steel pipe; 380 m lengthPower House Semi Underground Semi UndergroundTurbine 3 x 30 MW 3 x 30 MWGenerator 3 x 33.33 KVA 3 x 33.33 KVARated Capacity 3 x 30 MW 3 x 30 MWProgress On going On going

Project Features

Proposed Tariff 5.50 cent USD/kWh or Rp 506,00/kWhRevenue per Year USD 63,135,072 or Rp 580,842,662,000 Investment Costs USD 171,623,100 or Rp 1,578,932,520,000Interest During costs USD 16,226,128 or Rp 149,280,376,000Total Cost of Project USD 187,849,228 or Rp 1,728,212,896,000 Loan (65%) USD 150,279,382 or Rp 1,382,570,316,000Equity (35%) USD 37,569,846 or Rp 345,642,579,000Grace Period 4 Years or 4 TahunLoad Period 10 Years or 10 TahunRepayment Period 6 Years of 6 TahunInterest Rate 8 %IRR 19.24 %NPV USD 281,970,000 or Rp 2,594,124,000,000Payback Ratio 3 Years and 1 MonthsROE 13.80 % Project Life Time 30 YearsExchange Rate Rp 9200/USDStatus of Formalities Principal Permit, Pre FS

Projected Financial Highlights

Owner PT Kerinci EnergyAddress Jl Amil Gedung No 7, Wr. Buncit Jakarta 12740Phone/Fax 021-7990218/021-7985164Website www.indonesiahydropower.comEmail [email protected]

Contact

2KERINCI HYDROPOWER PROJECTS

Page 5: Bulletin Hydro Power 032007

MALEA HEPPKabupaten Tator, Sulawesi Selatan

I N D O N E S I A

Name Of Hydropower Malea 1 Malea 2Location Sadang River, Tana Toraja Regency,

South of Sulawesi ProvinceSadang River, Tana Toraja Regency, South of Sulawesi Province

Head 130 metre 130 metreAveraged Annual Flow 129.8 m3/sec 129 m3/secDependable Flow 97.40 m3/sec 97.4 m3/secAveraged Power Production 420 GWh/Year 413 GWh/YearWaterway HDPE Pipe; Dia 5 m, 3450 m length HDPE Pipe; Dia 5m, 4450 m lengthPenstock Steel pipe; 3.2 metre 320 metre length Steel pipe; 3,2 , 310 meter lengthPower House Semi Underground Semi UndergroundTurbine 2 x 45 MW/Francis/Vertical Shaft/250 rpm 2 x 45 Francis/Vertical Shaft/250 rpmGenerator 2 x 50 MVA/11 kV/50 Hz 2 x 50 MVA/11 kV/50 HzRated Capacity 2 x 45 MW 2 x 45 MWProgress On going On goingCommercial Operation Date End of 2009 End of 2009

Project Features

Proposed Tariff 5.88 cent USD/kWh or Rp 540.96 Rp/kWhRevenue per Year USD 42,556,571/Year or Rp 391,520,449,000/YearInvestment Costs USD 219,801,821 or Rp 2,022,176,750,000Interest During costs USD 16,367,223 or Rp 150,578,451,000 Total Cost of Project USD 236,169,044 or Rp 2,172,755,202,000Loan (65%) USD 165,318,331 or Rp 1,520,928,641,000Equity (35%) USD 70,850,713 or Rp 651,826,560,000 Grace Period 3 Years or 3 Tahun Loan Period 10 Years or 10 TahunRepayment Period 7 Years or 7 TahunInterest Rate 7%IRR 13.47% NPV USD 110,899,740 or Rp 1,020,277,608,000 Payback Ratio 7 Years and 10 monthsROE 13.80 %Project Life Time 30 YearsExchange Rate Rp 9,200/USDStatus of Formalities Principal Permit, PMDN, FS

Projected Financial Highlights

Owner PT Malea EnergyAddress Jl Amil Gedung No 7, Wr. Buncit, Jakarta 12740Phone/Fax 021-7990218/021-7985164Website www.indonesiahydropower.comEmail [email protected] Person Director

