Building Information Modelling (BIM) Guide for Facilities Upkeep (Version 1.0) Objective The primary purpose of this Guide is to provide a common reference on the adoption of BIM in As-built Modelling for Facilities Upkeep in building projects including capital works projects, entrustment works, subvented capital works projects and works that are undertaken by private parties with project estimates more than $30 million and will be handed back to ArchSD for maintenance according to Development Bureau Technical Circular (Works) No. 7/2017 or the latest version. Disclaimer Whilst the Architectural Services Department endeavours to ensure the accuracy of the contents in this Guide, no expressed or implied warranty is given on the accuracy of any of its contents and there are no representations, either expressed or implied, as to the suitability of the said information and data for any particular purpose. It is hereby stated expressly that the department does not approve, recommend, endorse or certify the use of any of the information and technologies contained in or in connection with this Guide. Users are responsible for making their own assessments and judgement of all information contained in or in connection with this Guide and are advised to seek independent verification as to its accuracy, currency or completeness. The department accepts no liability for any use of the said information and data or reliance placed on it. The department does not accept any responsibilities for any special, indirect or consequential loss or damages whatsoever arising out of or in connection with the use of this Guide. The Architectural Services Department reserves the right to omit, edit or update the Guide at any time in its absolute discretion without any prior notice. Property Services Branch Architectural Services Department

Transcript of Building Information Modelling (BIM) Guide for Facilities...

Building Information Modelling (BIM) Guide for Facilities Upkeep

(Version 1.0) Objective The primary purpose of this Guide is to provide a common reference on the adoption of BIM in As-built Modelling for Facilities Upkeep in building projects including capital works projects, entrustment works, subvented capital works projects and works that are undertaken by private parties with project estimates more than $30 million and will be handed back to ArchSD for maintenance according to Development Bureau Technical Circular (Works) No. 7/2017 or the latest version.

Disclaimer Whilst the Architectural Services Department endeavours to ensure the accuracy of the contents in this Guide, no expressed or implied warranty is given on the accuracy of any of its contents and there are no representations, either expressed or implied, as to the suitability of the said information and data for any particular purpose. It is hereby stated expressly that the department does not approve, recommend, endorse or certify the use of any of the information and technologies contained in or in connection with this Guide. Users are responsible for making their own assessments and judgement of all information contained in or in connection with this Guide and are advised to seek independent verification as to its accuracy, currency or completeness. The department accepts no liability for any use of the said information and data or reliance placed on it. The department does not accept any responsibilities for any special, indirect or consequential loss or damages whatsoever arising out of or in connection with the use of this Guide. The Architectural Services Department reserves the right to omit, edit or update the Guide at any time in its absolute discretion without any prior notice.

Property Services Branch Architectural Services Department

Property Services Branch, ArchSD

BIM Guide for Facilities Upkeep (Version 1.0) i First Issue Date – June 2018

Current Issue Date – June 2018

Building Information Modelling (BIM) Guide

for Facilities Upkeep

TABLE OF CONTENTS

Page

1. Introduction 1

1.1 Overview 1

1.2 Reference BIM Standards and Guidelines 1

1.3 Terminology and Abbreviation 1

1.3.1 Terminology 1

1.3.2 Abbreviation 2

2. As-built Model for Facilities Upkeep 3

2.1 Coverage of the As-built Model 3

2.2 Definition of LOD for As-built Model 4

2.3 Scope of As-built Model 5

2.3.1 General Requirements 5

2.3.2 Integration with ArchSD PSB’s System 5

2.3.3 3D Animation 6

2.3.4 Model Requirement for Graphic & Non-graphic

Information

7

2.3.5 Drawing Production 7

2.3.6 Photographic Record 7

2.3.7 3D Digital Point Cloud Scanning 7

2.4 File Folder Structure 8

Appendix 1 PSB Standard Parameters in As-built Model 10

Appendix 2 Example of PSB Standard Parameters in Object 16

Appendix 3 Model Requirement for As-built Model 17

Appendix 4 Creating Sheet Record 26

Property Services Branch, ArchSD

BIM Guide for Facilities Upkeep (Version 1.0) Page 1 First Issue Date – June 2018

Current Issue Date – June 2018

1. Introduction

1.1 Overview

This Building Information Modelling (BIM) Guide for Facilities Upkeep (FU) by

Property Services Branch (PSB) of the Architectural Services Department (ArchSD)

(hereinafter as the “Guide”) documented the general requirements and practices in

producing BIM as-built models for ArchSD managed Capital Works Projects,

entrustment works, subvented capital works projects and works that are undertaken by

private parties with project estimates more than $30 Million and will be handed back

to ArchSD for maintenance according to Development Bureau Technical Circular

(Works) No. 7/2017. The aim of this Guide is to provide the general requirements

and practice for the processing of BIM model and related deliverables at handover and

subsequent operation and maintenance stage as reference. The Guide is formulated

base on internationally and locally recognized BIM standards, guidelines and industry

practices. The Guide would be subject to regular review and update to suit the latest

development on BIM.

1.2 Reference BIM Standards and Guidelines

This Guide has made reference to the following standards and guidelines:

(a) Building Information Modelling Standards (Phase one) issued by Hong Kong

Construction Industry Council

(b) Computer-Aided-Drafting Standard for Works Projects (CSWP) issued by

Development Bureau of the HKSAR Government

(c) American Institute of Architects (AIA)’s G202-2013 Building Information

Modeling Protocol Form

(d) BS 1192:2007+A1:2016 Collaborative production of architectural, engineering

and construction information. Code of practice

(e) BS 8536-1:2015 Briefing for design and construction. Code of practice for

facilities management (Buildings infrastructure)

(f) PAS 1192-2:2013 Specification for information management for the

capital/delivery phase of construction projects using Building Information

Modelling

(g) PAS 1192-3:2014 Specification for information management for the

operational phase of assets using Building Information Modelling

(h) BS 1192-4:2014 Collaborative production of information Part 4: Fulfilling

employers information exchange requirements using COBie – Code of practice

(i) PAS 1192-5:2015: Specification for security-minded Building Information

Modelling, digital built environments and smart asset management

1.3 Terminology and Abbreviation

1.3.1 Terminology

The common terminologies for BIM process are listed below:

Property Services Branch, ArchSD

BIM Guide for Facilities Upkeep (Version 1.0) Page 2 First Issue Date – June 2018

Current Issue Date – June 2018

Terminology

Description

3D Three-dimensional geometry

CAD Computer-Aided Design

Common Data

Environment

(CDE)

Common Data Environment (CDE), an electronic information

management system platform to manage the collection,

creating, sharing and publishing of project information. This is

the single source of all information relating to the project and

should be set up to facilitate the spatial coordination

and information exchange processes described in PAS 1192.

COBie Construction Operations Building Information

Exchange (COBie), an international standard to manage asset

data information rather than geometric information such as

equipment list and product data. COBie may take several

approved formats include spreadsheet and IFC file format.

Federated Model

Compilation of Models from one or more programs that can

define a complete or partial data set for a design.

