BSS Planing

download BSS Planing

of 712

Transcript of BSS Planing

  • 8/6/2019 BSS Planing

    1/710

    CHAPTER 2TRANSMISSION SYSTEMS

    CHAPTER 3BSS CELL PLANNING

    CHAPTBTS PLANNING

    RUL

    CHAPTER 1INTRODUCTION TO

    PLANNING

  • 8/6/2019 BSS Planing

    2/710

  • 8/6/2019 BSS Planing

    3/710

    CHAPTER 7PCU UPGRADE FOR THE

    BSS

    CHAPTER 8BSC PLANNING STEPS AND

    RULES FOR LCS

    CHAPTOMC-R PLAN

    AND R

    CHAPTER 6RXCDR PLANNING STEPS

    AND RULES

  • 8/6/2019 BSS Planing

    4/710

  • 8/6/2019 BSS Planing

    5/710

    CHAPTER 12CALL MODEL PARAMETERS

    CHAPTER 13STANDARD BSS & HORIZON

    BTS CONFIGURATIONS

    CHAPTM-CEL

    CONFIGU

    CHAPTER 11PAGING & LOCATION

    AREA PLANNING

  • 8/6/2019 BSS Planing

    6/710

  • 8/6/2019 BSS Planing

    7/710

    CHAPTER 16EQUIPMENT DESCRIPTIONS

    FOR PRE M-CELL BTSs

  • 8/6/2019 BSS Planing

    8/710

  • 8/6/2019 BSS Planing

    9/710

    30th Jun 02

    System Information: BSS Equipment Planning

    68P02900W21-K

    GMR-01

    GMR Page 1

    Manual Revision

    GMR-01

    30th Jun 0268P02900W21-K

    GSM-001-103

    Motorola manualaffected

    Incorporate this GMR only in the manual number and version listed below:

    68P02900W21-K System Information: BSS Equipment Planning

    Software Release GSR6

    Problem reports

    This revision provides a fix to the following problem reports:

    SR1030458

    Reason forrevision

    This revision provides additional and updated information as follows:

    Chap. 5: Page 5-21: Note relating to 70% GPROC2 utilization removed.

    Chap. 7: Page 7-12: PCU shelf (MPROC board) planning considerations clarified.

    Action

    Remove and replace pages in the Manual as follows:

    Remove Insert

    All pages between the clear acetatefront sheet and the blank backingsheet, remove from binder.

    All pages of the GMR between thefront sheet and the blank backingsheet, insert into binder.

    Obsolete pages

    Destroy all obsolete pages. Do not destroy this page.

    Completion

    On completion of the Manual Revision, insert this Manual Revision sheet in the front or

    back of the manual, for future reference.

  • 8/6/2019 BSS Planing

    10/710

    GSM-001-103

    30th Jun 02GMR Page 2

    System Information: BSS Equipment Planning

    GMR-01

    68P02900W21-K

  • 8/6/2019 BSS Planing

    11/710

    GSR

    6

    BSS Equipment Planning

    GMR-01

    System Information

    GSM-001-103GSM Software Release 6

    68P02900W21-K

  • 8/6/2019 BSS Planing

    12/710

  • 8/6/2019 BSS Planing

    13/710

    GSR

    6System Information

    BSS Equipment Planning

    GSM-001-103GSM Software Release 6GMR-01 B

    SSE

    quipment

    Planning

    System

    Information

  • 8/6/2019 BSS Planing

    14/710

  • 8/6/2019 BSS Planing

    15/710

    30th Jun 02

    System Information: BSS Equipment Planning

    68P02900W21-K

    GMR-01

    i

    GSM-001-103

    Software Release GSR6

    System InformationBSS Equipment Planning

    E Motorola 1994-2002

    All Rights Reserved

    Printed in the UK.

  • 8/6/2019 BSS Planing

    16/710

    GSM-001-103

    30th Jun 02ii

    System Information: BSS Equipment Planning

    GMR-01

    68P02900W21-K

    Copyrights, notices and trademarks

    Copyrights

    The Motorola products described in this document may include copyrighted Motorola computer

    programs stored in semiconductor memories or other media. Laws in the United States and other

    countries preserve for Motorola certain exclusive rights for copyright computer programs, including the

    exclusive right to copy or reproduce in any form the copyright computer program. Accordingly, any

    copyright Motorola computer programs contained in the Motorola products described in this document

    may not be copied or reproduced in any manner without the express written permission of Motorola.

