![Page 1: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/1.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City
Chapter 1: Project Charter
Project Name: General Ledger with Asset Accounting "Hotel Management System”
Project Manager: Seblit, Regie R. Programmer: Roldan, Miole B.Document Specialist: Mon, Abegail E.Business Analyst: JohnPaul D. Gomez System Analyst: JohnReynal D. Gomez
General Ledger System with Asset Accounting Page 1
![Page 2: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/2.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City
Table of Contents
1 PROJECT BACKGROUP………….………………………….…..….41.1 Problem/Opportunity/Description...……………... …….…41.2 Benefits……………………….……..………………..…..….41.3 Goals…………………………………………..…….….…....41.4 Stakeholders and Clients….…………..….........….………4
2 PROJECT SCOPE …………………..……………………..….…....…52.1 Objective………………....……………………………….…..52.3 Deliverables……………………………………………….….52.4 Out of Scope…………………………………….………...…6
3 PROJECT PLAN………………………………………….………..…..7 3.1 Approach………………………….………………..………....7 3.2 Project Timeline………………….………………...….…......7 3.3 Success Criteria……………………………….……..….......7 3.4 Issues and Policy Implications……………………..……....7 3.5 Risk Management Plan……………………..……………….8 3.6 Service Transition………………..…………………………..8 3.7 Options Analysis…………………...……………..…….……8
4 TECHNICAL FEATURES………………….…….…………………...10
5 PROJECT ORGANIZATION……………………….…….................11
6 PROJECT BUDGET…………………………….……………….……12
7 APPENDIX A-ADDITIONAL INFORMATION…...……...……........13
General Ledger System with Asset Accounting Page 2
![Page 3: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/3.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City
Chapter 1: Project Charter
1 PROJECT BACKGROUNDGeneral ledger system is defined as service activity whose function
is to provide quantitative information, primarily financial reports in nature
about economic entities. The general ledger is the activities of an entity or
its financial data which are processed daily, periodically communicated to
various users by means of financial statements. The general ledger will be
useful in decision making. The preparation of the statements is guided by
the generally accepted accounting principles. General ledger system is
used by a business to make sure that information is properly recorded and
reported to the users and show the different accounting terms used in
recording the elements found in the financial statements.
General ledger or the accounting records have been found several
thousand years ago in various parts in the world. Even before the birth of
Christ, evidence of accounting system was used in Greece. Romans kept
records expressed in the letter of the alphabet. In the modern General
ledger system. Accounting is a service activity use in our modern times its
function is to provide quantitative information primarily financial in nature
about economic entities that is intended to be useful in making economic
decisions in making reasoned choices among alternative courses of
action. On our project influenced of information system has arose the
eagerness of discovering more things that will make everything easy for
client in such different aspects. It only shows that Information system is
not only for business purposes, it can be for personal use or it depends on
the client. This project has a lot of transactions and has different
departments. In every transaction there must be supporting documents,
where all data are encoded manually and compile the papers, all
department had their own process base on the system. Administrator’s
General Ledger System with Asset Accounting Page 3
![Page 4: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/4.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon Citytask has becoming more complex, there have been efforts to improve the
effectiveness of the problem solving and central to this are quantitative
and electronic devices such as upgraded computers and connection. In
the field of education, researchers and theorist have focused intensively in
recent years on examining the concepts and use of information systems to
assist administrators and other users. Others have raised and discussed
fundamental issues and uses of general ledger system to facilitate
judgment and decision making in this project.
All the transaction will be systematically organized. The traditional
way of handling documents which is manual encoding and compiling will
be easier than before. Hotel management system, like in any other
organization used to manage all sorts of data and information to ensure
attainment of its goal and objectives. The emerging needs in most
departments under Hotel Management System for accurate, relevant data
and reliable information are strengthen the information System. As of
today information system is one of the tools to succeed in modern
generation. General ledger system is the summarization of transaction
reports coming from different departments. All the report being processed
in General ledger is submitted to the audit department.
1.1 PROBLEM/OPPORTUNITY DESCRIPTIONThe project will address the problems that being encountered of the
client upon using the existing system to improve the current process, the
team give solutions to the following problems they come up with:
1. Unsecured Confidential FilesFile from general ledger can cause leakage of accounting records,
reports and other confidential files of general ledger. It might be
messed, altered or interfered by those unauthorized personnel. The
credibility of general ledger might be affected and questioned due to
the possible scenarios. Records must be protected to those leakers,
General Ledger System with Asset Accounting Page 4
![Page 5: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/5.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon Citycheaters, hackers and prying eyes to secure every records and data
entries.
2. Time consuming in saving filesWhen the general ledger facing a long term process in collecting and
recording all the report business time flow will be affected. Record
must be improving the progress of processing the reports on time to
avoid problem on time management.
3. Lack of Generated Reports
The system does not support a complete set of generated reports,
which gives a hard time for the user in viewing specific prepared
financial reports.
1.2 BENEFITSGeneral ledger system standardizes and systematizes the
procedures and general ledger activities based on how the users want it to
work with. The general objective of this project is to create a general
ledger system that can handle the entire transaction reports for accounting
department.
This project can handle those transactions needed by the user
especially in creating and viewing complete financial reports.
Record must be process the reports on time to avoid problem on
time risk.
Records must be protected to those leakers, cheaters, hackers and
prying eyes to secure every records and data entries.
Saving to database and generate the ledger reports base on the
transaction
1.3 GOAL
General Ledger System with Asset Accounting Page 5
![Page 6: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/6.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityThe project goal is to develop a general ledger system to create
possible solutions for the problem that the hotel experiencing currently and
to achieve the benefits lead by this system. The system will cover up the
general ledger components and activities which makes the work easy for
the accounting department.
1.4 STAKEHOLDERS/CLIENT
1. The project teamThis stakeholder is the proponents, which will be the project
handler and will develop a system. The proponents analyze all the
details problems where the solutions will include on the developed
system.
2. The accounting ManagerAn accounting manager has the responsibility for establishes
financial status by developing and implementing systems for
collecting, analyzing, verifying, and reporting financial information;
managing staff, maintains financial security by establishing internal
controls
3. The accountantAn accountant has the responsibility for Provides financial
information to management by researching and analyzing
accounting data; preparing reports.
4. The administratorAn administrator has the responsibility for the upkeep,
configuration, and reliable operation of computer systems;
especially multi-user computers, such as servers. The system
administrator seeks to ensure the uptime, performance, resources,
and security of the computers he or she manages meet the needs
of the users, without exceeding the budget.
General Ledger System with Asset Accounting Page 6
![Page 7: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/7.jpg)
General Ledger With Asset Accounting
Preparing ofDocuments
SupportingDocuments
View for COA
Charts of Accounts
Assets
Liabilities
Equity
Revenue
Expenses
Analyze OfDocuments
Bad Entry Good Entry
Save toDatabase
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City
2 PROJECT SCOPE2.1 OBJECTIVES
General Ledger System with Asset Accounting Page 7
![Page 8: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/8.jpg)
General Ledger With Asset Accounting
Preparing Journal
View saves Document
Posting In Ledger
General Journal
Ledger
General Ledger With Asset Accounting
FinancialsStatementsReports
Trial Balance
Balance Sheet
Income Statement
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityFigure 1.1 Preparing of documents andAnalyze of documents and Chart of accounts
Figure 1.2Preparing journal and posting in ledger
General Ledger System with Asset Accounting Page 8
![Page 9: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/9.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City
Figure 1.3Financial Statements and reports
2.2 DELIVERABLES
Objectives 2: Preparing of documents and analyze of documents and
chart of accounts
Project Deliverables Work Products / Description
Supporting
Documents
A source document is a document in which
data collected for all transaction in
accounting phase.
Bad entry
Determine the beginning balance of the "no
collectables" account or not accurate
connected to the transaction.
Good Entry
(Save to the
Database)
Determine the collectables accounts was
accurate to the transaction did.
Chart Of Accounts
A chart of accounts is a listing of the
names of the accounts that a company has
identified and made available for recording
transactions in its general ledger. A
company has the flexibility to tailor its chart
of accounts to best suit its needs, including
adding accounts as needed.
Objective 2: Preparing journal and posting in ledger
Project Deliverables Work Products / Description
Preparing Preparing journal entry, in accounting, is a
logging of transactions into accounting
General Ledger System with Asset Accounting Page 9
![Page 10: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/10.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityJournal
(View saves
document)
journal items. The journal entry can consist
of several recordings, each of which is
either a debit or a credit.
General Journal
The general journal is where double entry
bookkeeping entries are recorded
by debiting one or more accounts
and crediting another one or more
accounts with the same total amount
Post in ledger
Collection of an entire transaction of similar
accounts in double entry bookkeeping.
Also called book of final entry
Objective 3: Financial Statements and Reports
Project Deliverables Work Products / Description
Financial Statements
And Reports
Financial Statement and reports is a formal
record of the financial activities of a
business, person, or other entity. Relevant
financial information is presented in a
structured manner and in a form easy to
understand.
Trail Balance
A trial balance is a list of the entire General
ledger accounts both revenue and capital
contained in the ledger of a business. This
list will contain the name of the nominal
ledger account and the value of that
nominal ledger account.
Balance Sheet A balance sheet is used to inform a reader
General Ledger System with Asset AccountingPage 10
![Page 11: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/11.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon Cityof the ending balances in a company's
asset, liability, and equity accounts as of
the date stated on the report.
Income Statement
The income statement presents the results
of a business for a stated period of time.
The statement begins with revenues, from
which expenses are subtracted to arrive at
a profit or loss.
2.3 OUT OF SCOPE
The following details below are related to the general ledger system
but will not be managed as part of this system.
Payroll and DeductionsThe general ledger system can’t process payroll transaction.
Because the general ledger system is created to make
financial reports to the organization
ReservationThe general ledger system can’t process Reservation.
Because the general ledger system is created to make
financial reports to the organization
BookingThe general ledger system can’t process Booking. Because
the general ledger system is created to make financial
reports to the organization.
3 PROJECT PLAN3.1 APPROACH AND METHODOLOGY
The following approach and methodologies discussed to make this
system development possible. These are the following strategies for the
general ledger system development.
General Ledger System with Asset AccountingPage 11
![Page 12: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/12.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CitySDLC
System PlanningSystem planning is the fundamental step on proposing a
system. The proponents did such activities which are mostly done
or included on system planning and interview companies related on
human resource activities and procedures including the discussion
the problems that the most general ledger experiencing today.
Hence, the problem might be solved as the general ledger system
becomes possible. Interviewing is one of the primary steps to
gather data and conclusions to design a right interface that suits
general ledger needs. The problems they currently facing are
indicated in the problems and also discussed other related topic
that can help in the documentation of this research.
System AnalysisSystem analysis is the next step in order to analyze the
problems and data gathered. On this step, on the lead of system
analyst, the proponents analyze the problems in order to design the
interface of our proposed system and generalizing thoughts to give
a unified decision for this proposal. By the gathered data on the
interview the proponents formulate objectives as this was indicated
on the objectives and deliverables part of this documentation.
System DesignSystem design is the next step that the proponents done. On
this part, the proponents will design an interface of the proposed
general ledger system. This system design will determine and
discuss different system specifications and requirements needed to
make general ledger system possible. Design must be well
planned, in order to meet the clients’ need and user-friendly GUI.
The design of the transitions and process must also be consider.
General Ledger System with Asset AccountingPage 12
![Page 13: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/13.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityThe contents of financials must be consisting of the entire general
ledger activities and processes.
System ImplementationSystem implementation will be done after the development
of the software. This will test the affectivity of the software product if
this will work and meet the requirements and needs of the client.
When there are problems occurred on the system implementation
that is the time that the system must furnish the errors and bugs to
make the system work flawlessly.
System Operation, Support and MaintenanceThe system operation, support and maintenance is aiming to
incessantly satisfy the needs of the client by maintaining the
operation and the support of the system inside the business
transaction. In order to support and operate the general ledger
system the financials department, the project team must maintain
the system for the future errors or sudden supplementary changes
of features and content.
3.2 PROJECT TIMELINE
ID Task Name Start Finish Duration
1 Finding adviser 07/03/14 07/09/14 1 week
2 Research about the system 07/09/14 07/15/14 1 week
3 Brain storming 07/17/14 07/19/14 3 days
4 Find a company 07/21/14 07/27/14 1 week
5 Interview 07/28/14 07/30/14 3 days
6 Project Charter 07/31/14 08/04/14 5 days
General Ledger System with Asset AccountingPage 13
![Page 14: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/14.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City7 Local and Foreign literature 08/05/14 0/11/14 1 week
8 Syntheses and relevance to
The study(Matrix)
08/13/14 08/15/14 3 days
9 RMMM Plan 09/17/14 08/29/14 2 weeks
10 Software Configuration
Management plan
08/31/14 09/06/14 1 week
11 Software Quality Assurance
Plan
09/07/14 09/13/14 1 week
12 System Specification 09/15/14 09/19/14 5 days
13 Software Requirements
Specification
09/20/14 09/26/14 1 week
14 Software Design Specification 09/27/14 10/10/14 2 weeks
15 Test Specification 10/12/14 10/18/14 1 week
3.3 SUCCESS CRITERIAWhen the general ledger system is already working the accounting
department will encounter achievement based on the following success:
Provide information for predicting, comparing and
evaluating potential cash flows.