Industry

Foundation Class

(IFC)

A platform neutral, open and object-based file format with

specification developed by buildingSMART to

facilitate interoperability in the architectural, engineering and

construction industry, and is commonly used collaboration

format in BIM based projects. The IFC model specification is

registered by ISO as ISO 16739:2013.

LOD Level of Development (LOD) described in CIC Building

Information Modelling Standards

Object An occurrence of a building component in BIM software at a

particular location and orientation within a model (e.g.

Room.). Elements are also often called objects.

Object file

A data file that contains building elements. It often contains the

geometry and parameters representing the elements. It can be

created or loaded into the BIM authoring software to assist

design.

1.3.2 Abbreviation

The abbreviations adopted in this Guide are listed below.

Abbreviation

Full Name

ACTION System Automated Communication Technical Information and

Operations Network System

Property Services Branch, ArchSD

BIM Guide for Facilities Upkeep (Version 1.0) Page 3 First Issue Date – June 2018

Current Issue Date – June 2018

AIS Asset Information System

ArchSD Architectural Services Department

BIM Building Information Modelling

CIC Construction Industry Council

FU Facilities Upkeep

GIS Geographic Information System

InForM

ArchSD InForM System

O&M Operation and Maintenance

PSB Property Services Branch

2. As-built Model for Facilities Upkeep

2.1 Coverage of the As-built Model

The BIM applications in public works projects shall in according to the BIM Uses

defined by the relevant Technical Circular (Works) No. 7/2017 issued by the

Development Bureau (DEVB). The following sections describe the requirements and

acceptable deliverables in as-built model using BIM for facilities upkeep by PSB.

The as-built model should cover the entire project and it includes well-coordinated

architectural, structural and building services models.

The as-built model shall fulfill the following criteria:

(a) Give to-scale visualization and ability to walkabout within the model;

(b) Be prepared in the specified formats for data exchange with ArchSD systems

including AIS and ACTION System;

(c) Provide as-constructed information relating to architectural, structural and

building services information with links to operation, maintenance, asset data and

other essential information;

(d) Show construction assemblies, actual and accurate in terms of size, shape, location,

brand and particulars of products, quantity and orientation in the LOD as specified;

(e) Extract and produce meaningful coordinated drawings (including but not limited

to BIM output drawing) including locations and dimensions of all reserved

maintenance access (i.e. floor and reflected ceiling plans, sectional & elevation

drawings, details drawings, and etc.);

(f) Produce drawings in other formats (e.g. CAD, pdf, dwg, dwf, etc.) and printing;

(g) Provide data and documentation for planning the maintenance of structure,

building fabric, building installations and fixtures during the operational life of a

facility;

(h) Include, unless otherwise specified, non-structural building components not

Property Services Branch, ArchSD

BIM Guide for Facilities Upkeep (Version 1.0) Page 4 First Issue Date – June 2018

Current Issue Date – June 2018

embedded into concrete or building structure;

(i) Systematically prepare and incorporate the information required in Appendix 3

and Appendix 4 into the as-built model; and

(j) Fulfill the contract requirements on Particular Specification for Approved Shop

Drawings, As-built Drawings, Operation and Maintenance Manual and Records.

2.2 Definition of LOD for As-built Model

The LOD requirements are referred to the CIC Building Information Modelling

Standard. Apart from the CIC requirements, supplementary definition and

interpretation of the LOD requirements, if applicable, are listed below. The as-built

model shall follow the definition and interpretation as shown in this Guide in order to

achieve the required purpose of the as-built model in facilities upkeep.

LOD 350

CIC Building Information Modelling Standard’s Definition

The model element is graphically represented within the model as a specific

system, object, or assembly in terms of quantity, size, shape, orientation, and

interfaces with other building systems.

Interpretations in this Guide Element / object is modeled at sufficient detail and accuracy in terms of

quantity, size, shape, location, and orientation for construction coordination.

LOD 400

CIC Building Information Modelling Standard’s Definition

The model element is graphically represented within the model as a specific

system, object or assembly in terms of size, shape, location, quantity, and

orientation with detailing, fabrication, assembly, and installation information.

Interpretations in this Guide Element / object is modeled at sufficient detail and accuracy in terms of

quantity, size, shape, location, and orientation for fabrication

LOD 500

CIC Building Information Modelling Standard’s Definition

The model element is a field verified representation in terms of size, shape,

location, quantity, and orientation.

Interpretations in this Guide The existence, exact quantity, exact physical dimension, exact shape,

approximate orientation, approximate spatial location of the element / object

in the model was verified on site. Accuracy of the element / object’s setting-out

location and its spatial location should be within ± 50mm between the model

and the actual verified site installation. The 3D geometry details of the element

/ object is not less than LOD400 and the shape should be modelled for easy

identification. Essential information, such as data of fittings, manufacturer,

model number, etc. and other as specified in Appendix 1 and Appendix 3, should

be embedded in the model element / object for facilities upkeep use.

Property Services Branch, ArchSD

BIM Guide for Facilities Upkeep (Version 1.0) Page 5 First Issue Date – June 2018

Current Issue Date – June 2018

2.3 Scope of As-built Model

2.3.1 General Requirements

An accurate record of the physical conditions and assets of a project shall be provided

with reference to the requirements stated in this Guide. The as-built model using BIM

shall be based on final and verified information of the project actually built on site.

Information on location such as room number and building name, staircase number,

washroom number, lift lobby number is required to be incorporated into the as-built

model. It is necessary to include the operation data, product catalogues, O&M manuals,

maintenance history of installation and building component, etc. and other information

as required below into the as-built model.

The as-built model shall contain Room Label in 3D text object under Architectural

BIM model for labelling of all building block/ structure/ facilities in Site/ Block/ Floor

Level, etc. as required by PSB for easy identification in facilities upkeep and model

viewing.

2.3.2 Integration with ArchSD PSB’s System

Asset Information System (AIS)

The as-built model and 2D as-built record drawings including pdf shall comprise

customized building attributes and file structure for data submission in the format

approved by PSB. The as-built model and building attributes will be used for future

development on retrieval of asset and works records mapping in AIS, which is based

on a software named “ArcGIS1” by Esri.

Apart from the as-built model required in this Guide, an additional as-built model in

modified IFC version for viewing and integration with AIS should be provided. The

BIM data shall be in HK1980 Grid Coordinates System2 and refer to Hong Kong

Principal Datum. The data format shall be compatible with the IFC standard (IFC4 or

alternative advance format as requested by PSB). Coordination with PSB’s

representatives and their information technology vendor is required to further proceed

data conversion process to the submitted native BIM and IFC file for data conversion

and AIS web application by using FME 3 and GIS 4 using ArcGIS. Relevant

schedules and contract documentations stored in pre-defined folder structure shall also

be arranged to suit the file display/ downloading functions in AIS.

The IFC files produced for AIS integration shall be able to filter, screen, split or

combine to produce models for viewing with information of Site, Block and Floor

Levels. The information contained in these levels is required to be filtered suitably for

viewing and working in AIS.

