Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project
BUSHEHRPETROCHEMICAL COMPANY
P.O. No.: 05-POR-MA-305-119
Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01
Document No.: BU-05-VD-305-TI-REP-0000-009Page1 of 37
WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)
EQUIPMENT NAME: Steam Turbine
Code1 □ (Approved ) No comment and the document isreleased for Manufacturing
Code2 □ (Approved with comments) Vendor shallcorrect, revise and resubmit the documentThe document is released for manufacturing
Code3 □(Commented) : Vendor shall correct / revise &resubmit document
Code4 □ Not Acceptable Quality (Rejected)
Date:Dept:Signature:
Dong TainingZhou Liming
XielongTang Qingwei
Chen QianbaoZhang Jianyue
IFA2015-3-1001
Dong TainingZhou Liming
XielongTang Qingwei
Chen QianbaoZhang JianyueIFA2015-2-1400
AUT’DAPP’DCHC’DPRE’DPurpose of IssueStatusDateRev.
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project
BUSHEHRPETROCHEMICAL COMPANY
P.O. No.: 05-POR-MA-305-119
Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01
Document No.: BU-05-VD-305-TI-REP-0000-009Page2 of 37
Revision Index
Rev. 00 01 02 03 04 05 06 07 Rev. 00 01 02 03 04 05 06 07Sheet Sheet
1 X X2 X X3 X X4 X X5 X X6 X X7 X X8 X X9 X X10 X X11 X X12 X X13 X X14 X X15 X X16 X X17 X X18 X X19 X X20 X X21 X X22 X X23 X X24 X X25 X X26 X X27 X X28 X X29 X X30 X X31 X X32 X X33 X X34 X X35 X X36 X X37 X X
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project
BUSHEHRPETROCHEMICAL COMPANY
P.O. No.: 05-POR-MA-305-119
Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01
Document No.: BU-05-VD-305-TI-REP-0000-009Page3 of 37
ContentPage
1. Welding Map for butt welding between outer casing and trip valve casing 42. WPS for butt welding between outer casing and trip valve casing
(Including welder Qualification) 53. WPS for welding repair of the casting (Including welder Qualification) 84. PQR 22
Welding Detail焊接详图
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project
BUSHEHRPETROCHEMICAL COMPANY
P.O. No.: 05-POR-MA-305-119
Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01
Document No.: BU-05-VD-305-TI-REP-0000-009Page4 of 37
1. Welding Map for butt welding between outer casing and trip valve casingJoint Identification Card焊缝识别卡(JIC)
JIC NA识别卡名称
Joint Identification Cardof Casting Blank
汽缸毛坯焊缝标识
Page 1of 1第 1页共 1页
焊缝编号目录JIONT IDENTIFICATION CARD CONTENT
焊缝编号Joint No.
焊接方法WeldingProcess
WPS编号/版本号WPS No./Rev. No.
PQR编号PQR No.