Security of all confidential files and records of the general
ledger. The general ledger system will have a login form
on which unauthorized users cannot be accessed the
system aside from the authorized users which is the main
user of the system.
Posting reports and print reports needed by the general
ledger
3.4 ISSUES AND IMPLICATIONS
General Ledger System with Asset AccountingPage 14
![Page 15: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/15.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityGeneral ledger is affecting all the accounting aspect of a
management, without those accounts the general ledger system will
become none functional system because there’s no transactions made to
create an general ledger system.
3.5 RISK MANAGEMENT PLAN
Risk Factor Probability(H-M-L)
Impact(H-M-L)
Risk Management Action
Files risk M M Make sure the data
information is secure and
safety for easy to use.
Flow system risk M M Check the system before
you started. To
communicate to the
client.
Risk for error sending
report
To analyze all information
completed and we need
to pass to sender if make
sure the problem has
resolve and understand.
Business Impact Risk M M The project team must
understand the details of
the given factual
information, problems and
requirements to meet the
exact features that the
business requires.
Technology Risk H M This risk can happen to
General Ledger System with Asset AccountingPage 15
![Page 16: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/16.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon Citythe system developed by
the developers. Bugs and
logical problem might
occur on the system
which needed to be under
maintenance, repair and
preservation. Since the
developers offered this
application for the
business firm, developers
also responsible for its
maintenance to be
continuously utilized by
the users.
Financial Risk M H For the company,
financial risk occurs.
Financial budget are
needed to procure and
support the requirements
of the general ledger
constraint only the human
resource management. It
was cleared to the
company that these are
only the scope of the
system proposed to.
3.6 Service TransitionInformation technology is a commonly used term that
changes meaning with context. From the first perspective,
General Ledger System with Asset AccountingPage 16
![Page 17: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/17.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityThe applications and infrastructure are components
or sub-assemblies of a larger product. The project team enable or are
embedded in processes and services. From the second
perspective, IT is an organization with its own set of
capabilities and resources. The project team can be do
Various types of the project process functions, shared services in case of
difficulties the client will call the project team to extract or rebuild the
project for another feature.
3.7 Option AnalysisThe alternative option that the project will do during creating the
system that the PEC gives to us is Java Eclipse. This programming
language has a difference in Java netbeans so that Client will not confuse
on this programming language.
3 Technical FeaturesTechnical features discuss and provide broad description of the
features, applications and peripherals that will be used to make general
ledger system. Here are the following technical features:
Language: Java Net beans IDE 7.3 version
This platform using 4th generation java language and will be
used as a medium in system development. This will be used
as a front-end.
Database: MS SQL
This application will be the back-end of the general ledger
system application and the storage of all data inputs and
information
Operating System: Windows 7 Ultimate 64 bit
General Ledger System with Asset AccountingPage 17
![Page 18: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/18.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City Windows 7 is the most used MS Operating System and
will be the minimum requirement of the general ledger
system application.
Memory: 2GB
This is the capacity of the laptop or desktop computer
that will be used by the proponents. Java Net beans can
eat up huge amount of memory while general ledger
system is on development that is why the proponents
need this amount of memory capacity.
HDD: 320 GB
This is the capacity of the laptop or desktop computer
that the proponents have been used. Java Net beans and
MS SQL are applications that need a huge capacity of
storage. And as the system compiled it will spend more
storage capacity to make the software runs faster.
General Ledger System with Asset AccountingPage 18
![Page 19: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/19.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City
Project Organization and StaffingEach one of this team has a different task and this task is important
to create a project. This is the following task.
ROLE NAMES AND CONTACT INFORMATION
RESPONSIBILITIES
Project
Manager
He’s responsible to the planning, controlling,
facilitating, decision making, and all knowing
about the propose system. And she
responsible also in their handled members,
how to communicate others formally, how to
disciplined their own in front on the clients,
panelist etc. And most of all she has a unique
solution at all.
Lead
Programme
r
He’s responsible in system making
Document
Specialist
She’s responsible to document all the
information’s about the system. Researching
for the basis of our propose system.
Business
Analyst
He’s responsible to know the business
process.
System He’s responsible to analyzed all the
information’s in propose system. To think
General Ledger System with Asset AccountingPage 19
![Page 20: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/20.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityAnalyst what, how, where, when, why, who involve in
the system
PROJECT BUDGET
Budget Items Description Budgeted CostOne-Time CostProject Study Manual
This manual used as a guide of the project team in
managing and conceptualizing
documentation (All members have a manual)Title: Journey to Project
Study
Php 300.00
Fourth Edition)Published by: Internetworking & Broadband Consulting Co. LTD(IBC)
Total One-Time Cost Php 1,500Ongoing CostTransportation Transportation is
considered as ongoing cost because of ongoing work for the project
General Ledger System with Asset AccountingPage 20
![Page 21: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/21.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon Citydevelopment. It is also included in ongoing cost expenses for the project development.
Expenses Print Out Print is part of the project teams for checking documentation to advisory. It is also included in ongoing cost expenses for the project development.
Food Expenses Food is continuous consumable goods which part of the project team’s daily routine. It is also included in ongoing cost expenses for the project development.
Total One-Time Cost
General Ledger System with Asset AccountingPage 21
![Page 22: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/22.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City
Chapter 2 Review of Related Literature
2. FOREIGN STUDIES2.1.1 Fairmount Hotel Restaurant General Ledger
Fairmount Hotel Restaurant General ledger there system is you can
measure the financial health of your company. In accounting terms, the
general ledger records each transaction coming into or going out of your
company that involves the exchange of money, or involves an increase or
decrease in the overall value of your company. These transactions can
include everything from cash receipts to depreciation on equipment; all
such transactions should be reflected in General Ledger. In order to
record a transaction, you enter the amount into an “account”. The full set
of your accounts is called the chart of accounts. There are many types of
accounts in the Chart of Accounts. The broadest subdivision of accounts
separates them into “Assets”, which are generally tangible, valuable items
that your company owns; “Liabilities”, which are legal obligations your
company owes to its creditors; and “Owners’ Equity”, which reflects the
amounts that various individuals or companies have invested in your
business. When a business first begins, the only equity available is the
initial investment made by the owner of the business (the Owner’s Equity
or the Income Statement). As the company grows, it purchases goods,
services, supplies, and equipment; these items are necessary to conduct
business. In order to achieve transparency of the reports, the data that
extract in the ledger must be accurate and balance.
General Ledger System with Asset AccountingPage 22
![Page 23: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/23.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City
The General Ledger functionalities include: Chart of accounts
Prepared Statements
Reports for each accounts
Create view for decision making
Resources: http://www.fairmont.com/peace-hotel-shanghai/history/
2.1.2 HYATT Hotel General ledgerHyatt Hotel General Ledger consist of several accounting
application, by this application they can support there general ledger
transactions. It presents the application outcome of your organization’s
activities, delivering key business information to provide solid strategic
decision support their General Ledger automates the flow of postings. The
use of special accounts allows you to determine where postings go, and
how much detail flows through to the general ledger. Data entry staff
requires only minimal knowledge of general ledger postings as special
accounts perform this task for them for managing those report needed by
the general ledger.
The General Ledger functionalities include:
Automates the flow of posting
Special accounts that allows you to determine where
posting go
General Ledger System with Asset AccountingPage 23
![Page 24: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/24.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City Report needed by the general ledger
Resources:http://en.wikipedia.org/wiki/Hyatt
2.1.3 EXCALIBUR General Ledger
Excalibur general ledger is a powerful and comprehensive General
Ledger module is a flexible accounting and reporting system with special
emphasis placed on the requirements of the oil and gas industry. All
financial transactions entered or created in other Excalibur systems
automatically flow to the General Ledger. The General Ledger system
contains extensive standard financial reports and also allows you to
customize financial reports to your specific requirements: Journal Voucher
Data Entry Features, Duplication features to speed data entry, Unlimited
detail transaction descriptions, Copy feature for automatic duplication of
any current, historical or template journal voucher, Auto prompt feature for
changing voucher detail line amounts only while leaving all other coding
intact, Reversal feature for automatic reversal of any current or historical
journal voucher, Accrual feature for automatically creating reversing
journal vouchers in a user-specified accounting period, Recurring feature
for automatically creating duplicate journal vouchers in any number of
user-specified accounting periods, Journal voucher upload functionality
from Excel template, Internal and Accounting Controls, Flexible chart of
accounts structure to accommodate company preferences, Balanced
journal entries are required (one-sided or out-of-balance entries are not
permitted) Automatic generation of intercompany payable and receivable
entries Journal voucher review/approval required, at your option, prior to
creation of transactions, Multiple accounting periods open simultaneously
at an entity and system-specific level, Simplified automatic year-end
closing of P&L accounts, Bank account reconciliation for outstanding
General Ledger System with Asset AccountingPage 24
![Page 25: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/25.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon Citychecks and deposits, Automatic entry cutback from partnerships or
subsidiaries books to parents or partners books, Automatic company
vehicle mileage allocation to AFEs, properties, leases or cost centers
based on PMTA mileage rates.
Report Extensive standard financial reports, including trial
balances, general ledger activity, and comparative general ledger and
financial reports Extensive user-formatted financial reports including
balance sheet, statement of earnings (P&L), statement of cash flows, and
comparative financial statements and reports. Direct integration with
desktop PC reporting tools (such as Excel) for customized reporting
without having to rekey or download data from the system. User-defined
groupings of accounts for spreadsheet and user-formatted financial
reports. Multiple companies reporting including consolidations. Detail
transaction reports with all relevant source document information.
Extensive online inquiries including general ledger balances, general
ledger detail and drill-down from balance to underlying detail transactions.
Audit lead schedules online history information available for prior periods.
Resources: http://www.p2energysolutions.com/excalibur/financial-
accounting/general-ledger-and-financial-reporting#sthash.IbCofUAq
The General Ledger functionalities include:
Record and report on financial transactions
Have chart of accounts
Have general journal
Can generate financial reports
General Ledger System with Asset AccountingPage 25
![Page 26: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/26.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City
2.1.4University of Colorado Financial System and General Ledger
Based on the Finance System team provides support for
PeopleSoft Finance users including the areas of general accounting,
accounts payable, project accounting, billing, accounts receivable, and
asset management. We are also responsible for ensuring data integrity
between all University financial systems including Concur Expense and
CU Marketplace, and other systems such as HRMS, ISIS, and COFRS.
They are also responsible for design, testing, and project management of
fixes, enhancements, and system upgrades, Record and report on
financial transactions and Fix transaction.
The General Ledger functionalities include:
Record and report on financial transactions
The system is integrated
Fix transaction
Resources:
http://www.colorado.edu/abs/sites/default/files/attached-files/fin_training_manual
2.1.5 University of Wisconsin Financial and General Ledger system
General ledger system of UWFGLS this is where data from all
modules comes together and where most of the financial reporting is
done. Ledgers store posted general ledger journals for a set of Chart field
General Ledger System with Asset AccountingPage 26
![Page 27: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/27.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon Cityvalues by accounting period and fiscal year. The admin represent a set of
books for each business unit and are usually populated by journal entries.
There are several ledgers that are delivered with the SFS system. Most
campuses are currently using the actual ledger, which stores all
transactions except budgets and the student budget Ledger, which stores
budget information. Before looking at the ledger the user must familiarized
itself in the unique chart of fields and different acronyms that the admin
provided. In order to understand the flow of processing general ledger
reports, the business process of the system is included on the general
ledger needed to be done.
The General Ledger functionalities include: Financial reporting is done
Store posted general ledger in journals
Process of reports
Set of Charts by accounting terms
Resources:http://www.uwsa.edu/fadmin/sfs/glddict
2.2. LOCAL STUDIES
2.2.1Local Government Unit Accounting System (e-NGAS)
Local Government Unit Accounting System project aimed to create
an automated general ledger system that can handle the entire transaction
reports for accounting department. Specific objectives are to improve the
progress of processing the reports on time, to diminish the volume of
paper works of the client, to produce quality system based on the
combined clientele preferences and group decision, to create a user
friendly system that can maximized all the process in to a smooth and
systematical way. Since one of the specific objectives of the proponents is
General Ledger System with Asset AccountingPage 27
![Page 28: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/28.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon Cityto improve the progress of processing reports the design system would
allow three users accounts which are the Accountant, Accounting
Manager, Admin. Accountant would only access the downloading of
documents and importing files from the other subsystem and save it while
Accounting Manager user account is the one, who had the access on the
entire general ledger system. In addition AM is the one who can register
new user, can open
database edit and update. On the other hand Administrator user account
can access every feature design of the proposed integrated system,
meaning admin can access the entire local government unit system which
general ledger is under.
The General Ledger functionalities include: Completeness of supporting document that required in one transaction.
Computation must be balance.
All documents must be submitted original copy except the cheque and
scan.