Contact

MALEA 1 HYDROPOWER PROJECTS3

Page 6: Bulletin Hydro Power 032007

Tamboli HEPP Kabupaten Kolaka, Sulawesi Tenggara

I N D O N E S I A

Name Of Hydropower TamboliLocation Tamboli River, Samaturu District, Kolaka Regency,

Southeast Sulawesi ProvinceHead 217 metreAveraged Annual Flow 11 m3/secDependable Flow 88 m3/secAveraged Power Production 133.2 GWh/YearWaterway Open channel; 4 m Width x 2 m Height; 1675 m LengthPenstock Steel pipe; 1.8 metre Length 623 metrePower House Semi UndergroundTurbine 4 x 5.5 MW/Francis/Vertical Shaft/500 rpmGenerator 4 x 6.1 MVA/11 kV/50 HzRated Capacity 4 x 5 MWProgress On goingCommercial Operation Date End of 2008

Project Features

Projected Financial Highlights

Owner PT Tamboli EnergyAddress Jl Amil Gedung No 7, Wr. Buncit, Jakarta 12740Phone/Fax 021-7990218/021-7985164Website www.indonesiahydropower.comEmail [email protected] Person Director

Contact

TAMBOLI HYDROPOWER PROJECT

Proposed Tariff 6.5 cent USD/kWh or Rp 598,00/ kWhRevenue per Year USD 8,197,898,00/Year or Rp 75,420,663,00/YearInvestment Costs 23,606,208,00 or Rp 217,177,109,000Interest During costs 1,298,098,00 or 11,942,504.000Total Cost of Project 24,904,306.00 or 229,119,613.000Loan (65%) 17,433.014 or 160,383,729.000Equity (35%) 7,471,292.00 or 68,735,884,000Grace Period 2 Years or 2 TahunLoan Period 7 Years or 7 Tahun Repayment Period 5 Years or 5 TahunInterest Rate 7 %IRR 20.82 %NPV USD 27,719,495 or Rp 255,019,352,000 Payback Ratio 4 Years and 7 monthsROE 14.59 %Project Life Time 30 YearsExchange Rate Rp 9200 /USDStatus of Formalities Principal Permit, FS

4

Page 7: Bulletin Hydro Power 032007

Project Features

Proposed Tariff 5.88 cent USD/kWh or Rp 541/kWhRevenue per Year USD 4,575,883/Year or Rp 42,098,125,000/Year Investment Costs USD 14,324,353 or 131,784,047,000 Interest During const USD 2,062,458 or Rp 18,974,614,000Total Cost of Project USD 16,386,811 or Rp 150,758,661,000 Loan (65%) USD 10,651,427 or Rp 97,993,130,000 Equity (35%) USD 5,735,384 or Rp 52,765,532,000Grace Period 2 Years or 2 TahunLoan Period 7 Years or 7 TahunRepayment Period 5 Years or 5 TahunInterest Rate 15 %IRR 19.53 %NPV USD 1,413,071 or Rp 13,000,251,000Payback Ratio 4 Years and 11 MonthsROE 40.95 %Project Life Time 30 YearsExchange Rate Rp 9,200/USD Status of Formalities Principal Permit, FS

Projected Financial Highlights

Owner PT Lindu HydropowerAddress Jl Amil Gedung No 7, Wr. Buncit, Jakarta 12740Phone/Fax 021-7990218/021-7985164Website www.indonesiahydropower.comEmail [email protected] Person Director

Contact

LINDU HYDROPOWER PROJECT

Name Of Hydropower Lindu Location Binangga Rawa River, Donggala Regency,

Central of Sulawesi ProvinceHead 100 metreAveraged Annual Flow 21.90 m3/secDependable Flow 7.30 m3/secAveraged Power Production 90.46 GWh/YearWaterway Open channel; 3,65 m Height x 2.6 m Width x 2200 m

lengthPenstock Steel pipe; Dia 2.50 578 metre lenghtPower House Semi UndergroundTurbine 3 x 5 MW/Francis/Vertikal Shaft/500 rpmGenerator 3 x 5.55 MVA/11 kV/50 HzRated Capacity 3 x 5 MWProgress On going Commercial Operation Date End of 2009