备注Remarks
X1 GTAW/SMAW WD-03/Rev.A PD-03/Rev.A焊缝返修使用相同的
WPS、WPQThe WPS/PQR is alsoapplied to welding joint
repair
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project
BUSHEHRPETROCHEMICAL COMPANY
P.O. No.: 05-POR-MA-305-119
Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01
Document No.: BU-05-VD-305-TI-REP-0000-009Page5 of 37
2. WPS for butt welding between outer casing and trip valve casing (Including welderQualification)
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project
BUSHEHRPETROCHEMICAL COMPANY
P.O. No.: 05-POR-MA-305-119
Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01
Document No.: BU-05-VD-305-TI-REP-0000-009Page6 of 37
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project
BUSHEHRPETROCHEMICAL COMPANY
P.O. No.: 05-POR-MA-305-119
Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01
Document No.: BU-05-VD-305-TI-REP-0000-009Page7 of 37
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project
BUSHEHRPETROCHEMICAL COMPANY
P.O. No.: 05-POR-MA-305-119
Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01
Document No.: BU-05-VD-305-TI-REP-0000-009Page8 of 37
3. WPS for welding repair of the casting (Including welder Qualification)Welding Procedure Specification 焊接工艺规程(WPS)
Hangzhou Steam Turbine Casting& Forging Co., Ltd杭州汽轮铸锻有限公司
WPS No/Rev编号/版本号 WD-06/ Rev. B
Page 1 of 2第 1页共 2页
Welding Process(es)焊接方法
SMAW Type(s)自动化等级
Manual手工
Supporting PQR No/Rev
依据的 PQR 编号PD-01/Rev. A
JOINTS接头(QW-402)Joint Design接头型式 Groove 坡口焊Backing(Yes or No)衬垫(有或无): Yes有Backing Material(Type)衬垫材料(型式): Base Metals母材Weld Metal Thickness of each Pass每层焊道的熔敷金属厚度: ≤13mmWelding Detail焊接详图
BASE MATALS 母材(QW-403)P-No.类别号 Group No.组别号 To和 P-No.类别号 Group No.组别号 or或者Material Spec材料标准号 DIN17245 Type or Grade型号或等级 GS-17CrMoV511 To和Material Spec材料标准号 DIN17245 Type or Grade型号或等级 GS-17CrMoV511 Welding焊接BASE MATALS Thickness Range母材厚度范围:Groove坡口焊 5mm≤T≤200mm Fillet角焊 ALLPipe Diameter Range管子直径范围:Groove坡口焊 None(无) Fillet角焊 None(无)Other其他:FILLER METALS填充金属(QW-404)Welding process(es)焊接方法 SMAWAWS specification 标准号: GB/T 5118(国标 GB)AWS Classification分类号: E6215-G(国标 GB)Brand焊材商标: THR317B20Filler Metal F-No:Weld Metal Analysis A-No: 3Size of Filler Metals填充金属尺寸: Φ4.0、Φ5.0Weld Metal Thickness Range熔敷焊缝金属厚度范围 t≤200mmElectrode-flux(class) 焊丝-焊剂(分类号: None(无)Flux Trade Name焊剂商标名称: None(无)Consumable Insert 可熔合嵌条: None(无)Other其他:POSITION焊接位置(QW-405)Position of Groove坡口位置: 1GWeld Progression (up or down)焊接方向: None(无)
Position of Fillet角焊缝位置:None(无)Other其他:
PREHEAT预热(QW-406)Preheat Temp Min 最小预热温度: 200℃Inter-pass Temp Max 最大层间温度: 450℃Preheat Maintenance预热的保持方式: 火焰
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project
BUSHEHRPETROCHEMICAL COMPANY
P.O. No.: 05-POR-MA-305-119
Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01
Document No.: BU-05-VD-305-TI-REP-0000-009Page9 of 37
POSTWELD HEAT TREATMENT 焊后热处理(QW-407)Temperature Range温度范围:(710±10)℃Time Range时间范围: ≥10h
ELECTRICAL CHARACTERISTICS 电特性(QW-409)Current AC or DC 电流 AC或 DC see below(见下表)Polarity 极性: see below(见下表)Amps(Range)安培 see below(见下表)Volts(range)伏特 see below(见下表)Tungsten Electrode Size and Type 钨极尺寸和类型:None(无)Mode of Metal Transfer For GMAW 金属过渡方式:None(无)
GAS气体(QW-408)Percent Composition百分比组成