2.2.2 WinMed Hospital Information System (HIS)The General Ledger application is Multi Company and
accommodates the AHA chart of accounts. There is a monthly closing to
retained earnings, with a yearly closing to retained earnings. The system
will allow postings to previous periods, current period, and future
periods. The system includes a report writer for tailoring financial
statements. The balance sheet is free format, designed for total control by
the user. There are several formats for income and expenses statements
which lists previous periods and/or years with budget information. The
system has 10 years of history for accounts and all detailed transactions
processed in the General Ledger application with reports showing the
beginning balances, all detail transactions processed, with the closing
General Ledger System with Asset AccountingPage 28
![Page 29: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/29.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon Citybalance. The application also accommodates statistic information such as
patient days or payroll FTE's. The Accounts Payable application is
designed to process vendor invoices and patient refunds. This application
will track vendor invoices, payments, 1099 information and refunds to
patients. Cash requirements reports are produced upon demand and can
also include an ageing. A history database of vendor invoices and
payments is a base part of the system. System bank reconciliation and
check registry are done online. Printing of checks with a laser printer can
also include signatures and bank routing information. The system also
allows flexible distribution of invoices. Payroll / Personnel were designed
to be very flexible for hospitals use. There are many type of earnings, pay
periods, multi-company, and user defined accruals of benefits. The
hospital defines their deductions and accrual of additional compensation.
The payroll checks are printed on a laser printer which includes signatures
and bank routing information. Also available as a standard feature is direct
deposit. The system produces all required state and federal reporting. As
part of the pay period processing, all financial information is interfaced to
general ledger with accrual data, and automatic reversal of the accrual
data the next general ledger period. The system contains history
databases of all employees pay information for each check/direct deposit
issued. There is also a history database of each pay period labor
distribution for each division, department, and position the hospital has
defined in their payroll. The personnel system allows for personnel actions
to be documented on the employee record. The system tracks licenses,
leave, physical examine, education, and user defined fields for tracking.
The Depreciation application is an addition to the general ledger system,
and will track the depreciation of any asset of the hospital. There a many
conventions and methods to select from for deprecation of the assets. The
application tracks book value and tax value if the user chooses these
options. The depreciation is calculated each month and posted to general
ledger. As new assets are added during the year, they will be calculated
General Ledger System with Asset AccountingPage 29
![Page 30: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/30.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon Citybased on the method and convention selected and posted to general
ledger. Assets are tracked by division and classification. Material
Management application will maintain inventory for multi departments
within the hospital. The system can track both billable and non-billable
inventory items. The purchasing can process both inventory and non-
inventory items. The system also tracks inventory uses by department and
maintains a stock level for each hospital departments. The system
generates automatic re-orders based on information on each item.
Physical inventory can be done at any time, or as many times during the
year the users chooses. The material management department can
continue to operate during physical inventory and when the reports are
produced will calculate any activity that occurred during that taking of the
physical inventory.
Resources:http://www.winmedhis.com/financialsystems
The General Ledger functionalities include: The system will allow postings to previous periods, current period, and
future periods. Computation must be balance.
The system will allow postings to previous periods, current period, and
future periods.
The system will generate financial reports
The system will allow to view financial reports
.
2.2.3Manila Doctors Hospital Financial SystemIn 1989 is the birth of automated processes at the Manila Medical Service
Incorporated (MMSI) with Sycip, Gorres, Velayo as the commissioned systems
developer. MMSI implemented their first standalone computerized business
application: the Patient Account Receivable System (PARS) with Metro bank,
General Ledger System with Asset AccountingPage 30
![Page 31: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/31.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityIncorporated taking the lead in the project. PARS, DOS base accounts receivable
(A/R) system was managed by an Accounting staff, trained at the Meralco
Foundation Incorporated to provide internal systems support. In year 1992, the
General Ledger System developed by Innovative Concepts Software House was
implemented. At that time, computerization projects were still managed by the
Accounting Department. It was in year 1994 that the Electronic Data Processing
(EDP) came into form as a section unit of the Finance Division; with the
Accounting staff manning the section and the Assistant Financial Controller as
the Head. This also marked the start of the Local Area Network environment in
the hospital. The main focus of the EDP operations at that time is in the DOS
base financial applications covering General Ledger, Billing, Check Vouchers
and Payroll modules.
Resources: http://www.maniladoctors.com.ph
The General Ledger functionalities include: The system will generate financial reports
The system will allow to view financial reports
Check of Vouchers and payroll modules
2.2.4 Government Integrated Financial Management Information System
The Government of the Philippines (GOP) launched a comprehensive
public financial management (PFM) reform program in February 2011. The
details of the reform program are provided for in the Philippine Public Financial
Management Reform Roadmap, a strategic plan for a whole-of-government
approach to PFM reforms, which aims to clarify, simplify, improve and harmonize
the financial management processes and information systems of the civil service.
This includes reengineering business processes, integrating relevant systems in
General Ledger System with Asset AccountingPage 31
![Page 32: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/32.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon Citythe Department of Budget and Management (DBM), Commission on Audit
(COA), Department of Finance (DOF), Bureau of Treasury (BTR), and
implementing agencies, as well as, reassigning functions between the oversight
agencies. The desired results are improvements in fiscal discipline, fund
allocation efficiency, and operational efficiency for the effective delivery of public
services. A major reform of the Roadmap is the development of a Government
Integrated Financial Management Information System (GIFMIS), an
integrated IT solution that can collect and organize financial information in a
central database to support, at a minimum, budget preparation, execution and
financial reporting. President Benigno Simeon C. Aquino III, issued an Executive
Order in September 2011 directing GIFMIS system development. In line with this,
a two-track approach is being implemented by the GOP.
The General Ledger functionalities include: The system is integrated.
2.2.5 The Healthcare Integrated General Ledger Accounting System (HIGLAS)
The Centers for Medicare & Medicaid Services (CMS) has
implemented the Healthcare Integrated General Ledger Accounting
System (HIGLAS). HIGLAS is an integrated, dual-entry, general ledger
accounting system to manage healthcare outlays. CMS has 45 million
providers and beneficiaries, and it uses HIGLAS to process approximately
4.5 million claims daily. HIGLAS improves accountability for Medicare
payments to physicians, hospitals, and other providers servicing Medicare
beneficiaries. HIGLAS is also used to support accounting for Medicaid and
Children’s Health Insurance Program (CHIP) grants and to generate the
CMS Financial Statements, including all vendor payments, payables, and
receivables. The Healthcare Integrated General Ledger Accounting
System (HIGLAS), a single integrated Internet-based accounting system,
General Ledger System with Asset AccountingPage 32
![Page 33: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/33.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon Cityleverages the very latest in commercial off-the-shelf (COTS) software to
support CMS' mission to, collect standardized accounting data from
Medicare, Contractors for Part A and Part B claims, Process Medicaid and
CHIP grants. Perform internal administrative program accountingHIGLAS
is responsible for performing seven major financial functions: Accounts
Payable for disbursing payments owed to providers, physicians, suppliers,
beneficiaries, insurers, employers, and other entities. Accounts
Receivable for collection of overpayments made to providers, physicians,
suppliers, beneficiaries, insurers, employers, and other entities. General
Ledger for posting and recording all financial transactions summarizing
and maintaining account balances by the fund structure and individual
general ledger accounts. Cash Management for reconciling Medicare
Contractors' bank statements. Administrative Program Accounting for
maintaining data used to generate CMS' financial statements. Supporting
the issuance of grants and subsidiaries made to other organizations or
Individuals supporting budget formulation and execution. Audit Control for
auditing the integrity of the data as it is entered, altered or deleted
performed financial statement audits. Healthcare Transaction Base for
providing a federal document view of the data in HIGLAS. The Healthcare
Integrated General Ledger Accounting System (HIGLAS) is a new dual-
entry accounting system that replaces and modernizes the existing fee for
service Medicare Contractor accounting systems with a single
standardized system. In addition to processing Medicare claims, HIGLAS
will replace the legacy Financial Accounting and Control System (FACS),
which accumulates CMS' financial activities, both programmatic and
administrative, in its general ledger.
Benefits
HIGLAS, a component of the Department of Health and Human Services
(DHHS) Unified Financial Management System (UFMS), will:
General Ledger System with Asset AccountingPage 33
![Page 34: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/34.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City Improve accountability for Medicare's payments to
physicians, hospitals, and other providers servicing Medicare
beneficiaries.
Eliminate redundant accounting systems.
Allow more timely and effective collection activities on
outstanding debts
Pay nearly 3 Million healthcare claims a day.
Result in additional interest earned to the Medicare Trust
Funds.
Meet government financial regulations including the Joint
Financial Management Improvement Program (JFMIP) and
the Federal Financial Management Improvement Act of 1996
(FFMIA)
Resources: http://www.cms.gov/
The General Ledger functionalities include: The system is integrated.
Can generate financial statement
The system have accounts payable and can generate financial reports
General Ledger System with Asset AccountingPage 34
![Page 35: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/35.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City
2.3. SYNTHESIS AND RELEVANCE TO THE STUDY (MATRIX - COMPARATIVE ANALYSIS)
2.3.1. Local and Foreign Synthesis and Comparative Analysis
General Ledger System with Asset AccountingPage 35
![Page 36: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/36.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City
General Ledger System with Asset AccountingPage 36
Features FHR
Gen
eral
Led
ger
HY
ATT
H G
ener
al le
dger
EX
CA
LIB
UR
UC
FS G
ener
al L
edge
r
UW
F G
ener
al L
edge
r
LGU
Acc
ount
ing
Sys
tem
WH
Info
rmat
ion
Sys
tem
MD
H F
inan
cial
Sys
tem
GIF
MIS
HIG
LAS
GL
with
Ass
et A
ccou
ntin
g
Double-entry
Bookkeeping
Journal Entry
General Journal
Ledger
General Ledger
Chart of Accounts
Trial Balance
Income Statement
Financial Statement
Asset Accounts
Subsidiary Ledger
Balance Sheet
Financial Report
![Page 37: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/37.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City
RISK MITIGATION, MONITORING, AND MANAGEMENT PLAN
1.0 INTRODUCTION
1.1 SCOPE AND INTENT OF RMMM ACTIVITIES1.2 RSK MANAGEMENT ORGANIZATIONAL ROLE
2.0 FUNCTIONAL DATA DESCRIPTION
2.1 RISK TABLE
General Ledger System with Asset AccountingPage 37
![Page 38: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/38.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City2.1.1 DESCRIPTION OF RISK M2.1.2 PROBABILITY AND IMPACT FOR RISK M
3.0 RISK MITIGATION, MONITORING AND MANAGEMENT
3.1 RISK MITIGATION FOR RISK M3.1.1 PRODUCT SIZE3.1.2 BUSINESS IMPACT3.1.3 CUSTOMER (USER) RISK3.1.4 PROCESS RISKS3.1.5 TECHNOLOGY RISKS3.1.6 DEVELOPMENT RISKS3.1.7 EMPLOOYEE RISKS (TEAMMATES)
3.2 RISK MONITORING FOR RISK M3.2.1 PRODUCT SIZE3.2.2 BUSINESS IMPACT3.2.3 CUSTOMET (USER) RISKS3.2.4 PROCESS RISKS3.2.5 TECHNOLOGY RISKS3.2.6 DEVELOPMENT RISKS3.2.7 EMPLOYEE RISKS (TEAMMATES)
3.3 RISK MANAGEMENT FOR RISK M3.3.1 PRODUCT SIZE3.3.2 BUSINESS IMPACT3.3.3 CUSTOMER (USER) RISKS3.3.4 PROCESS RISKS3.3.5 TECHNOLOGY RISKS3.3.6 DEVELOPMENT RISKS3.3.7 EMPLOYEE RISKS (TEAMMATES)
4.0 SPECIAL CONDITIONS
Chapter 3
RISK MITIGATION, MONITORING, AND MANAGEMENT PLAN
1.0 Introduction
General Ledger System with Asset AccountingPage 38
![Page 39: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/39.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityThis section gives a general overview of the Risk Mitigation,
Monitoring and Management Plan for the General Ledger System with
Asset Accounting. It is responsibility of this section to perform risk
mitigation, monitoring and management in order to produce a quality
product. The quicker the risk can be identified and avoided, the smaller
the chances of having to face particular risks consequences. The fewer
consequences suffered as a result of good RMMM plan, the better the
product and the finer the development process.
1.1 Scope and intent of RMMM activitiesProject team aim to create or to develop free of any defects or
errors, but it is too hard or at times almost impossible to develop a system
that is free of any defects. To be safe we should like to have a risk
management plan to counter any difficulties that may impact the
development or the creation of the software. Our goal is to assist the
project team in developing a strategy to deal with any risk. To achieve this
aim, RMMM must be plan well and determine the possible potential risks
in a generic sense. When all possible risks have been identified, the
project team will then be evaluated the possible risks to determine the
probability of the occurrence and how General Ledger System will be
affected if they occur of happened.
1.2 Risk management organizational role.
Each stakeholder has a responsibility of managing the risk.
Everyone must be participate and undertake risk management.
General Ledger System with Asset AccountingPage 39
![Page 40: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/40.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City Development of the project, the client must give all the details and
business needs as early as possible and sudden changes that must
be added up or features that they want to occur on the product.
