Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs &...

48
March 27,2017 #62 We Build Futures ~ Communities ~ Confidence ~ We Build Your Business The Genuine. The Original. “We’re Not The Best Because We’re the Oldest... We’re The Oldest Because We’re the Best!” Overhead Door Company of Salinas 733 Sanborn Place • Salinas, CA 93901 Salinas (831) 422-3667 • Monterey (831) 375-3667 Fax (831) 422-1061 • Santa Cruz (831) 662-3122 Lic. #529655 Overhead Door Company of Santa Clara Valley 1266 Lawrence Expressway • Sunnyvale, CA 94089 Tel (408) 734-8010 • Fax (408) 734-3728 Lic. #215098 Bidding This Week... Builders Bulletin 3/27/17 * Monterey Coast Guard Monterey Waterfront Repairs & Repair Pier Water Supply 2:00 PM 3/27/17 San Jose Forever 21- East Ridge #2023 (Online) 9:00 AM 3/28/17 * San Jose San Jose High School Athletics Building Upgrades (Online) 2:00 PM 3/28/17 Sunnyvale Cupertino Middle School Modernization - Cupertino Union School District (Cusd) (Online) 2:00 PM 3/28/17 San Jose James Lick High School Student Center & Quad/Jl Site Infrastructure - Esuhsd (Online) 2:00 PM 3/28/17 San Jose Carlton Elementary Roof Repairs & Restorations 1:00 PM 3/28/17 Palo Alto Water Main Replacement Project 26 3:00 PM 3/28/17 Gonzales Destroy Well 3 Contract 2:00 PM 3/28/17 Morro Bay Morro Bay State Park - Water System Improvements 2:00 PM 3/28/17 * Monterey Belden Street 300 Block Widening 2:00 PM 3/28/17 * Marina Materials Recovery Facility (Mrf) Improvement - Office Improvements 3:00 PM 3/28/17 * Monterey Citywide Street Resurfacing (Slurry), Phase 4 2:00 PM 3/28/17 San Jose Amazon Books - Santana Row (Online) 2:00 PM 3/29/17 * Los Altos Ev Charging Stations Foothill College - Fdaccd 2:00 PM 3/29/17 San Jose Evergreen Valley College (Evc) Tennis Court Resurfacing 2:00 PM 3/29/17 San Jose Mt. Pleasant High School New Student Center & Quads - Esuhsd (Online) 2:00 PM 3/29/17 Gilroy Gavilan College Gym Bleachers & Flooring Project 2:00 PM 3/29/17 Palo Alto Matoc Vapa N. Medical Gas Outlet/Isolation Valve (Online) 1:00 PM 3/29/17 San Luis Obispo County Highway 1 Gateway Monuments Project 2:00 PM 3/29/17 Sunnyvale Mary Avenue Bicycle Lanes Project Phase 2 3:00 PM 3/30/17 * San Luis Obispo Vista Grande Facility Replacement 3:00 PM 3/30/17 San Jose Miller Middle School Roof Replacement Project Building 1100; Drain Repairs Bldgs 300 & 400 - Cusd 1:00 PM 3/30/17 San Jose 8349-Sanitary Sewer Condition Assessment 2016-2017 Package V 3:00 PM 3/30/17 Morgan Hill 2017 Pavement Repair Project 10:30 AM 3/30/17 San Luis Obispo County 2016-17 Chip Seal Treatment Various County Roads 3:00 PM 3/30/17 San Luis Obispo County Left Turn Lane Nacimiento Lake Drive At Adelaida Road 3:00 PM 3/30/17 Paso Robles Median/Parkway Landscape Maintenance 2:00 PM 3/30/17 San Jose Traffic Signal Modification At Almaden Expressway & Trinidad Drive 2:00 PM 3/30/17 Sunnyvale Holiday Inn Express Hotel (Online) 2:00 PM 3/31/17 Cupertino Rfp/Soq For Preliminary & Construction Services (Lease-Leaseback) Llb-Fremont Union High School District 2:00 PM

Transcript of Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs &...

Page 1: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

March 27,2017 #62

We Build Futures ~ Communities ~ Confidence ~ We Build Your Business

The Genuine. The Original.

“We’re Not The Best Because We’re the Oldest...We’re The Oldest Because We’re the Best!”

Overhead Door Company of Salinas733 Sanborn Place • Salinas, CA 93901

Salinas (831) 422-3667 • Monterey (831) 375-3667Fax (831) 422-1061 • Santa Cruz (831) 662-3122

Lic. #529655

Overhead Door Company of Santa Clara Valley1266 Lawrence Expressway • Sunnyvale, CA 94089

Tel (408) 734-8010 • Fax (408) 734-3728Lic. #215098

Bidding This Week...

Builders Bulletin

Bid Time Project NameLocationBid Date

3/27/17* Monterey Coast Guard Monterey Waterfront Repairs & Repair Pier Water Supply2:00 PM

3/27/17 San Jose Forever 21- East Ridge #2023 (Online)9:00 AM NEW

3/28/17* San Jose San Jose High School Athletics Building Upgrades (Online)2:00 PM

3/28/17 Sunnyvale Cupertino Middle School Modernization - Cupertino Union School District (Cusd) (Online)

2:00 PM

3/28/17 San Jose James Lick High School Student Center & Quad/Jl Site Infrastructure -Esuhsd (Online)

2:00 PM

3/28/17 San Jose Carlton Elementary Roof Repairs & Restorations1:00 PM

3/28/17 Palo Alto Water Main Replacement Project 263:00 PM NEW

3/28/17 Gonzales Destroy Well 3 Contract2:00 PM

3/28/17 Morro Bay Morro Bay State Park - Water System Improvements2:00 PM

3/28/17* Monterey Belden Street 300 Block Widening2:00 PM

3/28/17* Marina Materials Recovery Facility (Mrf) Improvement - Office Improvements3:00 PM

3/28/17* Monterey Citywide Street Resurfacing (Slurry), Phase 42:00 PM

3/28/17 San Jose Amazon Books - Santana Row (Online)2:00 PM NEW

3/29/17* Los Altos Ev Charging Stations Foothill College - Fdaccd2:00 PM

3/29/17 San Jose Evergreen Valley College (Evc) Tennis Court Resurfacing2:00 PM

3/29/17 San Jose Mt. Pleasant High School New Student Center & Quads - Esuhsd (Online)

2:00 PM

3/29/17 Gilroy Gavilan College Gym Bleachers & Flooring Project2:00 PM

3/29/17 Palo Alto Matoc Vapa N. Medical Gas Outlet/Isolation Valve (Online)1:00 PM NEW

3/29/17 San Luis Obispo County

Highway 1 Gateway Monuments Project2:00 PM

3/29/17 Sunnyvale Mary Avenue Bicycle Lanes Project Phase 23:00 PM

3/30/17* San Luis Obispo Vista Grande Facility Replacement3:00 PM

3/30/17 San Jose Miller Middle School Roof Replacement Project Building 1100; Drain Repairs Bldgs 300 & 400 - Cusd

1:00 PM NEW

3/30/17 San Jose 8349-Sanitary Sewer Condition Assessment 2016-2017 Package V3:00 PM

3/30/17 Morgan Hill 2017 Pavement Repair Project10:30 AM

3/30/17 San Luis Obispo County

2016-17 Chip Seal Treatment Various County Roads3:00 PM

3/30/17 San Luis Obispo County

Left Turn Lane Nacimiento Lake Drive At Adelaida Road3:00 PM

3/30/17 Paso Robles Median/Parkway Landscape Maintenance2:00 PM

3/30/17 San Jose Traffic Signal Modification At Almaden Expressway & Trinidad Drive2:00 PM

3/30/17 Sunnyvale Holiday Inn Express Hotel (Online)2:00 PM NEW

3/31/17 Cupertino Rfp/Soq For Preliminary & Construction Services (Lease-Leaseback) Llb-Fremont Union High School District

2:00 PM

Page 1 of 1

Page 2: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

Central Coast Builders Association

242 East Romie Lane (831) 758-1624 Salinas Salinas, CA 93901 423-5900 Santa Cruz Mon-Thurs 8-5 Fri 8-3 883-3933 Monterey

758-6203 Fax

[email protected]

Board of Directors

President: Clifford Fasnacht, Dougherty Pump & Drill Oscar Grijalva, OCG Plumbing, Inc

Vice President: Ken Steen, Steen Ass. Consulting Serv. Anka Hepper, Saleh WM B CO.

Secretary/Treasurer: Kevin McIntosh, Blach Constuction Kate Rueter, AON Risk Services

Past President: Kristine O’Dell, Absolute HR Edwin Sargenti, PSC

Gabriel Torres, CCRB/CHISPA

John Vorwerck, Otto Construction

CCBA STAFFChristie Cromeenes

Executive Director

Amanda Young Office Manager/AP Ingrid Vierra Planroom Coordinator

Shelly Verba Safety Coordinator Rikki Montejano Public Relations Coordinator

DisclaimerAll information provided by CCBA is obtained from sources deemed to be reliable. It is the user’s responsibility to confirm the accuracy of

all facts. We assume no responsibility for errors and/or omissions.All information included is for the intended recipient only, we ask that

you do not share this information

Page 3: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

Thursday March 30th

12:00pm-4:00pm

242 east romie lanesalinas, ca 93901

Members $75Non-Members $95

Walk away from this class with a better understanding of prevailing wages and how to remain in compliance.

Please call our o�ceto reserve your spot todayFIRST 16 PEOPLE ONLY!!!

Salinas: 831.758.1624

Prevailing Wage Contract Administration

•Contract Review to determine applicable prevailing wage: Funding source (i.e. local, state, federal, other)

Owner/agency contact Advertisement date Duration of Project Contract Amount

Prevailing wage determination & classi�cations

∞ •Understand the required documents:

Statement of Compliance (Certi�ed Payroll Certi�cate)

Fringe Bene�t Statement (PW 26) Public Works Contract Award Information

(DAS 140) Request for Dispatch of registered

Apprentice (DAS 142) Training Fund Contributions (CAC 2)

Veri�cation of Apprentice/Journeyman Hours Progress Billing & Waivers

(Conditional & Unconditional)

∞ •How to properly bid a prevailing wage project

Page 4: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

SEXUAL HARASSMENT PREVENTION

DATE: MAY 17TH 2017

ENGLISH: 3:00PM – 5:00PM

SPANISH: 1:00PM – 3:00PM

LOCATION: CCBA

242 E. ROMIE LN, SALINAS CA 93901

COST: $25.00

Description: The state of California requires sexual harassment training for all supervisory employees. Studies estimate one in four women will experience sexual harassment on the job. The U.S. Supreme Court has ruled that even if an employer is unaware of sexual harassment taking place the employer’s liability remains. All companies that don’t train their managers on sexual harassment are subject to lawsuits and other liabilities. You will learn how to define, recognize and prevent sexual harassment in the workplace. While it may be impossible to completely prevent harassment and discrimination claims and lawsuits, this course can help minimize potential workplace conflicts and complaints before they arise which will help reduce your companies liability exposure.

FIRST 16 PEOPLE

CALL 831-758-1624 OR EMAIL [email protected] TO RESERVE YOU’RE SPOT TODAY!

Page 5: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

Projects Out To Bid

Deadline for submission of materials for our Bulletin is end of day Wednesday each week.

Weekly Projects Bidding 3/22/2017

Reasonable care is given in gathering, compiling and furnishing the information contained herein which is obtained from sources believed to bereliable, but the Planroom is not responsible or liable for errors, omissions or inaccuracies.

Name Bid Date Time Contract # EstimateLocationOPR#

Monterey County

Bidders:

Plan Issuer:

Visit

Monterey

This USCG RMACC combined two Task Order project will take place at the United States Coast Guard Station Monterey, 100Lighthouse Ave., Monterey, CA 93940-1415. The work will involve the specified repairs for two combined projects, the waterfrontrepairs for wood pier #1 and the repairs to the pier water supply system. Work will include rebuilding the existing pier #1 and theoptional replacement of the existing floating dock. The second of the two combined projects will involve the replacement of existingunderground and above ground 4” main water lines and the associated branch lines to the piers. This solicitation is subject to theprovisions of the USCG Master RMACC Contract, the Buy American Act, and the Prevailing Wage Determination. Insurance compliantwith the US Longshoreman’s and Harborworker’s Compensation Act will be required for this project. The Schedule of Prices includestwo BASE BID Total Cost CLIN Price Lined, one Option CLIN Price Line, and (4) Unit Priced Line Items. Trades: Utility Locator,Material Testing, Hazardous Material Testing, Marine Biological Monitoring, Acoustic Monitoring, SWPPP, Selective Demolition,Selective Site Demolition, Siltation Curtains, Debris Booms, Structural Steel, Rough Carpentry, Steel Coatings, Steel Piles, Plumbing,Earthwork, Asphalt Paving, Pavement Markings, Site Utilities, Floating Docks, Marine Construction.

Site Visit: All attendees must notify D Square Const. no later than March 3, 2017 by 2:00 p.m. PST, and supply the name(s), driver’slicense numbers, and phone numbers, to obtain the required USCG clearance to the Base for those wishing to attend.

RFI Deadline: 03/20/2017 03:00 PMSubmit questions to Steve Almgren at [email protected]

17-00452

4

2:00 PM3/27/17

Addenda:COAST GUARD MONTEREY WATERFRONT REPAIRS & REPAIR PIER WATER SUPPLY

3/6 @ 10am (Site Visit)

D-Square Construction [email protected] 520-748-9371 888-543-8500

General Contractor Fax: 888-543-8500Office: 520-748-9371D-Square Construction

Bidders:

Marina

Work involves construction of interior improvements in existing Office Building including 1st level interior improvements to restrooms toaccommodate accessibility compliance, interior improvement to 2nd level offices, and an approximate 1,200 SF expansion of theexisting 2nd level office area to accommodate a multi-purpose room. The work also includes subgrade preparation and placement ofengineered fill for foundations as required by geotechnical engineer/consultant report.