LINDU HEPPKabupaten Donggala, Sulawesi Tengah

I N D O N E S I A

5

Page 8: Bulletin Hydro Power 032007

TANGGARA HEPPKabupaten Gowa, Sulawesi Selatan

I N D O N E S I A

Name Of Hydropower Tanggara Location Biring Mamingko/Tanggara River, Tabbingjai Village

Tombolopao District, Gowa Regency, South of Sulawesi Province

Head 189 metreAveraged Annual Flow 6.59 m3/secDependable Flow 3.61 m3/secAveraged Power Production 61.758 GWh/YearWaterway Open channel; 2.5 m Width 1.7 m Height 2.600 m lengthPenstock Steel pipe; 3,9 m Width, 2,4 m Height, 225 m Length, Dia.

0,85Power House Semi UndergroundTurbine 4 x 2.5 MW/Francis/Vertikal Shaft/500 rpmGenerator 4 x 2.77 MVA/11 kV/50 HzRated Capacity 4 x 2.5 MWProgress On goingCommercial Operation Date End of 2008

Project Features

Proposed Tariff 6.10 cent USD/kWh or Rp 561,20/kWhRevenue per Year USD 3,767,775/Year or Rp 34,663,530,000/ThnInvestment Costs USD 10,434,840 or Rp 96,000,526,000 Interest During costs USD 1,375,191 or Rp 12,651,754,000 Total Cost of Project USD 11,810,030 or Rp 108,652,280,000 Loan (65%) USD 8,267,021 or Rp 76,056,596,000Equity (35%) USD 3,543,009 or Rp 32,595,684,000Grace Period 2 Years or 2 TahunLoan Period 7 Years or 7 TahunRepayment Period 5 Years of 5 TahunInterest Rate 15%IRR 20.65%NPV USD 3,986,208 or Rp 36,673,111,000 Payback Ratio 5 Years ROE 15.50 % Project Life Time 30 YearsExchange Rate Rp 9200/USDStatus of Formalities Principal Permit, Amdal, UKL-UPL, FS

Projected Financial Highlights

Owner PT Tanggara EnergyAddress Jl Amil Gedung No 7, Wr. Buncit, Jakarta 12740Phone/Fax 021-7990218/021-7985164Website www.indonesiahydropower.comEmail [email protected] Person Director

Contact

TANGGARA MINI HYDROPOWER PROJECT6

MAKAWA MINI HYDROPOWER PROJECT

Page 9: Bulletin Hydro Power 032007

MAKAWAS HEPPKabupaten Luwu, Sulawesi Selatan

I N D O N E S I A

Name Of Hydropower Siteba-2 Location Makawa River, Luwu Regency, South Sulawesi ProvinceHead 175 metreAveraged Annual Flow 7.30 m3/secDependable Flow 2.44 m3/secAveraged Power Production 43.33 GWh/YearWaterway Open channel; 2339 meter lengthPenstock Steel pipe; Dia 1.0 metre, 425 meter lengthPower House Semi UndergroundTurbine 3 x 3.25 MW/Francis/Horizontal Shaft/500 rpmGenerator 3 x 3.61 MVA/11 kV/50 HzRated Capacity 3 x 3.25 MWProgress On goingCommercial Operation Date End of 2008

Project Features

Proposed Tariff 6.10 cent USD/kWh or Rp 561.20/kWhRevenue per Year USD 2,636,641/Year or Rp 24,257,096,000/YearInvestment Costs USD 6,507,526 or Rp 59,869,241,000Interest During costs USD 780,052 or Rp 7,176,480,000Total Cost of Project USD 7,287,578 or Rp 67,045,721,000Loan (65%) USD 4,736,926 or Rp 43,579,718,000Equity (35%) USD 2,550,652 or Rp 23,466,002,000Grace Period 2 Years or 2 TahunLoan Period 7 Years or 7 TahunRepayment Period 5 Years or 5 TahunInterest Rate 15 %IRR 23.89 % NPV USD 3,779,298 or Rp 34,769,537,000Payback Ratio 4 Years and 4 monthsROE 9.60 %Project Life Time 30 YearsExchange Rate Rp 9200/USDStatus of Formalities Principal Permit, FS