1 ArcGIS is a software by Esri. The version of the ArcGIS shall be Esri ArcGIS Enterprise Standard Edition 10.4.1 or

later edition. 2 HK1980 Grid Coordinates System is a local system by Lands Department of the Government of HKSAR used in

cadastral, engineering surveying and large scale mapping in Hong Kong. 3 FME is a software by Esri for transforming and exchanging data between ArcGIS and other applications. The version

of the FME shall be 2017 or later edition. 4 Geographic Information System is a system designed to capture, store, manipulate, analyze, manage and present spatial

or geographic data.

Property Services Branch, ArchSD

BIM Guide for Facilities Upkeep (Version 1.0) Page 6 First Issue Date – June 2018

Current Issue Date – June 2018

Level Description

Site One file for all building blocks, landscape, facilities, roads and

paths, etc. within the site boundary.

Block Separate file(s) for each individual building block, facilities and

structure, etc.

Floor Separate file(s) for each individual floor, such as basement,

mezzanine floor, cockloft, typical floors and roof, etc.

It shall be agreed with PSB if lower detailing level is preferred and accepted for display

in AIS. For projects with less complex scale and subject to PSB’s agreement, the

Site/Block/Floor levels may be provided with same IFC file(s). The original as-built

model files shall also be submitted to PSB for necessary examination and data

conversion purpose.

All contractual documentation submission shall be submitted as attachment files, i.e.

dwg, doc, docx, pdf, jpeg, jpg, xls, xlsx, mp4, etc. and other format(s) as specified/

commonly use. The submission of hyperlink for documentation retrieval from web

page is not allowed and it shall be converted to above format for storage and retrieval

in AIS.

Automated Communication Technical Information and Operations Network System

(ACTION System)

In addition, the information of the as-built model shall be modified for integration with

ACTION System, which is a property maintenance services management system of

ArchSD. The objects of the as-built model shall contain the properties as required in

Appendix 1 and one example is shown in Appendix 2. Subject to the complexity of the

project, the required properties shall be fine-tuned on request by PSB. The properties

of the objects shall be mapped with and input with the codes from the Elemental Code

Relation Table provided by the PSB in Microsoft Excel format. The table consists of

approx. 5 x 4500 numbers of parameter for elements, sub-elements, components,

attributes and remarks. As the Elemental Code Relational Table is restricted solely for

data input to the as-built model purpose, PSB shall be approached separately for

obtaining the latest version. Also, distribution of this table to third party is not allowed

without prior consent of PSB. The table may also be subject to change or amendment

without prior notification.

It is required to work with and provide at least 50 hours of technical communication

session with PSB, the AIS and ACTION System maintenance teams and/or their

information system vendor(s) to ensure the as-built model smoothly integrated with

these two systems.

2.3.3 3D Animation

The as-built model shall be provided with video clip files with 3D animation showing

the assembly, disassembly, repair and replacement method for special component or

special building system such as curtain wall system, etc. as specified in the contract

and Appendix 3 for viewing in the AIS. The objective of the 3D animation is to

illustrate how the special component or special building system can be maintained.

Property Services Branch, ArchSD

BIM Guide for Facilities Upkeep (Version 1.0) Page 7 First Issue Date – June 2018

Current Issue Date – June 2018

In general, the 3D animation shall be generated with LOD ranged from LOD350 to

LOD500 following Appendix 3. The 3D animation converted from the as-built model

shall be in mp4 format with resolution not lower than 1080p HD 30 fps or alternative

format requested by PSB. As the extent of the 3D animation required is depended on

the actual design of the building, proposal of the 3D animation shall be subject to

PSB’s approval.

2.3.4 Model Requirement for Graphic & Non-graphic Information

The model requirement of the architectural, plumbing and drainage as-built model

shall follow the requirement in Appendix 3. In case another requirement in the same

contract requests for a higher LOD, a higher LOD of the concerned as-built model

shall be provided. Besides, for plumbing and drainage as-built model, the requirements

stated in the Building Information Modelling for Asset Management (BIM-AM) –

Standards and Guidelines issued by Electrical & Mechanical Services Department

(EMSD) shall also be followed.

2.3.5 Drawing Production

The as-built model shall also be arranged to create sheet records and contain

information & schedules to meet the requirements indicated in Appendix 4 and

ArchSD’s Particular Specification for Approved Shop Drawings, As-built Drawings,

Operation and Maintenance Manual and Records.

2.3.6 Photographic Record

Photo record showing the site as-built condition (before the move-in of loose furniture)

shall be provided in every room including both internal and external. Each photo shall

cover not more than 10m x 10m area for each room. At least one photo should be taken

for every room and subject to PSB’s approval on demand of more photo records to

show the details of such area. As the purpose of the photo record is to see through

and cover the whole room, additional photo(s) shall be required for any obstruction,

recessed area, etc. A spreadsheet with floor plan (in dwg or pdf format) marking the

photo taken locations, field of visibility and to list the items (i) the photo filename, (ii)

room name, (iii) floor level and (iv) block level shall be in a presentable and agreed

format. For building with repetitive floor plan and design (e.g. government quarters,

etc.), only one of the typical floor should be selected for taking photo record. Proposed

locations for taking photo record shall be submitted to PSB for comment and approval.

The photo shall be stitched into a seamless 360-degree spherical panoramic image (i.e.

360 degree field of view horizontally and 180 degree vertically) with at least

7776x3888 pixels in JPEG format. The file size of each stitched 360-degree panoramic

photo shall be less than 7 MB. The image shall be in good quality with good sharpness,

contrast and without blur.

2.3.7 3D Digital Point Cloud Scanning

3D digital point cloud scanning shall be arranged for special feature and building

structure with historical value as indicated in Appendix 3. A 3D Model shall be created

from the point cloud laser scanning (with accuracy ≤5mm) with subsequent 3D

Property Services Branch, ArchSD

BIM Guide for Facilities Upkeep (Version 1.0) Page 8 First Issue Date – June 2018

Current Issue Date – June 2018

rendering showing the realistic colour and texture. The 3D Model integrated with As-

build Model shall accurately reflect the appearance and shape. The as-built condition

of the special feature and building structure at the completion of the project shall be

shown for facilitating future repair or renovation projects.

2.4 File Folder Structure

The required data and relevant documentations as specified in Appendices of this

Guide should be stored in a well-organized file folder structure and the as-built model

related materials should be filed in the respective folders. The proposed file folder

structure should follow the below standard or in other folder structure in an effective

manner to be accepted by PSB.

Tier Folder Name Stored Materials

1st InForM Number5

of Project &

Location Code /

Property Name in

ACTION System

2nd 10_Admin Stores all document for project management, including

contract, project execution plans, etc.

2nd 20_Library Stores resources files such as Templates, Title Blocks,

Line Styles, Fonts, Objects, Material Images and

Specific Families

2nd 30_BIM Stores as-built BIM models from all disciplines. Models

should be in native format (e.g. .rvt). The structure of

BIM to follow AIS BIM specification.

2nd 40_O&M Stores all documents related to operation and

maintenance, e.g. testing & commissioning reports,

catalogues, literatures, drawings, certificates, warranties

and O&M manuals, etc. Different system shall be

stored in pre-defined structured folder.