PREVAILING WAGE

MAND 2/23 @ 10:30am

17-00326

1

3:00 PM3/28/17

Addenda:MATERIALS RECOVERY FACILITY (MRF) IMPROVEMENT - OFFICE IMPROVEMENTS

Prebid Conf:

Construction Manager Fax: 831-633-3389Office: 831-633-3371Ausonio, Inc. - Construction Manager

General Contractor Fax: 831-633-3389Office: 831-633-3371Ausonio Incorporated

General Contractor Fax: 831-761-5513Office: 831-761-5511Coastwide Environmental Tech.

General Contractor Fax: 831-641-0586Office: 831-915-6823Pueblo Construction , Inc.

Bidders:

Plan Issuer:

Monterey $2,350,000

In general, the work consists of, but is not limited to, pavement spot repair of approximately 200,000 SF, crack sealing, placing ofapproximately 900,000 SF of slurry/cape seal, associated striping removal and replacement, refreshing of existing painted streetmarkings, traffic control and installation of necessary environmental pollution prevention requirements on various streets in the City ofMonterey.

2/28 @ 2pm- 601 Wave St, Suite 100, Monterey

17-00376

2

2:00 PM3/28/17

Addenda:CITYWIDE STREET RESURFACING (SLURRY), PHASE 4

Prebid Conf:

City of Monterey 831-646-3997 831-646-5686

General Contractor Fax: 510-723-0288Office: 510-723-0280American Asphalt Repair & Resurfacing

General Contractor Fax: 408-293-3633Office: 408-293-9516Graham Contractors, Inc.

General Contractor Fax: 831-761-1042Office: 831-763-6100Granite Construction

General Contractor Fax: 916-714-9868Office: 775-722-3741Intermountain Slurry Seal

Page 6: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

Projects Out To Bid Name Bid Date Time Contract # EstimateLocationOPR#

General Contractor Fax: 916-313-3438Office: 916-642-1751Pavement Coatings

General Contractor Fax: 916-383-4084Office: 916-383-1756Telfer Pavement Technologies, LLC

General Contractor Fax: 916-373-1438Office: 916-373-2422VSS International, Inc.

Plan Issuer:

Monterey $270,010

In general, the work consists of, but is not limited to, sawcutting, demolition of existing improvements, grading, and construction of newasphalt pavement, curb and gutter, sidewalk, retaining wall, driveway conforms, and storm drain system. Work also includesstormwater control, tree protection, traffic sign installation, water meter relocation, and resetting utility boxes to grade.

17-00478

1

2:00 PM3/28/17

Addenda:BELDEN STREET 300 BLOCK WIDENING

1022817-0031

City of Monterey-Dept of PW [email protected] 831-646-3877 831-646-3405

Plan Issuer:

Gonzales $60,000 $70,000

Obtain permit to destroy well from County of Monterey Health Department; Remove and dispose of back-up engine including disposalof oil and other fluids from engine; Disconnect electrical service/SCADA to well pump motor/casing; Remove well house; Removesurface piping for well and protect drainage inlet; Pull and dispose of the well motor, pump and column pipe, etc.; Sound well for totaldepth, obstructions, static water level; Bail oil from well if present and dispose of properly; Fill well with cement slurry from bottom up inone continuous pour; Collect and properly handle displaced water as cement slurry is placed in well; Set off charges to perforatecasing and ‘tie-in’ to low permeability clay formations; Top off cement slurry in well to 5-feet below ground; Bolt blind flange to top ofwell casing; Properly dispose of water and any separated solids; Complete well destruction report and submit to County of MontereyHealth Department.

PREVAILING WAGE

3/20 @ 10:30am- site

17-00543

0

2:00 PM3/28/17

Addenda:DESTROY WELL 3 CONTRACT

to

Prebid Conf:

City of Gonzales [email protected] 831-675-5000 831-675-2644

Bidders:

Plan Issuer:

Seaside

The City of Seaside is soliciting proposals from qualified firms to design improvements to remove access barriers in conformance toAmerican’s with Disability Act requirements at the Seaside Branch Library herein referred to as “the Project.” Funding for the designand construction comes from the Community Development Block Grant program administered by Housing and Urban Developmentunder the Federal Housing Administration. The selected consultant must be familiar with preparing construction bid documentsutilizing federal funds. The selected consultant shall perform the tasks specified in the "Scope of Work" section of the Request forProposal. The consultant is encouraged to suggest additions or modifications to the scope that will enhance or clarify the Project andthe suggestions should be incorporated into the proposal. Fax proposals will not be accepted.

17-00540

0

5:00 PM4/3/17

Addenda:RFP FOR PROFESSIONAL DESIGN SERVICES SEASIDE BRANCH LIBRARY - ADA IMPROVEMENTS

City of Seaside [email protected] 831-899-6825 831-899-6211

Consultant Fax: 831-372-2679Office: 831-521-9360Eagle Project Managament

General Contractor Fax: 831-455-2011Office: 831-455-2010Balestreri Builders Inc.

Bidders:

Plan Issuer:

Castroville

Project consists of: Selective Demo; Concrete; Structural Steel Framing; Wood and Plastics; Thermal and Moisture Protection; AccessDoors and Frames; Finishes; Plumbing; Mechanical; Electrical.

MAND 3/22 @ 11am- site

17-00607

0

2:30 PM4/5/17

Addenda:NORTH MONTEREY COUNTY HIGH SCHOOL BOILER AND HVAC REPLACEMENT

14-9429

Prebid Conf:

Teter, LLP [email protected] 559-437-0887 559-438-7554

General Contractor Fax: 831-633-3389Office: 831-633-3371Ausonio Incorporated

General Contractor Fax: 831-641-0586Office: 831-915-6823Pueblo Construction , Inc.

General Contractor Fax: 831-422-0566Office: 831-422-9696Tombleson Inc

Page 7: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

Projects Out To Bid

Name Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Seaside $980,000

In general, work will consist of the demolition of three (3) full 3-story surplus military structures located in the area bordered by 6th &7th Avenues and Inter-Garrison Road & A Street and one (1) 3 story handle surplus military structure at the corner of 6th Avenue andB Street, on the campus of California State University Monterey Bay (CSUMB).

PREVAILING WAGE

Project Contact: Reyola Carlisle - 831-582-3506 [email protected]

MAND 3/21 @ 2pm- 4314 6th Ave, Seaside

17-00611

1

2:00 PM4/5/17

Addenda:BIG DEMO, PHASE 2 + BUILDING 4580 HANDLE DEMOLITION

CPD14010-PH2D

Prebid Conf:

Demolition Contractor Fax: 626-350-8322Office: 626-350-8303American Wrecking Inc.

Demolition Contractor Fax: 661-805-9625Office: 661-805-9591Armour Inc.

General Contractor Office: 818-262-1611Interior Demolition

Plan Issuer:

Salinas

Santa Rita Unified School District is seeking submission of proposals from interested firms that are capable of, among other things,providing thermostats that are capable of web-based monitoring, central control, and can supply lifetime license for use of a web-baseduser interface. This will enable the District to more efficiently manage the usage of its HVAC systems, leading to significant energyand operating costs.

In addition, the system should be operable during any outage event – in conjunction with the District’s solar + storage energy back-upsystem. While in “battery-backup mode” the District will utilize the Energy Management System to curtail HVAC energy consumptionby adjusting the thermostat settings from the web-portal.

17-00570

0

3:00 PM4/6/17

Addenda:SMART THERMOSTATS AND ENERGY MANAGEMENT SYSTEM

Santa Rita Union School District 831-443-7207

Plan Issuer:

Pacific Grove

The work to be done under this contract consists of preparing the exterior of the building, all trim and planters prior to painting, exteriorpainting and the replacement of the gutters and downspout tie ins. The Exterior Red Tile Walls Will Not Be Painted. The paint colorswill be predetermined, but purchasing of all materials will be the responsibility of the contractor and must be included in the biddingprocess. Please reference the Scope of Services for a full description, section IV.

17-00565

0

2:00 PM4/7/17

Addenda:EXTERIOR BUILDING PAINTING OF PACIFIC GROVE POLICE DEPARTMENT

City of Pacific Grove Public Works dgho@cityof pacificgrove.org 831-648-5760 831-375-0627

Bidders:

Plan Issuer:

Marina $41,500,000

The Project will be funded in whole or in part by the following funding sources in addition to District funds: Clean Water State RevolvingFund (SRF) and Proposition 1 Recycled Water (Prop 1) Trucking/Off-Haul, Survey, Demolition, Ready Mix Concrete, ConcreteFormwork, Concrete Reinforcement, Hot/Cold Weather Concreting, Concrete Finishing, Grouting, Structural Metal Fasteners,Structural Metal Framing, Metal Fabrications, Aluminum Component Railing System, Fiberglass Fabrications, Waterproofing, Flashingand Sheet Metal, Roofing, Joint Sealants, Hollow Metal Work, Overhead Coiling Doors, Finish Hardware, Louvers, Metal SupportSystems/Framing, Gypsum Board, Painting and Coatings, Building Specialties, Welded Steel Tanks, Metal Building Systems, FireSuppression, Plumbing, HVAC, FRP Duct & Accessories, Electrical, Security System, Fire Alarm System, Excavation/Grading, Erosionand Sedimentation Controls, Aggregates, Asphalt Paving, Curb, Gutters and Sidewalks, Irrigation , Planting and Landscaping, PrecastConcrete Utility Vaults, Precast Concrete Manholes, Storm Drainage, Instrumentation and Controls, Pipe Supply, Valve, Pumps,Storage Tanks, Blowers, Compressed Air System, Hydropneumatic Surge Tank Systems, Process Water Treatment Equipment.

PREVAILING WAGE

***Please contact the builders exchange for the Appendix A-D

MAND 3/2 @ 10am- 14811 Del Monte Blvd, Marina

17-00399

2

3:00 PM4/10/17

Addenda:ADVANCED WATER PURIFICATION FACILITY AND PRODUCT WATER PUMP STATION

Prebid Conf:

Monterey Regional Water Pollution Control [email protected]

831-645-4605 831-656-0637

Excavation/SiteWork/Irrigation/Drainage/Landscape

Fax: 831-728-6544Office: 831-728-4018K & D Landscape

General Contractor Fax: 510-657-3688Office: 510-657-3686Blocka Construction Inc.

Page 8: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

NEW

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

General Contractor Fax: 707-746-0849Office: 707-742-6000Flatiron West, Inc.

General Contractor Fax: 925-447-0962Office: 925-447-0292GSE Construction Co. Inc.

General Contractor Fax: 510-237-2435Office: 510-234-0926Overaa Construction

General Contractor Fax: 661-387-1600Office: 661-387-1600W.M. Lyles Co.

Supplier Fax: 831-754-2096Office: 831-754-2020Hydro Turf

Bidders:

Plan Issuer:

Monterey

MRWPCA is seeking qualified contractors to furnish all materials, equipment, supplies, transportation, and labor, performing alloperations, and conducting all work necessary to drill, install, and develop two monitoring wells (MW-1S and MW 1D) and one deepinjection well (DIW-2) as part of the Pure Water Monterey Groundwater Replenishment Project at the Agency’s Regional TreatmentPlant.

PREVAILING WAGE

MAND 3/20 @ 10am- 5 Harris Court, Bldg. D, Monterey

17-00528

1

2:00 PM4/10/17

Addenda:PURE WATER MONTEREY GROUNDWATER REPLENISHMENT PROJECT INJECTION WELLFACILITIES, PHASE 1 REBID

Prebid Conf:

Monterey Regional Water Pollution Control [email protected]

831-645-4605 831-656-0637

HVAC Contractor Fax: 805-621-5050Office: 805-621-5000Smith Electric Service

Bidders:

Plan Issuer:

King City $250,000

AC Grinding and Overlaying on some or all of the Streets in City of King: Haven Drive, Carson Street and Vivian Street.

PREVAILING WAGE

17-00602

1

2:30 PM4/13/17

Addenda:2017 KING CITY STREET PROJECT

2017-03

Hanna & Brunetti 408-842-2173 408-842-3662

General Contractor Fax: 831-449-0700Office: 831-449-4273Don Chapin Co

Bidders:

Plan Issuer:

King City $80,000

Surface improvements to install new play equipment (provided by owner) at Forden Park at the corner of Canal Street and Rio VistaDrive, including but not limited to Grading, Removal of existing AC and Replace with Concrete Sidewalk and playground border andInstall Playground Equipment and rubberized surface.

PREVAILING WAGE

17-00603

0

2:00 PM4/13/17

Addenda:KING CITY FORDEN PARK IMPROVEMENT

2017-02

Hanna & Brunetti 408-842-2173 408-842-3662

General Contractor Fax: 661-587-4603Office: 661-587-4602Courts & Greens

General Contractor Fax: 831-449-0700Office: 831-449-4273Don Chapin Co

Supplier Fax: 831-385-0464Office: 831-678-9300San Benito Supply

Plan Issuer:

Salinas

Remove and replace 2 built up roof sections including all sheet metal, flashings and coping caps of the Multipurpose/Cafeteria buildingat Gavilan View Middle School.

PREVAILING WAGE

MAND 4/3 @ 10am- site

17-00700

0

3:00 PM4/14/17

Addenda:GAVILAN VIEW MIDDLE SCHOOL MULTIPURPOSE/CAFETERIA REROOF

3-2017-22

Prebid Conf:

Santa Rita Union School District 831-443-7207

NEW

Plan Issuer:

Monterey County

Replace existing interior and exterior light fixtures at NMC Middle School, Prunedale Elementary, Elkhorn Elementary, CastrovilleElementary, and Echo Valley Elementary, as provided in NMCUSD AMBAG Energy Watch Prop 39 Expenditure Plan.

