BTS3902E WCDMA Quick Installation Guide(01)(PDF)-En
description
Transcript of BTS3902E WCDMA Quick Installation Guide(01)(PDF)-En
BTS3902EV200R014 & V200R015Quick Installation
Issue: 01Date: 2012-4-30
HUAWEI TECHNOLOGIES CO., LTD.
Guide
BTS3902E Exterior and Dimensions
Dimensions without a housing
BTS3902E Installation Options
On a Metal Pole with the Diameter Ranging from 60 mm to 114 mm
On a Wall
1
Dimensions with a housing
On a Metal Pole with the Diameter Ranging from 114 mm to 400 mm
On a Wood Pole with the Diameter Ranging from 200 mm to 400 mm
1 Copyright © Huawei Technologies Co., Ltd. 2013. All rights reserved.
BTS3902E Installation Clearance RequRecommended clearance for installing
a single BTS3902
Recommended clearance for installing two BTS3902E side by side
Recommended clearance for installing two BTS3902E in a vertical line
2
uirementsMinimum clearance for installing a single BTS3902E
Minimum clearance for installing two BTS3902E side by side
Minimum clearance for installing two BTS3902E in a vertical line
2
Dimensions and Installation ClearanceProtection BoxExterior and Dimensions Recommend
clearance
交流防雷盒(选配)的安装场景
On a Metal Pole with the Diameter Ranging from 60 mm to 114 mm
On a Wall
3
e Requirements of AC Surge (Optional) ded installation Minimum installation
clearance
On a Metal Pole with the Diameter Ranging from 114 mm to 400 mm
On a Wood Pole with the Diameter Ranging from 200 mm to 400 mm
3
Installing on a Pole with the1 Installing the angle-adjustable mount
The composing of angle-adjustable mountinLifting eyeAttachment plate Lifting eye
Traction eye
Main mounting bracket
Auxiliary mounting
dhTraction eye
2. Installing the auxiliary mounting bra
双头螺母Double-headed nut
Hoist clamp
•Ensure that the arrow on the auxiliary bracket points up.
2 Installing the BTS3902E
•Tighten the two double-headed nuts synchronously and soand auxiliary brackets are the same.
Upper positioning pin
Lower positioning pin
Put the upper positioning pin through the hole on the ahole on the main mounting bracket.
3 Adjusting the installation angle of th
4
3 Adjusting the installation angle of th
The procedures of adjusting the installation angle
e Diameter of 60 mm to 114 mmting kits
g kits 1. Installing the main mounting bracket
g bracket
double-headed nut
Long bolt
Rubber washerDouble-headed nut
ackets
o that the distances between the two sides of the main
Positioning screw
attachment plate and the lower positioning pin through the
he BTS3902E
4
he BTS3902E
e, see the page 8.
Installing on a Pole with the1 Installing the mounting brackets
Adapting plate(1) Mounting hole group A
Ad
1. Inst( ) g g p(2) Mounting hole group B(3) Mounting hole group C(4) Adapting plate
Mabra
Ada
2. Installing the Hose clamp
Mounting hole group B喉箍 LeHose clamp
2 Installing the BTS3902E
Upper positioning pin
Lower positioning pin
Put the upper positioning pin through the hole on the ahole on the main mounting bracket.
5
3 Adjusting the installation angle of th
The procedures of adjusting the installation angle
e Diameter of 114 mm to 400 mm
ti l t
talling the adapting plate assembly
ain mounting acket
apting plateScrew
Hose clampevel
Positioning screw
attachment plate and the lower positioning pin through the
5
he BTS3902E
e, see the page 8.
Installing a BTS3902E on a 1 Installing the adapting plate assembl
Adapting plate(1) Mounting hole group A
Ada( ) g g p(2) Mounting hole group B(3) Mounting hole group C(4) Adapting plate
Mabra
2 Installing the mounting brackets on t1. Drilling holes and install expansion bolt assembliesp
(1) M10x80 b(2) Nut(3) Spring wa(4) Flat wash(5) Expansio
3 Installing the BTS3902E
Upper positioni
Lower positioning pin
Put the upper positioning pin through the hole on the attac
6
pp p g p ghole on the main mounting bracket.
4 Adjusting the installation angle of thThe procedures of adjusting the installation angle
6
Wallly
apting plateScrew
ain mounting acket
Screw
the Wall2. Fitting the mounting piece onto the expansion boltsp
bolt
asherhern tube
(1) Insulation washer(2) Flat washer( )(3) Spring washer(4) Nut
ng pin Positioning screw
chment plate and the lower positioning pin through the
6
p p g p g
e BTS3902Ee, see the page 8.
6
Installing on a Wood Pole wto 400 mm
1 Installing the adapting plate assembl
Adapting plate(1) Mounting hole group A
Ada( ) g g p(2) Mounting hole group B(3) Mounting hole group C(4) Adapting plate
Mabra
2 Installing the mounting piece
Mounting hole group C
BoltSpacer
C组安装Mountinghole grou
3 Installing the BTS3902EUpper positioning p
Lower positioning pin
Put the upper positioning pin through the hole on the attachole on the main mounting bracket.
7
4 Adjusting the installation angle of thThe procedures of adjusting the installation angle
with the Diameter of 200 mm
ly
apting plateScrew
ain mounting acket
Screw
Nut
Spacer
装孔g up C
pinPositioning screw
chment plate and the lower positioning pin through the
7
e BTS3902Ee, see the page 8.