    Furthermore, the purchase of Motorola products shall not be deemed to grant either directly or by

    implication, estoppel or otherwise, any license under the copyrights, patents or patent applications of

    Motorola, except for the rights that arise by operation of law in the sale of a product.

    RestrictionsThe software described in this document is the property of Motorola. It is furnished under a license

    agreement and may be used and/or disclosed only in accordance with the terms of the agreement.

    Software and documentation are copyright materials. Making unauthorized copies is prohibited by

    law. No part of the software or documentation may be reproduced, transmitted, transcribed, stored

    in a retrieval system, or translated into any language or computer language, in any form or by any

    means, without prior written permission of Motorola.

    AccuracyWhile reasonable efforts have been made to assure the accuracy of this document, Motorola

    assumes no liability resulting from any inaccuracies or omissions in this document, or from the use

    of the information obtained herein. Motorola reserves the right to make changes to any products

    described herein to improve reliability, function, or design, and reserves the right to revise this

    document and to make changes from time to time in content hereof with no obligation to notify any

    person of revisions or changes. Motorola does not assume any liability arising out of the application

    or use of any product or circuit described herein; neither does it convey license under its patent

    rights of others.

    Trademarks

    andMOTOROLA are registered trademarks of Motorola Inc.

    Aspira, Intelligence Everywhere, M-Cell and Taskfinder are trademarks of Motorola Inc.

    All other brands and corporate names are trademarks of their respective owners.

    .

    .

    .

  • 8/6/2019 BSS Planing

    17/710

    GSM-001-103

    30th Jun 02

    System Information: BSS Equipment Planning

    68P02900W21-K

    GMR-01

    iii

    Contents

    Issue status of this manual 1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    General information 2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    First aid in case of electric shock 4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Reporting safety issues 5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Warnings and cautions 6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    General warnings 7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    General cautions 9. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Devices sensitive to static 10. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Motorola manual set 11. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    GMR amendment 14. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    GMR amendment record 15. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Chapter 1Introduction to planning i. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Chapter overview 11. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction to BSS planning 11. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Manual overview 12. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 12. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Contents 12. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    BSS equipment overview 14. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    System architecture 14. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    System components 15. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Transceiver units 15. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    BSS features 17. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Features that affect planning 17. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Diversity 17. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Frequency hopping 17. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Short message service, cell broadcast 18. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Code storage facility processor 18. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    PCU for GPRS upgrade 19. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    BSS planning overview 110. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 110. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Initial information required 110. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning methodology 112. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Acronyms 113. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Acronym list 113. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Chapter 2Transmission systems i. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Chapter overview 21. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 21. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    BSS interfaces 22. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 22. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Interconnecting the BSC and BTSs 23. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 23. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Interconnection rules 23. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  • 8/6/2019 BSS Planing

    18/710

    GSM-001-103

    30th Jun 02iv

    System Information: BSS Equipment Planning

    GMR-01

    68P02900W21-K

    Network topology 24. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 24. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Star connection 25. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Daisy chain connection 26. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Daisy chain planning 27. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Aggregate Abis 29. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    RTF path fault containment 213. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    16 kbit/s RSL 215. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    16 kbit/s XBL 218. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Dynamic allocation of RXCDR to BSC circuits (DARBC) 219. . . . . . . . . . . . . . . . . . . .

    BTS concentration 220. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 220. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Key terms 221. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    DYNET 223. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Blocking considerations 224. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Radio signalling link (RSL) planning 225. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Network topologies 226. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Performance issues 232. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Configuration and compatibility issues 232. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Recommended BTS concentration planning guidelines 233. . . . . . . . . . . . . . . . . . . . .

    Examples 235. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    BTS concentration resource optimization for handovers (BCROH) 241. . . . . . . . . . .

    BCROH description 241. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Managed HDSL on micro BTS 245. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 245. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Integrated HDSL interface 246. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    General HDSL guidelines 248. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Microcell system planning 249. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Picocell system planning 251. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Chapter 3BSS cell planning i. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    BSS cell planning 31. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    BSS planning requirements 31. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning factors 32. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning tools 33. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 33. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    GSM frequency spectrum 34. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    The GSM900 frequency spectrum 34. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    The DCS1800 frequency spectrum 35. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    The PCS1900 frequency spectrum 35. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Horizonmacro adaptation for 850/1900 MHz operation 36. . . . . . . . . . . . . . . . . . . . .

