agnicoeagle.com Building a High Quality Manageable Gold Business in Challenging Times Sean Boyd, President and Chief Executive Officer Agnico Eagle Mines Limited Zurich November 2013

Transcript of Building a manageable gold business zurich nov7

Page 1: Building a manageable gold business   zurich nov7

agnicoeagle.com

Building a High Quality

Manageable Gold Business

in Challenging Times

Sean Boyd, President and Chief Executive Officer Agnico Eagle Mines Limited

Zurich November 2013

Page 2: Building a manageable gold business   zurich nov7

agnicoeagle.com

FORWARD LOOKING STATEMENTS

The information in this document has been prepared as at November 5, 2013. Certain statements contained in this document constitute

“forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward looking

information under the provisions of Canadian provincial securities laws. When used in this document, the words “anticipate”, “expect”,

“estimate”, “forecast”, “will”, “planned”, and similar expressions are intended to identify forward-looking statements or information.

Such statements include without limitation: statements regarding timing and amounts of capital expenditures and other assumptions; estimates

of future reserves, resources, mineral production, optimization efforts and sales; estimates of mine life; estimates of future internal rates of

return, mining costs, cash costs, minesite costs and other expenses; estimates of future capital expenditures and other cash needs, and

expectations as to the funding thereof; statements and information as to the projected development of certain ore deposits, including estimates

of exploration, development and production and other capital costs, and estimates of the timing of such exploration, development and

production or decisions with respect to such exploration, development and production; estimates of reserves and resources, and statements and

information regarding anticipated future exploration; the anticipated timing of events with respect to the Company’s mine sites and statements

and information regarding the sufficiency of the Company’s cash resources. Such statements and information reflect the Company’s views as at

the date of this document and are subject to certain risks, uncertainties and assumptions, and undue reliance should not be placed on such

statements and information. Many factors, known and unknown could cause the actual results to be materially different from those expressed or

implied by such forward looking statements and information. Such risks include, but are not limited to: the volatility of prices of gold and other

metals; uncertainty of mineral reserves, mineral resources, mineral grades and mineral recovery estimates; uncertainty of future production,

capital expenditures, and other costs; currency fluctuations; financing of additional capital requirements; cost of exploration and development

programs; mining risks; community protests; risks associated with foreign operations; governmental and environmental regulation; the volatility

of the Company’s stock price; and risks associated with the Company’s byproduct metal derivative strategies. For a more detailed discussion of

such risks and other factors that may affect the Company’s ability to achieve the expectations set forth in the forward-looking statements

contained in this document, see the Company’s Annual Report on Form 20-F for the year ended December 31, 2012, as well as the Company’s

other filings with the Canadian Securities Administrators and the U.S. Securities and Exchange Commission. The Company does not intend,

and does not assume any obligation, to update these forward-looking statements and information. Alain Blackburn, a Qualified Person and the

Company’s Senior Vice-President, Exploration, reviewed the technical information disclosed herein. For a detailed breakdown of the Company’s

reserve and resource position see the February 13, 2013 press release on the Company’s website. That press release also lists the Qualified

Persons for each project.

agnicoeagle.com 2

Page 3: Building a manageable gold business   zurich nov7

agnicoeagle.com

NOTES TO INVESTORS

Note Regarding the Use of Non-GAAP Financial Measures

This document presents estimates of future “total cash cost per ounce”, “minesite cost per tonne”, and “all-in sustaining cost per ounce of gold

produced” that are not recognized measures under United States generally accepted accounting principles (“US GAAP”). This data may not be

comparable to data presented by other gold producers. These future estimates are based upon the total cash costs per ounce and minesite

costs per tonne that the Company expects to incur to mine gold at the applicable sites and do not include production costs attributable to

accretion expense and other asset retirement costs, which will vary over time as each project is developed and mined. It is therefore not

practicable to reconcile these forward-looking non-GAAP financial measures to the most comparable GAAP measure. A reconciliation of the

Company’s total cash cost per ounce and minesite cost per tonne to the most comparable financial measures calculated and presented in

accordance with US GAAP for the Company’s historical results of operations is set forth in the notes to the financial statements included in the

Company’s Annual Information Form and Annual Report on Form 20-F, for the year ended December 31, 2012, as well as the Company’s other

filings with the Canadian Securities Administrators and the SEC.

