Building a new water infrastructure without an instruction manual

32
BUILDING A NEW WATER INFRASTRUCTURE WITHOUT AN INSTRUCTION MANUAL Presented by Al Rendl TWCA Annual Meeting – March 6, 2014 NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY

description

Presented by Al Rendl at the Texas Water Conservation Association Conference in The Woodlands, Texas - March 2014

Transcript of Building a new water infrastructure without an instruction manual

Page 1: Building a new water infrastructure without an instruction manual

BUILDING A NEW WATER INFRASTRUCTURE WITHOUT AN

INSTRUCTION MANUAL

Presented by Al RendlTWCA Annual Meeting – March 6, 2014

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY

Page 2: Building a new water infrastructure without an instruction manual

HOUSTON’S ETJ

Page 3: Building a new water infrastructure without an instruction manual

Gulf Coast Aquifer

SUBSIDENCE AND AQUIFER DECLINE

Page 4: Building a new water infrastructure without an instruction manual

“FM 1960 Area Fastest growing residential community in America…”

-- Wall Street Journal, 1975

Page 5: Building a new water infrastructure without an instruction manual

245% POPULATION GROWTH

Page 6: Building a new water infrastructure without an instruction manual

ANNEXATION IS COMMON ENEMY

Page 7: Building a new water infrastructure without an instruction manual

HGSD -- ARRESTING SUBSIDENCE

Page 8: Building a new water infrastructure without an instruction manual

SPIRIT OF NORTH HARRISCOUNTY

COALITION

Page 9: Building a new water infrastructure without an instruction manual

Phased groundwater reduction mandate for

NW Harris Co. area• January 2010 – 30%• January 2020 – 70%• January 2030 – 80%

HARRIS GALVESTON SUBSIDENCE DISTRICT

Page 10: Building a new water infrastructure without an instruction manual

NHCRWA PRIMARY MISSION:Secure adequate surface water,

develop a system for transition to surface water

Page 11: Building a new water infrastructure without an instruction manual

First BoardMeeting…

February 2000

Page 12: Building a new water infrastructure without an instruction manual

To find and assure a long-term supply of quality drinking water at the lowest responsible cost.• Promote water conservation• Identify/provide cost effective alternative

water sources.• Maintain regulatory compliance• Encourage intergovernmental cooperation• Develop and implement a strategy

for complying with HGCSD 1999 regulations

NHCRWA MISSION STATEMENT:

Page 13: Building a new water infrastructure without an instruction manual

CHARTING THE COURSE

Page 14: Building a new water infrastructure without an instruction manual

FINDING A LONG-TERM SOURCE OF WATERBRAZOS RIVER

TRINTIY RIVER

Page 15: Building a new water infrastructure without an instruction manual

Negotiated:• Initial surface water rights• Ownership and participation

in COH’s NEWPP on Lake Houston

Page 16: Building a new water infrastructure without an instruction manual

DEVELOP GROUNDWATER REDUCTION PLAN

D R A F TGROUNDWATER

REDUCTION PLAN

Page 17: Building a new water infrastructure without an instruction manual

AVAILABLE SOURCES OF FUNDING• No taxing authority• Ability to sell bonds

without constituent vote

• Allowed Authority to charge Groundwater Pumpage Fee to all well owners, and• Ability to set rates

for surface water

Page 18: Building a new water infrastructure without an instruction manual

GROUNDWATER PUMPAGE FEE2000 Initial Fee = $0.10 Increased to $0.12

Increased to $0.25CURRENT FEES:Groundwater = $1.75/1000 gallonsSurface water = $2.20/surface waterAPRIL, 2014:Groundwater = $2.00/1000 gallonsSurface water = $2.45/1000 gallons

Page 19: Building a new water infrastructure without an instruction manual

PLEDGE: AS CHEAP AS POSSIBLE FOR AS LONG AS POSSIBLE

Page 20: Building a new water infrastructure without an instruction manual

DISCLOSE PUMPAGE FEE ON WATER BILL

Page 21: Building a new water infrastructure without an instruction manual

FIRST WEBSITE -- 2001

Page 22: Building a new water infrastructure without an instruction manual

EDUCATORS

COMMUNITY EVENTS

TOWN HALLS

Page 23: Building a new water infrastructure without an instruction manual

TEXAS WATER HOG

MOBILE TEACHING LAB

“LEARNING FROM OUR PAST” ASSEMBLY

MEDIA INTERVIEWS

Page 24: Building a new water infrastructure without an instruction manual

US EPA ARSENIC REGULATION CHANGE

Page 25: Building a new water infrastructure without an instruction manual

GREENSPOINT LINEPARTNERSHIP

• IAH TO GREENSPOINT• INCREASE SIZE AND SHARE• WATER FOR 20 YEARS• SAVES AUTHORITY ALMOST $15 MILLION

Page 26: Building a new water infrastructure without an instruction manual
Page 27: Building a new water infrastructure without an instruction manual
Page 28: Building a new water infrastructure without an instruction manual

LAKE CONROE

LAKE HOUSTON

Page 29: Building a new water infrastructure without an instruction manual
Page 30: Building a new water infrastructure without an instruction manual

THE LUCE BAYOU PROJECT

TRINITY RIVER PUMP STATION

LUCE BAYOUMAIN CANAL

POTENTIAL SUPPLY 450 MGD INTOLAKE HOUSTON

Page 31: Building a new water infrastructure without an instruction manual
Page 32: Building a new water infrastructure without an instruction manual

North Harris County Regional Water

Authority3648 Cypress Creek Parkway, Suite 110

Houston, TX 77068 n 281-440-3924