Budgeting NMi Budgeting for maintenance and development of national measurement standards and

41
Strengthening of State Executive in Czech Republic in the field of metrology Budgeting NMi Cor van der Ploeg TwL project CZ2003/005- 601.08.09.02

description

Strengthening of State Executive in Czech Republic in the field of metrology Budgeting NMi Cor van der Ploeg TwL project CZ2003/005-601.08.09.02. Budgeting NMi Budgeting for maintenance and development of national measurement standards and surveillance on MI’s in use Brno, CMI, April 2006 - PowerPoint PPT Presentation

Transcript of Budgeting NMi Budgeting for maintenance and development of national measurement standards and

Page 1: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Strengthening of State Executive in Czech Republic in the field of

metrology

Budgeting NMi

Cor van der PloegTwL project CZ2003/005-

601.08.09.02

Page 2: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Budgeting NMi

Budgeting for maintenance and development of

national measurement standards and

surveillance on MI’s in use

Brno, CMI, April 2006Cor van der Ploeg

[email protected]

Page 3: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 3

Contents

• Introduction – with intermezzo legal metrology in The

Netherlands and NMi VSL

• Maintenance & realization of NMS• Research & development of NMS• Key comparisons• Surveillance• Preparation of Legislation and

International Representation• Other Surveillance activities

Page 4: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 4

Introduction (1)• Twinning Light Project Strengthening of State

Executive in Czech Republic in the field of metrology

– Twinning focused on the • approach to the Non-Harmonized Part of Regulated

Area in the Field of Measuring Instruments in EU and on

• Presentation of the Experience and Practical Approach to the Regulation and Surveillance in the Field of Medical Devices with Measuring Function.

This presentation will focus on:

Netherlands example in budgeting for maintenance and development of National Measurement Standards and surveillance on MI’s in use.

Page 5: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 5

Calculation of budget for maintenance and development of national measurement standards and supervision on MI’s in use at NMi

• What components to take into account in the budgeting process– Maintenance and realization– Research and development– Key-comparisons– Inspections– Preparation of Laws and

representation

Introduction (2)

Page 6: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 6

Introduction (3), Dutch legal metrology

A short intermezzo about the organisation of legal metrology in The Netherlands

Page 7: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 7

Legal Metrology in the Netherlands (1)• Privatisation of the legal metrology service

(’89)– New Weights and Measures Act– Nederlands Meetinstituut b.v. (NMi)– Fully owned by Ministry of Economic Affairs– TNO shareholder of NMi since 2001, TNO is a

leading independent Dutch research organisation

– New Law On Metrology 2006 introducing a.o. MID (Scope now more than fair trade)

• NMi is one central organisation– Two different profiles (legal metrology)– NMi Certin and Verispect

Page 8: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 8

Legal metrology in the Netherlands (2)

N M i V S L b .v.Ja n R id d er

N M i C e rtin b .v.P ie te r va n B reu g e l

V e risp e ct b .v.C e e s va n M u llem

N M i b .v.Ja n R id d er

Page 9: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 9

NMi Certin b.v.• Access to the market

– Type approval– Initial verification– Re-verification after repair– Authorisation for verification (via

Verispect)– System-certification (companies)– Notified Body for NAWI Directive (CE)

• On a commercial basis, no contract with government

• Located in Dordrecht (75 employees)

Page 10: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 10

Verispect b.v.• Supervision in the market

– Random inspections– Consumer protection and fair trade– Free of charge of owner– Weights and Measures Act, Gaming

Act and Hallmarking Act– Organised in two departments with

40 inspectors located over the country

• All activities covered by contracts with government

• Main office located in Delft, 58 employees

Page 11: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 11

Law for Weights and Measures• Weighing instruments• Measuring instruments (length)• Measuring systems for Fluids• Gas meters• Electricity-meters• Weights• Taximeters

• Implementation of MID (Approved New Law on Metrology implements MID)

Page 12: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 12

Supervision in service• Random inspections, unexpected• Instrument conform type approval• Inspections at the user place• Frequency dependent on metrological

properties• Independent from type approval and initial

verification• Cost effective for owner• Owner/user responsible for instrument

Page 13: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 13

Supervision

• Result of the inspection:– Metrological properties in line

with requirements– Sealing are broken/no marks– No initial verification– Maintenance of instrument

• Depending on the failure, follow-up action:– Repair under the

responsibility of owner– Rejection, re-verification– The inspector comes back

after two months

Page 14: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 14

Co-operation• Inspectors during the supervision take into

account the findings of skilful persons or corporations, who in the practice of a profession or business maintain or verify measuring and weighing instruments

• Co-operation agreement with manufactures and maintenance companies– Quality system based on ISO 9001:2000– Analysis of the procedures and working

instructions– Technical audit of the personnel– Official agreement– Co-operation mark

Page 15: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 15

Why co-operation?• Responsibility of measurement

instrument partly from government to owner/user.