Note Regarding Production Guidance

The gold production guidance is based on the Company’s mineral reserves but includes contingencies and assumes metal prices and foreign

exchange rates that are different from those used in the reserve estimates. These factors and others mean that the gold production guidance

presented in this disclosure does not reconcile exactly with the production models used to support these mineral reserves.

agnicoeagle.com 3

Page 4: Building a manageable gold business   zurich nov7

agnicoeagle.com

IMPROVING GOLD PRICE ENVIRONMENT

1100

1200

1300

1400

1500

1600

1700

12/12 01/13 02/13 03/13 04/13 05/13 06/13 07/13 08/13 09/13

Gold ($US/oz) YTD

Gold price likely to remain range bound between $1,200 - $1,800 /oz in the

medium term on solid demand and supply side constraints

China, India, and Central Bank demand roughly equals annual mine supply –

physical gold moving to stronger hands

Gold producers appear to have no safety margin to manage much lower gold

prices:

No hedge books

No ability to high-grade deposits

Few sources of new financing

4

Page 5: Building a manageable gold business   zurich nov7

agnicoeagle.com

IMPROVING GOLD PRICE ALLOWS QUALITY GOLD EQUITIES TO

DELIVER VALUE

High quality, manageable gold businesses can provide multiple sources

of value to investors:

Quality Gold

Producer Equities

Gold Exploration

Equities

Royalty Companies

Bullion and Gold

ETFs

Gold price Participation

Yield

Growth

Operating Leverage

5

Page 6: Building a manageable gold business   zurich nov7

agnicoeagle.com

DEFINING A HIGH QUALITY GOLD EQUITY

Investor requirements:

Manageable business

Producers with solid,

achievable growth

Ability to deliver on guidance

Low Cost Structure with ability

to deliver margin expansion

Low political risk

Experienced management

with consistent, focused

strategy

Return of capital (Yield)

6

Page 7: Building a manageable gold business   zurich nov7

agnicoeagle.com

AEM – DELIVERING RESULTS IN A CHALLENGING ENVIRONMENT

► Record quarterly gold production (Q3’13) of 315,828 oz at a total cash cost of

$591/oz

► 2013 Production guidance increased to approximately 1,060,000 oz of gold

► 2013 Total cash cost guidance reduced to approximately $690 / oz

► 2013 all-in sustaining cost estimate is reduced to $1,025/oz (from $1,100/oz)

► Goldex and La India contributing to ~20% production growth through 2015

7

Page 8: Building a manageable gold business   zurich nov7

agnicoeagle.com

IMPROVEMENTS IN CASH FLOW GENERATION Adjusting the business to the current gold price environment

2013

Reduction in capital and operating costs (announced Q2/13) $50 million

Reduction in exploration spending (announced Q2/13) $20 million

Estimated positive net impact on cash flow $70 million

2014

Reduction in capital costs (announced Q2/13) $200 million

Reduction in exploration spending (announced Q2/13) $50 million

Reduction in Labour and G&A costs (announced October 23, 2013) $40 million

Estimated positive net impact on cash flow $290 million

8

Page 9: Building a manageable gold business   zurich nov7

agnicoeagle.com

AEM – MANAGEABLE, SOLID BUSINESS Full year 2013 production revised higher to 1,060,000 moz gold

YTD 2013

EXPECTED

PRODUCTION1

Production

Total

Cash Cost 2014 2015

(Gold oz) ($/oz) (Gold oz) (Gold oz)

LaRonde 130,445 $801 215,000 250,000

Goldex 1,505 N/A 49,000 85,000

Kittila 104,711 $564 165,000 160,000

Lapa 74,407 $687 96,000 65,000

Meadowbank 307,180 $828 367,000 350,000

Northern Business 618,248 $760 892,000 910,000

Pinos Altos 135,283 $402 136,000 161,000

Creston Mascota 23,361 $511 52,000 55,000

La India 40,000 81,000

Southern Business 55,043 $428 228,000 297,000

AEM Total 776,892 $692 1,120,000 1,207,000

1.As per Feb 14, 2013 press release.