Gas(es)气体 Mixture混合比 Flow Rate流量Shielding保护气 None(无) None(无) None(无)Trailing尾部保护气 None(无) None(无) None(无)Backing背面保护气 None(无) None(无) None(无)
TECHNIQUE焊接技术(QW-410)String or Weave bead直进焊或横摆焊:Weave(横摆焊)Orifice or Gas cup Size嘴孔或喷嘴尺寸:None(无)Initial and Inter-pass Cleaning打底焊道和中间焊道的清理方法: Brush(刷)Method of Back Grouging背面清根方法:None(无)Oscillation横摆方法:Manual (手工)Contact Tube to Work distance导电嘴工作距离:None(无)Multiple or Single pass(Per Side)多道焊或单道焊:Multiple (多道焊)Multiple or Single Electrodes多丝焊或单丝焊:Single(单丝焊)Peening锤击有无: None(无)Other其他:
WeldLayer(s)焊层
Process焊接方法
Filler Metal填充金属 Current焊接电流 Volt Range电压范围
Other其他Class
种类Dia直径
Type Polar极性
Amp Range电流范围
Root根部
SMAW E6215-G(国标 GB) Φ4.0 DCEP
直流反接140~180A 22~26V
Others其他
SMAW E6215-G(国标 GB) Φ5.0 DCEP
直流反接170~240A 25~29V
Remark备注:
Prepared by编制:Zhang Jianyue 张健月 Certified by确认:Zhou Liming周黎明Date日期: 2015.01.28 Date日期:2015.01.28
Welding Procedure Specification焊接工艺规程(WPS)
WPS No/Rev编号/版本号 WD-06/ Rev. B
Page 2 of 2第 2页共 2页
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project
BUSHEHRPETROCHEMICAL COMPANY
P.O. No.: 05-POR-MA-305-119
Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01
Document No.: BU-05-VD-305-TI-REP-0000-009Page10 of 37
Welding Procedure Specification 焊接工艺规程(WPS)Hangzhou Steam Turbine Casting
& Forging Co., Ltd杭州汽轮铸锻有限公司
WPS No/Rev编号/版本号 WD-07/ Rev. B Page 1 of 2
第 1页共 2页
Welding Process(es)焊接方法
SMAW Type(s)自动化等级
Manual手工
Supporting PQR No/Rev
依据的 PQR 编号PD-04/Rev. A
JOINTS接头(QW-402)Joint Design接头型式 Groove 坡口焊Backing(Yes or No)衬垫(有或无): Yes有Backing Material(Type)衬垫材料(型式): Base Metals母材Weld Metal Thickness of each Pass每层焊道的熔敷金属厚度: ≤13mmWelding Detail焊接详图
BASE MATALS 母材(QW-403)P-No.类别号 Group No.组别号 To和 P-No.类别号 Group No.组别号 or或者Material Spec材料标准号 DIN17245 Type or Grade型号或等级 GS-C25 To和Material Spec材料标准号 DIN17245 Type or Grade型号或等级 GS-C25 Welding焊接BASE MATALS Thickness Range母材厚度范围:Groove坡口焊 5mm≤T≤200mm Fillet角焊 ALLPipe Diameter Range管子直径范围:Groove坡口焊 None(无) Fillet角焊 None(无)Other其他:FILLER METALS填充金属(QW-404)Welding process(es)焊接方法 SMAWAWS specification 标准号: AWSA5.1AWS Classification分类号: E7015(E5015)Brand焊材商标: THJ507Filler Metal F-No: 4Weld Metal Analysis A-No: 1Size of Filler Metals填充金属尺寸: Φ4.0、Φ5.0Weld Metal Thickness Range熔敷焊缝金属厚度范围 T≤200mmElectrode-flux(class) 焊丝-焊剂(分类号: None(无)Flux Trade Name焊剂商标名称: None(无)Consumable Insert 可熔合嵌条: None(无)Other其他:POSITION焊接位置(QW-405)Position of Groove坡口位置: 1GWeld Progression (up or down)焊接方向: None(无)
Position of Fillet角焊缝位置:None(无)Other其他:
PREHEAT预热(QW-406)Preheat Temp Min 最小预热温度: 100℃Inter-pass Temp Max 最大层间温度: 350℃Preheat Maintenance预热的保持方式: 火焰
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project
BUSHEHRPETROCHEMICAL COMPANY
P.O. No.: 05-POR-MA-305-119
Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01
Document No.: BU-05-VD-305-TI-REP-0000-009Page11 of 37
POSTWELD HEAT TREATMENT 焊后热处理(QW-407)Temperature Range温度范围:(610±10)℃Time Range时间范围: ≥7h
ELECTRICAL CHARACTERISTICS 电特性(QW-409)Current AC or DC 电流 AC或 DC see below(见下表)Polarity 极性: see below(见下表)Amps(Range)安培 see below(见下表)Volts(range)伏特 see below(见下表)Tungsten Electrode Size and Type 钨极尺寸和类型:None(无)Mode of Metal Transfer For GMAW 金属过渡方式:None(无)
GAS气体(QW-408)Percent Composition百分比组成