PREVAILING WAGE

MAND 3/24 @ 8:30am-1pm- 10301 Seymour St, Castroville

17-00686

0

4:00 PM4/17/17

Addenda:NMCUSD AMBAG ENERGY WATCH PROP 39 LED LIGHTING RETROFIT – MULTIPLE SITES

Prebid Conf:

North Monterey County USD 831-633-3343 831-633-5189

NEW

Page 9: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

NEW

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Visit

Marina

Services may include, but will not be limited to the following: mowing and edging; implementing approved watering of landscape plants;fertilizer application; weed, pest and disease control; implementing approved methods and techniques used for pruning shrubs andtrees; chemical controls; turf aeration; trash and debris control; ground cover care; irrigation systems maintenance; tree staking;immediate reporting of vandalism and/or safety hazards to City.

4/5 10 am @ 209 Cypress Ave.

17-00695

0

2:00 PM4/20/17

Addenda:LANDSCAPE MAINTENANCE SERVICES

Prebid Conf:

NON-MANDATORY

City of Marina - Engineering 831-884-1212

NEW

Plan Issuer:

Visit

Monterey

Rehabilitation of portions of the existing sanitary sewer system pipelines and structures. The work includes, but is not limited to, sewercleaning and CCTV inspection; pipeline rehabilitation via spot repairs, cured-in-place pipe (CIPP), sliplining, pipe bursting and opencut; lateral reinstatement, raising buried manholes and cleanouts, rehabilitating, reconstructing and installing new manholes andcleanouts, and the removal and replacement of existing improvements, including concrete and HMA (AC) pavement and trafficdetector loops, as well as other sewer related work as shown in the project plans and specifications. rehabilitation of portions of theexisting sanitary sewer system pipelines and structures. The work includes, but is not limited to, sewer cleaning and CCTV inspection;pipeline rehabilitation via spot repairs, cured-in-place pipe (CIPP), sliplining, pipe bursting and open cut; lateral reinstatement, raisingburied manholes and cleanouts, rehabilitating, reconstructing and installing new manholes and cleanouts, and the removal andreplacement of existing improvements, including concrete and HMA (AC) pavement and traffic detector loops, as well as other sewerrelated work as shown in the project plans and specifications.

PREVAILING WAGE

3/20 1pm @ City of Monterey Council Chambers, 580 Pacific St.

17-00594

0

2:00 PM5/9/17

Addenda:SANITARY SEWER SYSTEM REHABILITATION PACKAGE 3 & 5: D AND F RATED PIPEREHABILITATION PACKAGE 6: MANHOLE REHABILITATION

Prebid Conf:

non-mandatory

City Of Monterey 831-646-3877 831-646-3405

San Benito County

Bidders:

Plan Issuer:

Hollister

General Contractor Pre-Qualification for the San Benito County Jail Expansion Project. Project consists of $18million, 25,000 squarefoot facility.

17-00638

0

2:00 PM4/5/17

Addenda:PRE-QUALIFICATION SAN BENITO COUNTY JAIL EXPANSION

County of San Benito 831-636-4170 831-636-4176

NEW

General Contractor Fax: 951-289-7112Office: 951-788-0703Hal Hays Construction, Inc

Plan Issuer:

Hollister

The City of Hollister is requesting proposals for Traffic Signal Maintenance in the City of Hollister, California. The work will consist ofmaintaining traffic signals and Downtown Pedestrian Lights in the City of Hollister. As of March 1, 2017, the City of Hollister, SanBenito County and San Benito County Council of Governments will have twenty (20) existing traffic signals in operation seventeen (17)City of Hollister signals, three (3) County of San Benito signals, a network of decorative pedestrian lights with meter boxes for eachblock in the downtown area and two (2) In-ground Lighted Crosswalks. The City anticipates additional traffic signals and In-groundLighted Crosswalks may be completed and added to the contract during the term of the contract. The term of the services will be for aninitial period of sixty (60) months commencing on May 15, 2017.

17-00698

0

3:00 PM4/7/17

Addenda:RFP FOR TRAFFIC SIGNAL MAINTENANCE 2017

City of Hollister 831-636-4340 831-636-4349

NEW

Page 10: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

San Luis Obispo County

Bidders:

Plan Issuer:

Visit

Morro Bay

Furnish all labor, materials, tools and equipment necessary to install water line main and laterals to replace existing water system atMORRO BAY STATE PARK, complete and in accordance with the plans and specifications therefore and such addenda thereto asmay be issued prior to bid opening date.

PREVAILING WAGE

A job showing will not be held; however, the Contractor is required to visit the job site

17-00608

0

2:00 PM3/28/17

Addenda:MORRO BAY STATE PARK - WATER SYSTEM IMPROVEMENTS

C16E0082

Prebid Conf:

CA State Natural Resources Agency [email protected] 916-445-8889 916-445-9027

General Contractor Fax: 805-549-0702Office: 805-549-0667Sansone Company, Inc.

General Contractor Fax: 805-543-1722Office: 805-543-1706Specialty Construction

Supplier Fax: 661-393-0439Office: 661-393-2288HD Supply Waterworks

Bidders:

Plan Issuer:

San Luis ObispoCounty

The work includes the construction of three community gateway monument signs along or adjacent to State Route 1 (SR 1), one eachnear the southbound entry to San Luis Obispo, the southbound entry to Cambria, and the northbound entry to San Simeon. The workfor the Cambria Sign is subject to award of a Bid Alternate.At each location, the sign itself is the majority of the project. The following may be considered ancillary components:• San Luis Obispo: irrigation, lighting, and a sidewalk and trees on the Ferrini Rd. frontage• Cambria: no additional features; immediate area around sign will be re-seeded with Caltrans-approved hydroseed mix as necessary.• San Simeon: no ancillary components

PREVAILING WAGE

17-00558

0

2:00 PM3/29/17

Addenda:HIGHWAY 1 GATEWAY MONUMENTS PROJECT

CASB06-6096(038)

ASAP Reprographics 805-772-6921

Equipment Fax: 661-588-2157Office: 661-342-9959Golden Empire Equipment, Inc

General Contractor Fax: 805-549-0702Office: 805-549-0667Sansone Company, Inc.

Bidders:

Plan Issuer:

San Luis Obispo $22,000,000

Project consists of: Demolition; Selective Demo; Cast-in-Place Concrete; Penetrating reactive concrete stain; Concrete unit masonry;Adhered brick masonry; Metals; Plastic-laminate-faced architectural casework; Thermal and Moisture Protection; Openings; Finishes;Specialties; Loading dock bumpers; Food service equipment; Plastic-laminate-clad countertops; Simulated stone countertops; Electrictraction elevators; Fire Suppression; Plumbing; HVAC; Integrated Automation; Electrical; Communications; Electronic safety andsecurity; Earthwork; Exterior improvements; Utilities.

MAND 2/16 @ 10am- Julian A. McPhee University Union, Bldg. 65, rm 220

17-00193

3

3:00 PM3/30/17

Addenda:VISTA GRANDE FACILITY REPLACEMENT

MAJ 15-MJ0061

Prebid Conf:

Cal Poly Facilities Planning & Capital Projects 805-756-1299 805-756-7566

Concrete/Masonry Contractor Fax: 559-251-0435Office: 559-251-7363Harris Rebar

Demolition Contractor Office: 661-204-9942PSC

Electrical Contractor Fax: 805-238-0996Office: 805-238-3502Rossi & Carr Electrical Inc

General Contractor Fax: 661-251-7405Office: 661-251-7401AMG and Associates Inc.

General Contractor Fax: 831-372-5584Office: 831-372-5580Avila Construction

General Contractor Fax: 559-412-4744Office: 559-420-7505Bernards Bros. Inc

General Contractor Fax: 805-227-4502Office: 805-227-4450Boneso Brothers Construction Inc

General Contractor Fax: 650-576-3580Office: 415-367-9399Build Group

General Contractor Fax: 559-251-8645Office: 559-251-0301Harris Construction Co, Inc.

General Contractor Fax: 805-543-0514Office: 805-543-7411Maino Construction

General Contractor Fax: 951-678-1083Office: 951-678-1038ProWest Constructors

General Contractor Fax: 805-934-9500Office: 805-934-2119RK&G Construction

General Contractor Fax: 916-939-4027Office: 916-939-4000Roebbelen Contracting Inc.

General Contractor Fax: 661-391-9999Office: 661-392-7000S.C. Anderson, Inc.

General Contractor Fax: 619-296-7109Office: 619-296-6247Soltek Pacific Construction Company

General Contractor Fax: 559-252-1005Office: 559-252-1000Zumwalt Construction, Inc.

Page 11: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Sub-Contractor/SpecialtyContractor

Fax: 661-322-6816Office: 661-410-1333RLH Fire Protection

Supplier Fax: 661-588-2157Office: 661-342-9959Golden Empire Equipment, Inc

Supplier Fax: 661-393-0439Office: 661-393-2288HD Supply Waterworks

Plan Issuer:

Visit

Paso Robles

Furnishing all labor, materials, equipment, and performing all work necessary and incidental to Median/Parkway Maintenance. Thework is generally described as median, parkway and planter landscape maintenance.

PREVAILING WAGE

3/1 10 am @ City Hall Parking Lot, 1000 Spring St.

17-00281

0

2:00 PM3/30/17

Addenda:MEDIAN/PARKWAY LANDSCAPE MAINTENANCE

17-01

Prebid Conf:

NON-MANDATORY

City of Paso Robles 805-237-3861 805-237-3904

San Luis ObispoCounty

$1,653,165

This project will place chip seal coat surfacing on the various County roads and other such items or detail work not mentioned hereinthat are required by the Plans, the Standard specifications, Standard Plans, or these Special Provisions.

3/15 @ 10:30am- 5410 W. Pozo Rd (Approximately 1.84 miles south of Las Palitas Road) Gate Entrance to the SalinasDam

17-00495

0

3:00 PM3/30/17

Addenda:2016-17 CHIP SEAL TREATMENT VARIOUS COUNTY ROADS

300577

Prebid Conf:

San Luis ObispoCounty

$277,376

Grading and paving shall be performed for roadway widening to accommodate a left turn lane. Fill Embankment will be placed, cutslopes, roadway excavation, new striping, and such other items or detail work not mentioned herein that are required by the Plans, theStandard Specifications, Standard Plans, or these Special Provisions shall be performed, constructed, furnished and/or installed.

17-00496

0

3:00 PM3/30/17

Addenda:LEFT TURN LANE NACIMIENTO LAKE DRIVE AT ADELAIDA ROAD

300348

San Luis ObispoCounty

$469,035

This project will place Micro-surfacing and/or slurry seal on various county roads throughout Avila beach, Arroyo Grande, San LuisObispo, Templeton, and other such items or detail work not mentioned herein that are required by the Plans, the StandardSpecifications, Standard Plans, or these Special Provisions.

The non-mandatory pre-bid meeting will be held on Wednesday, March 15, 2017 at the following locations:1. 9:00 AM – Site 6 Booster Station and Access Road (Meet at Park-n-Ride adjacent to first entrance gate)2. 1:00 PM – Site 5 Lopez Water Treatment Plant (2845 Lopez Drive, Arroyo Grande, CA)

3/15 - 2 locations (see in description)

17-00498

1

3:00 PM4/3/17

Addenda:2016-17 SURFACE TREATMENT VARIOUS COUNTY ROADS

300578

Prebid Conf:

Plan Issuer:

Grover Beach

The City will be constructing a variety of public improvements and a stand-alone conference center as part of the Grover Beach Lodgeproject. The Grover Beach Lodge project involves three “partners” consisting of the City of Grover Beach (City), California Departmentof Parks and Recreation (State Parks), and Pacifica Companies (Pacifica), the project developer. The request is for the building andsite design of the conference center. The services required include, but are not necessarily limited to: internal project managementincluding but not necessarily limited to record keeping and file management, accounting, budget monitoring and control, schedulemonitoring and control, and quality control of the design work and quality assurance of sub-consulting work; professional landsurveying services; geotechnical engineering; full and complete professional design Architectural/Engineering (A/E) services toproduce bid ready plans and technical specifications that are incorporated into the City’s standard front-end construction document;Architect/Engineer’s opinion of probable construction cost; coordination and permitting with multiple agencies; and miscellaneousadministrative support of City staff (e.g., production of exhibits to support Council agenda items); support during bidding phase; andsupport during construction phase.

17-00573

0

4:00 PM4/3/17

Addenda:RFP FOR PROFESSIONAL ARCHITECTURAL/ENGINEERING SERVICES - GROVER BEACH LODGECONFERENCE CENTER DESIGN

CIP 3275

City of Grover Beach [email protected] 805-473-4520 805-489-9657

Page 12: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Atascadero $200,000 $235,000

Pavement maintenance, including asphalt leveling, minor repaving, and Type II slurry seal. Minor drainage improvements.

17-00493

0

2:00 PM4/4/17

Addenda:2016/2017 F-14 PAVEMENT MAINTENANCE

2017-003 to

City of Atascadero [email protected] 805-470-3180 805-470-3181

Bidders:

Plan Issuer:

Paso Robles $13,630,000

Furnishing all labor, materials, equipment, services, testing, permits, temporary controls and construction facilities, and all generalconditions, general requirements and incidentals required to complete the Work for the Paso Robles Tertiary Treatment FacilitiesProject in its entirety as described in the Contract Documents, which includes, but is not necessarily limited to, the following: site work,building construction, facility demolition including minor lead and asbestos abatement, installation of major process equipment such ascloth media filtration and ultraviolet light disinfection, SCADA, and related systems and facilities, as more fully described in the biddingand contract documents.

PREVAILING WAGE

MAND 3/8 9 am @ 3200 Sulphur Springs Rd.

17-00406

2

2:00 PM4/5/17

Addenda:TERTIARY TREATMENT FACILITIES

16-22

Prebid Conf:

City of Paso Robles 805-237-3865 805-237-3904

Demolition Contractor Office: 661-204-9942PSC

Equipment Fax: 661-588-2157Office: 661-342-9959Golden Empire Equipment, Inc

General Contractor Fax: 408-213-0532Office: 408-970-9900Anderson Pacific EngineeringConstruction, Inc.