2nd 50_Photo Stores all photographic record including the 360-view

photos.

2nd 60_Sheet Stores all drawing sheet record.

2nd 70_Inspection Stores all manuals containing the requirements on

cyclical maintenance inspection.

2nd 90_Others Stores all other miscellaneous documents.

Example of Folder Structure :

InForM Number of Project & Location Code / Property Name in ACTION System

10_Admin

20_Library

30_BIM

40_O&M

5 InforM Number is an unique project number for a project generated by ArchSD InForM System.

Property Services Branch, ArchSD

BIM Guide for Facilities Upkeep (Version 1.0) Page 9 First Issue Date – June 2018

Current Issue Date – June 2018

50_Photo

60_Sheet

70_Inspection

90_Others

Property Services Branch, ArchSD

BIM Guide for Facilities Upkeep (Version 1.0) Page 10 First Issue Date – June 2018

Current Issue Date – June 2018

Appendix 1 PSB Standard Parameters in As-built Model

Item Project Parameter Data type Mandatory Remarks Explanatory Note

1 PSB_LocCode 13 characters Yes

Data format refer to ArchSD's ACTION System's

Property Register.

This field is for PSB officer to assign location code(s) to

represent whole property/individual building/structure/ floor(s)

or individual room(s). Such as QA00200152000

2 PSB_Floor 3 characters Yes

Typical data format refer to 'Floor code table' This floor level shall be customized project parameter, say B5F

(basement), LGF (lower ground floor), 0GF (ground floor),

UG1 (upper ground floor), M1F (1/F mezzanine floor), M2F

(2/F Mezzanine floor), 99F, LRF (lower roof floor, 0RF (roof

floor), URF (upper roof), etc.)

3 PSB_ElementNo 5 digits Yes

from 00001 to 99999 This element number shall be referring to LocCode-Floor-

Element1-Subelement1 only.

4 PSB_Element1 textual Yes

The value shall refer to Elemental Code Relation

table and its code table.

Element 1 shall only be used to input information of major

object, such as door, window, wall, etc. Parts or components

belong to door and windows, waterproofing system, shall be

input to Element 2 to Element 5 with manufacturer/ catalogue

information.

5 PSB_Sub-element1 textual Yes The value shall refer to Elemental Code Relation

table and its code table.

6 PSB_Component1 textual Yes The value shall refer to Elemental Code Relation

table and its code table.

7 PSB_Attribute1 textual Yes The value shall refer to Elemental Code Relation

table and its code table.

8 PSB_Remarks1 textual

Property Services Branch, ArchSD

BIM Guide for Facilities Upkeep (Version 1.0) Page 11 First Issue Date – June 2018

Current Issue Date – June 2018

Item Project Parameter Data type Mandatory Remarks Explanatory Note

9 PSB_manufacturer1 textual

If the element has associated contractual

submission from

contractor/manufacturer/supplier, relevant

information of such

contractor/manufacturer/supplier shall be

provided to PSB

Name, contact number of contractor, manufacturer, supplier

shall be provided when the element has associated contractual

submission requirement stipulated under contract, quotation or

schedule of rates.

10 PSB_element_doc1 textual

Relative path of the zipped files (contractual

submission) to retrieve documents. Insert

separator ',' to divide path in case of multi-

directory.

If the element has associated contractual

submission from

contractor/manufacturer/supplier, relevant

documents of such

contractor/manufacturer/supplier shall be

provided to PSB

File path storing the contractual submission shall be provided.

PSB will convert these zipped file with its system to convert

into server's URL for updating the file path in BIM raw file.

Catalogue/warranty/test report/material origin, etc. from

manufacturer and suppliers shall have individual file to be

categorized and stored in specific file folder/sub-folder structure

so that the project officer could upload the documents to a user

interface of designated ArchSD system accordingly.

Manufacturer or supplier's web site shall be converted to pdf

format for submission.

11 PSB_Element2 textual The value shall refer to Elemental Code Relation

table and its code table.

The value shall refer to Elemental Code Relation table and its

code table.

12 PSB_Sub-element2 textual The value shall refer to Elemental Code Relation

table and its code table.

The value shall refer to Elemental Code Relation table and its

code table.

13 PSB_Component2 textual The value shall refer to Elemental Code Relation

table and its code table.

The value shall refer to Elemental Code Relation table and its

code table.

14 PSB_Attribute2 textual The value shall refer to Elemental Code Relation

table and its code table.

The value shall refer to Elemental Code Relation table and its

code table.

15 PSB_Remarks2 textual

Property Services Branch, ArchSD

BIM Guide for Facilities Upkeep (Version 1.0) Page 12 First Issue Date – June 2018

Current Issue Date – June 2018

Item Project Parameter Data type Mandatory Remarks Explanatory Note

16 PSB_manufacturer2 textual

If the element has associated contractual

submission from

contractor/manufacturer/supplier, relevant

information of such

contractor/manufacturer/supplier shall be

provided to PSB

Name, contact number of contractor, manufacturer, supplier

shall be provided when the element has associated contractual

submission requirement stipulated under contract, quotation or

schedule of rates.

17 PSB_element_doc2 textual

If the element has associated contractual

submission from

contractor/manufacturer/supplier, relevant

documents of such

contractor/manufacturer/supplier shall be

provided to PSB

Catalogue/warranty/test report/material origin, etc. from

manufacturer and suppliers shall have individual file to be

categorized and stored in specific file folder/sub-folder structure

so that the project officer could upload the documents to a user

interface of designated ArchSD system accordingly.

Manufacturer or supplier's web site shall be converted to pdf

format for submission.

18 PSB_Element3 textual The value shall refer to Elemental Code Relation

table and its code table.

The value shall refer to Elemental Code Relation table and its

code table.

19 PSB_Sub-element3 textual The value shall refer to Elemental Code Relation

table and its code table.

The value shall refer to Elemental Code Relation table and its

code table.

20 PSB_Component3 textual The value shall refer to Elemental Code Relation

table and its code table.

The value shall refer to Elemental Code Relation table and its

code table.

21 PSB_Attribute3 textual The value shall refer to Elemental Code Relation

table and its code table.

The value shall refer to Elemental Code Relation table and its

code table.

22 PSB_Remarks3 textual

Property Services Branch, ArchSD

BIM Guide for Facilities Upkeep (Version 1.0) Page 13 First Issue Date – June 2018

Current Issue Date – June 2018

Item Project Parameter Data type Mandatory Remarks Explanatory Note

23 PSB_manufacturer3 textual

If the element has associated contractual

submission from

contractor/manufacturer/supplier, relevant

information of such

contractor/manufacturer/supplier shall be

provided to PSB

Name, contact number of contractor, manufacturer, supplier

shall be provided when the element has associated contractual

submission requirement stipulated under contract, quotation or

schedule of rates.