    Absolute radio frequency channel capacity 36. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Modulation techniques and channel spacing 37. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Traffic capacity 38. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Dimensioning 38. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Channel blocking 39. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Traffic flow 310. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Grade of service 310. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  • 8/6/2019 BSS Planing

    19/710

    GSM-001-103

    30th Jun 02

    System Information: BSS Equipment Planning

    68P02900W21-K

    GMR-01

    v

    Propagation effects on GSM frequencies 311. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Propagation production 311. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Decibels 312. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Fresnel zone 313. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Radio refractive index (RRI) 314. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Environmental effects on propagation 318. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Multipath propagation 321. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    GSM900 path loss 334. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Path loss GSM900 vs DCS1800 335. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Frequency re-use 336. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction to re-use patterns 336. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Re-use pattern 337. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Carrier/ Interference (C/I) ratio 340. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Other sources of interference 341. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Sectorization of sites 341. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Overcoming adverse propagation effects 342. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Hardware techniques 342. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Error protection and detection 344. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    GSM speech channel encoding 346. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    GSM speech channel coding for enhanced full rate 348. . . . . . . . . . . . . . . . . . . . . . . .

    GSM control channel encoding 349. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    GSM circuit-switched data channel encoding 350. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Mapping logical channels onto the TDMA frame structure 351. . . . . . . . . . . . . . . . . . .

    GPRS channel coding schemes 357. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    32 kbit/s TRAU 359. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Voice activity detection (VAD) 360. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Discontinuous transmission (DTX) 360. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Receive diversity 361. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Subscriber environment 363. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Subscriber hardware 363. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Environment 363. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Distribution 364. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Hand portable subscribers 365. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Future planning 366. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    The microcellular solution 367. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Layered architecture 367. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Combined cell architecture 368. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Combined cell architecture structure 369. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Expansion solution 369. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Frequency planning 370. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction to frequency planning 370. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Rules for synthesizer frequency hopping (SFH) 370. . . . . . . . . . . . . . . . . . . . . . . . . . .

    Rules for baseband hopping (BBH) 374. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2G3G handovers using inter-radio access technology 375. . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction to 2G3G handovers 375. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2G3G handover description 375. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Impact of 2G3G handovers on GSM 376. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    System considerations 377. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Call model parameters for capacity calculations 378. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 378. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Typical call parameters 378. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  • 8/6/2019 BSS Planing

    20/710

  • 8/6/2019 BSS Planing

    21/710

    GSM-001-103

    30th Jun 02

    System Information: BSS Equipment Planning

    68P02900W21-K

    GMR-01

    vii

    Micro base control unit (microBCU) 412. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Introduction 412. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Planning considerations 412. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    MicroBCU planning actions 412. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Network interface unit (NIU) and site connection 413. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Introduction 413. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 413. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    NIU planning actions 414. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Main control unit, with dual FMUX (MCUF) 415. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Introduction 415. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 415. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .MCUF planning actions 415. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Main control unit (MCU) 416. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Introduction 416. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 416. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    MCU planning actions 416. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Cabinet interconnection (FMUX/FOX) 417. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 417. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 417. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    FMUX/FOX planning actions 418. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Power requirements 419. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 419. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 419. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Power planning actions 419. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Network expansion using macro/micro/picocell BTSs 420. . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 420. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Expansion considerations 420. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Mixed site utilization 420. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .PCC cabinet 421. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 421. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Cabinet planning actions 421. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Line interface modules (HIM-75, HIM-120) 422. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 422. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 422. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    HIM-75/HIM-120 planning actions 422. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    DRI/Combiner operability components 423. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    DRI and combiner relationship 424. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Chapter 5BSC planning steps and rules i. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Chapter overview 51. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 51. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    BSC planning overview 52. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 52. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Outline of planning steps 53. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Capacity calculations 54. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 54. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    BSC system capacity 55. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .System capacity summary 55. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Scaleable BSC 56. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Enhanced BSC capacity option 56. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  • 8/6/2019 BSS Planing