The client must also provide all necessary software information
before the project team initiates the system development.
The project team must monitor the progress of the work schedules,
cost estimations, scope analysis of the propose project, the
integration into other system and other possible present and future
risks that might possibly affect the General Ledger System as they
occur.
The client must also give an opinion for the additional features in
the project.
The users can help avoid risk by providing necessary information
during the early phase of the development.
2.0 Risk Description
This section describes the risks that are likely to be encountered
during this project.
2.1 Risk Table
The description of risks that might associate and affect General
Ledger System. The appropriate categories of the risks are also given, as
well a probability of each risk and its impact on the development process.
General Ledger System with Asset AccountingPage 40
![Page 41: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/41.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City
General Ledger System with Asset AccountingPage 41
Category Risk
Employee RiskDeficient knowledge on using
applications and technology
Technical Risk
Unexpected technical and power
interruptions and computer
configurations
Process RiskInsufficient quality of product and
unsuccessful system integration
Technology Risk Bugs and logical errors of the product
Financial RiskFinancial budget to procure and
support the system development
Product SizeEstimation planning might be
erroneous
Development RiskInadequate details, resources and
factual business requirements taken
Customer RiskClient might fail to partake or less
involvement
Business ImpactProduct may fail to meet the
requirements of the business.
![Page 42: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/42.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City2.1.1. Description of the Risk m
Business Impact RiskBusiness impact risk where concern is that of the not being able to
come up or produce the product that has impact on the client’s business. If
the product does not attain its goals it will fails to help and contribute to the
business needs.
Customer RisksCustomer risk where concern is clients motivation or willingness in
project development team. If the client fails to attend meeting regularly
and fails to describe the real need of the business the produces product
will not be one that helps the business.
Development RisksDevelopment risk refers to the failure of the client to support and
provide all necessary equipment for the development and execution of the
software which can cause the project to fail. On this scenario, project team
must think and assume another options or ways to continue the
development of the product.
Employee RiskThis risk is totally dependent on the ability, experience and
willingness of the software development team members to create the
working product. Every member should have respective tasks according to
the work plan which obligatory to accomplish. If one member cannot
accomplish one task due to its difficulty, co-members must fulfill these
weaknesses. Every member of the project team must put an effort
because if one fails to provide endeavor to the project, the efforts and
sacrifices of the other members to accomplish the project would be fail.
General Ledger System with Asset AccountingPage 42
![Page 43: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/43.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityThis risk is considered as one of the major risks to consider when it comes
to designing the product software.
Process RisksProcess risk involves risk regarding product quality. If the product
developed does not meet the standards set by the customer or the
development team it is a failure. Maybe the failure is on the part of the
client to describe the true and genuine business needs or failure of the
project team to understand and misconception the project proper
equipment and employees to finish the product.
Product SizeThis risk involves misjudgment on behalf of the customer and also
the project development team. If the customer fails to provide the proper
size of the product that is to be developed it will cause major problems for
the completion of the project. If software development team misjudgment
the size and scope of the project team may be too small or large for the
project thus spending too much money on project or not finishing project
at all because of shortage of finances
Technology Risks Technology risk involves of using technology that already is or is
soon to be obsolete in development of the product. Such product
will on be functional for short period of time thus taking away
resources from the customer.
General Ledger System with Asset AccountingPage 43
![Page 44: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/44.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City2.1.2 Probability and Impact for Risk m
The following is the sorted version of the table by probability:
General Ledger System with Asset AccountingPage 44
Category Risk Probability Impact
Employee Risk
Deficient knowledge on
using applications and
technology
40% 1
Technical Risk
Unexpected technical and
power interruptions and
computer configurations
40% 2
Process Risk
Insufficient quality of
product and unsuccessful
system integration
35% 2
Technology RiskBugs and logical errors of
the product 35% 3
Financial Risk
Financial budget to
procure and support the
system development
30% 3
Product SizeEstimation planning might
be erroneous30% 2
Development
Risk
Inadequate details,
resources and factual
business requirements
taken
20% 3
Customer RiskClient might fail to partake
or less involvement10% 3
Business Impact
Product may fail to meet
the requirements of the
business.
10% 3
![Page 45: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/45.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityTable – Risk
Table (sorted)
Impact Values Description1 Catastrophic
2 Critical
3 Marginal
4 Negligible
Above is the table that categorizes the risks involved in project
development. It gives brief description of the Risk column and also
provides the probability of risk occurring in percentage in probability
column and also the impact of the risk in the column.
The impacts values assigned to the each risk are described in the section
below the risk table. It is very convenient way to look at the risk and
derived the information risk.
3.0 Risk Mitigation, Monitoring and Management
This section in detailed describes Risk Mitigation, Monitoring and
Management for each possible risk. It will talk about ways to avoid,
monitoring and to have ways to manage the risks.
3.1 Risk Mitigation for Risk m
In this section different software development risk will be identified.
As all of the risks identified, a plan to avoid these risks will be created. The
project team will identify all possible risks and how all of this risk be
General Ledger System with Asset AccountingPage 45
![Page 46: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/46.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon Cityevaded as it come across during project development. It is essential to
devour mitigation plan just in case of risk formulation. The project team
mitigation plan support in ascertaining the risks and scrutinized them
during its existence. The plan will help in identifying the possible risk and
monitor them
3.1.1 Business Impact
In this risk category we are concerned about the quality of the final
product. The team with the business firm particularly to a source
documents to provide solutions to the general accounting department
needs. The project team must spend time and effort to produce a product
from system development and the schedules must be planned well and be
followed. If the product is not created according to time, the project will fail
and the needs of the general ledger system will not be process.
3.1.2Customer Risks
If the user of the product fail to participate during the different
phases of the product development project team will fail to recognize
problems with the project. To avoid mitigation the user must be followed
and participate the needs involved in this project.
3.1.3Process Risks
To achieve this we will set up guidelines to be followed for each of
the project team during all the phases of the project development cycle.
The project plan must document all gathered factual details to start the
project development. Then the project development got started, it is still
compulsory to consult the client regularly or as scheduled to ensure that
the requirements and features are still met and on tranquil. It is necessary
General Ledger System with Asset AccountingPage 46
![Page 47: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/47.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon Cityto meet all the requirements and needs because it will be one of the bases
of quality and better product.
3.1.4Technology Risks
To avoid risk of using technology that may become obsolete in the
making of the project have been developed. Project team will do
excessive research on what technology to use for product development
and will use the latest technology to avoid risk.
3.1.5Development Risks
If the necessary tools are not provided to all of the project team,
their work will luck of features. As mitigation phase project team will make
sure that the budget includes cost for latest technology and needed
information to achieve the desired product.
3.1.6Employee Risks
This risk concern the skills and the knowledge of the stakeholders
to help make the project succeeded. As mitigation step project team will
make sure that someone in all of the project development phases knows
exactly what to do and the tools to use to achieve the goals. If the
stakeholders that have a little knowledge in the main project
implementation, it may cause big problem in the project development.
3.1.7 Product Size
To monitor the risk project team will keep track of the amount
function throughout the entire WBS. The project team created a WBS
which shows the objectives and scope of General Ledger System. By that,
the project team can determine the size of the software to avoid problems.
General Ledger System with Asset AccountingPage 47
![Page 48: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/48.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityThis is also necessary to estimate the budget can cost the software
development
3.2 Risk Monitoring for Risk m
In this section project team will identify the conditions to monitor to
determine whether risk m becoming more or less likely
3.2.1Product Size
To mitigate the risk project team will keep track of the amount
function throughout the entire WBS. The project team created a WBS
which shows the objectives and scope of General Ledger System. By that,
the project team can determine the size of the software to avoid problems
General Ledger encounter.
3.2.2 Business Impact
The project team will setup meetings to show order to come up or
construct a better and quality product, the project team and the customer
will set-up weekly meeting to coordinate and update each other about the
progress of the software development. This will help team in staying in
touch with the customer and will also be very efficient way to derive
customer and will also be a way to get customer insight on the project,
which will help the team determine the changes that we may have to make
to the software upon customers request.
3.2.3 Customer (User) Risk
The project team monitors the successes of the meeting by keeping
track of people that have attended in the meeting. It will help to have
general guidelines set for all of the work to be carried on for the product
development. Project team will constantly check each other’s work, will
compare it with the set guidelines, and will inform a team member who is
failing to participate in following the guidelines.
General Ledger System with Asset AccountingPage 48
![Page 49: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/49.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City
3.2.4 Process Risks
The project team and clients have a set scheduled meeting to
update and coordinate with each other. As all data, requirements, and
needs are gathered to start software development by the project team, it is
necessary to have the follow-up discussion about other requirements that
the client will provide. It also necessary to follow-up the client if the factual
data gathered from them are accurate and correct to make it already
include in the software. By this scenario, the client can give and provide
inputs and propositions about the data that the proponents if the data
included on the software are correct or wrong. Thus, this is to ensure the
fact that both parties understand each other and has the unified idea
about the project.
3.2.5 Technology Risks
Technology risk can be monitored by checking the software
development progress and editing from time to time. All logical errors and
program bugs can be solved by analyzing the source codes. This will be
the part of the programmer’s responsibilities and identify what possible
problem or what part of the program has the consistency of errors.
Monitoring of software development can avoid logical errors and program
bugs to develop a better and quality software application particularly
General Ledger System and to monitor technical risk, the proponents
should provide trainings to the users of the software and make them know
that some technicalities happens to hardware configurations are depends
on the situations.
3.2.6 Development Risk
General Ledger System with Asset AccountingPage 49
![Page 50: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/50.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityTo monitor phase during the development of the software project
team will keep eye on tools being used in effectiveness. Project team will
also look for the availability of the inexpensive equipment that may provide
help in completion of this project.
3.2.7 Employee Risks
Monitoring and managing of this project will include looking out
each other. The software development can be possible on the hands of
the project team, if one must fails to do the tasks, the others will be
affected. Monitoring of each other’s tasks and arranging rules and
guidelines are the better way to monitor employee risk. Likewise to the
monitoring of customer risks, the every of the project team should comply
to a set meeting as per schedule to check the works of each other. It is
necessary to set guidelines and schedule to make sure that each
proponent meets the deadlines and exact job assigned to. By this, every
member of the team can identify the problems it may lead to and if one of
the members has a difficulty to do the assigned tasks, other member must
have the initiative to help the co-member. If the project team are
coordinated, system development can be constructed on time, with better
quality and functions.
3.3 Risk Management for Risk m
In this risk, project team will identify several different software
development risks and will try to create plan to manage these risks if they
do occur.
3.3.1 Product Size
This risk is to manage the project team studied the information
regarding General Ledger System by interview and sort of researches to
determine and track all modules or extents that must be included to
software development. The proponents created a WBS which shows the
General Ledger System with Asset AccountingPage 50
![Page 51: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/51.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon Cityobjectives and scope of General ledger system. By that, the team can
determine the size of the software to avoid miscalculations and
misapprehend. This is also necessary to estimate the budget can cost the
software development. This is the way that team think to manage the risk.
3.3.2 Business Impact
To complete the satisfaction and expectation of the client in the
proposed system, the needs and requirements of the client must be
inputted on the projecr. The risk causes mistakes on the construction and
engineering of the software is just because the misunderstanding between
the clients and the proponents are present. To manage the risk, the
stakeholders must conduct a weekly or twice a week meeting to update
each other about the progress of the software. It is essential to each other
to know the recent situation of the system, if the system follows the needs,
requirements and the features that the client wants to include on the
system and to make the system construct according to the satisfaction of
the client. The meeting will best way to go since the work that is done on
the project is revealed during the meetings and clients get chances to
make to adjustments necessary.
3.3.3 Customer RisksThis risk happens because the client did not participate as one of
the stakeholder of the proposed system. One of its responsibilities is to
monitor the process of the system development to know if its requirements
and needs are met. On risk monitoring part, it discusses the possible
solution to this risk which is to have a regular meeting and monitor the
attendance of the attendees. By this, client’s attendance will be monitored
and just in case that the client is absent, the proponents must follow-up
the absent client and ask for its presence on the next meeting. To monitor
General Ledger System with Asset AccountingPage 51
![Page 52: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/52.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon Citythe risk, the parties must follow the set-up between both parties and keep
the tracking of the attendance every meeting.
3.3.4 Process RisksThis risk manage entire process risk, it is declared in risk
monitoring that the client and the project team must set a schedule or set
a weekly meeting to coordinate with each other. The project team must
consult the client about the gathered factual data from the organization if it
is accurate and correct. By those procedures the proponents can start the
development process without any worries about the features that the
project team must include on the product. This process will help the
developer of the project to create accurately according to the general
ledger process.
3.3.5 Technology RisksThis risk monitors the product development of the software. The
project team managed to maintain the software features and transitions to
avoid problems between the client and the proponents. Logical errors or
program bugs are expected to be found in the system and the only way to
manage that scenario, the proponents must follow-up the implementation
of the system and preserve the accuracy and effectively to satisfy the
client’s and business needs.