Projected Financial Highlights

Owner PT Makawa EnergyAddress Jl Amil Gedung No 7, Wr. Buncit, Jakarta 12740Phone/Fax 021-7990218/021-7985164Website www.indonesiahydropower.comEmail [email protected] Person Director

Contact

MAKAWA MINI HYDROPOWER PROJECT7

Page 10: Bulletin Hydro Power 032007

MAKAWAS HEPPKabupaten Luwu, Sulawesi Selatan

I N D O N E S I A

Name Of Hydropower Siteba-4 Location Makawa River, Luwu Regency, South Sulawesi ProvinceHead 100 metreAveraged Annual Flow 12.05 m3/secDependable Flow 4.01 m3/secAveraged Power Production 40.29 GWh/YearWaterway Open channel; 4158 metre lengthPenstock Steel pipe; Dia 1.6 metre, 300 metre lengthPower House Semi UndergroundTurbine 3 x 2.5 MW/Francis/Horizontal Shaft/500 rpmGenerator 3 x 2.77 MVA/11 kV/50 HzRated Capacity 3 x 2.5 MWProgress On goingCommercial Operation Date End of 2008

Project Features

Proposed Tariff 6.10 cent USD/kWh or Rp 561.20/ kWhRevenue per Year USD 2,396,946/Year or Rp 22,051,905,000/YearInvestment Costs USD 6,729,526 or Rp 61,911,641,000 Interest During costs USD 813,322 or Rp 7,482,564,000Total Cost of Project USD 7,542,848 or Rp 69,394,206,000Loan (65%) USD 4,902,851 or Rp 45,106,234,000Equity (35%) USD 2,639,997 or Rp 24,287,972,000 Grace Period 2 Years or 2 TahunLoan Period 7 Years or 7 TahunRepayment Period 5 Years or 5 TahunInterest Rate 15 %IRR 20.87 % NPV USD 2,371,615 or Rp 21,818,856,000Payback Ratio 3 Years and 11 monthsROE 32%Project Life Time 30 YearsExchange Rate Rp 9200/USDStatus of Formalities Principal Permit, FS

Projected Financial Highlights

Owner PT Makawa EnergyAddress Jl Amil Gedung No 7, Wr. Buncit, Jakarta 12740hPhone/Fax 021-7990218/021-7985164Website www.indonesiahydropower.comEmail [email protected] Person Director

Contact

MAKAWA MINI HYDROPOWER PROJECT8

MAKAWA MINI HYDROPOWER PROJECTS

Page 11: Bulletin Hydro Power 032007

MAKAWAS HEPPKabupaten Luwu, Sulawesi Selatan

I N D O N E S I A

Name Of Hydropower Siteba-1 Siteba-3Location Makawa River, Luwu Regency, South Sulawesi -

ProvinceLino River, Luwu Regency, South Sulawesi Province

Head 180 metre 70 metreAveraged Annual Flow 5.07 m3/sec 3.84 m3/secDependable Flow 1.69 m3/sec 1.28 m3/secAveraged Power Production 40.20 GWh/Year 5.11 GWh/YearWaterway Open channel; 1625 metre length Open channel; 2100 metre lengthPenstock Steel pipe; Dia 1.0 metre, 420 meter length Steel pipe; Dia 1.0 metre, 425 metre lengthPower House Semi Underground Semi UndergroundTurbine 3 x 2.0 MW/Francis/Horizontal Shaft/500 rpm 3 x 0.5 MW/Francis/Horizontal Shaft/500 rpmGenerator 3 x 2.22 MVA/11 kV/50 Hz 3 x 0.55 MVA/11 kV/50 HzRated Capacity 3 x 2.0 MW 3 x 0.5 MWProgress On going On goingCommercial Operation Date End of 2008 End of 2008