CANADA 62%

FINLAND 13%

MEXICO 25%

Agnico Eagle 2015E Production

Profile By Country

9

Page 10: Building a manageable gold business   zurich nov7

agnicoeagle.com

FINANCIAL POSITION Adequate cash balance with financial flexibility

Long-Term Debt Maturities

2017 2020 2022 2024

Notes Outstanding (millions) $115 $360 $225 $100

Coupon 6.13% 6.67% 5.93% 5.02%

ALL AMOUNTS ARE IN US$, (unless otherwise indicated) Sep. 30, 2013

CASH AND CASH EQUIVALENTS (millions) $142

LONG TERM DEBT (millions) $950

AVAILABLE CREDIT FACILITIES $1.05 Billion

COMMON SHARES OUTSTANDING, BASIC (Q3’13 Weighted average, millions) 173.1

COMMON SHARES OUTSTANDING, FULLY DILUTED (Q3’13 Weighted average, millions) 173.5

10

Page 11: Building a manageable gold business   zurich nov7

agnicoeagle.com

MODERATE, ACHIEVABLE PRODUCTION GROWTH Low political risk, mining-friendly jurisdictions

900,000

950,000

1,000,000

1,050,000

1,100,000

1,150,000

1,200,000

1,250,000

2010A 2011A 2012A 2013E 2014E 2015E

Actual Estimate

Payable Gold Production Profile (oz)

11

Page 12: Building a manageable gold business   zurich nov7

agnicoeagle.com

PROJECTED CAPITAL SPENDING

$0

$200,000

$400,000

$600,000

$800,000

$1,000,000

$1,200,000

2008A 2009A 2010A 2011A 2012A 2013E 2014E

Actual Estimate

Capital Expenditures (US$ 000’s)

12

Page 13: Building a manageable gold business   zurich nov7

agnicoeagle.com

Production weighted Fraser institute Policy Potential Index scores by company (2012-2015)

LOW POLITICAL RISK, MINING FRIENDLY JURISDICTIONS

Source: Fraser Institute, Barclays, Absa and company data

Operating in low political risk theatres helps create a manageable business

13

Page 14: Building a manageable gold business   zurich nov7

agnicoeagle.com

AGNICO EAGLE

SOUTHERN BUSINESS

Page 15: Building a manageable gold business   zurich nov7

agnicoeagle.com

Skilled workforce, excellent mineral potential, and a well respected mining industry

Mining is the fourth largest sector in the Mexico economy

AEM operations are in two of the top gold producing northern states of Chihuahua

and Sonora

Capital Investment in Mexican Mining Industry (US$M)

0 200 400 600 800 1000 1200

Sonora

Zacatecas

Chihuahua

Guerrero

Durango

SLP

Oxaca

Other

2012 Gold Production by State (koz)

Source: Camimex Annual Report 2012.

$2,858 $3,310

$5,612

$8,043

$0

$1,000

$2,000

$3,000

$4,000

$5,000

$6,000

$7,000

$8,000

$9,000

2009 2010 2011 2012Years

MEXICO – WORLD CLASS MINING JURISDICTION

15

Page 16: Building a manageable gold business   zurich nov7

agnicoeagle.com

Pinos Altos was acquired in 2006; Began operations in Q4 2009

Creston Mascota was developed as a satellite project to Pinos Altos in 2011

Pinos Altos is now the 3rd largest gold producer in Mexico and is one of

AEM’s biggest cash flow generators

The company acquired the La India project in November 2011;

Commissioning is underway less than two years after acquisition

1500 AEM employees in Mexico have a proven track record and are well

positioned to continue delivering shareholder returns and future growth

AEM SUCCESS IN MEXICO Solid operations, Steady growth and Exploration upside

16

Page 17: Building a manageable gold business   zurich nov7

agnicoeagle.com 17

AGNICO EAGLE MEXICO - LARGE LAND POSITIONS

Page 18: Building a manageable gold business   zurich nov7

agnicoeagle.com

Cubiro

Creston Mascota

Bravo

Sinter

Reyna de Plata

San Eligio

Santo Nino

El Apache

Oberon de Weber

2.5 km

Cerro Colorado

Pinos Altos & Creston Mascota Numerous satellite deposits

18

Page 19: Building a manageable gold business   zurich nov7

agnicoeagle.com

► Agnico Eagle’s cornerstone asset in Mexico

PROBABLE GOLD RESERVES (million oz) 2.7

AVERAGE GOLD RESERVE GRADE (g/t) 2.2

Indicated gold resource (million oz)