3.3.6 Development RisksTo monitor phase during the development of the software project
team will keep eye on tools being used in effectiveness. Project team will
also look for the availability of the inexpensive equipment that may provide
help in completion of this project. The team will collect data from the client
and get some idea and opinion to develop the project.
General Ledger System with Asset AccountingPage 52
![Page 53: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/53.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City3.3.7 Employee Risk
Monitoring and managing employees well, it is necessary to
monitor the progress of tasks of every employee. It is necessary to update
the work of the staff to finish the project and meet the deadline. By this
procedures employee risk will be managed accordingly. And the employee
will give some addition or an opinion to the developer for the sake of the
program.
3.3.8 Financial RiskTo manage and monitor this risk the project team must listed down
all of the expenses, procurements, costing and must be included to the
financial statement. The financial statement must be discussed on the
meeting with the client for them to know on how much the costing and
budgets they must spend to.
4.0 Special Conditions
This section discussed the special condition associated with
general ledger software and these are the following:
The user must know what is accounting: The user of the software must be trained to be literate on using
the software. But before of the software usage, the user must
know or has the knowledge on accounting. They need to be
trained to be literate in terms and principle of accounting to
avoid big problem.
General Ledger System with Asset AccountingPage 53
![Page 54: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/54.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City
Software Configuration Management Plan
1.0 INTRODUCTION……………………………………………………………………………..…2
1.1 SCOPE AND INTENT OF SCM ACTIVITIES..................................................2
1.2 SCM ORGANIZATIONAL ROLE.....................................................................2
2.0 SCM TASKS............................................................................................................. 2
2.1 IDENTIFICATION............................................................................................3
2.1.1Description..........................................................................................3
2.1.2Works products and documentation....................................................5
2.2 CONFIGURATION CONTROL .......................................................................5
2.2.1Description..........................................................................................6
2.3 VERSION CONTROL......................................................................................6
2.3.1Description..........................................................................................6
2.3.2Increasing Version Number.................................................................6
2.3.3Work Products and Documentation....................................................8
2.4 CONFIGURATION STATUS ACCOUNTING (CSA) ......................................8
2.4.1 Description........................................................................................8
2.4.2 Work products and documentation...................................................8
3.0 SOFTWARE QUALITY ASSURANCE OVERVIEW.................................................8
SCOPE AND INTENT OF SQA ACTIVITIES..............................................................9
REVIEWS AND AUDITS.............................................................................................9
General Ledger System with Asset AccountingPage 54
![Page 55: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/55.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City3.1 Generic Review Guidelines............................................................................9
3.2 Formal Technical Reviews............................................................................10
3.3 SQA Audits....................................................................................................12
3.4 PROBLEM REPORTING AND CORRECTIVE ACTION/FOLLOW-UP........12
3.4.1 Reporting Mechanisms...............................................................................12
3.4.2 Responsibilities...........................................................................................12
3.4.3 Data Collection and Valuation....................................................................12
Software Configuration Management Plan
1.0 IntroductionThe project team will develop General Ledger system and it is still
on progress. But, while it is on progress, some changes and improvement
occur. Software Configuration Management Plan is created to identify
change, to approve the change and to make documentation about the
change. Changes in the software usually occur during the development
phase
1.1 Scope and Intent of SCM activities
The main purpose of SCM is to make report and trace all changes
might be made including the improvements and alterations from the
primordial and original concept of the software development plan. It is
necessary to bestow to help the project team to trace the changes in
software development process to improve the General Ledger application.
It can also help the proponents minimize the errors in development
process as the GL development is on progress. To make this SCM attain
its goals, the proponents must report or list down all possible changes
which are essential to improve and acquaint each member that they have
General Ledger System with Asset AccountingPage 55
![Page 56: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/56.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon Citychanges to be made and need to be amiable. This might be a time-
consuming and observant part but it is very important.
SCM activities are disentangled to the following:
Identify Change
Control Change
Improve Change
To ensure that change is properly implemented
Document Change
Document change
1.2 SCM Organizational roleThe project team composed of 5 members, each of them assigned
into different specific task. This will reduce or eliminate confusion between
the project team regarding changes with the software. It is necessary to be
responsible in informing the project team about the reported changes
might or possibly occur to General Ledger development process. Some
changes might be came from the proponents based on the factual data
gathered and must suit or apply those to the software application. And
some changes might occur because of the client’s inputs and propositions
which must be apply or a sudden changes of requirements and features
that suit more to the project.
2.0 SCM Tasks
The project team will make keep one-person from the client’s team
informed of all the changes that will be discussed with the project team on
the client’s team during the meetings.
2.1 Identification
General Ledger System with Asset AccountingPage 56
![Page 57: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/57.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityIn this section the project team will discuss the way of software
configuration items will be identified for the software configuration
management plan.
2.1.1 Description
Identify change
The project team will propose changes for a better software
that includes the client’s side such as the changes or additional
requirements and features. It is necessary to gather the suggestion
of changes is necessary and is justified.
Approve change
The project team will be able to control over any changes
within the software. The team might give control to the given
changes and come up into the following ideas: there are changes
which are changeable or needed to change and improve like the
features of the application, but there are circumstances that change
given are prevented because it is really necessary to the software
but this must be included to the SCM report.
Improve change
All changes that gathered it must be categorized into two
classifications, the changeable changes and the unchangeable
changes. The unchangeable changes are changes that must be
retain due to its necessity for the software and must remain to its
features and processes. The changeable change are changes that
needs to improve like the system interface, the components and
General Ledger System with Asset AccountingPage 57
![Page 58: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/58.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon Citymodules of the software, the scope and limitations and etc. these
must be improve to avoid risks and to make the software more
advantage to the company.
Ensure that change is being properly implemented
The project team change to the software is already identified.
The change was implemented properly. There are mistakes might
occur in the implemented changes or the proponents must ensure
that the change will implemented and ends on time and not wasting
a time to set-up changes. The change aims to improve software by
changing an application but make sure that the knowledge of using
the application is present and the time will not be wasted.
Document the Change
All changes are gathered, analyzed, classified and
implemented. It is necessary to document any areas of changes
that occur and after all of the studies regarding the change, it will
finalized by the stakeholders.
2.1.2 Work products and documentation
Identify change
Once the change is identified it will be produced and it will be
enlisted and reported to the members and client. All of the identified
changes will be discussed.
Control Change
General Ledger System with Asset AccountingPage 58
![Page 59: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/59.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityAfter evaluator SCM team member got the change request
form, change report form will be generated
Improvements of Change
All changes, the changeable change must be altered, modified
and improved based on the necessity of the organization.
Ensure that change is being properly implemented
Document Change
When the change is discussed and approved, it must be
documented to become reference for the software development
2.2.1 Description
When changes will be controlled by using human procedures and
generated tools. Here are the steps, which will be taken in order to control
change.
Request the Change
Software developer will evaluate the change request
The result of the evaluation will be presented as change report
Final decision on change will be made
If change is approved
1. Define constraint
2. “Check out” items for changes
3. Make necessary change
4. Apply SQA activities
5. “Check in ” items
6. Apply testing activities
General Ledger System with Asset AccountingPage 59
![Page 60: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/60.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City7. Rebuilt the software
8. Distribute the software
2.3 Version Control
2.3.1 Description
As a result of changes, the version number of various modules will
in increase accordingly. The project team will be used a universal version
number system for every changes or modifications of the features of the
software. The proponents will also do have the final version of the entire
product. Even the revised or additional features of the documentation will
also have version number.
2.3.2 Increasing Version number
When a change is already implemented, a change report will be
created. After the change is finalized, it will be documented. The project
team will be using decimal point version number system.
<Major Update>.<Minor Update><Bug Fix>
Bug Fix
The project team as the system will be implemented. There are
parts of the technology risks that might be monitored including the logical
and code errors of the software. it is necessary to fixed those problems
and preserve the software. If the software maintained and fixed another
version will imposed, the increased of version will follow.
Minor Update
Includes changing of design interface or any features might need to
change and will cause the product to increase its user-friendliness and
accuracy of the software. If the minor update imposed the increase of
version follows.
General Ledger System with Asset AccountingPage 60
![Page 61: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/61.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityMajor Update
The software will undertake major revision like changing a platform
application of the software into another platform like Visual Basic to Java
application. Another example is database revision or changing the
database application to another database application like Access to SQL
databases. As major update imposed, another increase of version will be
done and the increase of version will be labeled as Version 2.
2.3.3 Work Products and DocumentationA single document titled Version Revisions History will be used to
document all the version revisions. Version Revision History will be the
reference of all revisions done on the software even the past and original
features of the first concept of the system.
2.4 Configuration Status Accounting
The project team will discuss different ways to communicate with
the client’s and to inform others that changes may concern.
Verbal communicationBy the follow-up meetings of the project team and the client,
there will be a discussion of the changes might be happen to the
software. It is necessary to discuss because some changes are
inputs and proposition of the clients which are necessary to know if
that changes are imposed on the system. This is also to inform the
client that another version was created for them to utilize. These
follow-up meetings are part of the maintenance service of the
General Ledger for the client.
Changes Report request
General Ledger System with Asset AccountingPage 61
![Page 62: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/62.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityThe project team will have different forms that will use as
tools to request a change or to report a change to the SCM team.
The documents will be a guide on the project team base on the
request.
Software Help WindowThe software, it indicates the changes or the versions of the
software. It also includes on how the software can manipulate by
using the modules or components of it.
2.4.2 Work products and documentation Verbal Communication
Changes request report
Software help window
3.0 Software Quality Assurance OverviewThe description regarding the Software Quality Assurance will be
elaborated mote to Software Quality Assurance (SQA) Plan.SQA focused
and discussed on management issues of the software and process
activities to ensure that the system does on the right and planned way.
SQA provides client a right track by stipulating software quality assurance
Scope and Intent of SQA Activities
The objectives of SQA are:
A quality management approach
Effective software engineering technology
Formal technical reviews that are applied throughout the
software process
A multi testing strategy is draw
General Ledger System with Asset AccountingPage 62
![Page 63: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/63.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City Control of software documentation and the changes made to it
A procedure to assure compliance with software development
standards when applicable
Measurement and reporting mechanism
Reviews and Audits
The Formal Technical Review (FTR) is an elicit software quality
assurance activities performed by software engineers. The objectives are:
1. To uncover errors in function, logic, or implementation for any
representation of the software.
2. To verify that the software under review meets its requirements.
3. To ensure that the software that is developed in a uniform
manner.
4. To achieve software that is developed in uniform manner
5. To make projects more manageable.
3.1 Generic Review Guidelines
ISO 9001 is a quality assurance standard that applies software
engineering and the 20 requirement have been delineated. The
proponents will try to pursue the following standard as part of the HRMS
quality assurance plan.
Management Responsibility
Quality System
Contract Review
Design Control
Document and Data Control
Purchasing
Control of Customer Supplied Product
Product Identification and Trace Ability
Process Control
General Ledger System with Asset AccountingPage 63
![Page 64: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/64.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City Inspection and Testing
Control of Inspection, Measuring and Test Equipment
Inspection and Test Status
Control of Non-Conforming Products
Corrective and Preventive Action
Handling, Storage, Packaging, Preservation and Delivery
Control of Quality Audits
Training
Servicing
Statistical Techniques
3.1.1 Condition a Review
The client is necessary to give inputs about the changes, since on
the first place, they are the head of the project same with the requirements
and the budget. The inputs must be firstly be given by the client. For the
additional or better features, the client claims to replace the older one.
Then the proponents must have the review for the client’s needs and meet
up is the changes are possible to implement, improve or retain as the
same.
3.1.2 Roles and Responsibilities
This section declaring SQA Organizational Role, the rule of each
member will includes responsibly
Project Manager: Regie R. Seblit
Business Analyst: JohnPaul D. Gomez
System Analyst: John Reynald D. Gomez
Lead Programmer: Roldan D.Miole
General Ledger System with Asset AccountingPage 64
![Page 65: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/65.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityDocument Specialist: Abegail E. Mon
3.1.3 Review Work ProductFor each period, the team has a consultation with the adviser and
the PEC staff and has a question-and-answer approach regarding with the
problem encountered, activities and the solution. Having weekly meeting
with the following people helps a lot in the completion of documentation
and system process.
3.2 Formal Technical ReviewsThe FTR are conducted by the proponents during the software
development process.
-Walkthrough
-Inspections
Each interface that will be designed by the project team will
undergo testing of its transitions. The project teams will set-up a meeting
for each member including the client to give inputs and suggestions.
Description of reviews WalkthroughsThis review mainly focus on the integration of the parts that project
team design such as interfaces, form, and database. The team will ask
other stakeholders to do the walkthroughs with the presence coder.
Description of Review InspectionThis review is mainly concern on the correctness of every part that
the team has designed. The project manager is the responsible to perform
a testing and inspection without the presence of the other team member.
This idea is try to allow other stakeholders bring out the test cases.
3.2.1 System Specifications Review
General Ledger System with Asset AccountingPage 65
![Page 66: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/66.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityThe system specification of General Ledger is fixed and constant
especially to the platform of database which is MS SQL and platform for
the software development which is Java Language application furthermore
it is required by the PEC of the IT Department.