Gas(es)气体 Mixture混合比 Flow Rate流量Shielding保护气 None(无) None(无) None(无)Trailing尾部保护气 None(无) None(无) None(无)Backing背面保护气 None(无) None(无) None(无)
TECHNIQUE焊接技术(QW-410)String or Weave bead直进焊或横摆焊:Weave(横摆焊)Orifice or Gas cup Size嘴孔或喷嘴尺寸:None(无)Initial and Inter-pass Cleaning打底焊道和中间焊道的清理方法: Brush(刷)Method of Back Grouging背面清根方法:None(无)Oscillation横摆方法:Manual (手工)Contact Tube to Work distance导电嘴工作距离:None(无)Multiple or Single pass(Per Side)多道焊或单道焊:Multiple (多道焊)Multiple or Single Electrodes多丝焊或单丝焊:Single(单丝焊)Peening锤击有无: None(无)Other其他:
WeldLayer(s)焊层
Process焊接方法
Filler Metal填充金属 Current焊接电流 Volt Range电压范围
Other其他Class
种类Dia直径
Type Polar极性
Amp Range电流范围
Root根部
SMAW E7015(E5015) Φ4.0 DCEP
直流反接140~180A 22~26V
Others其他
SMAW E7015(E5015) Φ5.0 DCEP
直流反接170~240A 25~29V
Remark备注:
Prepared by编制:Zhang Jianyue张健月 Certified by确认:Zhou Liming周黎明Date日期: 2015.01.28 Date日期:2015.01.28
Welding Procedure Specification焊接工艺规程(WPS)
WPS No/Rev编号/版本号 WD-07/ Rev. B
Page 2 of 2第 2页共 2页
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project
BUSHEHRPETROCHEMICAL COMPANY
P.O. No.: 05-POR-MA-305-119
Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01
Document No.: BU-05-VD-305-TI-REP-0000-009Page12 of 37
Welding Procedure Specification 焊接工艺规程(WPS)Hangzhou Steam Turbine Casting
& Forging Co., Ltd杭州汽轮铸锻有限公司
WPS No/Rev编号/版本号 WD-08/ Rev.B Page 1 of 2
第 1页共 2页
Welding Process(es)焊接方法
SMAW Type(s)自动化等级
Manual手工
Supporting PQR No/Rev
依据的 PQR 编号PD-03/Rev. A
JOINTS接头(QW-402)Joint Design接头型式 Groove 坡口焊Backing(Yes or No)衬垫(有或无): Yes有Backing Material(Type)衬垫材料(型式): Base Metals母材Weld Metal Thickness of each Pass每层焊道的熔敷金属厚度: ≤13mmWelding Detail焊接详图
BASE MATALS 母材(QW-403)P-No.类别号 Group No.组别号 To和 P-No.类别号 Group No.组别号 or或者Material Spec材料标准号 DIN17245 Type or Grade型号或等级 GS-22Mo4 To和Material Spec材料标准号 DIN17245 Type or Grade型号或等级 DIN GS-22Mo4 Welding焊接BASE MATALS Thickness Range母材厚度范围:Groove坡口焊 5mm≤T≤200mm Fillet角焊 ALLPipe Diameter Range管子直径范围:Groove坡口焊 None(无) Fillet角焊 None(无)Other其他:
FILLER METALS填充金属(QW-404)Welding process(es)焊接方法 SMAWAWS specification 标准号: GT/T 5118AWS Classification分类号: E5015-1M3(国标 GB)Brand焊材商标: THR107Filler Metal F-No:Weld Metal Analysis A-No: 2Size of Filler Metals填充金属尺寸: Φ4.0、Φ5.0Weld Metal Thickness Range熔敷焊缝金属厚度范围 T≤200mmElectrode-flux(class) 焊丝-焊剂(分类号: None(无)Flux Trade Name焊剂商标名称: None(无)Consumable Insert 可熔合嵌条: None(无)Other其他:POSITION焊接位置(QW-405)Position of Groove坡口位置: 1GWeld Progression (up or down)焊接方向: None(无)
Position of Fillet角焊缝位置:None(无)Other其他:
PREHEAT预热(QW-406)Preheat Temp Min 最小预热温度: 100℃Inter-pass Temp Max 最大层间温度: 350℃Preheat Maintenance预热的保持方式: 火焰
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project
BUSHEHRPETROCHEMICAL COMPANY
P.O. No.: 05-POR-MA-305-119
Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01
Document No.: BU-05-VD-305-TI-REP-0000-009Page13 of 37
POSTWELD HEAT TREATMENT焊后热处理(QW-407)Temperature Range温度范围:(670±10)℃Time Range时间范围: ≥10h
ELECTRICAL CHARACTERISTICS 电 特 性 ( QW-409)Current AC or DC 电流 AC或 DC see below(见下表)Polarity 极性: see below(见下表)Amps(Range)安培 see below(见下表)Volts(range)伏特 see below(见下表)Tungsten Electrode Size and Type钨极尺寸和类型:None(无)Mode of Metal Transfer For GMAW 金属过渡方式:None(无)
GAS气体(QW-408)Percent Composition百分比组成
Gas(es)气体 Mixture混合比 Flow Rate流量Shielding保护气 None(无) None(无) None(无)Trailing尾部保护气 None(无) None(无) None(无)Backing背面保护气 None(无) None(无) None(无)