(17.9 M tonnes @ 1.52 g/t) 0.9

Inferred gold resource (million oz)

(24.6 M tonnes @ 1.19 g/t) 0.9

Estimated LOM (years) 17

See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources.

Pinos Altos & Creston Mascota

Reserves December 31st , 2012

19

Page 20: Building a manageable gold business   zurich nov7

agnicoeagle.com

Mexico - Gold & Silver Production Trend

10

,82

3 2

6,2

28

25

,61

9

35

,24

8

39,9

55

43

,44

0

51

,06

6

52

,73

9

52

,57

4

57

,01

6

63

,35

6

61

,97

3

52,4

92

46

,07

1 57

,53

0

55

,04

3

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

Q4 09 Q1 10 Q2 10 Q3 10 Q4 10 Q1 11 Q2 11 Q3 11 Q4 11 Q1 12 Q2 12 Q3 12 Q4 12 Q1 13 Q2 13 Q3 13

Mexico Quarter Payable Au Oz Production

90,0

00 22

2,00

0

225,

000

290

,00

0

42

8,0

00

406,

000

452,

000

485

,00

0

508,

000

50

7,0

00

537,

000

639

,00

0

628,

000

616,

000

619,

000

614,

000

0

100,000

200,000

300,000

400,000

500,000

600,000

700,000

Q4 09 Q1 10 Q2 10 Q3 10 Q4 10 Q1 11 Q2 11 Q3 11 Q4 11 Q1 12 Q2 12 Q3 12 Q4 12 Q1 13 Q2 13 Q3 13

Mexico Quarter Payable Ag Oz Production

20

Page 21: Building a manageable gold business   zurich nov7

agnicoeagle.com

STRONG RETURN ON INVESTED CAPITAL IN MEXICO $80 Million acquisition with short payback period

Short payback period – 5.5 years

Approximately $800 million in cumulative operating cash flow

Both Pinos Altos and Creston Mascota already have positive

ROIC, including acquisition costs

17 years remaining in Life Of Mine

Solid track record of delivering projects on time and on budget

One of the largest cash flow generators in the Company

21

Page 22: Building a manageable gold business   zurich nov7

agnicoeagle.com

La India Project

22

Page 23: Building a manageable gold business   zurich nov7

agnicoeagle.com

LA INDIA First gold pour expected in November

Approx. 125,000 tonnes of ore stacked to

date with crushing circuit now operational

Estimated annual gold production of 90

koz @ average total cash costs of

$500/oz

Metallurgical testing results on La India

sulphides and Tarachi mineralization

expected later this year

PROBABLE GOLD RESERVES (million oz) 0.8

AVERAGE GOLD RESERVE GRADE (g/t) 0.7

Indicated gold resource (million oz)

(43.2 M tonnes @ 0.4 g/t) 0.6

Inferred gold resource (million oz)

(81 M tonnes @ 0.4 g/t) 1.0

Estimated LOM (years) 8

See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources.

