    BUDGET COST FOR GAS TURBINE POWER PLANT

    Project name: Gas turbine Power plant for Tuwairqi Mill LimitedLocation: Karachi, Pakistan.Gas turbine source: efei !it", !hina.T"pe: !ombined # $as turbine % & steam turbine'hippin$ Port: (rom )uhu*+anjin$*'han$hai port to Karachi.

    '.+. T-M' !'T + /M0 !'T + 1'2

    & Total equipment in the site of -(-

    G3' T1/0+- P)-/ PL3+T

    &45,644,444.44 &7,474,444.44

    # 2ismantlin$ and packin$ &4,444,444.44 &,666,666.44

    6 Land transportation 6,444,444.44 744,444.44

    7 'hippin$ &,544,444.44

    5 nstallation*hot trial*commissionin$ 6#,444,444.44 7,#88,889.44

    8 /aw material required for theinstallation

    5,444,444.44888,888.4

    9 /e;en$ineerin$ cost &4,444,444.44 &,666,666.4

    Total #6,56

  • 8/16/2019 budget of power plant (2).doc

    2/2

      电线电缆进出口联营公司

    CHINA NATIONAL ELECTRIC WIRE & CABLE IMP/EXP CORP.

     

    Schedule of the project

    '.

    +.

    2escription Period Project schedule@monthsA

    & # 6 7 5 8 9 < &4 &&

    & 2ismantlin$*packin$

     

    #

    # Transportation #

    6 -n$ineerin$ 8

    7 !i?il

    5 nstallation@$as turbineA 5

    9 nstallation@0oilerA 5

    nstallation@'team 5

    < -lectric s"stem 5

    &4 ther s"stem 5

    && 2ebu$$in$*commissionin$ #