24 PSB_element_doc3 textual

If the element has associated contractual

submission from

contractor/manufacturer/supplier, relevant

documents of such

contractor/manufacturer/supplier shall be

provided to PSB

Catalogue/warranty/test report/material origin, etc. from

manufacturer and suppliers shall have individual file to be

categorized and stored in specific file folder/sub-folder structure

so that the project officer could upload the documents to a user

interface of designated ArchSD system accordingly.

Manufacturer or supplier's web site shall be converted to pdf

format for submission.

25 PSB_Element4 textual The value shall refer to Elemental Code Relation

table and its code table.

The value shall refer to Elemental Code Relation table and its

code table.

26 PSB_Sub-element4 textual The value shall refer to Elemental Code Relation

table and its code table.

The value shall refer to Elemental Code Relation table and its

code table.

27 PSB_Component4 textual The value shall refer to Elemental Code Relation

table and its code table.

The value shall refer to Elemental Code Relation table and its

code table.

28 PSB_Attribute4 textual The value shall refer to Elemental Code Relation

table and its code table.

The value shall refer to Elemental Code Relation table and its

code table.

29 PSB_Remarks4 textual

Property Services Branch, ArchSD

BIM Guide for Facilities Upkeep (Version 1.0) Page 14 First Issue Date – June 2018

Current Issue Date – June 2018

Item Project Parameter Data type Mandatory Remarks Explanatory Note

30 PSB_manufacturer4 textual

If the element has associated contractual

submission from

contractor/manufacturer/supplier, relevant

information of such

contractor/manufacturer/supplier shall be

provided to PSB

Name, contact number of contractor, manufacturer, supplier

shall be provided when the element has associated contractual

submission requirement stipulated under contract, quotation or

schedule of rates.

31 PSB_element_doc4 textual

If the element has associated contractual

submission from

contractor/manufacturer/supplier, relevant

documents of such

contractor/manufacturer/supplier shall be

provided to PSB

Catalogue/warranty/test report/material origin, etc. from

manufacturer and suppliers shall have individual file to be

categorized and stored in specific file folder/sub-folder structure

so that the project officer could upload the documents to a user

interface of designated ArchSD system accordingly.

Manufacturer or supplier's web site shall be converted to pdf

format for submission.

32 PSB_Element5 textual The value shall refer to Elemental Code Relation

table and its code table.

The value shall refer to Elemental Code Relation table and its

code table.

33 PSB_Sub-element5 textual The value shall refer to Elemental Code Relation

table and its code table.

The value shall refer to Elemental Code Relation table and its

code table.

34 PSB_Component5 textual The value shall refer to Elemental Code Relation

table and its code table.

The value shall refer to Elemental Code Relation table and its

code table.

35 PSB_Attribute5 textual The value shall refer to Elemental Code Relation

table and its code table.

The value shall refer to Elemental Code Relation table and its

code table.

36 PSB_Remarks5 textual

37 PSB_manufacturer5 textual

If the element has associated contractual

submission from

contractor/manufacturer/supplier, relevant

information of such

contractor/manufacturer/supplier shall be

provided to PSB

Name, contact number of contractor, manufacturer, supplier

shall be provided when the element has associated contractual

submission requirement stipulated under contract, quotation or

schedule of rates.

Property Services Branch, ArchSD

BIM Guide for Facilities Upkeep (Version 1.0) Page 15 First Issue Date – June 2018

Current Issue Date – June 2018

Item Project Parameter Data type Mandatory Remarks Explanatory Note

38 PSB_element_doc5 textual

If the element has associated contractual

submission from

contractor/manufacturer/supplier, relevant

documents of such

contractor/manufacturer/supplier shall be

provided to PSB

Catalogue/warranty/test report/material origin, etc. from

manufacturer and suppliers shall have individual file to be

categorized and stored in specific file folder/sub-folder structure

so that the project officer could upload the documents to a user

interface of designated ArchSD system accordingly.

Manufacturer or supplier's web site shall be converted to pdf

format for submission.

39 PSB_MWORRF_link textual

This textual value will be replaced by URL(s) by PSB's system

to read Repair Request Form generated in Repair Call Centre's

Desktop Application in a customized pop-up windows.

40 PSB_MWO_link textual

This textual value will be replaced by URL(s) by PSB's system

to read minor works order generated in ACTION System in a

customized pop-up window.

41 PSB_WO_link textual

This textual value will be replaced by URL(s) by PSB's system

to read works order generated in ACTION System in a

customized pop-up window.

42 SoR_no textual

This textual value will be replaced by URL(s) by PSB's system

to read schedule of rates record in a customized pop-up

windows upon customization of relevant ArchSD's system, such

as ACTION System.

Property Services Branch, ArchSD

BIM Guide for Facilities Upkeep (Version 1.0) Page 16 First Issue Date – June 2018

Current Issue Date – June 2018

Appendix 2

Example of PSB Standard Parameters in Object

Property Services Branch, ArchSD

BIM Guide for Facilities Upkeep (Version 1.0) Page 17 First Issue Date – June 2018

Current Issue Date – June 2018

Appendix 3

Model Requirement for As-built Model

Remarks : (i) The elements shown in the table are under the relevant trades with reference to ArchSD General Specification and Schedule of Rates. Reference should also be

made to the CIC Building Information Modelling Standards.

(ii) This list is not exhaustive, additional element(s) or feature(s) may be required to include for individual project.

Legends : - Required

- Not required

Item Element Graphic

Model

Element

Non-

graphic

information

3D Animation BIM Object

from original

manufacturer

Photo

record

(other

than

360o

photos)

Other Modelling Requirements Other Supporting Information

Level of

Development

(LOD)

Level of

Development

(LOD)

1.0 Excavation

1.1 Elements under this trade 350 500 (if available)

2.0 Concrete Work

2.1 Elements under this trade 350 500 (if available)

3.0 Brickwork and Blockwork

3.1 Elements under this trade 350 500 (if available)

4.0 Masonry

4.1 Elements under this trade 350 500 (if available)

Property Services Branch, ArchSD

BIM Guide for Facilities Upkeep (Version 1.0) Page 18 First Issue Date – June 2018

Current Issue Date – June 2018

Item Element Graphic

Model

Element

Non-

graphic

information

3D Animation BIM Object

from original

manufacturer

Photo

record

(other

than

360o

photos)

Other Modelling Requirements Other Supporting Information

Level of

Development

(LOD)

Level of

Development

(LOD)

5.0 Roofing and Waterproofing

5.1 Elements under this trade

(unless otherwise specified below)

350 500 (if available)

1) Showing shop drawings

2) Showing Maintenance access

1) Contractor / Specialist Contractor

information.

2) Brand name and model information.

3) Technical literature.

4) Guarantee and warranty.

5) O&M manual.

6) Cyclical maintenance requirement (if

applicable).

5.2 Waterproofing 350 500 (if available)

1) Ditto (to Item 5.1).

2) Showing fixing details

including movement/ expansion

joints, tiling and insulation, etc.

1) Ditto (to Item 5.1).

2) Infra-red thermograph testing report.

5.3 Corrugated or Profiled Sheet

Roofing

500 500 (in LOD 350 or

above ; Step-

by-step process

showing the

assemble &

disassemble of

fixtures)

(if available)

1) Ditto (to Item 5.1).