    22/710

    GSM-001-103

    30th Jun 02viii

    System Information: BSS Equipment Planning

    GMR-01

    68P02900W21-K

    Determining the required BSS signalling link capacities 57. . . . . . . . . . . . . . . . . . . . . . . . . .BSC signalling traffic model 57. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Typical parameter values 59. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Assumptions used in capacity calculations 511. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Link capacities 513. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Determining the number of RSLs required 514. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 514. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 514. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Determining the number of RSLs 514. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Standard traffic model 515. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Non-standard traffic model 517. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    BSC to BTS E1 interconnect planning actions 519. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    BSC to BTS T1 interconnect planning actions 520. . . . . . . . . . . . . . . . . . . . . . . . . . . . .Determining the number of LCF-GPROC2s for RSL processing 521. . . . . . . . . . . . .

    Determining the number of MTLs required 524. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Introduction 524. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 524. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Standard traffic model 525. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Non-standard traffic model 528. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Calculate the number of LCFs for MTL processing 530. . . . . . . . . . . . . . . . . . . . . . . . .MSC to BSC signalling over a satellite link 530. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Determining the number of XBLs required 531. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Introduction 531. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 531. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Determining the number of XBLs 531. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Standard traffic model 532. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Non standard traffic model 532. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Determining the number of GSLs required 533. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 533. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Generic processor (GPROC2) 535. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 535. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .GPROC2 functions and types 535. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    BSC types 536. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 536. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    GPROC2 planning actions 538. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Cell broadcast link 538. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    OMF GPROC2 required 538. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Code storage facility processor 539. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    GPROC2 redundancy 539. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Transcoding 540. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Introduction 540. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    GDP/XCDR planning considerations 540. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .T1 conversion 541. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Planning actions for transcoding at the BSC 542. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Multiple serial interface (MSI, MSI-2) 543. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Introduction 543. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 543. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    MSI/MSI-2 planning actions 544. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Kiloport switch (KSW) 545. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 545. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 545. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    KSW planning actions 546. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  • 8/6/2019 BSS Planing

    23/710

    GSM-001-103

    30th Jun 02

    System Information: BSS Equipment Planning

    68P02900W21-K

    GMR-01

    ix

    BSU shelves 547. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Introduction 547. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 547. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    BSU shelf planning actions 548. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Kiloport switch extender (KSWX) 549. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Introduction 549. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 549. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    KSWX planning actions 549. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Generic clock (GCLK) 551. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 551. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Planning considerations 551. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    GCLK planning actions 551. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Clock extender (CLKX) 552. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 552. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 552. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    CLKX planning actions 552. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Local area network extender (LANX) 553. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 553. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 553. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    LANX planning actions 553. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Parallel interface extender (PIX) 554. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 554. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 554. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    PIX planning actions 554. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Line interface boards (BIB, T43) 555. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 555. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 555. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .BIB/T43 planning actions 555. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Digital shelf power supply 556. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 556. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 556. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Power supply planning actions 556. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Battery backup board (BBBX) 557. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 557. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 557. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    BBBX planning actions 557. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Non volatile memory (NVM) board 558. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 558. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Planning Considerations 558. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .NVM planning actions 558. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Verify the number of BSU shelves and BSSC2 cabinets 559. . . . . . . . . . . . . . . . . . . . . . . . . .

    Verification 559. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Chapter 6RXCDR planning steps and rules i. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Chapter overview 61. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 61. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Remote transcoder planning overview 62. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 62. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Outline of planning steps 63. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  • 8/6/2019 BSS Planing

    24/710

    GSM-001-103

    30th Jun 02x

    System Information: BSS Equipment Planning

    GMR-01

    68P02900W21-K

    RXCDR to BSC links 64. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 64. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    E1 interconnect planning actions 65. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    T1 interconnect planning actions 65. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    RXCDR to MSC links 66. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Introduction 66. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    E1 interconnect planning actions 66. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    T1 interconnect planning actions 66. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Generic processor (GPROC2) 67. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 67. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 67. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    GPROC planning actions 67. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Transcoding 68. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 68. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    GDP/XCDR planning considerations 69. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    T1 conversion 69. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Planning actions for transcoding at the RXCDR 610. . . . . . . . . . . . . . . . . . . . . . . . . . .