• Co-operation leads to an efficient supervision and where appropriate a cost-saver for the government.

• Advantage for the owner or user of the measuring instrument: less stagnation of the production-process.

• Co-operation with 68 companies in all the sectors of supervision.

Page 16: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 16

Summary Supervision

• Supervision system differs from country to country– Dependent on the culture in a

country– The role of government– Independent from type approval

• Dutch system incorporates more responsibility for the owner/user

• Co-operation leads to cost reduction for government and has benefits for owner of instrument.

Page 17: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 17

• Maintenance is up keeping:– the level of uncertainty of the NMS– the NMS in operation– the QS– the contacts within the metrology infrastructure

• Realization is:– improving the uncertainty of the NMS– adjusting NMS to new (international) requirements– introducing QS– substantial extension of NMS

• Development– introducing new standards and realization of new

methods

Introduction (4)

Page 18: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 18

Introduction (5)• Research

– Research on new standards and methods• Surveillance

– Surveillance on instruments in use in legal area

• Preparation of Law and International representation– Law preparation and participation in EU

groups– Representation in OIML, WELMEC etc

• Separate contracts for Hallmarking and Gaming

Page 19: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 19

Introduction (6)

Fundemental research

Research

Development

Maintenance of NMS

Calibration, comparisons, international recognition

Fu

nd

am

enta

l

metr

olo

gy

Scie

nti

fic m

etr

olo

gy

Indust

rial

metr

olo

gy

Num

ber

of

Av

og

ad

ro,

SE

T, W

att

CO

MB

, J

AW

S,

CR

DS

New

co

mp

on

ents

,

Ex

ten

sio

n

facil

itie

s

Cali

bra

tion

labo

rato

ries

Type of metrology

Examples Czech Republic

?

NA

NO

tech

mil

ogy

Page 20: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 20

• Royal Decisions– Units– National Measurement Standards– Appointment National Measurement Standards

Institute NMi VSL for all national measurement

standardsShort Introduction of NMi VSL

Short Introduction of NMi VSLNational measurement standards; The law

NMi B.V.

NMi Van Swinden

Laboratorium

NMi Certin

Verispect

Page 21: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 21

Responsibilities

• The Dutch government signed the Metre Convention in 1929

• Use of SI system is mandatory since 1979 (Directive 80/181/EEG)

• Dutch Metrology law determines:– Which units are recognised– That maintenance and development of national

standards is described in a separate directive (AMVB)

– That one institute will be designated as the national metrology institute

– Requirements for the national metrology institute

– Metrology Council

• Metrology law is just revised (2006)

Page 22: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 22

Standaardenbesluit 1989

• Pubished on 19 April 1989• National standards will be

maintained for mass, length, temperature, electrical voltage, electrical resistance

• Desciption on how standards must be maintained or realised

• NMi VSL B.V. was designated as the Dutch NMI on 24 April1989

Page 23: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 23

Standaardencontract

• Contract agreement between MEA and VSL was signed on 1 May 1989The contract is renewed each year

• NMi VSL is obligated by contract to:– Maintain and realise the standards mentioned in

the “Standaardenbesluit”– Maintain calibration facilities for these standards– Maintain and realise other standards and their

calibration facilities as described in “maintenance agreements” (our annual work plan)

– Make the uncertainty level of the national standards comparable to the international level

Page 24: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 24

Contracts of VSL with MEA

• SBO Contract (~ 35 man years)– Maintenance of (national) standards– Development of new standards– Metrology infrastructure– Investments

• Key comparisons (~ 3 man years)

• Research contract (~ 8 man years)

Page 25: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 25

Standards Contract 2004

Standards Contract 2004 (43010 hrs)

2%

22%

9%

23%3%

3%

11%

5%

9%

10%3%

AUV

Chemistry

Contact thermometry

Electricity

Time & Frequency

Ionising radiation

Length

Mass

Photometry & Radiometry

Flow

Infrastructure

Page 26: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 26

Maintenance & realization (1)

• Yearly offer to MoEA within the

framework of the contract consists of three parts:

– Work plan for the realization of the contract

– List of activities per NMS and for International participation (Meter convention, Euromet etc), including indication of hours and money