2) Showing fixing details

including joints, provision of

subgrid & purlin, fall arrest, etc.

1) Ditto (to Item 5.1).

5.4 Green Roofing System 350 500 (if available)

1) Ditto (to Item 5.1).

2) Showing different layers of the

system (e.g. roof barrier,

moisture retention layer,

drainage layers and inspection

chamber, irrigation system, etc.)

1) Ditto (to Item 5.1).

2) Structural assessment record by

Registered Structural Engineer.

6.0 Carpentry and Joinery

6.1 Elements under this trade

(unless otherwise specified below)

350 500 (if available)

1) Brand name and model information.

2) Technical literature.

6.2 Fire resisting door set, windows,

partition and enclosure

350 500 (if available)

1) Showing fixing details including

all accessories, ironmongeries, joints,

supporting frames, etc.

1) Ditto (to Item 6.1).

2) Fire certificate.

Property Services Branch, ArchSD

BIM Guide for Facilities Upkeep (Version 1.0) Page 19 First Issue Date – June 2018

Current Issue Date – June 2018

Item Element Graphic

Model

Element

Non-

graphic

information

3D Animation BIM Object

from original

manufacturer

Photo

record

(other

than

360o

photos)

Other Modelling Requirements Other Supporting Information

Level of

Development

(LOD)

Level of

Development

(LOD)

6.3 Acoustic door, panel, fixtures 350 500 (if available)

1) Showing fixing details including

all accessories, ironmongeries, etc.

1) Ditto (to Item 6.1).

2) Warranty and certificate.

3) Specification of the acoustic

properties.

7.0 Ironmongery

7.1 Elements under this trade 350 500 (if available)

1) Brand name and model information.

2) Technical literature.

3) O&M manual.

8.0 Steel and Metal Work

8.1 Elements under this trade

(unless otherwise specified below)

350 500 (if available)

1) Brand name and model information.

2) Technical literature.

8.2 Fall arrest system 350 500 (if available)

1) Ditto (to Item 8.1).

2) Contractor / Specialist Contractor

information.

3) O&M manual.

4) Particular specification for

examination, testing and operation

training.

8.3 Steel sheet / composite aluminium

cladding

350 500 (if available)

1) Showing fixing details

including joints, supporting

frames, insulation layer, etc.

1) Ditto (to Item 8.1).

2) Contractor / Specialist Contractor

information.

3) Guarantee and warranty.

4) O&M manual.

8.4 Proprietary shutter, swing and

sliding door

350 500 (if available)

1) Showing fixing details

including joints, supporting

frames, rail / track, etc.

1) Ditto (to Item 8.1).

2) Contractor / Specialist Contractor

information.

3) Guarantee and warranty.

4) O&M manual.

8.5 Aluminium windows and doors 350 500 (if available)

1) Ditto (to Item 8.1).

9.0 Plastering and Finishes

9.1 Elements under this trade

(unless otherwise specified below)

350 500 (if available)

1) Brand name and model information.

2) Technical literature.

Property Services Branch, ArchSD

BIM Guide for Facilities Upkeep (Version 1.0) Page 20 First Issue Date – June 2018

Current Issue Date – June 2018

Item Element Graphic

Model

Element

Non-

graphic

information

3D Animation BIM Object

from original

manufacturer

Photo

record

(other

than

360o

photos)

Other Modelling Requirements Other Supporting Information

Level of

Development

(LOD)

Level of

Development

(LOD)

9.2 Suspended ceiling system 350 500 (if available)

1) Showing fixing details

including frames, etc.

1) Ditto (to Item 9.1).

2) Test certificates and manufacturer’s

guarantee.

9.3 Acoustic plaster / fire resisting

fireproofing plaster

350 500 (if available)

1) Ditto (to Item 9.1).

2) Manufacturer’s recommendation on

application.

3) Manufacturer’s guarantee.

9.4 Floor tiles, slabs, paving blocks 350 500 (if available)

1) Showing fixing details

including tiles adhesive, sand

filling/bedding, pointing and

grouting joint, etc.

1) Ditto (to Item 9.1).

2) Laying or fixing patterns.

3) Configuration and dimension.

4) Slip resistance classification and test

certificate.

9.5 Flexible tiles and sheet finishes 350 500 (if available)

1) Showing fixing details

including weld-joints, etc.

1) Ditto (to Item 9.1).

2) Laying or fixing patterns.

3) Configuration and dimension.

4) Slip resistance classification and test

certificate.

9.6 Stone or marble slabs / tiles 350 500 (in LOD 350;

for marble tiles

at external

wall/area; Step-

by-step process

showing the

assemble &

disassemble of

fixtures)

(if available)

1) Showing fixing details

including supporting

frame/bedding, pointing and

grouting joint, edges, etc.

1) Ditto (to Item 9.1).

2) Laying or fixing patterns.

3) Configuration and dimension.

4) Anti-stain treatment details.

5) Calculation endorsed by Registered

Structural Engineer for fixing of

stone or marble slabs to vertical or

sloping surfaces.

9.7 Raised Accessed Flooring 350 500 (if available)

1) Showing fixing details

including supporting frame,

grids, etc.

1) Ditto (to Item 9.1).

2) Laying or fixing patterns.

3) Configuration and dimension.

4) Test certificate and manufacturer’s

guarantee.

10.0 Roadwork and Cable Duct

10.1 Elements under this trade

350 500 (if available)

Property Services Branch, ArchSD

BIM Guide for Facilities Upkeep (Version 1.0) Page 21 First Issue Date – June 2018

Current Issue Date – June 2018

Item Element Graphic

Model

Element

Non-

graphic

information

3D Animation BIM Object

from original

manufacturer

Photo

record

(other

than

360o

photos)

Other Modelling Requirements Other Supporting Information

Level of

Development

(LOD)

Level of

Development

(LOD)

11.0 Plumbing and Drainage

11.1 Elements under this trade

(unless otherwise specified below)

350 500 (if available)

1) Showing exposed, underground

and concealed pipeworks,

valves, cisterns, tanks, brackets,

hangers, flexible joints, fittings,

manholes, petrol interceptor,

traps, gullies, sub-soil drain, etc.

2) Showing maintenance access

for tanks, duct well, pipe-duct,

concealed installations, etc.

1) Brand name and model information.

2) Type of joints & jointing method.

3) Size, volume, capacity, physical

dimension, etc.

4) Technical literature.

5) O&M Manual.

6) Cyclical maintenance requirement (if

applicable).

11.2 Glass-fibre reinforced plastic water

tank

350 500 (if available)

1) Ditto (to Item 11.1).

2) Showing the fixing of the

panels, fittings, ladders,

overflow, warning pipe, etc.

1) Ditto (to Item 11.1).

2) Structural calculation endorsed by

Registered Structural Engineer.

3) Test certificates.

11.3 Pressure Reducing Value 350 500 (if available)

1) Ditto (to Item 11.1). 1) Ditto (to Item 11.1).

2) Cleaning and maintenance

requirements.