    Multiple serial interface (MSI, MSI-2) 611. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 611. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 611. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    MSI planning actions 612. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Kiloport switch (KSW) 613. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 613. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 613. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    KSW planning actions 614. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    RXU shelves 615. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 615. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Planning considerations 615. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    RXU shelf planning actions 615. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Kiloport switch extender (KSWX) 616. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 616. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 616. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    KSWX planning actions 616. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Generic clock (GCLK) 618. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 618. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 618. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    GCLK planning actions 618. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Clock extender (CLKX) 619. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 619. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 619. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    CLKX planning actions 619. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    LAN extender (LANX) 620. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 620. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 620. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    LANX planning actions 620. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Parallel interface extender (PIX) 621. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 621. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 621. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    PIX planning actions 621. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  • 8/6/2019 BSS Planing

    25/710

    GSM-001-103

    30th Jun 02

    System Information: BSS Equipment Planning

    68P02900W21-K

    GMR-01

    xi

    Line interfaces (BIB, T43) 622. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Introduction 622. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 622. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    BIB/T43 planning actions 622. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Digital shelf power supply 623. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Introduction 623. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 623. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Power supply planning actions 623. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Battery backup board (BBBX) 624. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 624. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 624. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    BBBX planning actions 624. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Non volatile memory (NVM) board 625. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 625. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning Considerations 625. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .NVM planning actions 625. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Verify the number of RXU shelves and BSSC cabinets 626. . . . . . . . . . . . . . . . . . . . . . . . . . .

    Verification 626. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Chapter 7PCU upgrade for the BSS i. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Chapter overview 71. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Introduction 71. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    BSS planning for GPRS 72. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction to BSS planning for GPRS 72. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    PCU to SGSN interface planning 73. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Feature compatibility 74. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    BSS upgrade to support GPRS 77. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    BSS upgrade provisioning rules 77. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Maximum BSS configuration 78. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    PCU hardware layout 711. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    PCU shelf (cPCI) 712. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 712. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 712. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    MPROC board 713. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 713. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations (PSP use) 713. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    DPROC board 714. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 714. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Planning considerations (PICP or PRP use) 714. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    PMC module 716. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 716. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 716. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Transition module 717. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 717. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 717. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    PCU equipment redundancy and provisioning goals 718. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Support for N + 1 equipment redundancy 718. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    PCU redundancy planning 718. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Upgrading the PCU 721. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  • 8/6/2019 BSS Planing

    26/710

    GSM-001-103

    30th Jun 02xii

    System Information: BSS Equipment Planning

    GMR-01

    68P02900W21-K

    E1 link provisioning for GPRS 722. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    E1 interface provisioning 722. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 722. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    PCU SGSN: traffic and signalling planning 723. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 723. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Gb entities 723. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    General planning guidelines 724. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Specific planning guidelines 724. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    The Gb signalling overhead 725. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Determine the net Gb load 727. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Gb link timeslots 728. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Frame relay parameter values 729. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    BSS PCU hardware planning example for GPRS 732. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction to BSS PCU hardware planning 732. . . . . . . . . . . . . . . . . . . . . . . . . . . .

    BSS PCU planning example 733. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Chapter 8BSC planning steps and rules for LCS i. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Chapter overview 81. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction to LCS planning 81. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    LCS description 82. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    LCS overview 82. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    The positioning mechanism 83. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    System architecture 84. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Overview of BSC planning for LCS 88. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction to GSR6 LCS provisioning 88. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Outline of planning steps 88. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Capacity calculations 89. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 89. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Determining the required BSS signalling link capacities 810. . . . . . . . . . . . . . . . . . . . . . . . . .

    BSC LCS signalling traffic model 810. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Typical parameter values 810. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Assumptions used in capacity calculations 812. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Link capacities 812. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Determining the number of RSLs required 813. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 813. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 813. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Determining the number of RSLs 813. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Standard traffic model 814. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Non-standard traffic model 816. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    BSC to BTS E1 interconnect planning actions 816. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    BSC to BTS T1 interconnect planning actions 816. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Determine the number of LCFs for RSL processing 817. . . . . . . . . . . . . . . . . . . . . . . .

    Determining the number of MTLs required 818. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 818. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 818. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Standard traffic model 819. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Non-standard traffic model 823. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Calculate the number of LCFs for MTL processing 824. . . . . . . . . . . . . . . . . . . . . . . . .