3.2.2 Software Project Plan ReviewThe purpose of Software Project Plan is over look of the whole
project. For more information, please see the document titled as Software
Project Plan.
3.2.3 RMMM ReviewRMMM, is the risk mitigation, monitoring and management which
prevents, monitor and manage the risks might or possibly occur to the
software. Please see the document titled as Software RMMM.
3.2.4 Requirements ReviewSoftware Requirements stated the data requirement, specifications.
For more information, please see the document titled “Requirement”
3.2.5 Data Design ReviewThe Data Design is about the data flow between each form
(interface) and to the database. For Architectural Design, please refer to
“Architectural Design”.
3.2.6 Architectural Design ReviewThe Architectural Design document is about the whole project
design, layout, and data flow. For Architectural Design, please see the
document titled “Architectural Design”
3.2.7 Interface (GUI)
General Ledger System with Asset AccountingPage 66
![Page 67: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/67.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityThe Interface of the project is based on the process. The team uses
Java Net beans as the Front-End.
3.2.8 Component Design ReviewGeneral Ledger System is on design phase as of now, but the
project team already planned all the components and the extents of the
software. But as of now, the team can say that the design will be object-
oriented which can easy to understand and utilized by the users.
3.2.9 Code ReviewOn process
3.2.10 Test Specification ReviewOn process
3.2.11 Change Control Reviews an AuditsOn process
3.3 SQA Audits Team members have a weekly meeting with the adviser and
reporting the progress of the system development and
documentation. Each of the members has a documentation
of the tasks already finished and documented on the project
timeline. And any problems, question regardless on the
performance of other team members will also note there
Any changes and improvement on the software development
must be discussed with other team members including the
client. For the minor and major revisions and bugs fixing, it
must be consulted first to the client as a head of the project
and producer of requirements and budget of the project.
General Ledger System with Asset AccountingPage 67
![Page 68: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/68.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City The project team will write part of the software help menu
that related to their design parts. And the team will also
share between members
3.4 Problem Reporting and Corrective Action/Follow-up
In this section will describe the problem reporting mechanism that
might occur as a consequence of the FTR that are conducted and the
means for corrective action, follow-up and management
3.4.1 Reporting Mechanism
The project team used a method of follow-up meetings to inform
each member about the progress and changes of the software
development. It is more formal and verbal that the proponents can consult
to the client directly and for the clients to suggest inputs and additional
features directly to the project team.
3.4.2 Responsibilities
The project team has tasks to observe and to be responsible with.
the project team must have a project manager to manage the team but it
doesn’t mean that all of the decision-making procedures will be decided
only by the Project Manager although it is necessary for the Project
Manager to have a decision making, all of the members must be decide
with something and as one for a unified and accurate decisions.
.
Project Manager: Regie R. Seblit
Business Analyst: JohnPaulD. Gomez
System Analyst: John Reynald D. Gomez
Lead Programmer: Roldan D. Miole
General Ledger System with Asset AccountingPage 68
![Page 69: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/69.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityDocument Specialist: Abegail E. Mon
3.4.3 Data Collection and Valuation
To properly conduct software quality assurance accordingly and
properly, all data regarding software engineering and development
process must be collected, evaluated, disseminated and documented. By
these procedures, it will help improve the quality and affectivity of the
software. The project is still on progress and planning. The proponents
don’t yet have the prototype but already been drafted the possible design
in consideration of the clients business needs. After the development
process, the proponents will undergo defense of the software to know all
possible add-ons, feedback and errors to improve.
Software Quality Assurance Plan
I. TABLE OF CONTENTS
1.0 INTRODUCTION
1.1 SCOPE AND INTENT OF SQA ACTIVITIES1.2 SQA ORGANIZATIONAL ROLE
2.0 SQA TASKS2.1Task Overview 2.2Standard, Practices and Conventions (SPC)2.3 SQA Resources
3.0 REVIEWS AND AUDITS 3.1Generic Review Guidelines 3.2Formal Technical Reviews 3.3SQA Audits
4.0 PROBLEM REPORTING AND CORRECTIVE ACTION/FOLLOW-UP4.1Reporting Mechanisms 4.2Responsibilities4.3Data Collection and Valuation
General Ledger System with Asset AccountingPage 69
![Page 70: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/70.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City4.4Statistical SQA
5.0 SOFTWARE PROCESS IMPROVEMENT ACTIVITIES5.1Goal and Object of SPI5.2SPI Tasks and Responsibilities
6.0 SOFTWARE CONFIGURATION MANAGEMENT AND OVERVIEW 7.0 SQA TOOLS, TECHNIQUES, METHODS
Software Quality Assurance Plan
1.0 IntroductionThis section gives a general overview of the Software Quality
Assurance Plan (SQA) for the General Ledger System with Asset
Accounting. SQA plan delivers thoroughfare for introducing the software
quality assurance plan. The project team created SQA Plan stencils for
different SQA activities while the software development is on process.
1.1 Scope and Intent of SQA Activities
The objectives of SQA are:
A quality management approach
Effective software engineering technology
General Ledger System with Asset AccountingPage 70
![Page 71: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/71.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City Formal technical reviews that are applied throughout the
software process
A multi testing strategy
Control of software documentation and the changes made
to it
A procedure to assure compliance with software
development standards when applicable
Measurement and reporting mechanism
1.2 SQA Organizational Role
The team is relatively small team and composed of only 5
members. The project team are actually used a Structure of organizational
Role.
Project Manager: Regie R. Seblit
Business Analyst: JohnPaulD. Gomez
System Analyst: John Reynald D. Gomez
Lead Programmer: Roldan D. Miole
General Ledger System with Asset AccountingPage 71
Project Manager
Business Analysts
SystemAnalyst
DocumentSpecialist
LeadProgrammer
![Page 72: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/72.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityDocument Specialist: Abegail E. Mon
A project team has its advantages and disadvantages. The
advantages of having a small team are, it is manageable, thus making the
group leading to one goal, the tasks are directed and monitored carefully,
everyone will work hand-in-hand with the project and it maximizes the
strength and capability of each member. The disadvantages of having a
small team are lack of manpower that results to heavy workloads and it
requires more contribution to the members. But despite of having these
advantages and disadvantages, the proponents still devour initiative and
perseverance to furnish every task. And as a unified team, the proponents
will do the entire task as much as possible until it reaches the end or the
termination process of the software development. Quality assurance plan
will help to eliminate errors by tracking and chasing it. If that so, changes
will imposed to eliminate the errors one-by-one and improve the software
contents. The errors will be discovered during the requirements, planning
and design phase but by monitoring the development, the proponents can
achieve the goals and objectives. The testing stage is still expectable; this
is a reflex of software development to test its affectivity until it has been
fully developed and ready for utilization.
2.0 SQA TasksHere are tasks that project team have:
- Voting system
- Close Contact with the client
- Research on the subject
- Review of requirements
2.2 Task Overview
General Ledger System with Asset AccountingPage 72
![Page 73: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/73.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityThis section will discuss the tasks that extend to product quality
assurance control, saving design time and cost, minimizing the errors and
problems including the data flow.
2.2.1 Standard, Practices and Convention (SPC)Voting System
The project team is grouped into 5 members. Each member is
appointed according to its knowledge and skills. But the project team
ensures that the tasks are equally distributed to avoid the unfairness
among members. Each of the members has the right to suggest, to decide
and to lead which is the Project manager. Each of the members is given
the authority to provide insights such as the Document specialist, System
Analyst, Business Analyst and the Lead Programmer, in order to develop
a General Ledger System effectively.
Close Contact with the ClientThe team closes contact with the client during the meeting. The
project team ask the client’s proposition on the time of the interview, and
in the follow-up interview. In the time of interviews, the client provides the
requirements, information and problems regarding the HotelAccounting
management activities.
This is the time table of the client and project team meeting:
Meeting Date Discussions / Subjects Company Time
August, 7, 2014 Interview:
Company’s Overview
and Background
Details of the
Company
General Ledger
OrangeView Hotel
General Ledger System with Asset AccountingPage 73
![Page 74: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/74.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon Cityprocess
Problem regarding
General Ledger
October 4,2014
Asking for the inputs
regarding the created
WBS or the system
objectives and scope.
Giving add-ons
regarding General
Ledger activities
particularly the post-
employment.
Bestlink College of the
Philippines
Research on the projectThe project has a limited insights regarding General Ledger. Having
the interview or meeting with the client is not enough to acquire knowledge
regarding these procedures. The project must do a research also to gain
facts regarding General ledger Accounting management. The research
may include the related literature reference like books an manual. It can
also be a past project study or software that also composed of project
team who done the same software as the proponents do. There are lot of
ways to acquire knowledge regarding General Ledger that can be included
as the scope of the project.
Review of RequirementsReviewing of the requirements given by the client is very necessary
because this will be the basis of software development initialization. The
client give the inputs, problems and needs regarding General Ledger
experiences and by that the project team can proposed and develop a
General Ledger System with Asset AccountingPage 74
![Page 75: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/75.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon Citysoftware that can ease the process of the true General Ledger. It must be
considered and be included on the software design procedures to make it
easy for them to understand. The requirements can also be included on
the objective or scope of the software as a basis.
2.3 SQA Resources
No external SQA resources are defined for this project
3.0 Generic Reviews and Audits
The Formal Technical Review (FTR) is a software quality
assurance activities performed by software engineers. The objectives of
the FTR are:
1. To prevent errors in General Ledger System functions, logic,
or implementation for any representation of the software.
2. To verify that the software under review meets its
requirements.
3. To ensure that the software has been represented according
to predefined standards.
4. To achieve software that is developed in a uniform manner
5. To make General Ledger System more manageable.
3.1 Generic Review Guidelines
3.1.1 Conducting a Review
There a two kinds of reviews, review circumstances with the client
and with the project team.
For the changes that may affect the client regarding the software
development. When the software already develop, the client will utilized
General Ledger System with Asset AccountingPage 75
![Page 76: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/76.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon Citythe product. The result will be the fact on how the client will be affected by
the product. The project team must consult the client to make sure that the
requirements are included or not depending to the purpose of the
requirements. If there are changes, it must be consulted first with the
team. It must be a unified decision between the members regarding the
circumstances. It must be coordinated and at the same time, each
member do not bypassed each other’s position. And keep a good record
of the project before and after changes.
3.1.2 Roles and ResponsibilitiesAs stated in 1.2, SQA Organizational Role the project team
members including the responsibilities:
Project Manager: Regie R. Seblit
Business Analyst: JohnPaulD. Gomez
System Analyst: John Reynald D. Gomez
Lead Programmer: Roldan D. Miole
Document Specialist: Abegail E. Mon
3.1.3 Review Work Product
For each period, the team has a consultation with the adviser and
the PEC staff and has a review approach regarding with the problem
encountered, activities and the solution. This consultation will be
extremely helpful when comes to documentation and system
development.
General Ledger System with Asset AccountingPage 76
![Page 77: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/77.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City3.2 Formal Technical Review
Here are the FTR that will conduct during the software process:
- Walkthroughs
- Inspection
After each form or interface that will be designed by the project
team it will going for testing of its transitions. The project team appoints a
meeting for each member including the client to give inputs and
suggestions for the project development.
Description of the Walkthroughs
This review refers to the inputs and proposition of the client and the
project team themselves regarding some additional or revised features
that will suit to the organizational needs. If there are changes or
improvements occur, consultation must be imposed to make other
members aware about the development of the project.
Description of Review InspectionThis review is mainly concern on the correctness of every part that
the team has designed. The project manager is the responsible to perform
a testing and inspection without the presence of the other team member.
This idea is try to allow other team members bring out the test cases.
3.2.1 System Specification Review
The system specification review of General Ledger system is
usually changed after the consultation of the work to the respective
adviser and the PEC staff and brainstorming with the project team.
Although the system design is already done, the team actually performs
bug fixing which is good in terms of changes. But for more elaborated and
General Ledger System with Asset AccountingPage 77
![Page 78: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/78.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon Cityprécised information about system specification, please see the system
specification documentation.
3.2.2 Software Project Plan ReviewThe purpose of Software Project Plan is over look of the whole
project. For more information, please see the document titled as Software
Project Plan.
3.2.3 RMMM ReviewRMMM, is the risk mitigation, monitoring and management which
prevents, monitor and manage the risks might or possibly occur to the
software. Please see the document titled as Software RMMM.
3.2.4 Requirements ReviewSoftware Requirements stated the data requirement, specifications.
For more I nformation, please see the document titled “Requirement”
3.2.5 Data Design ReviewThe Data Design is about the data flow between each form
(interface) and to the database. For Architectural Design, please refer to
“Architectural Design”.
3.2.6 Architectural Design ReviewThe Architectural Design document is about the whole project
design, l ayout, and data flow. For Architectural Design, please see
the document titled “Architectural Design”
General Ledger System with Asset AccountingPage 78
![Page 79: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/79.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City3.2.7 Interface (GUI)
The Interface of the project is based on the process. The team uses
Java Net beans as the Front-End.
3.2.8 Component Design ReviewGeneral Ledger System is on design phase as of now, but the
project team already planned all the components and the extents of the
software. But as of now, the team can say that the design will be object-
oriented which can easy to understand and utilized by the users.