Project Features

Proposed Tariff 6.10 cent USD/kWh or Rp 561.20/kWhRevenue per Year USD 2,721,616/Year or Rp 25,038,869,000/YearInvestment Costs USD 7,817,520 or Rp 71,921,182,000Interest During costs USD 950,676 or Rp 8,746,220,000Total Cost of Project USD 8,768,196 or Rp 80,667,402,000Loan (65%) USD 5,699,327 or Rp 52,433,811,000Equity (35%) USD 3,068,869 or Rp 28,233,591,000 Grace Period 2 Years or 2 Tahun Loan Period 7 Years or 7 Tahun Repayment Period 5 Years or 5 Tahun Interest Rate 15 %IRR 20.44 % NPV USD 2,501,183 or Rp 23,010,885,000Payback Ratio 5 YearsROE 9.04 %Project Life Time 30 YearsExchange Rate Rp 9200 /USDStatus of Formalities Principal Permit, FS

Projected Financial Highlights

Owner PT Makawa EnergyAddress Jl Amil Gedung No 7, Wr. Buncit, Jakarta 12740Phone/Fax 021-7990218/021-7985164Website www.indonesiahydropower.comEmail [email protected] Person Director

Contact

MAKAWA MINI HYDROPOWER PROJECTS9

Page 12: Bulletin Hydro Power 032007

BATUGANDA HEPPKabupaten Kolaka Utara, Sulawesi Tenggara

I N D O N E S I A

Name Of Hydropower Batuganda Location Indewe River, North of Kolaka Regency,

Southeast Sulawesi ProvinceHead 77 metreAveraged Annual Flow 7.45 m3/secDependable Flow 2.48 m3/secAveraged Power Production 20.55 GWh/YearWaterway Pipa HDPE Dia; 2.50 m x 1500 m lengthPenstock Steel pipe Dia; 1.59 m x 200 m length Power House Semi UndergroundTurbine 3 x 1.25 MW/Francis/Horizontal Shaft/500 rpmGenerator 3 x 1.38 MVA/11 kV/50 HzRated Capacity 3 x 1.25 MWProgress On going Commercial Operation Date End of 2008

Project Features

Proposed Tariff 6.10 cent USD/kWh or Rp 561.20/kWhRevenue per Year USD 1,161,397/Year or Rp 10,684,849,000/YearInvestment Costs USD 3,915,608 or Rp. 36,023,595,000 Interest During costs USD 484,353 or Rp 4,456,044,000Total Cost of Project USD 4,425,783 or Rp 40,717,205,000Loan (65%) USD 2,876,759 or Rp 26,466,183,000Equity (35%) USD 1,549,024 or Rp 14,251,022,000 Grace Period 2 Years or 2 TahunLoan Period 7 Years or 7 TahunRepayment Period 5 Years or 5 Tahun Interest Rate 15 %IRR 21.79 % NPV USD 1,779,294 or Rp 16,369,506,000 Payback Ratio 5 Years and 3 monthsROE 10.74 %Project Life Time 30 YearsExchange Rate Rp 9,200/USDStatus of Formalities FS

Projected Financial Highlights

Owner PT Batuganda EnergyAddress Jl Amil Gedung No 7, Wr. Buncit, Jakarta 12740Phone/Fax 021-7990218/021-7985164Website www.indonesiahydropower.comEmail [email protected] Person Director

Contact

BATUGANDA MINI HYDROPOWER PROJECT10

USSU MALILI MINI HYDROPOWER PROJECT

Page 13: Bulletin Hydro Power 032007

USSU MALILI HEPPKabupaten Luwu Timur, Sulawesi Selatan

I N D O N E S I A

Name Of Hydropower Ussu Malili Location Kawata River, Usu Village, Malili District, Luwu Timur

Regency, South Sulawesi ProvinceHead 100 metreAveraged Annual Flow 4.59 m3/secDependable Flow 3.31 m3/secAveraged Power Production 19.75 GWh/YearWaterway Open channel; 1.6 m Width 1.9 m Height 1680 m lengthPenstock Steel pipe; Dia 1.2-0.6 m length 250mPower House Semi UndergroundTurbine 3 x 1.15 MW/Francis/Horizontal Shaft/1000 rpmGenerator 3 x 1.27 MVA/11 kV/50 HzRated Capacity 3 x 1.15 MWProgress On goingCommercial Operation Date Mid of 2008

