BUILDING RENEWAL 2020
UpdateMay 2020
FIRST THINGS FIRST!
The leadership team at PCC (Pastors, Elders, Deacons and Trustees)
sincerely hope that you are all doing well and staying safe during this
unprecedented time of sheltering-in-place. Please know that we are
holding you up in prayer knowing that the Lord is gracious, good and
well-able to provide for each of us during this unsettled time. If you
have a need, please let us know. We are all looking earnestly to the
time when we can gather together again as family to fellowship and
renew friendships but especially to worship the Lord together.
Hopefully, that will happen in the not-to-distant future!
BUILDING RENEWAL 2020
Construction Has Begun!
BUILDING RENEWAL 2020: SCHEDULE
•Construction Began May 4th!
• Installed plastic barriers
•Ordered new lift the end of April
•Scheduled Completion Date: August 28th
DESIGN UPDATE
•Vendor/design changes reduced costs
• New architect
• New lift vendor
• Redesign of restrooms
•Cost savings used to upgrade aspects of project
RESTROOMS• 3 toilets/2 sinks in lady’s room & 2 toilets/1 urinal/2 sinks in men’s room (ADA compliant)
• Small under-counter cabinet by sinks in each restroom
• New ceilings in both restrooms
• New drywall to replace wallboard in both restrooms
• Ceramic tile behind toilets/urinal
• Luxury vinyl tile (LVT) and floor drains to replace ceramic floor tile in both restrooms
• New doors with kick plates for both restrooms
• Baby changing station in each restroom
• New LED light fixtures to replace current fluorescent fixtures in both restrooms
• Paint each restroom
• Move janitor’s closet from lady’s restroom to right (north side) of lift in Foyer
RESTROOMS CONTINUED
•Relocation of janitor’s closet
• Sinks will be installed where current janitor’s closet is located
• With relocation of janitor’s closet, restrooms will NOT be switched
• See diagram in following slide
RESTROOMS RE-DESIGN
FOYER
• LVT to replace existing ceramic floor tile
•New janitor’s closet on right side of lift
•New storage closet adjacent to new janitor’s closet
•New bi-level drinking water fountain
•New LED light fixtures to replace existing fluorescent lights
• Paint Foyer
•New railings from Foyer to Fellowship Hall and to lower level
FOYER RE-DESIGN
LIFT
•New 54 in x 42 in vertical platform lift
• Automatic doors at each level
• Intercom installed in lift
• LVT flooring in lift to match Foyer
•New (larger) lift shaft
• Will extend approximately 1 foot into library and Fellowship Hall
• Will extend mechanical closet in café
FELLOWSHIP HALL
•New 48 in high wall extending from lift to railing
•Permanent storage room walls replacing current temp walls
• 45 degree corner bevel
•Double doors with kick plates for storage room
•Paint new storage room
FINISHES• Selected Mainly by Aesthetics Committee
• LVT and door finishes selected to match current Fellowship Hall color scheme
• LVT also selected consistent with potential complementary carpet to allow for any future Fellowship Hall carpet upgrades
• Ceiling tiles, ceramic tiles (behind toilets/urinal) and paint colors have been selected
• Final selection of toilet stall partitions underway
BUILDING RENEWAL 2020
That’s it for now! Check Back!
We will keep you posted!!