General Contractor Fax: 805-357-5315Office: 805-964-8661Cushman Contracting Corp

General Contractor Fax: 925-447-0962Office: 925-447-0292GSE Construction Co. Inc.

Plan Issuer:

Paso Robles

The work is generally described as a sports field barrier netting system on one (1) softball field at Barney Schwartz Park, 2970 UnionRoad, Paso Robles.

PREVAILING WAGE

3/14 @ 10am- site

17-00428

0

2:00 PM4/6/17

Addenda:BARNEY SCHWARTZ PARK SPORTS FIELD NETTING

17-03

Prebid Conf:

City of Paso Robles 805-237-3861 805-237-3904

Plan Issuer:

San Luis Obispo

Removing and replacing hot water piping and valves throughout Campus. Work will include new welded steel piping, valves, anchors,concrete flatwork, asphalt paving, and minor concrete structures. Work will take place on the California Polytechnic State Universitycampus.

GENERAL PREVAILING

MAND 3/21 10 am @ site, Bldg 70 - Room 114

17-00541

0

3:00 PM4/6/17

Addenda:HOT WATER UTILIDOR PROJECT PHASE II

MAJ 15-MJ0065.1

Prebid Conf:

Cal Poly Facilities Planning & Capital Projects 805-756-1299 805-756-7566

Visit

San Luis Obispo $607,649

Construction and installation of a modular building on a permanent foundation, Type V-B Sprinkled, one story 2130 SF, with ADAparking and access with all the related HVAC, Electrical, plumbing, communication and site improvements.

Bid Contact: Carl Spier [email protected]

17-00548

0

3:00 PM4/6/17

Addenda:CRISIS STABILIZATION UNIT (HEALTH SLO CHFFA CALIFORNIA HEALTH FACILITIES FINANCINGAUTHORITY)

320080

3/22 @ 1:30pm- site visit

Page 13: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Atascadero AndTempleton

$2,890,000

Resurface existing roadbed with RHMA-O In San Luis Obispo County In Atascadero And Templeton From Traffic Way To VineyardDrive OvercrossingThe Contractor must have either a Class A license or one of the following Class C licenses: C-12.

17-00111

0

2:00 PM4/12/17

Addenda:DOT 05-1H4004 RESURFACE EXISTING ROADBED WITH RHMA-O

05-SLO-101-46.0/50.7

Plan Issuer:

Morro Bay

San Luis Coastal Unified School District is seeking proposals from qualified persons, firms, partnerships, corporations, associations, orprofessional organizations to provide design, construct-ability review, value engineering, master scheduling, cost estimating,budgeting, and construction services for the development and construction for the Projects at Morro Bay High School, in accordancewith the lease-leaseback structure set forth in Education Code section 17406 et seq.All Respondents must have already been prequalified by the District in accordance with the Public Contract Code section 20111.6.Proposed electrical, mechanical and plumbing subcontractors are also subject to the prequalification requirements as required byPublic Contract Code section 20111.6. Respondents must prequalify for this RFQ/P on or before March 28, 2017 throughwww.pqbids.com. Respondents should account for time for the prequalification process to be completed.

MAND 3/23 2pm @ 937 Southwood Dr., SLO

17-00629

1

2:00 PM4/12/17

Addenda:LEASE-LEASEBACK CONSTRUCTION SERVICES PROJECTS AT MORRO BAY HIGH SCHOOL

286

Prebid Conf:

San Luis Coastal Unified School District [email protected] 805-549-1200

Plan Issuer:

San Luis Obispo

San Luis Coastal Unified School District is seeking proposals from qualified persons, firms, partnerships, corporations, associations, orprofessional organizations to provide, construct-ability review, value engineering, master scheduling, cost estimating, budgeting, andconstruction services for the development and construction for the Project at C.L. Smith Elementary School, in accordance with thelease-leaseback structure set forth in Education Code section 17406 et seq.All Respondents must have already been prequalified by the District in accordance with the Public Contract Code section 20111.6.

MAND 3/23 2p @ 937 Southwood Dr., SLO

17-00633

0

2:00 PM4/12/17

Addenda:LEASE-LEASEBACK CONSTRUCTION SERVICES PROJECTS AT C.L. SMITH ELEMENTARY SCHOOL

Prebid Conf:

San Luis Coastal Unified School District [email protected] 805-549-1200

Plan Issuer:

San Luis Obispo

San Luis Coastal Unified School District is seeking proposals from qualified persons, firms, partnerships, corporations, associations, orprofessional organizations to provide design, construct-ability review, value engineering, master scheduling, cost estimating,budgeting, and construction services for the development and construction for the Projects at San Luis Obispo High School, inaccordance with the lease-leaseback structure set forth in Education Code section 17406 et seq.Respondents must pre-qualify for this RFQ/P on or before March 28, 2017 through www.pqbids.com

MAND 3/23 2p @ 937 Southwood Dr.

17-00639

0

2:00 PM4/12/17

Addenda:LEASE-LEASEBACK CONSTRUCTION SERVICES PROJECTS AT SAN LUIS OBISPO HIGH SCHOOL

285

Prebid Conf:

San Luis Coastal Unified School District [email protected] 805-549-1200

NEW

Bidders:

Plan Issuer:

San Luis Obispo $733,000

In general, the work consists of, but is not limited to, providing all labor, products, equipment and services required for installation ofnew gas line and partial replacement, on the California Polytechnic State University campus in San Luis Obispo.

PREVAILING WAGE

MAND 3/29 @ 9am- Facilities (Bldg. 70), room 110

17-00699

0

3:00 PM4/13/17

Addenda:GAS LINE REPLACEMENT

MIN 17-DM5206

Prebid Conf:

Cal Poly Facilities Planning & Capital Projects 805-756-1299 805-756-7566

NEW

Equipment Fax: 661-588-2157Office: 661-342-9959Golden Empire Equipment, Inc

Plan Issuer:

Paso Robles

The Request for Qualifications and Proposals (RFQ/P) describes the general project background and scope of services for thedevelopment of a Library Facilities Master Plan to address the current and future facility needs of the Paso Robles City Library.

17-00538

0

5:00 PM4/17/17

Addenda:FACILITY PLANNING SERVICES

City of Paso Robles [email protected] 805-227-7539

Page 14: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

San Luis Obispo

The Contractor shall provide all labor, including travel, per diem, parts, materials, supplies, transportation, equipment, tools and everyother item of expense necessary to perform scheduled maintenance, repair, emergency repair and source test services to includeinspections, calibrations, mechanical and electrical repairs, adjustments with tuning and instrument components associated with theoperation of the boilers for the specified herein for the California Department of Corrections and Rehabilitation California Men's Colony.

PREVAILING WAGE

17-00618

0

10:30 AM4/19/17

Addenda:BOILER INSPECTION, CALIBRATIONS, MAINTENANCE, REPAIRS AND SOURCE TESTING

60000000872

CA State Dept. of Corrections & Rehabilitation 916-255-5666 916-255-6187

Plan Issuer:

Visit

Paso Robles

The work is generally described as street tree trimming of all trees on both sides of Riverglen Drive between Union Road and SkyviewDrive.

3/28 @ 10am, meet at the corner of Riverglen Dr. & Via Camelia

17-00590

0

2:00 PM4/20/17

Addenda:TREE TRIMMING ON RIVERGLEN DRIVE

17-09

Prebid Conf:

non-mandatory

City of Paso Robles 805-237-3861 805-237-3904

Plan Issuer:

San Luis Obispo $130,000

In general, the project consists of remodel and tenant improvements to the Transit Facility for a classroom/training room along withrequired interior and exterior ADA facility upgrades.

PREVAILING WAGE

Project Manager: Mike McGuire 805-783-7716

MAND 4/11 @ 10am or 2pm- site

17-00701

0

2:00 PM4/20/17

Addenda:TRANSIT FACILITY CLASSROOM REMODEL

91384

Prebid Conf:

City of San Luis Obispo 805-781-7200 805-781-7198

NEW

Plan Issuer:

Visit

San Luis Obispo $40,000

The Contractor shall provide all materials and labor, including travel and per diem, transportation, tools, licenses, bond(s), and anyother item of expense necessary to perform miscellaneous roof repair and/or replacement on an as-needed and emergency basis forthe California Department of Corrections and Rehabilitation, at the California Men’s Colony. Roof types to be repaired include, but arenot limited to: composition, built-up tar, and gravel, modified cap sheet, and single-ply PVC.

PREVAILING WAGE

4/4 10 am @ site

17-00622

0

10:30 AM4/25/17

Addenda:ROOF REPAIR SERVICES

C5607107-D

Prebid Conf:

Notification of Intent to Participate 3/16 by 5pm

CA State Dept. of Corrections & Rehabilitation 916-255-5666 916-255-6187

Santa Clara County

Bidders:

Plan Issuer:

San Jose

Tenant improvement

Available ONLINE ONLY

17-00640

3

9:00 AM3/27/17

Addenda:FOREVER 21- EAST RIDGE #2023 (ONLINE)

Reconn Construction 281-549-6267 281-549-6271

NEW

General Contractor Fax: 281-549-6271Office: 281-549-6267Reconn Construction

Page 15: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

San Jose

Construction of a new team locker room and weight room building; renovations to the exiting athletics building locker rooms, showers,restrooms; addition of front lobby including concessions stand; addition of visiting team locker room building to include restrooms,showers and locker room.

Project Contact: Chris Moreno, Van Pelt Construction Services, 707-372-4969 cellEmail: [email protected]

Available ONLINE ONLY

MAND 2/22 at 2PM & 2/23 at 10AM

17-00462

7

2:00 PM3/28/17

Addenda:SAN JOSE HIGH SCHOOL ATHLETICS BUILDING UPGRADES (ONLINE)

Z0483

Prebid Conf:

Van Pelt Construction 707-438-3790

General Contractor Fax: 650-367-7645Office: 650-364-8141Beals Martin

General Contractor Fax: 916-652-3922Office: 916-652-3868BRCO Constructors Inc

General Contractor Fax: 510-657-1810Office: 510-657-1800Calstate Construction

General Contractor Fax: 650-965-7139Office: 650-965-3430RC Benson & Sons, Inc.

General Contractor Fax: 650-508-1705Office: 650-508-1700Rodan Builders Inc.

General Contractor Fax: 000-000-0000Office: 408-287-2700Teamwrkx Construction

General Contractor Fax: 510-236-4979Office: 510-236-9111Vila Construction

Roofing Contractor Fax: 888-900-7566Office: 408-213-8858Bartek

Sub-Contractor/SpecialtyContractor

Fax: 408-848-8778Office: 408-848-8700McKim Corporation

Sub-Contractor/SpecialtyContractor

Fax: 408-413-4130Office: 408-848-4088R Titus Waterproofing

Bidders:

Plan Issuer:

Sunnyvale $3,700,000

Various areas of modernization work including, but not limited to, demolition of specified concrete and asphalt areas, interior andexterior painting, interior finishes including casework and tackable wall surfaces, fire alarm, various electrical and plumbing work,fencing and miscellaneous roofing.

Available ONLINE ONLY

MAND 3/7 & 3/14 at 3:30PM (Front of Admin Building)

17-00472

0

2:00 PM3/28/17

Addenda:CUPERTINO MIDDLE SCHOOL MODERNIZATION - CUPERTINO UNION SCHOOL DISTRICT (CUSD)(ONLINE)

17-B08-24

Prebid Conf:

Cupertino Union School District 408-252-3000 408-343-2802

General Contractor Fax: 650-557-1239Office: 650-557-1238Cal Pacific Construction

General Contractor Fax: 510-657-1810Office: 510-657-1800Calstate Construction

General Contractor Fax: 650-965-7139Office: 650-965-3430RC Benson & Sons, Inc.

General Contractor Fax: 650-508-1705Office: 650-508-1700Rodan Builders Inc.

General Contractor Fax: 510-632-9769Office: 510-568-6600Sausal Corporation

General Contractor Fax: 415-459-0665Office: 415-456-8972Thompson Builders Corp.

HVAC Contractor Fax: 916-344-3168Office: 916-344-1711Environmental Systems

Sub-Contractor/SpecialtyContractor

Fax: 408-848-8778Office: 408-848-8700McKim Corporation

Sub-Contractor/SpecialtyContractor

Fax: 408-413-4130Office: 408-848-4088R Titus Waterproofing

Page 16: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

San Jose $9,500,000

Renovation to an existing multipurpose building / cafeteria making it into a student union building. This includes approximately 6,000square feet of demolition of existing structure and a 16,000 square feet addition. Also included is the installation of supportinginfrastructure including a fire service that will pick up on the North Side of the site, run around the back of the site and end outside theSouth East side of the site. Outside we will be renovating the area directly outside the building to the North as well as performingupgrades to the inner campus storm water system.

Project Contact: Kwan Choie, Gilbane 408-478-5904Email: [email protected]

Available ONLINE ONLY

MAND 3/7 & 3/14 at 10AM ((Admin Bldg)

17-00509

1

2:00 PM3/28/17

Addenda:JAMES LICK HIGH SCHOOL STUDENT CENTER & QUAD/JL SITE INFRASTRUCTURE - ESUHSD(ONLINE)

B-24-16-17

Prebid Conf:

East Side Union High School District (ESUHSD) 408-347-5100

Electrical Contractor Fax: 408-708-7611Office: 408-506-4143Lakeshore Electric and Engineering

Electrical Contractor Fax: 408-559-3594Office: 408-210-3741Sanpri Electric

General Contractor Fax: 650-367-7645Office: 650-364-8141Beals Martin

General Contractor Fax: 707-643-4581Office: 707-643-4580BHM Construction

General Contractor Fax: 916-652-3922Office: 916-652-3868BRCO Constructors Inc

General Contractor Fax: 650-802-2970Office: 650-802-2960Gonsalves & Stronck Construction

General Contractor Fax: 650-508-1705Office: 650-508-1700Rodan Builders Inc.