Project Features

Proposed Tariff 6.10 cent USD/kWh or Rp 561.20/kWhRevenue per Year USD 1,166,407/Year or Rp 10,730,944,000/YearInvestment Costs USD 3,551,160 or Rp 32,670,673,000Interest During consts USD 482,669 or Rp 4,440,559,000Total Cost of Project USD 4,033,830 or Rp 37,111,233,000Loan (65%) USD 2,823,681 or Rp 25,977,863,000Equity (35%) USD 1,210,149 or Rp 11,133,370,000Grace Period 2 Years or 2 TahunLoan Period 7 Years or 7 TahunRepayment Period 5 Years or 5 TahunInterest Rate 15 %IRR 21.02 %NPV USD 1,508,148 or Rp 13,874,961,000 Payback Ratio 4 Years and 11 monthsROE 14.67 %Project Life Time 30 YearsExchange Rate Rp 9200/USDStatus of Formalities Principal Permit, FS

Projected Financial Highlights

Ownerz PT Ussu Malili HydropowerAddress Jl Amil Gedung No 7, Wr. Buncit, Jakarta 12740Phone/Fax 021-7990218/021-7985164Website www.indonesiahydropower.comEmail [email protected] Person Director

Contact

USSU MALILI MINI HYDROPOWER PROJECT11

Page 14: Bulletin Hydro Power 032007

KONDARA HEPPKabupaten Kolaka Utara, Sulawesi Tenggara

I N D O N E S I A

Name Of Hydropower Kondara Location Olooloho River, North of Kolaka Regency,

Southeast Sulawesi ProvinceHead 100 metreAveraged Annual Flow 4.77 m3/secDependable Flow 1.59 m3/secAveraged Power Production 18.22 GWh/YearWaterway Pipa HDPE Dia; 2.50 metre x 1800 m lengthPenstock Steel pipe Dia; 1.20 metre x 215 metre lengthPower House Semi UndergroundTurbine 3 x 1.1 MW/Francis/Horizontal Shaft/500 rpmGenerator 3 x 1.22 MVA/11 kV/50 HzRated Capacity 3 x 1.1 MWProgress On going Commercial Operation Date End of 2008

Project Features

Proposed Tariff 6.10 cent USD/kWh or 561.20/kWhRevenue per Year USD 1,055,538/Year or Rp 9,710,951,000/YearInvestment Costs USD 3,915,608 or Rp 36,261,161,000Interest During costs USD 477,684 or Rp 4,394,690,000 Total Cost of Project USD 4,393,292 or Rp 40,418,285,000Loan (65%) USD 2,855,640 or Rp 26,271,886,000Equity (35%) USD 1,537,652 or Rp 14,146,400,000 Grace Period 2 Years or 2 TahunLoan Period 7 Years or 7 TahunRepayment Period 5 Years or 5 Tahun Interest Rate 15 % IRR 20.23 % NPV USD 1,273,483 or Rp 11,716,041,000 Payback Ratio 5 Years and 8 monthsROE 10.44 % Project Life Time 30 YearsExchange Rate Rp 9,200/USDStatus of Formalities FS

Projected Financial Highlights

Owner PT Kondara EnergyAddress Jl Amil Gedung No 7, Wr. Buncit, Jakarta 12740Phone/Fax 021-7990218/021-7985164Website www.indonesiahydropower.comEmail [email protected] Person Director

Contact

KONDARA MINI HYDROPOWER PROJECT12

SALUNOA MINI HYDROPOWER PROJECT

Page 15: Bulletin Hydro Power 032007

SALUNOA HEPPKabupaten Luwu Timur, Sulawesi Selatan

I N D O N E S I A

Name Of Hydropower Saluanoa Location Anoa River, Kasintuwu Village, Mangkutana District,