23

Page 24: Building a manageable gold business   zurich nov7

agnicoeagle.com

Significant exploration upside - 55,000

hectare claim block in Multatos Gold belt, 60

km from Pinos Altos

Gold production expected to average

approximately 90 koz/yr @ average total

cash costs of approximately $500/oz

Project ahead of schedule and on budget -

$157.6 million

Commissioning began 22 months after

acquisition

Low technological risk

La India – Project Key facts

24

Page 25: Building a manageable gold business   zurich nov7

agnicoeagle.com

NORTHERN

BUSINESS

Page 26: Building a manageable gold business   zurich nov7

agnicoeagle.com

CANADA - QUEBEC Established, experienced business with upside potential

LaRonde – Agnico Eagle’s flagship mine, operating for 25 years with 14 years of

remaining mine life

Gold production expected to expand to over 300,000 oz in 2015-2018; Driven

by significant increases in expected gold grade

Lapa – Steady operation demonstrates effective cost control

Potential to expand mine life past 2015 through Zulapa extension

Goldex – First gold pour occurred in October

Expected to add approximately 90,000 oz annually to the Company’s

production profile

Technical studies on other satellite zones expected by end of 2013; Could

provide meaningful extension on mine life

26

Page 27: Building a manageable gold business   zurich nov7

agnicoeagle.com

CANADA - NUNAVUT Record quarterly gold production at Meadowbank

Meadowbank - Record quarterly production – 133 koz at $623 cash costs

Excellent cost control due to improved productivity and cost reduction initiatives

Grades forecast to remain strong through the first half of 2014

Meliadine - Project has possibility to be the Company’s largest producing asset

2014 capital expenditures reduced by $80 million to $45 million

Program will focus on ramp development and exploration drilling

Updated technical study on track for H2 2014

Encouraging exploration results from Tiriganiaq, Normeg, Pump South, and F

Zones

27

Page 28: Building a manageable gold business   zurich nov7

agnicoeagle.com

FINLAND – KITTILA Production positively impacted by high-grade pit pillar

Record quarterly gold production on

increased throughput, and

recoveries

Better SAG mill performance and

simplified autoclave operation

following the Q2 2013 relining

750 tpd mill expansion remains on

budget and schedule

Remains Agnico Eagle’s largest

reserve asset, with significant

exploration and expansion potential

P&P GOLD RESERVES (million oz) 4.8

AVERAGE GOLD RESERVE GRADE (g/t) 4.5

Indicated resource (million oz)

(7.8 M tonnes @ 2.65 g/t) 0.7

Inferred resource (million oz)

(19.0 M tonnes @ 3.88 g/t) 2.4

Estimated LOM (years) 25

See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources.

28

Page 29: Building a manageable gold business   zurich nov7

agnicoeagle.com

MANAGING AND DELIVERING IN A VOLATILE GOLD MARKET

► 2013 production guidance raised

► Improved cash flow generation for 2013 and 2014 expected through cost

savings and increased production guidance – potential total impact

approximately $400 million

► Delivering on production - strong operating performance expected to continue

into 2014

► Funded production growth - expecting ~20% growth through 2015

► Bringing on new mines ahead of schedule and on budget - La India and Goldex

► Financial flexibility maintained

► Consistent acquisition strategy – small scale, early stage investments with

exploration upside

29

Page 30: Building a manageable gold business   zurich nov7

agnicoeagle.com

APPENDIX

Page 31: Building a manageable gold business   zurich nov7

agnicoeagle.com

COST EFFECTIVE EXPLORATION REFLECTS SUCCESSFUL M&A STRATEGY Significant exploration results at acquired properties

0

3,000

6,000

9,000K

itti

la '0

5

Kit

tila

'12

Pin

os

Alt

os

'06

Pin

os

Alt

os

'12

Mea

do

wb

ank

'07

Mea

do

wb

ank

'12

Mel

iad

ine

'10

Mel

iad

ine

'12

La In

dia

'11

La In

dia

'12

Mined

Proven &ProbableMeasured &IndicatedInferred

+1105 koz

+5644 koz

+3161 koz

+3085 koz

+1097 koz

$54 $43

$173

$121

$186

$18 $27 $48

$26 $10

$0

$50

$100

$150

$200

Kittila Pinos Altos Meadowbank Meliadine La India

Purchase Cost per OzDiscovery Cost per Oz

Note: The terms “measured resources”, “indicated resources” and “inferred resources” are not recognized under the SEC guidelines. Detailed information can be found in the February 13, 2013 press release.