General Contractor Fax: 530-229-0070Office: 530-229-0001Seward L. Schreder Construction

General Contractor Fax: 408-286-1288Office: 408-286-1299Strawn Construction

General Contractor Fax: 415-459-0665Office: 415-456-8972Thompson Builders Corp

General Contractor Fax: 714-503-6805Office: 714-828-4882USS Cal Builders, Inc.

Sub-Contractor/SpecialtyContractor

Fax: 408-727-7051Office: 408-727-6999Mission City Rebar, Inc

Sub-Contractor/SpecialtyContractor

Fax: 408-413-4130Office: 408-848-4088R Titus Waterproofing

Sub-Contractor/SpecialtyContractor

Fax: 999-999-9999Office: 650-999-0700Stumbaugh and Associates

Bidders:

Plan Issuer:

San Jose

Roof Repairs and Restorations 1: Minor alterations to roof edge, including limited re-roofing of classrooms and covered walkways.Curb modification and installation of gutters. Restoration of existing roofing.

Plans and specs also available for review at Santa Clara Builders Exchange

3/14 at 11AM

17-00516

0

1:00 PM3/28/17

Addenda:CARLTON ELEMENTARY ROOF REPAIRS & RESTORATIONS

Prebid Conf:

Greystone West Company 707-933-0624 707-996-8390

Sub-Contractor/SpecialtyContractor

Fax: 408-413-4130Office: 408-848-4088R Titus Waterproofing

Bidders:

Plan Issuer:

San Jose

Interior tenant fit-out of existing mercantile space. No change in zoning use or occupancy file under this application. Work shallinclude new non-load bearing partitions, entry doors, at existing storefront system, finishes, HVAC, electrical, lighting, and storefixtures.

Available ONLINE ONLY

17-00663

0

2:00 PM3/28/17

Addenda:AMAZON BOOKS - SANTANA ROW (ONLINE)

Gray Builders 503-228-4729 714-333-9777

NEW

General Contractor Fax: 714-333-9777Office: 503-228-4729Gray

Page 17: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Palo Alto

Installation of water mains, services, fire hydrant assemblies, reconnection of the existing fire services, installation of line stoppers, andperformance system tie-ins, performance of required testing and disinfection, and excavation, recycling and surface restoration.

Project Contact: Jennifer CioffiEmail: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

MAND 3/15 at 2PM (Utilities Dept, Conference Room 1)

17-00681

0

3:00 PM3/28/17

Addenda:WATER MAIN REPLACEMENT PROJECT 26

167501

Prebid Conf:

City of Palo Alto - DPW 650-329-2271

NEW

Plan Issuer:

Los Altos $45,000

Install (OFCI) Electric Vehicle Charging Stations and payment kiosk machines in 3 separate parking lots.

Project Contact: Annette Perez - 650-949-6163Email: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

MAND 2/15 at 1PM & 3/8 at 10AM (Plant Services Conference Room, Bldg D160_

17-00307

2

2:00 PM3/29/17

Addenda:EV CHARGING STATIONS FOOTHILL COLLEGE - FDACCD

1735

Prebid Conf:

Foothill - DeAnza Community College District 408-864-5888

Plan Issuer:

San Jose

There are (11) eleven tennis courts located at Evergreen Valley College. The courts are grouped in two sets including a group of (3) atthe west and another group of (8) at the east. Resurfacing of courts will include crack filling, patching, installation of acrylic resurfacing,and installation of acrylic color courses for courts, surrounding fields, and playing lines. The Contractor will also install (11) Ownerfurnished nets.

Plans and specs also available for review at Santa Clara Builders Exchange

MAND 3/16 at 10AM

17-00483

1

2:00 PM3/29/17

Addenda:EVERGREEN VALLEY COLLEGE (EVC) TENNIS COURT RESURFACING

G2010.0173

Prebid Conf:

San Jose Evergreen Community College District, Cindy Giesing 408-270-6487

Bidders:

Plan Issuer:

Sunnyvale

Installing bicycle lanes on Mary Avenue between Evelyn Avenue and Maude Avenue including design of appropriate roadwayresurfacing treatment(s), new roadway striping, green bike lanes per FHWA guidance, new inductive loops and/or video detection forbikes and motorists, modifications to existing traffic signal hardware for inclusion of video detection equipment, modification of existingcurbs, and related signage.

Project Contact: Lisa Vo 408-730-7608Email: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

17-00514

0

3:00 PM3/29/17

Addenda:MARY AVENUE BICYCLE LANES PROJECT PHASE 2

PW17-17

City of Sunnyvale DPW 408-730-7403

Sub-Contractor/SpecialtyContractor

Fax: 510-783-9907Office: 510-783-9909Bond Blacktop, Inc

Page 18: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Gilroy

Building alterations for the installation of new athletic wood flooring, new telescoping bleachers, new toilet rooms, new drinkingfountains, and site low voltage data fiber.

Project Contact: Donna MartinEmail: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

MAND 3/14 at 11AM (Gilbane Construction Trailer)

17-00536

0

2:00 PM3/29/17

Addenda:GAVILAN COLLEGE GYM BLEACHERS & FLOORING PROJECT

Prebid Conf:

Gilbane Building Co- Gavilan College District 408-660-4400

Flooring Contractor Office: 650-593-6837Hy Floor and Gameline Painting

General Contractor Fax: 408-846-5660Office: 408-846-5550Kent Construction

General Contractor Fax: 831-641-0586Office: 831-915-6823Pueblo Construction , Inc.

Sub-Contractor/SpecialtyContractor

Fax: 408-413-4130Office: 408-848-4088R Titus Waterproofing

Bidders:

Plan Issuer:

San Jose $3,950,000

Modernization of an existing library building located in the center of Campus. This includes the surrounding adjacent quads/courtyardsand all necessary site and utility improvements. Site improvements include new concrete stairs, ramp and walks, all associated utilities,site drainage, landscaping and irrigation, accessibility and logistics. The 7,056 gross square foot modernized library will includestudy/office spaces, a group gathering or communal space, study areas with book stacks, and building support. This Project alsoincludes upgrading the roof of the Administrative Building and associated overhangs/canopies.

Project Contact: Landon Stoddard, Gilbane 650-280-3637Email: [email protected]

Available ONLINE ONLY

MAND 3/8 at 10AM

17-00545

0

2:00 PM3/29/17

Addenda:MT. PLEASANT HIGH SCHOOL NEW STUDENT CENTER & QUADS - ESUHSD (ONLINE)

B-27-16-17

Prebid Conf:

East Side Union High School District (ESUHSD) 408-347-5100

Electrical Contractor Fax: 408-708-7611Office: 408-506-4143Lakeshore Electric and Engineering

General Contractor Fax: 650-508-1705Office: 650-508-1700Rodan Builders Inc.

Sub-Contractor/SpecialtyContractor

Fax: 408-727-7051Office: 408-727-6999Mission City Rebar, Inc

Sub-Contractor/SpecialtyContractor

Fax: 999-999-9999Office: 650-999-0700Stumbaugh and Associates

Bidders:

Plan Issuer:

Palo Alto

Please note that these are two separate projects bidding as one project. Please refer to SOW (in specs folder) for further information.

VA Palo Alto Building #7 - Provide and Install Additional Oxygen And Medical Gas Outlets in 4 Patient Bed Space Locations. RFP No:VA261-17-B-0355Project No.: 640-17-919

VA Palo Alto - Bldg. 50/51 – Provide and Install New Domestic And Fire Water Underground Valve.RFP No: VA261-17-B-0355Project No.: 640-17-1-5070-0244

Project Contact: Angela Oppenheimer 925-372-2354

Available ONLINE ONLY

3/10 at 10AM (Loading Dock-Bldg 6) Site Visit Strongly Encouraged

17-00637

0

1:00 PM3/29/17

Addenda:MATOC VAPA N. MEDICAL GAS OUTLET/ISOLATION VALVE (ONLINE)

VA261-17-B-0355

Prebid Conf:

Department of Veterans Affairs

NEW

General Contractor Fax: 209-249-5301Office: 209-982-9900Patriot Construction

Page 19: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

San Jose

Traffic control and lane closure, signal shut down, temporary traffic detection, traffic lane and crosswalk restriping and lanerealignment, removal of existing thermoplastic traffic/bicycle/ arrow striping and bicycle legends, furnish and install proposedthermoplastic traffic/bicycle/arrow striping and bicycle legends, abandon existing traffic signal pole foundation, loop detectors anddetector hand holes(s), remove existing traffic signal pole, install County-furnished traffic signal pole and furnish and install trafficsignal pole foundation, traffic signs and traffic signal heads and conductors,furnish and install proposed loop detectors.for vehicles andbicycles, furnish and install proposed detector lead-in cables (DLC's), detector handlhole(s) and signal conductors, removal of existingDLC's and signal conductors and pull in with new conductors as one unit, demolition, reconstruction and painting of median island,relocation and readjustment of existing traffic signal heads, install Countv-furnished CCTV cameras, furnished and install microwavebicycle sensors and audible pedestrian signals, re-wiring for existing pedestrian sensors, and other improvements.

Project Contact: Nora Chung 408-494-1390Email: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

3/14 at 2PM (Roads & Airports, 101 Skyport Dr, SJ)

17-00335

1

2:00 PM3/30/17

Addenda:TRAFFIC SIGNAL MODIFICATION AT ALMADEN EXPRESSWAY & TRINIDAD DRIVE

Prebid Conf:

County of Santa Clara Roads & Airports 408-573-2440

Plan Issuer:

San Jose $784,365

Clean and assess the existing sanitary sewer system in the several areas.

Project Contact: Karen Vences 408-535-3897

Plans and specs also available for review at Santa Clara Builders Exchange

17-00577

0

3:00 PM3/30/17

Addenda:8349-SANITARY SEWER CONDITION ASSESSMENT 2016-2017 PACKAGE V

8349

City of San Jose - DPW 408-535-8300

Bidders:

Plan Issuer:

Morgan Hill $40,000

Full depth AC pavement repair on Wright Avenue between Monterey Road and Hale Avenue.

Project Contact: Cynthia IwanagaEmail: [email protected]

Specs also available for review at Santa Clara Builders Exchange

17-00623

1

10:30 AM3/30/17

Addenda:2017 PAVEMENT REPAIR PROJECT

City of Morgan Hill DPW 408-778-6480

General Contractor Fax: 408-279-2044Office: 408-279-2027Guerra Construction & Engineering, Inc

Plan Issuer:

San Jose

Re-roofing of 2 equipment wells, and re-stucco of the entire wall above each equipment well, at Building 1100. Re-roofing around 5roof drains per building at, Buildings 300 and 400.

Plans and specs also available for review at Santa Clara Builders Exchange

MAND 3/15 & 3/20 at 3:30PM (Admin Bldg)

17-00657

0

1:00 PM3/30/17

Addenda:MILLER MIDDLE SCHOOL ROOF REPLACEMENT PROJECT BUILDING 1100; DRAIN REPAIRS BLDGS300 & 400 - CUSD

17-B10-24

Prebid Conf:

Cupertino Union School District 408-252-3000 408-343-2802

NEW

Page 20: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Sunnyvale

CPE Construction Inc. is NEGOTIATED GENERAL CONTRACTOR

51 Unit 45,352 SF 5-Story hotel with 9,999 SF above ground garage concrete and 39,632 FF of 4-stories of wood frame structure withstucco exterior. CPE Construction is requesting subcontractor and supplier bids for all trades. Project includes site demo, site clearing,Earthwork, Paving, Underground Utilities, concrete, rough framing, doors, windows, storefronts, fire sprinkler system, fire alarmsystem, electrical, plumbing, HVAC, sheet metal, structural steel, finish carpentry, cabinets, tops, drywall, light weight concrete,insulation, roofing, fire extinguishers, bath accessories, roof accessories, masonry, landscape and irrigation.

Available ONLINE ONLY

17-00684

0

2:00 PM3/30/17

Addenda:HOLIDAY INN EXPRESS HOTEL (ONLINE)

Chris P. Ensslin Construction (CPE) 209-745-2870 209-745-2879

NEW

Sub-Contractor/SpecialtyContractor

Fax: 559-528-6703Office: 559-528-6705Garcia Window Screens

Supplier Fax: 408-294-2331Office: 408-391-0508River City Building Supply

Plan Issuer:

Cupertino

The District is also requesting submission of a proposal (“RFP”) from qualified firms, partnerships, corporations, associations, persons,or professional organizations (“Contractor(s)” or “Firm(s)”) to perform preliminary services and construction services for the projectidentified here in Attachment 1 (“Project) Description”) pursuant to a lease-leaseback structure. (Education Code section 17406.)(“Proposal”).

Project Contact: Aram DarmanianEmail: [email protected]

RFP also available for review at Santa Clara Builders Exchange

MAND 3/21 at 1PM (Homestead HS, 21370 Homestead Road)

17-00631

3

2:00 PM3/31/17

Addenda:RFP/SOQ FOR PRELIMINARY & CONSTRUCTION SERVICES (LEASE-LEASEBACK) LLB-FREMONTUNION HIGH SCHOOL DISTRICT

Prebid Conf:

Fremont Union High School District FUHSD 408-522-2255

Plan Issuer:

San Jose $46,000

Prep existing floor by removing existing muslin “ground cloth”. Remove all staples from the wood holding ground cloth to the stagefloor, the floor will need to be patched after removing old scenic show items installed into the floor. Full sanding of the existing woodfloor planks and patches to provide a smooth surface before the hardboard is installed. Install approximately 120 sheet of 1/4”tempered both sides hardboard countersunk screwed to the existing stage floor. Precise cuts around floor pockets, trap floor platforms,and other items at edges will be required. The hard board at the wings on either side downstage of the proscenium will require to beglued to the existing concrete floor for a smooth transition from side stage wing to stage floor and orchestra lift. Replace both existingfire doors at proscenium wall with new thresholds so doors can clear new floor surface. The new floor will be painted with two coats oftheatrical floor paint.