TECHNIQUE焊接技术(QW-410)String or Weave bead直进焊或横摆焊:Weave(横摆焊)Orifice or Gas cup Size嘴孔或喷嘴尺寸:None(无)Initial and Inter-pass Cleaning打底焊道和中间焊道的清理方法: Brush(刷)Method of Back Grouging背面清根方法:None(无)Oscillation横摆方法:Manual (手工)Contact Tube to Work distance导电嘴工作距离:None(无)Multiple or Single pass(Per Side)多道焊或单道焊:Multiple (多道焊)Multiple or Single Electrodes多丝焊或单丝焊:Single(单丝焊)Peening锤击有无: None(无)Other其他:
WeldLayer(s)焊层
Process焊接方法
Filler Metal填充金属 Current焊接电流 Volt Range电压范围
Other其他Class
种类Dia直径
Type Polar极性
Amp Range电流范围
Root根部
SMAW E5015-1M3(国标 GB) Φ4.0 DCEP
直流反接140~180A 22~26V
Others其他
SMAW E5015-1M3(国标 GB) Φ5.0 DCEP
直流反接170~240A 22~26V
Remark备注:
Prepared by编制:张健月 Certified by确认:周黎明Date日期: 2015.02.02 Date日期:2015.02.02
Welding Procedure Specification焊接工艺规程(WPS)
WPS No/Rev编号/版本号 WD-08/ Rev. B
Page 2 of 2第 2页共 2页
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project
BUSHEHRPETROCHEMICAL COMPANY
P.O. No.: 05-POR-MA-305-119
Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01
Document No.: BU-05-VD-305-TI-REP-0000-009Page14 of 37
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project
BUSHEHRPETROCHEMICAL COMPANY
P.O. No.: 05-POR-MA-305-119
Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01
Document No.: BU-05-VD-305-TI-REP-0000-009Page15 of 37
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project
BUSHEHRPETROCHEMICAL COMPANY
P.O. No.: 05-POR-MA-305-119
Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01
Document No.: BU-05-VD-305-TI-REP-0000-009Page16 of 37
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project
BUSHEHRPETROCHEMICAL COMPANY
P.O. No.: 05-POR-MA-305-119
Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01
Document No.: BU-05-VD-305-TI-REP-0000-009Page17 of 37
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project
BUSHEHRPETROCHEMICAL COMPANY
P.O. No.: 05-POR-MA-305-119
Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01
Document No.: BU-05-VD-305-TI-REP-0000-009Page18 of 37
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project
BUSHEHRPETROCHEMICAL COMPANY
P.O. No.: 05-POR-MA-305-119
Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01
Document No.: BU-05-VD-305-TI-REP-0000-009Page19 of 37
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project
BUSHEHRPETROCHEMICAL COMPANY
P.O. No.: 05-POR-MA-305-119
Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01
Document No.: BU-05-VD-305-TI-REP-0000-009Page20 of 37
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project
BUSHEHRPETROCHEMICAL COMPANY
P.O. No.: 05-POR-MA-305-119
Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01
Document No.: BU-05-VD-305-TI-REP-0000-009Page21 of 37
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project
BUSHEHRPETROCHEMICAL COMPANY
P.O. No.: 05-POR-MA-305-119
Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01
Document No.: BU-05-VD-305-TI-REP-0000-009Page22 of 37
4.PQR
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project
BUSHEHRPETROCHEMICAL COMPANY
P.O. No.: 05-POR-MA-305-119
Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01
Document No.: BU-05-VD-305-TI-REP-0000-009Page23 of 37
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project