31

Page 32: Building a manageable gold business   zurich nov7

agnicoeagle.com

GOLD AND SILVER RESERVES AND RESOURCES December 31, 2012

Gold

Tonnes

(000’s)

Gold

(g/t)

Gold

(ounces)

(000’s)

Proven 13,836 3.13 1,394

Probable 170,300 3.16 17,286

Total

Reserves 184,136 3.16 18,681

Measured &

Indicated 140,995 1.79 8,104

Inferred 199,503 1.90 12,159

Silver

Tonnes

(000’s)

Silver

(g/t)

Silver

(ounces)

(000’s)

Proven 9,390 47.30 14,281

Probable 57,536 43.93 81,256

Total

Reserves 66,926 44.40 95,537

Measured &

Indicated 23,379 31.95 24,015

Inferred 36,479 20.66 24,228

See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources. Reserves are not a subset of resources.

32

Page 33: Building a manageable gold business   zurich nov7

agnicoeagle.com

COPPER, ZINC AND LEAD RESERVES AND RESOURCES December 31, 2012

See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources. Reserves are not a subset of resources.

Copper Tonnes

(000’s)

Copper (%)

Copper (tonnes)

Proven 6,323 0.30 18,744

Probable 22,462 0.24 53,835

Total

Reserves 28,786 0.25 72,580

Indicated 5,432 0.12 6,644

Inferred 11,887 0.25 29,317

Zinc Tonnes

(000’s)

Zinc (%)

Zinc (tonnes)

Proven 6,323 1.06 67,211

Probable 22,462 0.68 152,973

Total

Reserves 28,786 0.76 220,184

Indicated 5,432 1.50 81,551

Inferred 11,887 0.58 69,048

Lead Tonnes

(000’s)

Lead (%)

Lead (tonnes)

Proven 6,323 0.12 7,738

Probable 22,462 0.05 10,304

Total

Reserves 28,786 0.06 18,042

Indicated 5,432 0.15 8,071

Inferred 11,887 0.05 5,375

33

Page 34: Building a manageable gold business   zurich nov7

agnicoeagle.com

NOTES TO INVESTORS REGARDING THE USE OF RESOURCES

Cautionary Note to Investors Concerning Estimates of Measured and Indicated Resources

This document uses the terms “measured resources” and “indicated resources”. We advise investors that while those terms are recognized and required by

Canadian regulations, the SEC does not recognize them. Investors are cautioned not to assume that any part or all of mineral deposits in these

categories will ever be converted into reserves.

Cautionary Note to Investors Concerning Estimates of Inferred Resources

This document also uses the term “inferred resources”. We advise investors that while this term is recognized and required by Canadian regulations, the SEC

does not recognize it. “Inferred resources” have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal

feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates

of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases. Investors are cautioned not to assume that

part or all of an inferred resource exists, or is economically or legally mineable.

Scientific and Technical Data

Agnico Eagle Mines Limited is reporting mineral resource and reserve estimates in accordance with the CIM guidelines for the estimation, classification and

reporting of resources and reserves.

Cautionary Note To U.S. Investors – The SEC permits U.S. mining companies, in their filings with the SEC, to disclose only those mineral deposits that a

company can economically and legally extract or produce. Agnico Eagle uses certain terms in this press release, such as “measured”, “indicated”, and

“inferred”, and “resources” that the SEC guidelines strictly prohibit U.S. registered companies from including in their filings with the SEC. U.S. investors are

urged to consider closely the disclosure in our Form 20-F, which may be obtained from us, or from the SEC’s website at: http://sec.gov/edgar.shtml. A “final” or

“bankable” feasibility study is required to meet the requirements to designate reserves under Industry Guide 7.

Estimates for all properties were calculated using historic three-year average metals prices and foreign exchange rates in accordance with the SEC Industry

Guide 7. Industry Guide 7 requires the use of prices that reflect current economic conditions at the time of reserve determination, which the Staff of the SEC

has interpreted to mean historic three-year average prices. The assumptions used for the mineral reserves and resources estimates at the Lapa, Meadowbank

and Creston Mascota mines and the Goldex and Meliadine projects reported by the Company on February 13, 2013 are based on three-year average prices for

the period ending December 31, 2012 of $1,490 per ounce gold, $29.00 per ounce silver, $0.95 per pound zinc, $3.67 per pound copper, $1.00 per pound lead

and C$/US$, US$/Euro and MXP/US$ exchange rates of 1.00, 1.34 and 12.75, respectively. The assumptions used for the mineral reserves and resources

estimates at the LaRonde, Pinos Altos and Kittila mines and the La India and Tarachi projects reported by the Company on February 13, 2013 were based on

three-year average prices for the period ending June 30, 2012 of $1,345 per ounce gold, $25.00 per ounce silver, $0.95 per pound zinc, $3.49 per pound

copper, $0.99 per pound lead and C$/US$, US$/Euro and MXP/US$ exchange rates of 1.00, 1.30 and 13.00, respectively.