Adjusting the installation an
•Horizontal angle ±30°, vertical angle ±10°.•If the positioning pin is tightened too hard, the installatiopositioning screw first
1 Adjusting the horizontal angle
positioning screw first.The horizontal angle and vertical angle can be adjusted either from the plan or elevation view.•Ensure that the positioning screws both in the vertical d
2 Adjusting the vertical angle
8
ngle of the BTS3902E
on angle cannot be adjusted. In this case, loosen the
simultaneously. The vertical angle can be determined
irection and horizontal direction have been secured.
P iti iPositioning screw
Positioning screw
8
(Optional) Installing the AC 1 Install an AC surge protection box on
•When the diain. to 4.49 in.)protection box•When the dia(4.49 in. to 15•If the diametesmall, cut the
2 Install an AC surge protection box on1. Marking the anchor 2. Installing angpoints
gbolt
(1) M10x65 bolt(2) Spring washer 10(3) Plastic tube(4) Flat washer 10(5) Expansion tube
3 Install an AC surge protection box on1. Drilling holes 2. Instal
the woo
9
Surge Protection Boxn a pole
ameter of the pole ranges from 60 mm to 114 mm (2.36 ), the hose clamps delivered with the AC surge x is used.ameter of the pole ranges from 114 mm to 400 mm 5.75 in.), the hose clamps purchased locally is used.er of the pole around which the clamp is installed is extra part of the clamp.
n a wall.n expansion 3. Installing the AC p g
Surge Protection Box
n a wood poleling the AC surge protection box on
od pole
9
Installing a PGND Cable1 Installing a PGND Cable without AC S
PGND cable
2 Installing a PGND Cable and Equipoten
External ground ba
g q p
Equipotential cablePGND cable
1
External ground bar
Surge Protection Box
OInstalling an OT terminal in the correct manner
ntial Cable with AC Surge Protection Box
ar
g
Installing an OT terminal in the correct manner
0
Installing the Power Cable o1 Installing a Power Cable without AC S
Power Cable
2 Installing a Power Cable with AC Sur
1.Installing the AC Power Cable
BTS390
Thread-lock sealing nuof the PG connector
PG connector
Waterproof blockBTS390Blue----Brown-Yellow/
2. Installing the BTS3902E Power Cable
External Power CableBTS3902E Power Cable
1
of BTS3902ESurge Protection Box
rge Protection Box
02E Power Cable
External Power CableBrown----LinBiue Nin
Insulation layerClip
ut
02E Power Cable-Nout---Lout/Green ----GND
Biue----NinYellow/Green----GND
e
1
Installing the signal Cable1 Installing an FE/GE Fiber Optic Cable
A fast Ethernet or gigabit Ethernet (FE/GE) cable or fibe
1. Installing the optical module
1. Rst
2 T
2.Preparing the FE/GE Optic Cable
2. Tth
3 I t lli FE/GE O ti C bl
DLC connector
Traction cables
3. Installing FE/GE Optic Cable
Socket
Clamping jaw
1
e
r optic cable must be installed for BTS3902E as required.
Remove the dustproof cap of the optical module and tore it properly for future use.urn the puller of an optical module outwards and inserturn the puller of an optical module outwards and insert
he optical module into the OPT0 port on the BTS3902E.
Inner gasket
1. Sort the optical fibers, remove the dustproof cap from the optical fiber connector, and insert the DLC connector into the optical module.
2. Align the clamping jaw on the inner gasket with the socket of the OPT0 port on the BTS3902E. Insert and fit the clamping jaw into the socket.
3. Push the outer gasket of the round connector upwards and tighten the outer gasket until you hear a click sound.
2
Installing the signal Cable
A fast Ethernet or gigabit Ethernet (FE/GE) cable or fibe
2 Installing an FE/GE Cable
3 (Optional) Installing the Alarm Cable
1
r optic cable must be installed for BTS3902E as required.
DB15 male connector
MON Port
DB15 male connector
3
(Optional) Installing a BTS3
1 Installing the BTS3902E RF jumper
You must install a radio frequency (RF) jumper when a B
1. Installing the BTS3902E RF jumper
Type N connector
2. Wrap the connector of the BTS3902E
绝缘PVCinsulation
Waterproof tapePVCinsulation tape
a. Wrap a layer of PVC insulation tape around the cb. Tightly wrap three layers of waterproof tape aroun
up, the second layer from top down, and the thirdc. Tightly wrap three layers of PVC insulation tape ag y p y p
bottom up, the second layer from top down, and td. Bundle cable ties 3 mm to 5 mm away from the e
• When wrapping waterproof tape, stretch the tape ev• When wrapping insulating tape , do not stretch it.• Wrap each layer of tape around the connector tightly
1
Wrap each layer of tape around the connector tightlyoverlaps more than 50% of the preceding layer.• Ensure that the side with adhesive tape is covered o• When cutting off the cable tie, reserve a surplus leng
3902E RF Jumper
BTS3902E uses an external antenna.
E RF jumper
缘胶带tape
onnector from bottom up. nd the connector, with the first layer from bottom layer from bottom up.
around the connector with the first layer from ythe third layer from bottom up. nd of insulating tape.
enly until it is twice of the original length.
y and neatly and ensure that each layer of tape
4
y and neatly, and ensure that each layer of tape
on the wrapped tape.gth of 3 mm to 5 mm.
(Optional) Installing a Camo1. Moving the upper housing
UpUp
2. Installing the camouflage shell
(1) Camoufla
3. Installing the upper housing
(1) Camoufla(2) Slots(3) Tabs
HU
1
ouflage Shell
pper housingpper housing
age shellage shell
UAWEI TECHNOLOGIES CO., LTD.Huawei Industrial Base Bantian Longgang
Sh h 518129
5
Shenzhen 518129People’s Republic of China
www.huawei.com