Project Contact: Priscilla LouangrathEmail: [email protected]

Available ONLINE ONLY

MAND 2/7 at 10AM

17-00159

3

2:00 PM4/4/17

Addenda:THEATER ACCESSIBILITY & ENTRANCE IMPROVEMENTS (TAEI) STAGE FLOOR SURFACEREPLACEMENT SJCC - SJECCD (ONLINE)

G-2010.0161

Prebid Conf:

San Jose Evergreen Community College [email protected]

408-270-6431 408-239-8807

Page 21: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Los Altos $3,800,000

Upgrades to classrooms including carpet, paint, tackable wall panels, casework and countertops; new fire alarm system; ADAupgrades; renovation of administration building and upgrades to warming kitchen; site work improvements associatedwith ADA accessibility; roof repairs/replacement on certain buildings; replacement of some exterior doors; and replacement ofnoncompliant drinking fountains.

Available ONLINE ONLY

MAND 2/28 at 3:30PM (Admin Bldg)

17-00463

1

1:00 PM4/4/17

Addenda:MONTCLAIRE ELEMENTARY SCHOOL MODERNIZATION - CUSD (ONLINE)

17-B-09-24

Prebid Conf:

Cupertino Union School District 408-252-3000 408-343-2802

Consultant Fax: 408-727-5641Office: 408-727-6665Kier & Wright

Demolition Contractor Office: 661-204-9942PSC

General Contractor Fax: 650-557-1239Office: 415-824-8871Cal Pacific Construction

General Contractor Fax: 650-508-1705Office: 650-508-1700Rodan Builders Inc.

General Contractor Fax: 510-632-9769Office: 510-568-6600Sausal Corporation

General Contractor Fax: 415-459-0665Office: 415-456-8972Thompson Builders Corp

Roofing Contractor Fax: 888-900-7566Office: 408-213-8858Bartek

Sub-Contractor/SpecialtyContractor

Fax: 408-413-4130Office: 408-848-4088R Titus Waterproofing

Plan Issuer:

San Jose

Provide Dome Coating Rehabilitation of Digester #9.

Project Contact: Jeannie Lee 408-535-7049Email: [email protected]

RFB also available for review at Santa Clara Builders Exchange

MAND 3/22 at 1PM

17-00578

2

3:00 PM4/4/17

Addenda:RFB DOME COATING REHABILITATION OF DIGESTER #9- SJ-SANTA CLARA REGIONALWASTEWATER FACILITY

RFB 16-17-27

Prebid Conf:

City of San Jose - DPW 408-535-8300

Plan Issuer:

Los Altos

Remove and replace the roof with ventilation system on the City Hall building.

Specs also available for review at Sana Clara Builders Exchange

MAND 3/21 at 10AM

17-00609

0

2:00 PM4/4/17

Addenda:CITY HALL ROOF REPLACEMENT

CF-01014

Prebid Conf:

City of Los Altos - Engineering 650-947-2780

Plan Issuer:

Palo Alto

Provide asphalt paving

Project Contact: Holly BoydEmail: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

17-00621

0

3:00 PM4/4/17

Addenda:FY17 ASPHALT PAVING PROJECT

167781

City of Palo Alto - DPW 650-329-2271

Page 22: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Palo Alto

Prepare existing wall surfaces for new acoustical walls panels. Remove existing electrical panel. Outlets and other devices on existingwalls and reinstall on new acoustical Wall panels.

Project Contact: Matt RaschkeEmail: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

MAND 3/27 at 9AM

17-00679

1

3:00 PM4/4/17

Addenda:MITCHELL PARK LIBRARY ACOUSTICAL WALL PANELS INSTALLATION PROJECT

167596

Prebid Conf:

City of Palo Alto - DPW 650-329-2271

NEW

Plan Issuer:

Saratoga

Install asphalt overlays, striping.

Plans and specs also available for review at Santa Clara Builders Exchange

17-00703

0

11:00 AM4/4/17

Addenda:CITYWIDE ACCESSIBLE PEDESTRIAN SIGNAL UPGRADE

City Of Saratoga, DPW 408-868-1239

NEW

Bidders:

Plan Issuer:

Cupertino

The Campus Exterior Lighting Phase III project continues with the installation of exterior pathway and building lights and thereplacement of light fixtures at specific buildings on Campus.

MAND 3/15 at 11AM (Admin Building, Room 106)

17-00529

1

2:00 PM4/5/17

Addenda:CAMPUS EXTERIOR LIGHTING PHASE III DE ANZA COLLEGE

#1766R-276

Prebid Conf:

Foothill - DeAnza Community College District 408-864-5888

General Contractor Fax: 650-508-1705Office: 650-508-1700Rodan Builders Inc.

Plan Issuer:

Los Gatos

Portland cement concrete (PCC) and asphalt concrete (AC) pavement demolition, demolition of PCC curb and gutter, sidewalk, anddriveways, subgrade preparation and grading, construction of PCC curb and gutter, sidewalk and driveways, PCC pavement, ADAcurb ramps, adjusting utility covers and boxes, tree removal, landscaping, tree planting, storm drain improvements (curb inlets, stormdrain piping, and manhole), striping and signage, traffic control and environmental protection on Almendra Avenue, Bayview Avenue,Bean Avenue, Glen Ridge Avenue, Massol Avenue, Nicholson Avenue, Tait Avenue, and Wilder Avenue in the AlmondGrove District.

Plans and specs also available for review at Santa Clara Builders Exchange

17-00534

1

9:00 AM4/5/17

Addenda:ALMOND GROVE STREET RECONSTRUCTION PHASE II

#13-31

Town of Los Gatos - DPW 408-399-5770

Bidders:

Plan Issuer:

Sunnyvale

Replacing the existing Old Mountain View - Alviso Road Bridge and approaches.

Project Contact: Lisa Vo 408-730-7608Email: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

3/22 at 9AM (456 W. Olive Ave, Council Chambers)

17-00576

0

3:00 PM4/5/17

Addenda:OLD MOUNTAIN VIEW-ALVISO ROAD BRIDGE (REPLACE) AT CALABAZAS CREEK

PW17-22

Prebid Conf:

City of Sunnyvale DPW 408-730-7403

General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company

Sub-Contractor/SpecialtyContractor

Fax: 408-727-7051Office: 408-727-6999Mission City Rebar, Inc

Page 23: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Sunnyvale

Seeking proposals from licensed Engineering firms to provide professional services for design and preparation for SecondaryTreatment Dewatering Project.

Project Contact: Husam Aburabi 408-730-7627Email: [email protected]

RFP also available for review at Santa Clara Builders Exchange

3/3 at 9:30AM (456 W. Olive Ave, City Council Chambers) (Recommedned)

17-00349

0

3:00 PM4/6/17

Addenda:RFP FOR PROFESSIONAL DESIGN SERVICES ASSOCIATED WITH SECONDARY TREATMENT &DEWATERING PROJECT

UY-20-01

Prebid Conf:

City of Sunnyvale DPW 408-730-7403

Bidders:

Plan Issuer:

San Jose

Site modernization, phase 3.

Available ONLINE ONLY

MAND 3/16 at 10AM

17-00662

0

2:00 PM4/6/17

Addenda:BLACKFORD ELEMENTARY SCHOOL SITE MODERNIZATION - PHASE 3, BID PACKAGE 1 - CAMPBELLUNION SCHOOL DISTRICT (ONLINE)

2016038

Prebid Conf:

Aedis Architects 408-300-5160

NEW

Electrical Contractor Fax: 408-708-7611Office: 408-506-4143Lakeshore Electric and Engineering

General Contractor Fax: 650-508-1705Office: 650-508-1700Rodan Builders Inc.

General Contractor Fax: 510-632-9769Office: 510-568-6600Sausal Corporation

Sub-Contractor/SpecialtyContractor

Fax: 408-413-4130Office: 408-848-4088R Titus Waterproofing

Plan Issuer:

San Jose $884,316

Clean and assess the existing sanitary sewer system.

Project Contact: Thanh Vo 408-793-4167

Plans and specs also available for review at Santa Clara Builders Exchange

17-00665

0

3:00 PM4/6/17

Addenda:8385-SANITARY SEWER CONDITION ASSESSMENT 2016-2017 PACKAGE IV

8385

City of San Jose - DPW 408-535-8300

NEW

Plan Issuer:

San Jose $1,713,524

Repair and rehabilitation of existing sanitary sewer mains located at various locations.

Project Contact: Ray Cunanan 408-535-7878

Specs also available for review at Santa Clara Builders Exchange

17-00667

0

3:00 PM4/6/17

Addenda:8360-SANITARY SEWER REPAIRS

8360

City of San Jose - DPW 408-535-8300

NEW

Bidders:

Plan Issuer:

San Jose $150,000

Removing existing 800 feet of chain link fencing (6-feet in height) and install 880 feet of new wrought iron fencing (8-feet in height). Inaddition, removal of existing roll gates (one automatic & two manual) and replace with two (2) new automatic gates along with one (1)manual gate.

Project Contact: Darwin Lasat 408-277-3671Email: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

17-00668

0

3:00 PM4/6/17

Addenda:8448-MUNI YARD FENCE REPLACEMENT PROJECT

8448

City of San Jose - DPW 408-535-8300

NEW

General Contractor Fax: 650-365-5817Office: 650-365-8828A & D Automatic Gate

Page 24: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Los Gatos

Temporary housing.

Available ONLINE ONLY

3/13 at 10AM (front office Rosemary ES)

17-00687

0

3:00 PM4/6/17

Addenda:TEMPORARY HOUSING AT ROLLING HILLS MIDDLE SCHOOL-CAMPBELL UNION SCHOOL DISTRICT(ONLINE)

2017002

Prebid Conf:

Aedis Architects 408-300-5160

NEW

General Contractor Fax: 408-279-2044Office: 408-279-2027Guerra Construction & Engineering, Inc

Plan Issuer:

Los Altos

On-call repairs to the City’s sanitary sewer system on an as needed basis.

Plans and specs also available for review at Santa Clara Builders Exchange

17-00557

0

2:00 PM4/11/17

Addenda:ON-CALL SANITARY SEWER SPOT REPAIRS & CCTV INSPECTION SERVICES

City of Los Altos - Engineering 650-947-2780

Plan Issuer:

Cupertino

Reroof Child Development Center.

Plans and specs also available for review at Santa Clara Builders Exchange

MAND 3/24at 10AM (Admin Blg, Room 106)

17-00641

0

2:00 PM4/11/17

Addenda:WING B REROOF AT CHILD DEVELOPMENT CENTER DE ANZA COLLEGE

#1776

Prebid Conf:

Foothill De Anza College District (De Anza) 408-864-5888

NEW

Plan Issuer:

San Jose $50,000

Installation of the HVAC System within the Reprographics facility located on the Evergreen Valley College Campus. System upgradesto be completed include but not limited to installation of (2) Indoor Fan Coil Units and (1) Roof MountedCondensing Unit. Contractor must coordinate its work with the operating Reprographics Shop, as well as ongoing day-to-dayoperations of an active school site.

Project Manager Chau Duong 408-592-7264Email: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

MAND 3/29 at 10AM

17-00652

0

2:00 PM4/11/17

Addenda:EVERGREN VALLEY COLLEGE (EVC) REPROGRAPHICS HVAC UPGRADE - SJECCD

#32110-02

Prebid Conf:

San Jose Evergreen College Dist, Facilities 408-288-3105

NEW

Plan Issuer:

Palo Alto

Provide the necessary work and furnish various specified materials for the installation of underground electric duct systems.

Project Contact: Josefino GonzalesEmail: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

MAND 3/28 at 2:30PM (Utilities Dept, Conference Room 1)

17-00680

0

3:00 PM4/11/17

Addenda:UNDERGROUND DISTRICT 46-REBID

167534

Prebid Conf:

City of Palo Alto - DPW 650-329-2271

NEW

Plan Issuer:

Los Altos

Mobilization, traffic control, curb and gutter installation, curb ramp installation, hot mix asphalt sidewalk paving, high visibility crosswalkpainting, installation of signs, installation of in-ground warning lights, installation of flexible channelizer posts, pavement marking andstriping.

Plans and specs also available for review at Santa Clara Builders Exchange

17-00690

0

2:00 PM4/11/17

Addenda:WEST EDITH & UNIVERSITY AVENUE CROSSWALK IMPROVEMENT

TS-0103416

City of Los Altos - Engineering 650-947-2780

NEW

Page 25: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Cupertino

Rehabilitate existing sanitary sewer system at two (2) different locations.

Plans and specs also available for review at Santa Clara Builders Exchange

17-00501

0

2:00 PM4/13/17

Addenda:DISTRICT CAPITAL IMPROVEMENTS FISCAL YEAR 2016-2017; PROJECT 1: VALLEY VIEW AVESANITARY SEWER; PROJECT 2: JERILY DR SANITARY SEWER SPOTS

Mark Thomas -County Sanitation District 2-3 408-253-7863

Plan Issuer:

Los Altos

The project includes lining approximately 679 lf of existing 24” sewer main at Covington Road and 506 lf of existing 30” sewer main atDel Medio Avenue with cured-in-place pipe as described in the Contract including design, installation, and operation of a sewagebypass pumping system.

Plans and specs also available for review at Santa Clara Builders Exchange

17-00566

0

2:00 PM4/13/17

Addenda:CIPP CORROSION REHABILITATION

WW0100517

City of Los Altos - Engineering 650-947-2780

Plan Issuer:

San Jose

Channel headcut repair, grading to create stable banks, removal of soil and placement in repository within Almaden Quicksilver CountyPark, replacement with clean soil, re-grading to form gentler slopes and revegetation and Hydroseeding of the disturbed area.