    Planning actions for transcoding at the BSC 824. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  • 8/6/2019 BSS Planing

    27/710

    GSM-001-103

    30th Jun 02

    System Information: BSS Equipment Planning

    68P02900W21-K

    GMR-01

    xiii

    Determining the number of LMTLs required 825. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Introduction 825. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Planning considerations 825. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Determining the number of LMTLs 825. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Generic processor (GPROC2) for LCS 826. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Introduction 826. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .GPROC2 functions and types 826. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Planning considerations 826. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Chapter 9OMC-R planning steps and rules i. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Overview of OMC-R planning steps and rules 91. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction to OMC-R planning steps and rules 91. . . . . . . . . . . . . . . . . . . . . . . . . . .The OMC-R and GPRS 91. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Terminology 91. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning a GSR4.x or GSR5 OMC-R scaleable system 92. . . . . . . . . . . . . . . . . . . . . . . . . .

    Outline of planning steps 92. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .OMC-R capacity 93. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Server hardware 94. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Server ancillary equipment 94. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .GUI server hardware and software 95. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Optional printer 95. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Datacomms equipment 96. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Additional optional items 97. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Network support program (NSP) 97. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Upgrading the OMC-R system from GSR 4.x to GSR5 98. . . . . . . . . . . . . . . . . . . . . . . . . . .Introduction to upgrading the OMC-R 98. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Hardware upgrade 98. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Software upgrade 98. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Upgrading the OMC-R to GSR6 99. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction to upgrading the OMC-R to GSR6 99. . . . . . . . . . . . . . . . . . . . . . . . . . . .Hardware upgrade 99. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Software upgrade 99. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Chapter 10Planning exercise i. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Chapter overview 101. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction to the planning exercise 101. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Initial requirements 102. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Requirements 102. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Network topology 103. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .The exercise 104. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 104. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Determine the hardware requirements for BTS B 105. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Introduction 105. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Cabinet 105. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Summary 106. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Determine the hardware requirements for BTS K 108. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Introduction 108. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Cabinet 108. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Receiver requirements 108. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Transmitter combining requirements 108. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Summary 109. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  • 8/6/2019 BSS Planing

    28/710

    GSM-001-103

    30th Jun 02xiv

    System Information: BSS Equipment Planning

    GMR-01

    68P02900W21-K

    Determine the hardware requirements for the BSC 1011. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Introduction 1011. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Summary 1013. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Determine the hardware requirements for the RXCDR 1014. . . . . . . . . . . . . . . . . . . . . . . . . . .

    MSI requirements 1014. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Transcoder requirement 1014. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Link interface 1014. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    GPROC2 requirement 1014. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    KSW requirement 1014. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    KSWX requirement 1015. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    GCLK requirement 1015. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    CLKX requirement 1015. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    PIX requirement 1015. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    BBBX requirement 1015. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    LANX requirement 1015. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Power supply 1015. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Summary 1016. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Determine the requirements for the OMC-R 1017. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    OMC-R example 1017. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Calculations using alternative call models 1019. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 1019. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning example 1 1019. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning example 2 1031. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    A planning example of BSS support for LCS provisioning 1042. . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction to the LCS planning example 1042. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Typical parameter values 1042. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .LCS planning example calculations 1043. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Chapter 11Paging rate and location area planning i. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Location area planning overview 111. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction to location area planning 111. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Location area planning considerations 111. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Location area planning 112. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Example procedure 112. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Chapter 12Deriving call model parameters from network statistics i. . . . . . . . . . . . . . .

    Chapter overview 121. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction to deriving call model parameters 121. . . . . . . . . . . . . . . . . . . . . . . . . . . . .Deriving call model parameters from network statistics 122. . . . . . . . . . . . . . . . . . . . . . . . . . .

    Standard call model parameters 122. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Call duration (T) 123. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Ratio of SMSs per call (S) 124. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Ratio of handovers per call (H) 125. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Ratio of intra BSS handovers to all handovers (i) 125. . . . . . . . . . . . . . . . . . . . . . . . . .