3.2.9 Code ReviewOn process
3.2.10 Test Specification ReviewOn process
3.2.11 Change Control Reviews and Audits
3.3 SQA Audits Team members have a weekly meeting with the adviser and
reporting the progress of the system development and
documentation. Each of the members has a documentation
of the tasks already finished and documented on the project
timeline. And any problems, question regardless on the
performance of other team members will also noted there
Any changes and improvement on the software development
must be discussed with other team members including the
client. For the minor and major revisions and bugs fixing, it
must be consulted first to the client as a head of the project
and producer of requirements and budget of the project.
General Ledger System with Asset AccountingPage 79
![Page 80: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/80.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City The project team will write part of the software help menu
that related to their design parts. And the team will also
share between members
4.0 Problem Reporting and Corrective Action/Follow up
In this section will describe the problem reporting mechanism that
might occur as a consequence of the FTR that are conducted and the
means for corrective action, follow-up and management
4.1 Reporting Mechanism
The project team used a method of follow-up meetings to inform
each member about the progress and changes of the software
development. It is more formal and verbal that the proponents can consult
to the client directly and for the clients to suggest inputs and additional
features directly to the project team.
4.2 Responsibilities
The project team has a task to observe and to be responsible with.
the project team must have a project manager to manage the team but it
doesn’t mean that all of the decision-making procedures will be decided
only by the Project Manager although it is necessary for the Project
Manager to have a decision making, all of the members must be decide
with something and as one for a unified and accurate decisions.
Project Manager: Regie R. Seblit
Business Analyst: JohnPaulD. Gomez
System Analyst: John Reynald D. Gomez
Lead Programmer: Roldan D. Miole
Document Specialist: Abegail E. Mon
General Ledger System with Asset AccountingPage 80
![Page 81: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/81.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City
4.3 Data Collection and Valuation
To properly conduct software quality assurance accordingly and
properly, all data regarding software engineering and development
process must be collected, evaluated, disseminated and documented. By
these procedures, it will help improve the quality and affectivity of the
software. The project is still on progress and planning. The proponents
don’t yet have the prototype but already been drafted the possible design
in consideration of the clients business needs. After the development
process, the proponents will undergo defense of the software to know all
possible add-ons, feedback and errors to improve.
4.4 Statistical SQA
On process.
5.0 Software Process Improvement Activities
General Ledger System with Asset AccountingPage 81
![Page 82: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/82.jpg)
GLProcess
CustomerCharacteristics
Business Conditions
DevelopmentEnvironment
PRODUCT
PEOPLE TECHNOLOGY
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityDetermining Factor for Software Quality and Organizational Effectiveness
5.1 Goal and Object of SPI
Figure 1
Explanation:
The project team has responsibilities in this. Here are some of the goals
SPI:
1. All errors and defects are categorized by origin (e.g. flaws in design
and system specification, flaws in logic and transitions and non-
compliance to standards)
2. To record the précised errors and flaws of the software.
3. The numbers of errors and defects in each category are counted in
descending order.
General Ledger System with Asset AccountingPage 82
![Page 83: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/83.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City4. The overall cost of errors and defects in each category is
computed.
5. Resultant data are analyzed to uncover the categories that results
in highest cost to the organization.
6. Plans are developed to modify the process with the intent of
eliminating the class of errors and defects that is most costly.
The graph below illustrated the error that the project team encountered.
Fields % Reason
Logic 30%None of the other member team
have any experience
Interface 20%
Interface is one of the important.
It acts as the face of the software.
This is the area where the user
interacts with the software. It is
very important to design an
interface according to the level of
understanding of the user. It must
consider the user-friendly
attributes of an interface to make
it easier for the user to utilize
software.
Data Handling 20%
This project involved a lot of data
accessing or storing, data flow
between each interface. It’s not
easy to keep track them.
Standard 10% Having a working and beautiful
interface design is not enough to
General Ledger System with Asset AccountingPage 83
![Page 84: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/84.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon Citycall a system an effective one. It
must fall into standard provision
to make an assurance that the
software is really working and
quality-imposed.
Resources 10%
The resources coming from the
client. The reason for project
development is the client. The
project team will be the head of
designing and developing a
system but it must also be
consulted to the client about the
changes. The software’s design
must also be consulted, for them
to give inputs because they will
be the one who can utilized the
product. The proponents must
give considerations to the
requirements, problems and
business rules of the client as
one of the extents of this
software.
Error Checking 10% Error checking for software is
very crucial and sensitive. Having
a correct error checking during
the programming of the software
will cause it to work properly and
accurately.
General Ledger System with Asset AccountingPage 84
![Page 85: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/85.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City
Error Graph
LogicInterfaceData HandlingStandardsResourcesError Checking
5.2 SPI Task and Responsibilities
The project team has only five members, each member will take
over the responsibility of SPI activities.
5.0 Software Configuration Management and Overview
During the software development, it is normal to have errors and
defects while it is on progress. Software Configuration Management Plan
is created to identify change, to approve the change and to make
documentation about the change. Changes in the software usually occur
General Ledger System with Asset AccountingPage 85
![Page 86: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/86.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon Cityduring the development phase. For further information, please see the
document titled “Software Configuration Management Plan”.
6.0 SQA Tools, Techniques, Methods
The project teams have methods and techniques for SQA. The
project team will use software and requirements review, logical and coding
error tracking and follow the standards as the proponents organizational
structure, responsibilities, procedures, processes and resources for
implementing quality management. But the fact is that the project team
was really out of the schedule due to the other responsibilities and
priorities. Furthermore the tasks given to every team members are not
complete on time due to lack of initiative sometimes.
System Specification
1.0INTRODUCTION
1.1 GOALS AND OBJECTIVES 1.2 SYSTEM STATEMENT OF SCOPE
1.2.1 Version 1 General Requirements1.2.2 Version 2 General Requirements
General Ledger System with Asset AccountingPage 86
![Page 87: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/87.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City1.2.3 Extended Enhancement Requests
1.3 SYSTEM CONTEXT 1.4 MAJOR CONSTRAINTS
2.0FUNCTIONAL DATA DESCRIPTION
2.1 SYSTEM ARCHITECTURE 2.2.1 Architecture Model 2.2.1 Current Subsystem Overview
2.2 DATA DESCRIPTION 2.2.1 Major Data Objects 2.2.2 Relationships
2.3 HUMAN INTERFACE DESCRIPTION
3.0SUBSYSTEM DESCRIPTION
3.1 SUBSYSTEM FLOW DIAGRAMS3.1.1 Create Checklist 3.1.2 Print Checklist3.1.3 Generate Letter
4.0ENHANCED INTERFACE PROTOTYPING
4.1 PROTOTYPING REQUIREMENTS
System Specification
1.0 Introduction
This section gives general overview of General Ledger System
1.1 Goals and Objectives
General Ledger System with Asset AccountingPage 87
![Page 88: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/88.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityThe main goals and objectives of the system are to ease the entire
process of recording business transactions and financial system.
The goals of General Ledger System are:
To minimize the time span of any inspection
To minimize the amount of paper work required
To provide a searchable database of all past inspection
To create needed financial reports
1.2 Statement of the Scope
The General Ledger System scope is to record all financial
statement of the organization. A general statement of intent to the system
should be providing here. That is, what information is produced, what
major function are implemented, and what data are provided as input to
GL
1.2.1 General Requirements
The following general requirements were laid out for the project
team named General Ledger System.
A way in which department could add new accounts to the database.
A way in which business transaction and
financial statement could be generate
electronically.
A way in which they could view transactions in
a specific period of time.
A search on all account titles.
A way in which they could generate reports
based on the results of the transactions.
General Ledger System with Asset AccountingPage 88
![Page 89: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/89.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City A way in which Accounts Payable and
Accounts Receivable are separated.
A way in which all the account titles are compiled in a journal
A way to search existing transaction.
Interface EnhancementsStaff members of the Hotel have requested a lot of
interface enhancement that will increase the usability of the
product for the staff.
Database Administrative InterfaceThere is currently no documented interface for HRMS
staff members to maintain the checklist and letter templates.
TrainingThe staff members has also requested for the entire
staff for the proper training for the use of the software.
1.3 Software Context
General Ledger System can be used by particular users because
this is a type of system that should only be used by those people that has
knowledge in accounting and accounting process. This leads to issues
about future support for a larger user base.The purpose of a
competitive hotel management system is to assess the situation and then
plan out strategic reforms to better the quality of the hotel business
1.4 Major Constraints
Time
The team actually out of the schedule and the time become short to
make all tasks fulfill. The teams have a limited knowledge which is
disadvantage because the tasks distributed to each member are very
General Ledger System with Asset AccountingPage 89
![Page 90: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/90.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon Citycrucial which makes it harder to finish on time. But the team still work on it
to make the tasks complete.
CostTo provide or develop and implement a computerized system, the
project team will need funding for the group’s budget to sustain needs in
printing the documentation and for providing the developer the devices
that is necessary for the development and completion of the project.
2.0 Functional Data Description
This section describes overall system function and the information
domain in which it operates
2.1 System Architecture
2.2.1 Architectural model
General Ledger System with Asset AccountingPage 90
![Page 91: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/91.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City
2.1.2 Sub system overview
Preparing of Documents
General Ledger System with Asset AccountingPage 91
![Page 92: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/92.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityAllow user to collect for all transaction in accounting phase.
Preparing of Journal EntryPreparing journal entry, in accounting, is a logging of transactions
into accounting journal items. The journal entry can consist of several
recordings, each of which is either a debit or a credit.
General JournalThe general journal is where double entry bookkeeping entries are
recorded by debiting one or more accounts and crediting another one or
more accounts with the same total amount
Posting to LedgerCollection of an entire transaction of similar accounts in double
entry bookkeeping. Also called book of final entry
Financial Statements reports
Financial Statement and reports is a formal record of the financial
activities of a business, person, or other entity. Relevant financial
information is presented in a structured manner and in a form easy to
understand. The user allows to generate trial balance, balance sheet and
income statement.
2.2 Data Description
General Ledger System with Asset AccountingPage 92
![Page 93: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/93.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City2.2.1 Major Data Objects
Bookkeeper Data ObjectBookkeeper ID: a unique id number given to employee to identify what
department.
Bookkeeper Name: a journal entry must have the name of encoder or the
other subsystem for the record of the system.
Accountant Data
Employee ID: a unique identifier given to accountant to access system.
Employee Name: to locate the accountant who validate the journal entry of
different department and for the record of the system
Employee Information: for the record of other department.
Accounting Manager DataEmployee ID: a unique identifier given to accounting manager to access
the system.
Employee Name: for the record of the system
Employee information: address and contact number for the record of
system
Transaction DataTransaction Name: every transaction has named to help the accountant
identify and analyze the documents.
Type of transaction: to identify if general fund or others
Date of transaction: to identify what date posted.
Time of posted
Reports DataTrial Balance: This list will contain the name of the nominal ledger account
and the value of that nominal ledger account.
Balance sheet: summary of financial balances of departments. Annual
generation of reports
General Ledger System with Asset AccountingPage 93
![Page 94: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/94.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityIncome Statement: summary of income statement of department, annual
generation of reports.
General Ledger: summary of daily transaction
2.2.2 Relationships
General Ledger System with Asset AccountingPage 94
![Page 95: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/95.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityThis relation diagram picture out the relations of each user according to their given task.
2.3 Human Interfaces Description
General ledger system standardizes and systematizes the
procedures and general ledger activities based on how the users want it to
work with. The general objective of this project is to create a general
ledger system that can handle the entire transaction reports for accounting
department.
It contains different option to choose from. User can collect
accurate data from the subsystem and can generate post general ledger
and the software can create can make different financial statement.
Preparing of Document sallow user to collect for all transaction in
accounting phase.
Preparing of Journal Entry allow user to prepare journal entry,
in accounting, is a logging of transactions into accounting journal items.
The journal entry can consist of several recordings, each of which is either
a debit or a credit.
General Journal Allow user to generate journal. The general
journal is where double entry, entries are recorded by debiting one or
more accounts and crediting another one or more accounts with the same
total amount
Posting to Ledger Allow user to collect of an entire transaction of
similar accounts in double entry bookkeeping. Also called book of final
entry.Financial Statements reports allow user to create financial
Statement and reports is a formal record of the financial activities of a
business, person, or other entity. Relevant financial information is
presented in a structured manner and in a form easy to understand. The
user allows to generate trial balance, balance sheet and income
statement.
General Ledger System with Asset AccountingPage 95
![Page 96: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/96.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City3.0 Subsystem Description
3.1 Subsystem flow diagrams
3.1.1 Preparing of documents
Figure 1
Explanation:
This diagram explains what is the first thing that will be do during the transaction
first thing the user need source document or document from the other system to create
an data to the transaction.
3.1.2 Preparing Journal Entry
General Ledger System with Asset AccountingPage 96
![Page 97: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/97.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City
Figure 2
Explanation:
After getting documents second thing that should have to do is to
put on the Journal so that the user will determined if its good entry or bad
entry this process have an adjusting
Entries to make accurate data base on the given document.