Project Contact: Tom McLauchlan 408-355-2208

Plans and specs also available for review at Santa Clara Builders Exchange

3/28 at 10AM (Amaden Quicksilver Parrk, intersection Almaden Rd/Bertam Roads)

17-00645

0

2:00 PM4/13/17

Addenda:CALCINE PAVED ROADS REMEDIATION PROJECT AT ALMADEN QUICKSILVER COUNTY PARK

Prebid Conf:

County of Santa Clara Roads & Airports 408-573-2440

NEW

Plan Issuer:

San Jose

Removal of existing 48 and 54 inch diameter sanitary sewer pipe, installation of an approximately 4,500 feet of 84 inch diameterinterceptor pipe along North 4th Street, and approximately 300 feet of 72 inch diameter interceptor pipe along Commercial Street toconvey the sewage from Structure G on Commercial Street to Structure E on Old Bayshore Road just north of US Highway 101, andinstallation of small diameter local collector sanitary sewer system.

Available ONLINE ONLY

MAND 2/15 at 1PM (200 E. Santa Clara St, SJ, City Hall)

17-00352

8

3:00 PM4/16/17

Addenda:4880-RFP FOURTH STREET 84" INTERCEPTOR PHASE VI-A PROJECT (ONLINE)

4880

Prebid Conf:

City of San Jose - DPW 408-535-8300

Plan Issuer:

San Jose

Provide parking garage and surface lot management services, including operational, maintenance, janitorial and administrativeservices, at each of the City’s parking facilities, in support of the Department of Transportation.

Project Contact: Jay Coleman 408-535-7057Email: [email protected]

Available ONLINE ONLY

MAND 2/22 at 11AM (200 E Santa Clara St, 9th Flr, Room 955)

17-00371

3

4:00 PM4/20/17

Addenda:RFP PARKING GARAGE & SURFACE LOT MANAGEMENT SERVICES (ONLINE)

RFP 16-17-07

Prebid Conf:

City of San Jose - DPW 408-535-8300

Plan Issuer:

Los Altos

Upgrades to the existing building HVAC system including related demolition, electrical and structural work.

Plans and specs also available for review at Santa Clara Builders Exchange

MAND 4/11 at 10AM

17-00691

0

2:00 PM4/20/17

Addenda:CITY HALL HVAC SYSTEM UPGRADES

CF-01007 (04-08A)

Prebid Conf:

City of Los Altos - Engineering 650-947-2780

NEW

Page 26: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Santa Clara County

Removal of an existing bridge, construction of a new bridge, realig11me11t of t!te roadway at the structure approach a11d departure,drainage improvements, aml mitigation site grading.

Project Contact: Barni Roncal 408-573-2494Email: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

4/3 at 10AM (101 Skyport Dr, SJ, Roads & Airports)

17-00702

0

2:00 PM4/20/17

Addenda:REPLACEMENT OF ISABEL CREEK BRIDGE ON SAN ANTONIO VALLEY ROAD

37C0089

Prebid Conf:

County of Santa Clara Roads & Airports 408-573-2440

NEW

Plan Issuer:

San Jose

The project entails New Wayfinding & Signage throughout the campus

Project Contact: Sandy Lott, Gilbane 408-288-3194Email: [email protected] or 408-288-3194

Plans and specs also available for review at Santa Clara Builders Exchange

MAND 4/4 at 10AM

17-00696

0

2:00 PM4/24/17

Addenda:#31328 WAYFINDING & SIGNAGE SAN JOSE CITY COLLEGE (SJCC) - SJECCD

G2010.0127

Prebid Conf:

San Jose Evergreen College Dist, Facilities 408-288-3105

NEW

Bidders:

Plan Issuer:

Sunnyvale

The project consists of 1.66 acres of improvements, 34 Townhomes, including two Accessible Lots (7 and 15) and 4 BMR Lots(tentatively 9, 15, 23 and 31) with associated on site and off site work. Each Townhome will be plumbed for sub water meters suppliedby Classic Communities.

Available ONLINE ONLY

17-00705

0

1:00 PM4/28/17

Addenda:CLASSICS AT LAWRENCE STATION (ONLINE)

Nexgen Builders 650-322-5800 650-322-5806

NEW

General Contractor Fax: 650-322-5806Office: 650-322-5800Nexgen Builders

Santa Cruz County

Plan Issuer:

Santa Cruz Co.

The Santa Cruz County Sanitation District is soliciting a Request for Qualifications from qualified consulting professionals to provide on-call environmental consulting services for various sanitation projects throughout the County. Work may include but is not limited topreparing Caltrans Preliminary Environmental Study, preparation and review of environmental technical studies, obtaining CEQAclearance, obtaining NEPA clearance, and obtaining permits from various regulatory agencies. Some work will require coordinationwith Caltrans, and may include compliance with Federal Highway Administration requirements. All work will be performed inaccordance with County and/or Caltrans practices, regulations, policies, procedures, manuals, and standards, as appropriate. Theanticipated term for the on-call environmental consulting services contract shall be two years. A consultant with satisfactoryperformance during the first two-year contract term may be retained for up to three additional one-year contract terms.

17-00613

0

5:00 PM3/29/17

Addenda:SANTA CRUZ COUNTY SANITATION DISTRICT ON-CALL ENVIRONMENTAL CONSULTING SERVICES

County of Santa Cruz 831-454-2160 831-454-2385

Bidders:

Plan Issuer:

Watsonville $3,000,000

Addition of a 1.25 MGD package conventional treatment system and associated facilities to the Corralitos Creek WTP.

MAND 3/9 @ 10am- 6 Eureka Canyon Rd, Watsonville

17-00323

2

2:00 PM3/30/17

Addenda:CORRALITOS CREEK WATER TREATMENT PLANT IMPROVEMENTS

W-17-01

Prebid Conf:

City of Watsonville 831-768-3115 831-763-4065

Sub-Contractor/SpecialtyContractor

Fax: 408-727-7051Office: 408-727-6999Mission City Rebar, Inc

Page 27: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

Name Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Santa Cruz

The project will modify two (2) existing restrooms to bring them into compliance with the latest requirements of the Americans withDisabilities Act (ADA) and the California Building Code (CBC).

PREVAILING WAGE

If you have any questions concerning this solicitation, call contact Michael Hopper, Public Works Operations Manager, at 831/420-5556, or email [email protected].

MAND 3/16 @ 1pm- site

17-00597

0

2:00 PM3/31/17

Addenda:DELAVEAGA GOLF LODGE ADA RESTROOM MODIFICATIONS

Prebid Conf:

City of Santa Cruz 831-420-5160 831-420-5161

General Contractor Fax: 831-459-9297Office: 831-459-9270Cen-Con, Inc.

Sub-Contractor/SpecialtyContractor

Office: 650-488-7585Stumbaugh and Associates

Plan Issuer:

Watsonville

Request for Proposal (RFP) for preparation of planline document for Freedom Boulevard fromGreen Valley Road to Buena Vista Drive.

17-00568

0

11:00 AM4/3/17

Addenda:FREEDOM BOULEVARD PLANLINE

ST-17-03

City of Watsonville 831-768-3115 831-763-4065

Bidders:

Plan Issuer:

Santa Cruz $215,000

The work to be done for the Wastewater Treatment Facility Bioassay Laboratory Project consists in general of civil, electrical, plumbingand instrumentation site work to construct complete in place a new wastewater treatment facility bioassay laboratory and effluentsample station. Work includes but is not limited to the removal and replacement of existing fiberglass building shell, removal andreplacement of concrete pad, electrical construction, instrumentation installation, start-up and commissioning.

17-00530

0

2:00 PM4/5/17

Addenda:WASTEWATER TREATMENT FACILITY BIOASSAY LABORATORY

C401605

City of Santa Cruz [email protected] 831-420-5425 831-420-5161

General Contractor Fax: 831-459-9297Office: 831-459-9270Cen-Con, Inc.

Sub-Contractor/SpecialtyContractor

Fax: 408-727-7051Office: 408-727-6999Mission City Rebar, Inc

Plan Issuer:

Brookdale $252,725

The project involves the construction of a 48 lineal foot by 10 foot high steel soldier pile timber lagging retaining wall with soil tiebackanchor assemblies, fabricated steel walers, gabion end closures, wall underdrain system, storm downdrain, gabion mattress energydissipater, metal beam guard railing with terminal end systems, asphalt concrete dike, asphalt pavement repair and erosion control &revegetation.

17-00651

0

2:00 PM4/6/17

Addenda:ALTA VIA ROAD PM 0.392 STORM DAMAGE REPAIR

County of Santa Cruz 831-454-2160 831-454-2385

NEW

Plan Issuer:

Aptos $200,000

This project includes the maintenance and repair of the C & D parking lots. Maintenance and repair to include tree removal, retainingwall, curbs and ADA remediation.

PREVAILING WAGE

MAND 3/23 @ 10am- Purchasing, Bldg 2030

17-00601

0

2:00 PM4/10/17

Addenda:C & D PARKING LOT MAINTENANCE

B17-08

Prebid Conf:

Cabrillo Community College District 831-477-5613 831-477-5640

Page 28: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

Name Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Aptos $980,000

This project is to replace approximately 2,600 linear feet of water main in Clubhouse Dr., Aptos between St. Andrews Dr. and the golfcourse with 12 inch and 8 inch pipe, and includes tie-ins, water service replacements, road repair and application of Caltrans Type IIslurry seal.

PREVAILING WAGE

17-00551

0

2:00 PM4/11/17

Addenda:CLUBHOUSE DRIVE MAIN REPLACEMENT

16-025

Soquel Creek Water District [email protected] 831-475-8500 831-475-4291

Bidders:

Plan Issuer:

Santa Cruz

Replace the existing roof and deck and add new stucco to the exterior walls and ceilings as well as paint the exterior of the building.

PREVAILING WAGE

MAND 3/29 10 am @ site

17-00612

0

2:30 PM4/11/17

Addenda:FALL CREEK FIRE STATION ROOF AND SIDING REPLACEMENT PROJECT

16C1-003

Prebid Conf:

County of Santa Cruz - General Services 831-454-2723 831-454-2710

Sub-Contractor/SpecialtyContractor

Fax: 408-413-4130Office: 408-848-4088R Titus Waterproofing

Bidders:

Plan Issuer:

Aptos

Modernization of classrooms, office spaces, multi-purpose room, staff and student restrooms, exterior ramp, parking lot and campus-wide fire alarm system; addition of accessible ramp to play fields; replacement of portable classrooms with new modular classroombuildings.

PREVAILING WAGE

MAND 3/15 @ 1:30pm- site

17-00544

0

2:00 PM4/12/17

Addenda:MAR VISTA ELEMENTARY SCHOOL CAMPUS MODERNIZATION & CLASSROOM REPLACEMENT

B-17-06-03-840-8133

Prebid Conf:

Watsonville Blueprint 831-728-7717

Excavation/SiteWork/Irrigation/Drainage/Landscape

Fax: 831-728-6544Office: 831-728-4018K & D Landscape

General Contractor Fax: 831-459-9297Office: 831-459-9270Cen-Con, Inc.

General Contractor Fax: 530-229-0070Office: 530-229-0001Seward L. Schreder Construction Inc.

General Contractor Fax: 831-422-0566Office: 831-422-9696Tombleson Inc

Bidders:

Plan Issuer:

Boulder Creek

Upgrades to restrooms in the Multi Use room, ADA improvements at the Multi Use entrance, new paving at Shade Structure.

PREVAILING WAGE

MAND 3/23 10 am @ site, meet at front of the Admin Bldg.

17-00626

0

10:00 AM4/12/17

Addenda:BOULDER CREEK ELEMENTARY SITE IMPROVEMENTS

Prebid Conf:

San Lorenzo Valley Unified School District [email protected] 831-336-9679 831-336-9531

General Contractor Fax: 831-459-9297Office: 831-459-9270Cen-Con, Inc.

Bidders:

Plan Issuer:

Aptos $120,000

***B17-09 Bldg 1300 Fire Suppression project has been DELAYED pending DSA approval.Job walk and everything has been cancelled until further notice.

This project includes minor modifications and addition to the existing fire alarm system to accommodate the installation of a retrofit firesprinkler system and the installation of an automated gas shut-off valve. See specifications for complete details.

PREVAILING WAGE

MAND 3/28 @ 10:30am- Purchasing, Bldg 2030

17-00628

0

2:00 PM4/12/17

Addenda:BLDG 1300 FIRE SUPPRESSION

B17-09

Prebid Conf:

Cabrillo Community College District 831-477-5613 831-477-5640

General Contractor Fax: 831-459-9297Office: 831-459-9270Cen-Con, Inc.

Page 29: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

Name Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Davenport $2,968,000 $3,000,005

This project will upgrade the Davenport County Sanitation District’s wastewater treatment plant by dredging accumulated solids in thetreatment lagoon, installing alarms for the filtration and disinfection processes, and adding redundancy for coagulant and hypochloritedosing. The project also consists of the construction of a storage pond for treated water, which will allow adjacent farmers to userecycled water for irrigation. The work contemplated consists of:

1. Work within an existing wastewater treatment plant including:a) Dredging an existing aerated lagoon to remove accumulated solids, dewatering, and disposal of the solids,b) Installing system controls, pumps, equipment, and alarms,c) Installing recycled water pumping, metering, and a truck fill station, andd) Related electrical and instrumentation and controls work.2. Construction of a new recycled water storage pond with associate piping and controls.3. Installation of approximately 3,000 feet of 4-inch diameter recycled water distribution piping. A bore-and-jack crossing of Highway 1and the adjacent railroad tracks is an additive alternate.

MAND 3/30 @ 10am- site

17-00588

0

2:00 PM4/13/17

Addenda:DAVENPORT RECYCLED WATER PROJECT

to

Prebid Conf:

County of Santa Cruz 831-454-2160 831-454-2385

Sub-Contractor/SpecialtyContractor

Fax: 209-462-9800Office: 209-462-9600Karl Needham Enterprises, Inc.