11.4 Sub-soil drain pipes and drain layer 350 500 (if available)

1) Ditto (to Item 11.1).

2) Showing the layers of the sub-

soil drain, e.g. filter, pipe, etc.

should be shown.

1) Ditto (to Item 11.1).

12.0 Glazing

12.1 Elements under this trade

(unless otherwise specified below)

350 500 (if available)

1) Showing fixing details. 1) Brand name, model information and

technical literature for proprietary

product.

12.2 Glazing 350 500 (if available)

1) Ditto (to Item 12.1). 1) Type, size, colour, coating,

thickness, u-value, fire rated

properties, etc.

2) Test certificate and manufacturer’s

guarantee.

12.3 Louvre

350 500 (if available)

1) Ditto (to Item 12.1). 1) Ditto (to Item 12.1).

Property Services Branch, ArchSD

BIM Guide for Facilities Upkeep (Version 1.0) Page 22 First Issue Date – June 2018

Current Issue Date – June 2018

Item Element Graphic

Model

Element

Non-

graphic

information

3D Animation BIM Object

from original

manufacturer

Photo

record

(other

than

360o

photos)

Other Modelling Requirements Other Supporting Information

Level of

Development

(LOD)

Level of

Development

(LOD)

13.0 Painting

13.1 Elements under this trade 350 500 (if available)

1) Brand name, model information and

technical literature.

2) Test certificates, warranty and

certificate (if applicable).

14.0 Recreational / Sports Surfacing

and Protective Padding

14.1 Elements under this trade

(unless otherwise specified below)

350 500 (if available)

1) Brand name, model information and

technical literature.

14.2 Proprietary sport flooring system 350 500 (if available)

1) Showing fixing details

including all accessories,

components, finishes, sub-base,

joint, etc.

1) Ditto (to Item 14.1).

2) Certificate of origins.

3) Test certificates, warranty and

certificate.

4) O&M Manual.

14.3 Protective padding 350 500 (if available)

1) Showing fixing details

including all components,

finishes, etc.

1) Ditto (to Item 14.1).

2) Certificate of origins.

3) Test certificates, warranty and

certificate.

14.4 Impact absorbing surfacing material 350 500 (if available)

1) Showing fixing details

including all accessories,

components, finishes, sub-base,

joint, etc.

1) Ditto (to Item 14.1).

2) Certificate of origins

3) Test certificates, warranty and

certificate.

4) O&M Manual.

15.0 Fixtures and Fittings

15.1 Elements under this trade

(unless otherwise specified below)

350 500 (if available)

1) Brand name, model information and

technical literature.

15.2 Cabinets, cupboards, wardrobes,

sink cabinets, shelves, rack unit,

locker, counter, blinds, curtains,

awing, canvas, seating benches /

chairs, chess tables, drying rack, etc.

350 500 (if available)

1) Showing fixing details

including all accessories,

ironmongeries, etc.

1) Ditto (to Item 15.1).

Property Services Branch, ArchSD

BIM Guide for Facilities Upkeep (Version 1.0) Page 23 First Issue Date – June 2018

Current Issue Date – June 2018

Item Element Graphic

Model

Element

Non-

graphic

information

3D Animation BIM Object

from original

manufacturer

Photo

record

(other

than

360o

photos)

Other Modelling Requirements Other Supporting Information

Level of

Development

(LOD)

Level of

Development

(LOD)

15.3 Proprietary fume cupboards 350 500 (if available)

1) Showing fixing details

including all accessories,

connection to plumbing /

drainage / building services

installations, etc.

1) Ditto (to Item 15.1).

2) Specification on suitable chemical

resistant laboratory-grade material

3) Warranty and certificate.

4) O&M manual.

15.4 Flag pole 350 500 (if available)

1) Showing fixing details

including all accessories,

foundation, etc.

1) Ditto (to Item 15.1).

2) Warranty and certificate.

3) O&M manual.

15.5 Sanitary fittings 350 500 (if available)

1) Ditto (to Item 15.1).

2) Specification of the accessories and

flush valves.

3) O&M manual.

15.6 Taps and mixers 350 500 (if available)

1) Ditto (to Item 15.1).

2) WELS information.

15.7 Braille and tactile map 350 500 1) Certificate issued by recognized

certifying body.

16.0 Partitions and Cubicle System

16.1 Elements under this trade

(unless otherwise specified below)

350 500 (if available)

1) Showing fixing details

including all accessories,

ironmongeries, insulation,

supporting frame, track, rail,

finishes, etc.

1) Brand name, model information and

technical literature.

16.2 Demountable partition system 350 500 (if available)

1) Ditto (to Item 16.1). 2) Ditto (to Item 16.1).

3) Warranty and certificate.

4) O&M manual.

16.3 Dry wall partition 350 500 (if available)

1) Ditto (to Item 16.1). 2) Ditto (to Item 16.1).

3) Fire certificate for fire resisting

partition.

16.4 Sliding / folding partition including

acoustic partitions

350 500 (if available)

1) Ditto (to Item 16.1). 2) Ditto (to Item 16.1).

3) Warranty and certificate.

4) O&M manual.

16.5 Toilet cubicle system 350 500 (if available)

1) Ditto (to Item 16.1). 2) Ditto (to Item 16.1).

3) Warranty and certificate.

4) O&M manual.

Property Services Branch, ArchSD

BIM Guide for Facilities Upkeep (Version 1.0) Page 24 First Issue Date – June 2018

Current Issue Date – June 2018

Item Element Graphic

Model

Element

Non-

graphic

information

3D Animation BIM Object

from original

manufacturer

Photo

record

(other

than

360o

photos)

Other Modelling Requirements Other Supporting Information

Level of

Development

(LOD)

Level of

Development

(LOD)

17.0 Landscape Work

17.1 Elements under this trade 350 500 (if available)

18.0 Geotechnical Works

18.1 Elements under this trade 350 500 (if available)

19.0 Trees

19.1 Elements under this trade 200 350 For i) OVT and ii) tress on registered

SIMAR slope only.

20.0 Curtain Wall

20.1 Elements under this trade 500 500 (in LOD 350 or

above; Step-

by-step process

showing the

assemble &

disassemble of

fixtures)

(if available)

1) Showing details including

fixing, connection, anchorages,

spandrels & supporting system,

type of finishes, water bars,

movement joints, etc.

2) Showing maintenance access.

1) Contractor / Specialist Contractor

information.

2) Information & specification of the

materials, e.g. glazing,

ironmongeries, supporting

framework, ironmongeries, fire

insulation, fixing & connection,

coated finishes, water bars,

movement joint, sealant, etc.

3) OTTV calculation.

4) O&M manual.

5) Warranty.

6) Cyclical maintenance requirement (if

applicable).

21.0 Others (not mentioned above)

21.1 Elements under this trade 350 500 (if available)

1) Cyclical maintenance requirement (if

applicable).

21.2 Special feature / Building structure

with historical value

(*exact feature / structure to be

specified by the PSB)

350 500 (unless

otherwise

specified)

1) Showing maintenance access 1) Ditto (to Item 21.1).

