Building Prothro Football Practice Fields
Tom CookOregon State University
Cameron, McCarthy, Gilbert, & ScheibeLandscape Architects LLPEugene, OR
Bernhardt Golf ConstructionDarryl Bernhardt, Bob Short & CrewPortland, OR
Greg GorackeOSU Intercollegiate Athletics
Design Group
Contractor
OSU liaison
Design Features
1.Excavate existing field 2.Grade subgrade to 1.5% slope3.Head-head multizoned irrigation, Hunter heads4.Drains 15 ft on center, 8” mains, 4” laterals5.Trenches lined with geotextile fabric6.90-10 sand/organic topmix approx. 12” depth7.Sand grown perennial ryegrass sod8.Fixed goals at south end of field
Scheduled start date April 1, 2003Scheduled finish date July 9, 2003
Staging area set up at east end of existing fields
Stockpiling soil for removal
Irrigation lines trenched 2 ft deep into subgradeso drainlines could be installed above irrigation lines
Main drainline at south end of field
Double walled corrugated pipe
Drain lines trenched to a constant depth
Spreading trench spoils away from trench
Packing down trench spoils after spreading
Connecting 20 ft drain sections prior to installation
Packing bottom of trench prior to drain placement
Unprotected drain 8 yrs after construction
Laying geotextile fabric on trench prior to placing pipes
Backfilling drains with gravel
Connecting laterals to main drain
Herringbone pattern on 15ft centers
Stockpiling sand + organic topmix from Fazio Bros.
Spreading topmix in preparation for final grading
Watering to firm surface for grading
Laser Grading to produce flat surface
Finish grade slope is 1.5% from north to south
Laser beacon
Rootzone depth approximately 12”
Float and roller to smooth for finish grade
Ryegrass from Bos Sod Co. in British Columbia
Cleanup drag just prior to laying sod
Positioning sod to get tight fitting seams
Sodding finished by July 3, 2003
Jess Lewis, Field mgr.
Root depth 3 wks after sodding
Two-a-day practices started about 5 wks after sodding
Turf appearanceafter 2 wksof preseason practice
How did it turn out?
1.Fixed goals = conc. wear at south end2.Worn areas lost stability3.Turf recovered well after season started4.Need to rotate drill locations more