Bidders:

Plan Issuer:

Santa Cruz $1,995,000

Construction of STUDENT HOUSING TIU PHASE 1 includes architectural alterations to existing utility room spaces to create newTelecommunications Rooms, miscellaneous architectural demolition and repair of existing assemblies, new thermostatically controlledpowered ventilation systems, interface of new mechanical systems to campus building management system, commissioning of newmechanical systems, design/build alterations of fire sprinklers, electrical power for telecommunications and mechanical equipment,emergency power for telecommunications equipment, lighting and lighting controls for telecommunication rooms, fire alarm devicesand connections to existing fire alarm systems, and grounding for the telecommunication systems, floor and wall mountedcommunications racks and cabinets, communications cable tray, communications horizontal station cabling using new and existingpathway, placement of University furnished wireless access points at interior and exterior locations, demolition of existingcommunications riser and horizontal station cabling, demolition of existing broadband video system.

PREVAILING WAGEj

MAND 3/27 @ 2pm- 1156 High Street, Barn G, PP&C Conference Room

17-00606

1

2:00 PM4/13/17

Addenda:STUDENT HOUSING TELECOMMUNICATIONS UPGRADES PHASE 1

9804B

Prebid Conf:

UCSC Physical Planning & Construction 831-459-2366 831-459-5540

Communications / TechnologyContractor

Fax: 661-637-2006Office: 661-599-4219RLH Fire Protection

General Contractor Fax: 831-459-9297Office: 831-459-9270Cen-Con, Inc.

Bidders:

Plan Issuer:

Aptos $175,000

Provide fully functional Access Control System. System will incorporate all new and existing readers and associated devices, which willbe fully functional upon completion of the project. All existing systems shall remain functional throughout the course of the project.

PREVAILING WAGE

MAND 3/29 @ 10am- Purchasing, Bldg 2030

17-00627

0

2:00 PM4/13/17

Addenda:BLDG 400 REPLACE DOOR HARDWARE UPPER CAMPUS

B17-10

Prebid Conf:

Cabrillo Community College District 831-477-5613 831-477-5640

General Contractor Fax: 831-459-9297Office: 831-459-9270Cen-Con, Inc.

Page 30: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

Name Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Santa Cruz $424,536 $454,434

San Lorenzo River Culvert Installation:-Pre Construction Meeting-Hazard Mitigation Plans & pre-construction probe-Project consists of: Installing Riser with weirs, filter packs, junction boxes, 24" pipe and anchors. HDPE pipe bays (includingexcavation), duckbill (furnished and installed), and post construction survey.

PREVAILING WAGE

MAND 3/28 1 pm @ site, on the beach next to the San Lorenzo River

17-00666

0

2:00 PM4/13/17

Addenda:SAN LORENZO RIVER CULVERT INSTALLATION

c601403 to

Prebid Conf:

City of Santa Cruz [email protected] 831-420-5428 831-420-5161

NEW

Bidders:

Plan Issuer:

Santa Cruz

Construction of STUDENT HOUSING TIU PHASE 1 includes electrical power for telecommunications equipment and rooms,emergency power for telecommunications equipment, for telecommunication rooms, fire alarm devices and connections to existing firealarm systems, and grounding for the telecommunication systems. Floor and wall mounted communications racks and cabinets,communications cable tray, use of existing or supply new, at Contractor’s option, communications horizontal station cabling using newand existing pathway, placement of University furnished wireless access points at interior and exterior locations, demolition of existingcommunications riser and horizontal station cabling, demolition of existing broadband video system.

PREVAILING WAGE

***Bidding documents will be available at 4:00 PM Monday, March 27, 2017

MAND 4/3 @ 2pm- 1156 High Street, Barn G, PP&C Conference Room, Santa Cruz Campus

17-00685

0

2:00 PM4/20/17

Addenda:STUDENT HOUSING TELECOMMUNICATIONS UPGRADES PHASE 1, COWELL AND OAKES COLLEGE

9804A

Prebid Conf:

UCSC Physical Planning & Construction 831-459-2366 831-459-5540

NEW

General Contractor Fax: 831-459-9297Office: 831-459-9270Cen-Con, Inc.

Plan Issuer:

Watsonville

Janitorial services at the Watsonville DMV Field Office. Term: September 1, 2017 or upon contract approval, whichever occurs later,through August 31, 2019.

MAND 4/4 10 am @ site, meet inside at window 9

17-00692

0

2:00 PM4/25/17

Addenda:JANITORIAL SERVICES FOR THE WATSONVILLE DMV FIELD OFFICE

17-037

Prebid Conf:

Ca State Dept of Motor Vehicles [email protected] 916-651-2555 916-657-5936

NEW

Plan Issuer:

Santa Cruz $115,000

Perform vegetation management in San Lorenzo River and Branciforte Creek.

Project Contact: Tony Lau [email protected]

MAND 6/14 @ 9am- 1125 River Street, Santa Cruz

17-00624

0

2:00 PM7/5/17

Addenda:ANNUAL SAN LORENZO RIVER FLOOD CONTROL MAINTENANCE

Prebid Conf:

City of Santa Cruz 831-420-5160 831-420-5161

Page 31: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17
Page 32: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17
Page 33: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17
Page 34: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

Yes, no and sometimes a maybe. Answering questions about the complex law and interpretations of it in the real world is why it’s often hard for contractors to know what’s what; yes, no or maybe! Getting it wrong can be costly, and why we always welcome your questions…

Q: We are replacing our Qualifying Individual in Nevada. He only qualifies the Business portion of the license. Does he still need to get the four references completed?

A: No, only Trade Qualifiers are required to obtain references and complete a resume.

Q: We are a non-profit organization that builds dirt trails. Are we required to have a Contractor’s License and is the process any different for nonprofits? Would a “C-27” (Landscaping) license work for this?

A: Yes, you are required to have a Contractor’s License to build dirt trails. The most appropriate license would be either the “A” (General Engineering) classification, or the “C-12” (Earthwork and Paving) classification. The “C-27” classification would not cover you for the engineering involved in building the trails.

Q: I completed an application in mid-July of last year and then we got busy and I never did anything with it. I still have it with original signatures. Can I submit this with dates from last year or will I need to get a new Certification page and everything? I noticed the CSLB released new applications late last year.

A: Maybe, before deadlines. You may want to update the dates on the application, but the CSLB will currently still accept the old forms. However, effective May 1, 2017, the CSLB will no longer

accept older forms. All applications submitted after May 1st are required to have a revision date of October 2016 (or later) reflected in the bottom left corner.

Also, the sooner you get it submitted the better, because effective July 1, 2017, the CSLB’s fees are going to increase. For example, the current license/application fee will be increased from $480 to $530.

Q: I have a “C-10” (Electrical) Contractor who wants to work with my corporation. He wants to still work with his licensed Sole Proprietorship while he works with me as a Responsible Managing Officer (RMO). Is this possible? How can we structure it so he can Qualify my corporation for a “C-10” license while he still has an Active Sole Proprietor?

A: Yes.” The “C-10” Contractor would be required to have at least 20% ownership in your corporation in order for your scenario to work out. Also recommend checking with a tax and legal advisor in this choice.

While knowledge is power, knowing where to go for the answers is half the battle. Get expert assistance immediately when you call 866-443-0657, email [email protected], or write us at Capitol Services, Inc., 1225 8th St. Ste. 500, Sacramento, CA 95814. Research past columns at www.cutredtape.com.#

Page 35: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17
Page 36: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

City Building Permits Salinas

NONE THIS WEEK

Accurate Finance Group125 Bethany Drive, Suite 11

Scotts Valley, CA 95066Ph 831.515.8383

Fax 831.515.5026www.AccurateFinanceGroup.com

-- Karen Stebbins - Owner

Accounting & BookkeepingServices for Contractors

Accounting & BookkeepingServices for Contractors

• Job Costing• Payroll/Certified Payroll• AIA invoicing• Lien Releases• Work Comp, Liability, Union audits• Quarterly and Year End Reporting• QuickBooks Hosting• QuickBooks Hosting• Receivables & Collections

“You Keep Bidding, Building & Earning... We’ll Handle the Accounting for You.”

Page 37: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

Richard ZenkLic #0E21165

Ted J. RinkerLic #0486570

Rinker/Zenk I N S U R A N C E S E R V I C E S

Exchange member since 1988Serving the Tri-County area since 1974

See our ad on the Membership Listings tab

“We Specialize in Construction”Ted J. Rinker, Broker/Agent • Richard Zenk, Broker/Agent

35 E. Romie Lane, Suite C - Salinas, CA 93901Toll Free: (800) 991-8822 • Office: (831) 758-8472 • Fax: (831) 758-8942

[email protected]

Page 38: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17
Page 39: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

Bid Results

NONE THIS WEEK

Page 40: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

Rent a temporary Debris Box— Earn a Bonus.

“We’ll drop it off and you load it up.”

Republic Services of Salinaswww.republicservicessalinas.com For further information call: 831-775-3840

r P

rinte

d on

recy

cled

pape

r.

PARTNERS for a GREENER,CLEANER Salinas.

SALINAS RECYCLES

Why should I rent a debris box?

• Sanitary • Reduces Fire Hazard • Saves Labor• Aids in pest control • Versatile in a variety of sizes

For every 5th Debris Box you rent*, receive a $50. Gift Card Certificate for any

Oldtown Salinas business of your choice!

*Account must be paid current to receive Gift Card Certificate

$50.Gift Card Certificate=

3 or 4 Yard Dumpster

10 Yard (Limited to Rock and Concrete)

15 Yard

20 Yard

30 Yard

Debris box promo_bleeds.indd 1 10/7/11 9:32:55 AM

Page 41: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

Notice of Completion

Mechanic’s Liens

Release of LienNONE THIS WEEK

NONE THIS WEEK

NONE THIS WEEK

Page 42: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

Get strategic counseling for increased bond capacity.

575 Price Street, #207 Pismo Beach, CA 93449

805-343-7434

www.cndbonding.com

Work with the largest independently owned surety only brokerage in the Western US.

Myrna Smith, FPO Title

We specialize in bonds of all types:

• Bidbonds• Subdivisionbonds• PerformanceandPaymentbonds• Commercial,licenseandpermitbonds

Withover80yearsofcombinedsuretyandunderwritingexperience,weprovidebondstocontractors,developersandallotherusersofsuretycreditsectors.

Your link to the right SuretY Bond CompanY

Myrna Smith, Vice President

Page 43: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

Get strategic counseling for increased bond capacity.

575 Price Street, #207 Pismo Beach, CA 93449

805-343-7434

www.cndbonding.com

Work with the largest independently owned surety only brokerage in the Western US.

Myrna Smith, FPO Title

We specialize in bonds of all types:

• Bidbonds• Subdivisionbonds• PerformanceandPaymentbonds• Commercial,licenseandpermitbonds

Withover80yearsofcombinedsuretyandunderwritingexperience,weprovidebondstocontractors,developersandallotherusersofsuretycreditsectors.

Your link to the right SuretY Bond CompanY

Myrna Smith, Vice President

Page 44: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17
Page 45: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17
Page 46: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

Classified Ads

Page 47: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

Safety Tip of the WeekPOWDER-ACTUATED TOOLS

Hilti, Ramset, and Red Head are just a few of the manufacturers of powder-actuated tools. These tools are designed to fire a special nail or fastening device into concrete, steel and masonry using a small caliber charge as a firing device. [See 1926.302(e)]

The number one safety rule to remember is - only property trained and qualified operators should ever use powder-actuated tools. Users should possess 'Qualified Operations Cards' which, after thorough training, are issued by a particular manufacturer's authorized dealer or distributor or other competent source.

When using the tool it must be held firmly against and perpendicular to the surface into which the fastening device is being driven. Never shoot into a blind surface. Take the necessary time to check the other side. Many innocent construction workers have been injured, and some even killed, from being struck by a wayward fastening device which ricocheted off or went completely through the target.

Personal protective equipment must be worn by the operator, and the face should be protected if there is any danger of spallingmaterials. Check with your supervisor on the type of safety goggles required. [See 1926.102 Table E-1 I

All powder-actuated tools must be tested daily - before use - and all defects discovered before or during use must be corrected. Tools must not be loaded until immediately before use. Loaded tools must not be left unattended. Keep hands clear of the muzzle end.Powder-actuated tools should never be stored or used in explosive atmospheres.

When you are through using a powder-actuated tool, unload it and dispose of firing rounds property; never leave them laying around. For proper training check with your powder-actuated vendor, who will often come to the work site and conduct a safety class. Finally, if you are not qualified to use the tool, don't!

Powder-actuated tools should never be pointed at anyone whether the tool is loaded or not!

Safety Recommendations:__________________________________________________________________________________

Job Specific Topics:_______________________________________________________________________________________

M.S.D.S Reviewed:_______________________________________________________________________________________

Attended By:

_______________________________________________________________________________________________________

_______________________________________________________________________________________________________

_______________________________________________________________________________________________________

_______________________________________________________________________________________________________

_______________________________________________________________________________________________________

Page 48: Builders Bulletin · 2017. 3. 22. · 3/28/17 1:00 PM San Jose Carlton Elementary Roof Repairs & Restorations NEW 3/28/17 3:00 PM Palo Alto Water Main Replacement Project 26 3/28/17

The Flyers Fuel Program offers member discounts of 2-5 cents per gallon at over 240,000 gas stations throughout the United States. In addition, you can utilize their Fleet Management System that helps members control costs, set limits on fuel services, and streamline reporting. Contact Irish Chapman to sign up today to sign up or to get your free fuel cost analysis.

• 5 cents per gallon discount at CFN sites

• 2 cents at gas stations everywhere

Discount Fuel Program for CCBA Members

CONTROL YOUR FUEL Contact Irish Chapman

[email protected] (530) 885-0401 ext. 2181