2) 3D digital point cloud scanning.

Property Services Branch, ArchSD

BIM Guide for Facilities Upkeep (Version 1.0) Page 25 First Issue Date – June 2018

Current Issue Date – June 2018

Item Element Graphic

Model

Element

Non-

graphic

information

3D Animation BIM Object

from original

manufacturer

Photo

record

(other

than

360o

photos)

Other Modelling Requirements Other Supporting Information

Level of

Development

(LOD)

Level of

Development

(LOD)

21.3 Modular Integrated Construction 500 500 (in LOD 350 or

above; Step-

by-step process

showing the

assemble &

disassemble of

fixtures)

(if available)

1) Showing details including

fixing, joints and gaps,

connection, anchorages,

supporting system, connection

and route of services and

fittings, etc.

2) Showing Maintenance access.

1) Ditto (to Item 21.1).

2) Contractor / Specialist Contractor

information.

3) Information, specification and

literature of the installations and

materials.

4) O&M manual.

5) Warranty and Certificate.

21.4 Other items covered in i)

Architectural Model & ii) Plumbing

& Drainage Model but not listed

above.

350 500 (if available)

1) Ditto (to Item 21.1).

21.5 Furniture 350 350 1) Showing the layout including

the furniture.

Property Services Branch, ArchSD

BIM Guide for Facilities Upkeep (Version 1.0) Page 26 First Issue Date – June 2018

Current Issue Date – June 2018

Appendix 4

Creating Sheet Record

Item Description Information Contained in :

As-built

Model

Sheet

Record

1.0 Location Drawings

(a) List of Drawings -- Required

(b) Site / location / block plan showing the size and position of the

building and of other buildings in the immediate vicinity, and

neighbouring streets

Required Required

(c) GLA/Lot boundary, lease boundary, right of way, etc. Required Required

(d) The existing nature of the site and the surrounds and particulars of

structures, foundations, public utilities, drains and sewers and other

services on and adjacent to the site

Required Required

(e) Existing layout / demolition plan (if existing works should be

shown)

Required Required

(f) General plans of every floor and of the roof of the building, on

which there shall be shown full dimensions, the thickness of walls,

the position of all windows, soil fitments, waste fitments and water

storage tanks, and the intended use of every part of the building

Required Required

(g) Drawings showing -

-all elevations of the building;

-the level of adjacent streets in relation to a known datum and to the

levels of the site and the building;

-the width of every street adjacent to the site; and

-the position, depth and construction of any well;

Required Required

(h) Plans and sections of the proposed site formation works and

associated surface water drainage works

Required Required

(i) A diagrammatic plan, with full dimensions and calculations,

showing:

-the height, site coverage, plot ratio and disposition of the building

-any open space required

-the usable floor area

-the number and type of soil fitments and waste fitments to be

provided in the building

-provision made for persons with a disability

-list of modifications and/or exemptions

-details of the fire engineering approached adopted

-means of escape

-fire resisting construction including fire compartments & fire

resistant of building elements

-travel distance indicated on plan

Required Required

(j) Canopy, bridge or other projection over a street or unleased

Government land, plans showing clearly the nature and dimension of

such projection

Required Required

2.0 Principal Elements

(a) Architectural features / wall sections Required Required

(b) Roofing details Required Required

(c) Staircases Required Required

(d) Lift Shafts Required Required

(e) Openings for skylights / escalators, etc. Required Required

3.0 Component drawings / assembly drawings

(a) Door schedules and details Required Required

Property Services Branch, ArchSD

BIM Guide for Facilities Upkeep (Version 1.0) Page 27 First Issue Date – June 2018

Current Issue Date – June 2018

Item Description Information Contained in :

As-built

Model

Sheet

Record

(b) Window schedules and details Required Required

(c) Glass / metal louvres schedules Required Required

(d) Roller shutter schedules Required Required

(e) Sliding door / gate schedules Required Required

(f) Finishing schedule and details Required Required

(g) Ironmongery schedules Required Required

(h) Sanitary fittings schedules Required Required

(i) Glass block / grille wall schedules and details Required Required

(j) Waterproofing and tanking system Required Required

4.0 Suspended ceiling system / special flooring system

(a) Reflected ceiling plans and details Required Required

(b) Raised floors and details Required Required

(c) Sports flooring system Required Required

5.0 Sanitary plumbing and drainage system

(a) Drainage plan (including exposed, concealed & underground),

showing the size and depth of drains or sewers; connexions to a

public sewer or drain or nullah, any other method for the disposal of

drainage, the position of disconnecting traps, and the means of

ventilation

Required Required

(b) Vertical diagrams Required Required

(c) Manholes schedule Required Required

(d) Drainage details (e.g. manholes, BITG, gully trap, surface/stepped

channels, channel covers, grease trap, petrol interceptor, septic tanks,

etc.)

Required Required

6.0 Water supply system

(a) Layout plan (including exposed, concealed & underground),

showing the size and location of the pipeworks including the

associated installation (e.g. meter, valve, pump, tanks, etc.);

connexions to WSD main / well.

Required Required

(b) Vertical diagrams Required Required

7.0 Detailed layouts

(showing the detailed location and precise information of components

and assembly details in the project, e.g. toilets, changing rooms, lift

lobbies, services rooms, etc.)

(a) Layout plans Required Required

(b) Sections Required Required

(c) Elevations Required Required

(d) Details Required Required

8.0 External works

(showing the detailed location of components and assembly details at

external areas, e.g. paving, steps, ramps, planters, benches, arbours,

tree pit & grille, perimeter walls, fences, railings, gates, draw pit,

earth pit, etc.)

(a) Layout plans Required Required

(b) Sections Required Required

(c) Elevations Required Required

(d) Details Required Required

(e) Landscape plans and details Required Required

Property Services Branch, ArchSD

BIM Guide for Facilities Upkeep (Version 1.0) Page 28 First Issue Date – June 2018

Current Issue Date – June 2018

Item Description Information Contained in :

As-built

Model

Sheet

Record

9.0 Miscellaneous

(showing precise information of components and assemblies for

workshop manufacture or on site fabrication.)

(a) Other unclassified elements (e.g. details of notice board, cat ladders,

trap doors, flagpoles, signage system, cabinets, FS inlet / HR

cabinets, etc.)

Required Required

(b) Hidden and exposed structural elements Required Required

(c) Skylights Required Required

(d) Projections Required Required

(e) Railing and parapets Required Required

(f) Expansion / Construction / Movement Joints Required Required

10.0 Others

(a) List of Proprietary Products, Warranty Period, Scope of Warranty and

Details of Suppliers and Manufacturers

Required Required

(b) List, Details, Dimensions, Respective Locations and Quantity of

Spare Materials, Finishes and Parts and their Storage Area;

Required Required

(c) Management and Maintenance Responsibilities Required Required

(d) Location and Details of Special Feature that need attention Required Required

(e) Traffic Impact Assessment, Drainage Impact Assessment,

Environmental Impact Assessment, etc.

Required Required

(f) Engineering Conditions, Assignment, Deed of Mutual Covenants, etc. Required Required