– Goals and resources

Page 27: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 27

• Contents of the work plan– Introduction– General– Activities

•Within the framework of the contract•Other activities

– Turnover calibrations– Offer maintenance 2003– Financial basis and calculation of costs

•Basis•Calculation•Built up of costs

– Long term planning 2004, 2005, 2006

Maintenance & realization (2)

Page 28: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 28

• Offer maintenance & realization 2003– Costs for man hours– Costs made for financing– Costs for subcontracting part of the

contract– Overhead costs– Investments in standards on basis of in

time dispersed depreciation– Office refurbishment costs on basis of in

time dispersed depreciation

Maintenance & realization (3)

Page 29: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 29

(Continuation former sheet)

– Other costs related to:• material use• other personnel costs• other costs of premises• rent for premises• usage of technical capital assets• sale costs• advise and verification• technical support

– Continuity surcharge

Maintenance & realization (4)

Page 30: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 30

Explanation ‘other costs’

• Material use; costs depending on production and directly related to turnover– Travel and hotel expenses

•contacts maintaining international traceability

• international cooperation at construction of NMS

•contacts for declarations of conformity– Related office costs, consumable goods

and technical resources

Maintenance & realization (5)

Page 31: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 31

• Other personnel costs– house-office traveling– knowledge update– employees council– canteen– passenger car lease, etc

• Other costs of premises; related to the buildings but excluding costs for rent– including gas, water, electricity,

insurance, safeguarding and house cleaning

Maintenance & realization (6)

Page 32: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 32

• Usage of technical capital assets; related to means of production– costs for office automation, maintenance

costs for office apparatus and inventory and lease costs for company cars

• Sale costs; related to promotion of metrology– yearly ‘clients-day’, world metrology day,

promotion of SI, metrology brochures etc• Advise and verification costs

– accountant, accreditation• Technical support

– costs related to workshop

Maintenance & realization (7)

Page 33: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 33

• R&D projects– project management, also with regard to

the calculation of budgets • Hours• Investments• Direct order costs

• Key-comparisons– Hours

Research & developmentKey-comparisons

Page 34: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 34

Surveillance (1)• Yearly offer to MoEA within the

framework of the contract consists of three parts:

– Work plan for the realization of the contract

– List of activities per focus area taking into account co-operation, including indication of hours and money

– Goals and resources

Page 35: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 35

Surveillance (2)

• Contents of the work plan– Introduction– General– Activities– Co-operation– Offer Surveillance 2003– Financial basis and calculation of costs

•Basis•Calculation•Built up of costs

– Long term planning 2004, 2005, 2006

Page 36: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 36

Surveillance (3)• Offer Surveillance 2003

– Costs for man hours– Costs made for financing– Costs for subcontracting part of the contract– Overhead costs– Investments in equipment on basis of in time

dispersed depreciation– Office refurbishment costs on basis of in time

dispersed depreciation– Other costs related to:

• material use• other personnel costs• other costs of premises• rent for premises• usage of technical capital assets• advise and verification

– Continuity surcharge

Page 37: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 37

Surveillance (4)Explanation ‘other costs’

• Material use; costs depending on production and directly related to turnover– Travel and hotel expenses– Related office costs, consumable

goods and technical resources

Page 38: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 38

Surveillance (5)• Other personnel costs

– house-office traveling– knowledge update– employees council– canteen– passenger car lease, etc

• Other costs of premises; related to the buildings but excluding costs for rent– including gas, water, electricity,

insurance, safeguarding and house cleaning

Page 39: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 39

Surveillance (6)• Usage of technical capital assets; related to

means of production– costs for office automation, maintenance

costs for office apparatus and inventory and lease costs for company cars

• Information costs; related to promotion of metrology– yearly ‘clients-day’, world metrology day,

promotion of SI, metrology brochures etc• Advise and verification costs

– accountant, accreditation• Technical support

– costs related to workshop

Page 40: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 40

Preparation Regulation & Representation• Yearly plan for legal support MoEA

– Participation in EU groups (now mainly focused on MID)

– Participation in WELMEC (Work groups)– Representation and participation in OIML

• Costing elements:•Hours•Investments•Direct order costs

Page 41: Budgeting NMi Budgeting for maintenance  and development of  national measurement standards and

Cz Brno, April 2005 Butgeting NMi 41

Other legal activities

• Contract for Surveillance Hallmarking with MoEA

• Contract for Surveillance Gaming with MoJ

– Same costing structure as for Metrological Surveillance