The Canadian Securities Administrators’ National Instrument 43-101 (“NI 43-101”) requires mining companies to disclose reserves and resources using the

subcategories of “proven” reserves, “probable” reserves, “measured” resources, “indicated” resources and “inferred” resources. Mineral resources that are not

mineral reserves do not have demonstrated economic viability.

agnicoeagle.com 34

Page 35: Building a manageable gold business   zurich nov7

agnicoeagle.com

NOTES TO INVESTORS REGARDING THE USE OF RESOURCES

A mineral reserve is the economically mineable part of a measured or indicated mineral resource demonstrated by at least a preliminary feasibility study. This

study must include adequate information on mining, processing, metallurgical, economic and other relevant factors that demonstrate, at the time of reporting,

that economic extraction can be justified. A mineral reserve includes diluting materials and allows for losses that may occur when the material is mined. A

proven mineral reserve is the economically mineable part of a measured mineral resource demonstrated by at least a preliminary feasibility study. A probable

mineral reserve is the economically mineable part of an indicated, and in some circumstances, a measured mineral resource demonstrated by at least a

preliminary feasibility study.

A mineral resource is a concentration or occurrence of natural, solid, inorganic material, or natural solid fossilized organic material including base and precious

metals in or on the Earth’s crust in such form and quantity and of such a grade or quality that it has reasonable prospects for economic extraction. The location,

quantity, grade, geological characteristics and continuity of a mineral resource are known, estimated or interpreted from specific geological evidence and

knowledge. A measured mineral resource is that part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics

are so well established that they can be estimated with confidence sufficient to allow the appropriate application of technical and economic parameters, to

support production planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration, sampling and

testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely

enough to confirm both geological and grade continuity. An indicated mineral resource is that part of a mineral resource for which quantity, grade or quality,

densities, shape and physical characteristics can be estimated with a level of confidence sufficient to allow the appropriate application of technical and

economic parameters, to support mine planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable

exploration and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are

spaced closely enough for geological and grade continuity to be reasonably assumed. An inferred mineral resource is that part of a mineral resource for which

quantity and grade or quality can be estimated on the basis of geological evidence and limited sampling and reasonably assumed, but not verified, geological

and grade continuity. The estimate is based on limited information and sampling gathered through appropriate techniques from locations such as outcrops,

trenches, pits, workings and drill holes. Mineral resources which are not mineral reserves do not have demonstrated economic viability.

Investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally mineable.

A Feasibility Study is a comprehensive technical and economic study of the selected development option for a mineral project that includes appropriately

detailed assessments of realistically assumed mining, processing, metallurgical, economic, marketing, legal, environmental, social and governmental

considerations together with any other relevant operational factors and detailed financial analysis, that are necessary to demonstrate at the time of reporting

that extraction is reasonably justified (economically mineable). The results of the study may reasonably serve as the basis for a final decision by a proponent or

financial institution to proceed with, or finance, the development of the project. The confidence level of the study will be higher than that of a Pre-Feasibility

Study.

The effective date for all of the Company’s mineral resource and reserve estimates in this press release is December 31, 2012. Additional information about

each of the mineral projects that is required by NI 43-101, sections 3.2 and 3.3 and paragraphs 3.4 (a), (c) and (d) can be found in the Technical Reports

referred to above, which may be found at www.sedar.com. Other important operating information can be found in the Company’s Form 20-F and this news

release dated February 13, 2013.

Alain Blackburn, a Qualified Person and the Company’s Senior Vice-President, Exploration, reviewed the technical information disclosed herein.