BUSHEHRPETROCHEMICAL COMPANY
P.O. No.: 05-POR-MA-305-119
Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01
Document No.: BU-05-VD-305-TI-REP-0000-009Page24 of 37
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project
BUSHEHRPETROCHEMICAL COMPANY
P.O. No.: 05-POR-MA-305-119
Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01
Document No.: BU-05-VD-305-TI-REP-0000-009Page25 of 37
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project
BUSHEHRPETROCHEMICAL COMPANY
P.O. No.: 05-POR-MA-305-119
Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01
Document No.: BU-05-VD-305-TI-REP-0000-009Page26 of 37
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project
BUSHEHRPETROCHEMICAL COMPANY
P.O. No.: 05-POR-MA-305-119
Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01
Document No.: BU-05-VD-305-TI-REP-0000-009Page27 of 37
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project
BUSHEHRPETROCHEMICAL COMPANY
P.O. No.: 05-POR-MA-305-119
Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01
Document No.: BU-05-VD-305-TI-REP-0000-009Page28 of 37
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project
BUSHEHRPETROCHEMICAL COMPANY
P.O. No.: 05-POR-MA-305-119
Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01
Document No.: BU-05-VD-305-TI-REP-0000-009Page29 of 37
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project
BUSHEHRPETROCHEMICAL COMPANY
P.O. No.: 05-POR-MA-305-119
Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01
Document No.: BU-05-VD-305-TI-REP-0000-009Page30 of 37
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project
BUSHEHRPETROCHEMICAL COMPANY
P.O. No.: 05-POR-MA-305-119
Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01
Document No.: BU-05-VD-305-TI-REP-0000-009Page31 of 37
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project
BUSHEHRPETROCHEMICAL COMPANY
P.O. No.: 05-POR-MA-305-119
Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01
Document No.: BU-05-VD-305-TI-REP-0000-009Page32 of 37
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project
BUSHEHRPETROCHEMICAL COMPANY
P.O. No.: 05-POR-MA-305-119
Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01
Document No.: BU-05-VD-305-TI-REP-0000-009Page33 of 37
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project
BUSHEHRPETROCHEMICAL COMPANY
P.O. No.: 05-POR-MA-305-119
Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01
Document No.: BU-05-VD-305-TI-REP-0000-009Page34 of 37
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project
BUSHEHRPETROCHEMICAL COMPANY
P.O. No.: 05-POR-MA-305-119
Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01
Document No.: BU-05-VD-305-TI-REP-0000-009Page35 of 37
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project
BUSHEHRPETROCHEMICAL COMPANY
P.O. No.: 05-POR-MA-305-119
Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01
Document No.: BU-05-VD-305-TI-REP-0000-009Page36 of 37
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionationand Inter Connection Pipeline Between Plants Project
BUSHEHRPETROCHEMICAL COMPANY
P.O. No.: 05-POR-MA-305-119
Document Title: WPS& PQR &Welder qualification record for SteamTurbine(05-330-C-1-T)Rev.: 01
Document No.: BU-05-VD-305-TI-REP-0000-009Page37 of 37