Luwu Timur Regency, South Sulawesi ProvinceHead 100 metreAveraged Annual Flow 2.95 m3/secDependable Flow 2.38 m3/secAveraged Power Production 13.76 GWh/YearWaterway Open channel; 1.8 m Height x 1.6 m Width x 198 m LengthPenstock Steel pipe; 225 m Length Dia. 0.85 metrePower House Semi UndergroundTurbine 2 x 1.15 MW/Francis/Horizontal Shaft/1000 rpmGenerator 2 x 1.27 MVA/11 kV/50 HzRated Capacity 2 x 1.15 MWProgress On goingCommercial Operation Date End of 2008

Project Features

Proposed Tariff 6.10 cent USD/kWh or Rp 561.20,000 /kWhRevenue per Year USD 777,605/Year or Rp 7,153,963,000/YearInvestment Costs USD 2,335,590 or Rp 21,487,428,000 Interest During costs USD 298,971 or Rp 2,750,532,000Total Cost of Project USD 2,634,561 or Rp 24,237,960,000Loan (65%) USD 1,844,193 or Rp 16,966,572,000Equity (35%) USD 790,368 or Rp 7,271,388,000 Grace Period 2 Years or 2 TahunLoan Period 7 Years or 7 TahunRepayment Period 5 Years or 5 TahunInterest Rate 15 %IRR 20.95 % NPV USD 964,467 or Rp 8,873,092,000 Payback Ratio 4 Years and 11 monthsROE 13.92 %Project Life Time 30 YearsExchange Rate Rp 9200/USDStatus of Formalities Principal Permit, FS

Projected Financial Highlights

Owner PT Anoa HydropowerAddress Jl Amil Gedung No 7, Wr. Buncit, Jakarta 12740Phone/Fax 021-7990218/021-7985164Website www.indonesiahydropower.comEmail [email protected] Person Director

Contact

SALUNOA MINI HYDROPOWER PROJECT13

Page 16: Bulletin Hydro Power 032007

MAPPUNG HEPPKabupaten Gowa, Sulawesi Selatan

I N D O N E S I A

Name Of Hydropower Mappung Location Mappung River, Tabbingjay Village, Tombolopao District,

Gowa Regency, South Sulawesi ProvinceHead 189 metreAveraged Annual Flow 62 m3/secDependable Flow 0.57 m3/secAveraged Power Production 2.1 GWh/YearWaterway No WaterwayPenstock HDPE pipe; Dia. 0.6, Length 240 mPower House Semi UndergroundTurbine 1 x 0.295 MW/Francis/Horizontal Shaft/1000 rpmGenerator 1 x 0.32 MVA/11 kV/50 HzRated Capacity 1 x 0.29 MWProgress On goingCommercial Operation Date Mid of 2007

Project Features

Proposed Tariff 6.10 cent USD/kWh or Rp 561.20/ kWhRevenue per Year USD 127,786 or Rp 1,175,635,000 Investment Costs USD 424,383 or Rp 3,904,325,000Interest During costs USD 52,763 or Rp 485,416,000 Total Cost of Project USD 477,146 or Rp 4,389,740,000 Loan (65%) USD 334,002 or Rp 3,072,818,000 Equity (35%) USD 143,144 or Rp 1,316,922 ,000 Grace Period 2 Years or 2 TahunLoan Period 7 Years or 7 TahunRepayment Period 5 Years or 5 TahunInterest Rate 15 %IRR 19.43%NPV USD 125,880 or Rp 1,158,099,000 Payback Ratio 5 Years and 5 monthsROE 18.08% Project Life Time 30 YearsExchange Rate Rp 9,200/USDStatus of Formalities Principal Permit, SITU, Amdal, UKL-UPL, IMB, HOA, FS

Projected Financial Highlights

Owner PT Mappung HydropowerAddress Jl Amil Gedung No 7, Wr. Buncit, Jakarta 12740Phone/Fax 021-7990218/021-7985164Website www.indonesiahydropower.comEmail [email protected] Person Director

Contact

MAPPUNG MICRO HYDROPOWER PROJECT14