    Ratio of location updates per call (I) 126. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Ratio of IMSI detaches per call (Id) 126. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Location update factor (L) 127. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Paging rate (P) 127. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Pages per call (PPC) 128. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Sample statistic calculations 128. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  • 8/6/2019 BSS Planing

    29/710

    GSM-001-103

    30th Jun 02

    System Information: BSS Equipment Planning

    68P02900W21-K

    GMR-01

    xv

    Chapter 13Standard BSS and Horizon BTS configurations i. . . . . . . . . . . . . . . . . . . . . . .

    Chapter overview 131. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    BSS/BTS equipment covered 131. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Standard configurations 132. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction to standard configurations 132. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Typical BSS configurations 133. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    BSC with 24 BTSs 133. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    BSC with full redundancy 134. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Transcoder 135. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Single cabinet BTS configuration 136. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Single cabinet Horizonmacro BTS 136. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Two cabinet BTS configuration 137. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Two cabinet Horizonmacro BTS 137. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Three cabinet BTS configuration 138. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Three cabinet Horizonmacro BTS 138. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Four cabinet BTS configuration 139. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Four cabinet Horizonmacro BTS 139. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Horizon macrocell RF configurations 1310. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Overview of configuration diagrams 1310. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Horizonmacro cabinets 1310. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Horizoncompact2 1319. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Microcell RF configurations 1323. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Horizonmicro2 1323. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Connecting Horizon BTS cabinets to M-Cell6 BTS cabinets 1326. . . . . . . . . . . . . . . . . . . . . . .Connection overview 1326. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    900 MHz BTSs 1326. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1800 MHz BTSs 1327. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Chapter 14M-Cell BTS configurations i. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Chapter overview 141. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    M-Cell equipment covered 141. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Standard M-Cell configurations 142. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction to standard M-Cell configurations 142. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Picocell (M-Cellaccess) configurations 143. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Single site 143. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Two site cabinet 145. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Single cabinet BTS configurations 147. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Single cabinet M-Cell6 BTS 147. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Single cabinet M-Cell2 BTS 148. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Two cabinet BTS configuration 149. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Two cabinet M-Cell6 BTS 149. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Three cabinet BTS configuration 1410. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Three cabinet M-Cell2 BTS 1410. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Four cabinet BTS configuration 1411. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Four cabinet M-Cell6 BTS 1411. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  • 8/6/2019 BSS Planing

    30/710

    GSM-001-103

    30th Jun 02xvi

    System Information: BSS Equipment Planning

    GMR-01

    68P02900W21-K

    M-Cell RF configurations 1412. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Overview of M-Cell configuration diagrams 1412. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    M-Cell6 cabinets 1413. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    M-Cell2 cabinets 1444. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Chapter 15Previous generation BSC planning steps and rules i. . . . . . . . . . . . . . . . . . .

    Chapter overview 151. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 151. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    BSC planning overview 152. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 152. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Outline of planning steps 153. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Capacity calculations 154. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 154. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Determining the required BSS signalling link capacities 155. . . . . . . . . . . . . . . . . . . . . . . . . .

    BSC signalling traffic model 155. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Typical parameter values 157. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Assumptions used in capacity calculations 158. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Link capacities 159. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Determining the RSLs required 1510. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 1510. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 1510. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Standard traffic model 1510. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Non-standard traffic model 1511. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    BSC to BTS E1 interconnect planning actions 1511. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    BSC to BTS T1 interconnect planning actions 1512. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Calculate the number of LCFs for RSL processing 1513. . . . . . . . . . . . . . . . . . . . . . . . .

    Assigning BTSs to LCFs 1514. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Determining the number of MTLs required 1515. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 1515. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning considerations 1515. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Standard traffic model 1516. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Non-standard traffic model 1517. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Calculate the number of LCFs for MTL processing 1519. . . . . . . . . . . . . . . . . . . . . . . . .

    MSC to BSC signalling over a satellite link 1519. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Generic processor (GPROC, GPROC2) 1520. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 1520. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    GPROC functions and types 1520. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    BSC types 1521. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Planning considerations 1522. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    GPROC planning actions (GSR3) 1524. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    GPROC planning actions (GSR2 and earlier) 1525. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Cell broadcast link 1525. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    OMF GPROC required 1525. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Code storage facility processor 1526. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    GPROC redundancy 1526. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Transcoding 1527. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Introduction 1527. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    GDP/XCDR planning considerations 1527. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    T1 conversion 1528. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Planning actions transcoding at the BSC 1529. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  • 8/6/2019 BSS Pl