电线电缆进出口联营公司
CHINA NATIONAL ELECTRIC WIRE & CABLE IMP/EXP CORP.
BUDGET COST FOR GAS TURBINE POWER PLANT
Project name: Gas turbine Power plant for Tuwairqi Mill LimitedLocation: Karachi, Pakistan.Gas turbine source: efei !it", !hina.T"pe: !ombined # $as turbine % & steam turbine'hippin$ Port: (rom )uhu*+anjin$*'han$hai port to Karachi.
'.+. T-M' !'T + /M0 !'T + 1'2
& Total equipment in the site of -(-
G3' T1/0+- P)-/ PL3+T
&45,644,444.44 &7,474,444.44
# 2ismantlin$ and packin$ &4,444,444.44 &,666,666.44
6 Land transportation 6,444,444.44 744,444.44
7 'hippin$ &,544,444.44
5 nstallation*hot trial*commissionin$ 6#,444,444.44 7,#88,889.44
8 /aw material required for theinstallation
5,444,444.44888,888.4
9 /e;en$ineerin$ cost &4,444,444.44 &,666,666.4
Total #6,56
-
8/16/2019 budget of power plant (2).doc
2/2
电线电缆进出口联营公司
CHINA NATIONAL ELECTRIC WIRE & CABLE IMP/EXP CORP.
Schedule of the project
'.
+.
2escription Period Project schedule@monthsA
& # 6 7 5 8 9 < &4 &&
& 2ismantlin$*packin$
#
# Transportation #
6 -n$ineerin$ 8
7 !i?il
5 nstallation@$as turbineA 5
9 nstallation@0oilerA 5
nstallation@'team 5
< -lectric s"stem 5
&4 ther s"stem 5
&& 2ebu$$in$*commissionin$ #