General Ledger System with Asset AccountingPage 97
![Page 98: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/98.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City3.1.3 General journal
Figure 3
Explanation:
After put in the journal and adjust some entries third thing that
should be do is put on the General journal this journal show list of finance
transaction has made on the company.
General Ledger System with Asset AccountingPage 98
![Page 99: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/99.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City
3.1.4 Posting into Ledger
Figure 4
Explanation:
After send data to the General journal the user should needed to
post transaction to the Ledger this reports shows the some account tiltles.
General Ledger System with Asset AccountingPage 99
![Page 100: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/100.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City
3.1.5 Preparing of Financial reports
Figure 5
Explanation:
This reports some financial reports needed by the company.
General Ledger System with Asset AccountingPage 100
![Page 101: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/101.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City
Software Requirements Specification
I. Table of Contents
I. TABLE OF CONTENTS
II. GRAPHICAL NOTATIONS USED
1.1 GOALS AND OBJECTIVES 1.2 SYSTEM STATEMENT OF SCOPE
1.2.1 General Requirements 1.2.2 Extended Enhancement
1.3 SYSTEM CONTEXT 1.4 MAJOR CONSTRAINTS
2.0 USAGE SCENARIO
2.1 USER PROFILES2.2 USE-CASES Read Only Users Read/Write/Modify Own Users Read/Write/Modify All Users Full Control Users
3.0 DATA MODEL AND DESCRIPTION
3.1 DATA DESCRIPTION 3.1.1 Data Objects and Dictionary 3.1.2 Relationships
4.0 FUNCTIONAL MODEL AND DESCRIPTION
4.1 SUBSYSTEM FLOW DIAGRAMS4.1.1 Create Checklist 4.1.2 Print Checklist4.1.3 Generate Letter
4.2 HUMAN INTERFACE
5.0 RESTRICTIONS, LIMITATIONS AND CONSTRAINTS
6.0 VALIDATION CRITERIA
General Ledger System with Asset AccountingPage 101
![Page 102: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/102.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City
System Requirements Specification
1.1 Goalsand Objectives
The main goals and objectives of the system are to ease the entire
process of recording business transactions and financial system.
The goals of General Ledger System are:
To minimize the time span of any inspection
To minimize the amount of paper work required
To provide a searchable database of all past inspection
1.2 System Statement of Scope
1.2.1 General Requirements
The General Ledger System scope is to record all financial
statement of the organization. A general statement of intent to the system
should be providing here. That is, what information is produced, what
major function are implemented, and what data are provided as input to
GL
The following general requirements were laid out for the project
team named General Ledger System.
A way in which department could add new accounts to the
database.
General Ledger System with Asset AccountingPage 102
![Page 103: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/103.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City A way in which business transaction and
financial statement could be generate
electronically.
A way in which they could view transactions in
a specific period of time.
A search on all account titles.
A way in which they could generate reports
based on the results of the transactions.
A way in which Accounts Payable and
Accounts Receivable are separated.
A way in which all the account titles are compiled in a journal
A way to search existing transaction.
Interface EnhancementsStaff members of the Hotel have requested a lot of
interface enhancement that will increase the usability of the
product for the staff.
Database Administrative InterfaceThere is currently no documented interface for HRMS
staff members to maintain the checklist and letter templates.
TrainingThe staff members has also requested for the entire
staff for the proper training for the use of the software.
1.2.2 Extended Enhancement
1.3 System Context
General Ledger System can be used by particular users because
this is a type of system that should only be used by those people that has
General Ledger System with Asset AccountingPage 103
![Page 104: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/104.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon Cityknowledge in accounting and accounting process. This leads to issues
about future support for a larger user base.
1.4 Major ConstraintsTime
The team actually out of the schedule and the time become short to
make all tasks fulfill. The teams have a limited knowledge which is
disadvantage because the tasks distributed to each member are
very crucial which makes it harder to finish on time. But the team
still work on it to make the tasks complete.
CostTo provide or develop and implement a computerized
system, the project team will need funding for the group’s budget to
sustain needs in printing the documentation and for providing the
developer the devices that is necessary for the development and
completion of the project.
2.0 Usage Scenario
2.1 User Profiles
There will be three levels of users:
Full Control (Administrator)
Read/Write/Modify All(Accounting Manager)
Read/Write/Modify Own(Accountant)
Read Only(General Public)
General Ledger System with Asset AccountingPage 104
![Page 105: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/105.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City2.2 Use-cases
Read Only Users
The read only users will only read the database and cannot insert,
delete or modify records.
Read/Write/Modify Own User
The accountant has the responsibility for Provides financial
information to management by researching and analyzing accounting
data; preparing reports. This kind of user will be also able to modify the
entries they made in the past.
Read/Write/Modify All
This level of user will be able to do all the record maintenance
tasks. They will be to modify any records created by any users.
Full Control
This is the system administrative level which be able to change any
application settings, as well as maintaining user profiles.
3.0 Data Model and Description
3.1 Data Description
3.1.1 Data Objects and Dictionary
Add user accounts
1. ID Number:
Unique ID number of an user.
General Ledger System with Asset AccountingPage 105
![Page 106: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/106.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City2. User Last name:
User last name.
3. User First name:
User first name.
4. User Middle name:
User middle name.
5. User Type:
User type of accounts.
6. Username :
User username.
7. Password:
User password use to log in to the system
Preparing of Documents
1. Document name:
Name of the document
2. Description:
Determine the entry of the document its either Good
or Bad Entry.
Chart of Accounts
1. Asset
This contains description of asset
2. Liabilities
This contains description of Liabilities
3. Equity
This contains description of Equty
4. Revenue
This contains description of Revenue
5. Expenses
General Ledger System with Asset AccountingPage 106
![Page 107: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/107.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityThis contains description of Expenses
Preparing of Journal Entry1. Journal Entry number
This number is given to each journal entry.
2. Date
Date of the day of the transaction.
3. Description
Particular is the description of the transaction.
4. Transaction Detail
This is the list of transaction title under the
specific account including the Debit and Credit.
General Journal
1. Date
Date of the day of transaction.
2. Description
This shows the status of each posted transaction.
3. Posted by
Shows the name of the Accountant Manager.
Ledger
1. Ledger Number
This number is given to each ledger.
2. Debit
General Ledger System with Asset AccountingPage 107
![Page 108: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/108.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityThe amount of each account entered in this
column.
3. Credit
The amount of each account entered in this
column.
Balance
This shows the total amount of balance.
Financial Statement and Reports
1. Trial Balance
This contains description of Trial Balance
2. Balance Sheet
This contains description of Balance Sheet
3. Income Statement
4. This contains description of Income Statement
3.1.2 Relationships
General Ledger System with Asset AccountingPage 108
![Page 109: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/109.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City
General Ledger System with Asset AccountingPage 109
![Page 110: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/110.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City4.0 Functional Model and Description
4.1 Subsystem Flow Diagrams
4.1.1 Preparing of documents
General Ledger System with Asset AccountingPage 110
![Page 111: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/111.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City4.1.2 Preparing Journal Entry
General Ledger System with Asset AccountingPage 111
![Page 112: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/112.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City
4.1.3 General journal
General Ledger System with Asset AccountingPage 112
![Page 113: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/113.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City
4.1.4 Posting into Ledger
General Ledger System with Asset AccountingPage 113
![Page 114: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/114.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City
4.1.5 Preparing of Financial reports
General Ledger System with Asset AccountingPage 114
![Page 115: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/115.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City
4.2 Human Interface
General ledger system standardizes and systematizes the
procedures and general ledger activities based on how the users want it to
work with. The general objective of this project is to create a general
ledger system that can handle the entire transaction reports for accounting
department.
It contains different option to choose from. User can collect
accurate data from the subsystem and can generate post general ledger
and the software can create can make different financial statement.
Preparing of Documents Allow user to collect for all transaction in
accounting phase.
Preparing of Journal Entry allow user to prepare journal entry,
in accounting, is a logging of transactions into accounting journal items.
The journal entry can consist of several recordings, each of which is either
a debit or a credit.
General Journal Allow user to generate journal. The general journal is
where double entry, entries are recorded by debiting one or more
accounts and crediting another one or more accounts with the same total
amount
Posting to Ledge Allow user to collect of an entire transaction of similar
accounts in double entry bookkeeping. Also called book of final entry
Financial Statements reports allow user to create financial Statement and
reports is a formal record of the financial activities of a business, person,
or other entity. Relevant financial information is presented in a structured
manner and in a form easy to understand. The user allows generating trial
balance, balance sheet and income statement.
General Ledger System with Asset AccountingPage 115
![Page 116: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/116.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City
Search for an existing transaction enable user to know all financial reports.
5.0 Restrictions, Limitation and Constraints
Time
The team actually out of the schedule and the time become short to
make all tasks fulfill. The members are composed of only four members
which is disadvantage because the tasks distributed to each member are
very crucial which makes it harder to finish on time. But the team still
works on it to make the tasks finished
Cost
The project team is composed of five members. One the problem is the
financial expenditures of the project. The team enlisted all possible
expenditures that this software development might cost. But despite of the
problem, the team still works on the software development.
6.0 Validation Criteria
View Chart of Accounts
Can generate Journal Entry
Can generate General Journal
Can update entries
Print of financial reports
Viewing of Transaction
General Ledger System with Asset AccountingPage 116
![Page 117: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/117.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City
Software Design Specification
I. Table of Contents
I. TABLE OF CONTENTS
1.0 INTRODUCTION 1.1 GOALS AND OBJECTIVES 1.2 SYSTEM STATEMENT OF SCOPE
1.2.1 General Requirements 1.3 SYSTEM CONTEXT 1.4 MAJOR CONSTRAINTS
2.0 DATA DESIGN 2.1 DATABASE DESCRIPTION
3.0 ARCHITECTURAL AND COMPONENT-LEVEL DESIGN3.1 PROGRAM STRUCTURE
3.1.1 Overall 3.1.2 Create Inspection3.1.3During Inspection3.1.4 Post-Inspection3.1.5 Approval
3.2 DESCRIPTION FOR COMPONENTS 3.2.1 Switch User 3.2.2 Facility3.2.3 Create/Modify Inspection – Step 13.2.4 Create/Modify Inspection – Step 23.2.5 File Results – Step 1 3.2.6 File Results – Step 2 3.2.7 Approval 3.2.8 Checklist Maintenance3.2.9 Letter Maintenance
4.0 USER INTERFACE DESIGN4.1 DESCRIPTION OF THE USER INTERFACE
4.1.1 Screen Images Login Screen Search Pages Approval Queue
4.1.2 Objects and actions • Menu Items
General Ledger System with Asset AccountingPage 117
![Page 118: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/118.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City4.2 INTERFACE DESIGN RULES4.3 COMPONENTS AVAILABLE
4.3.1 Intrinsic Controls4.3.2 ActiveX Controls
5.0 RESTRICTION, LIMITATIONS, AND CONSTRAINTS TIME EMPLOYEE SKILLS
INSUFFICIENT RESOURCES 6.0 TESTING ISSUES
6.1 CLASSES OF TEST6.2 PERFORMANCE BOUNDS 6.3 IDENTIFICATION OF CRITICAL COMPONENTS
7.0 APPENDICES
General Ledger System with Asset AccountingPage 118
![Page 119: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/119.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City
Software Design Specification
1.0 Introduction
1.1 Goals and Objectives
The main goals and objectives of the system are to ease the entire
process of recording business transactions and financial system.
The goals of General Ledger System are:
To minimize the time span of any inspection
To minimize the amount of paper work required
To provide a searchable database of all past inspection
This section describes the design for the General Ledger System with
Asset Accounting
1.2 System Statement of Scope
The General Ledger System scope is to record all financial statement of
the organization. A general statement of intent to the system should be providing
here. That is, what information is produced, what major function are
implemented, and what data are provided as input to GL
General Ledger System with Asset AccountingPage 119
![Page 120: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/120.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityThe following general requirements were laid out for the project team
named General Ledger System.
A way in which department could add new accounts to the
database.
A way in which business transaction and
financial statement could be generate
electronically.
A way in which they could view transactions in
a specific period of time.
A search on all account titles.
A way in which they could generate reports
based on the results of the transactions.
A way in which Accounts Payable and
Accounts Receivable are separated.
A way in which all the account titles are compiled in a journal
A way to search existing transaction.
Interface EnhancementsStaff members of the Hotel have requested a lot of
interface enhancement that will increase the usability of the
product for the staff.
Database Administrative InterfaceThere is currently no documented interface for HRMS
staff members to maintain the checklist and letter templates.
TrainingThe staff members has also requested for the entire
staff for the proper training for the use of the software.
1.3 System Context
General Ledger System with Asset AccountingPage 120
![Page 121: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/121.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityGeneral Ledger System can be used by particular users because this is a
type of system that should only be used by those people that has knowledge in
accounting and accounting process. This leads to issues about future support for
a larger user base.
1.4 Major Constraints
Time
The team actually out of the schedule and the time become short to make
all tasks fulfill. The teams have a limited knowledge which is disadvantage
because the tasks distributed to each member are very crucial which makes it
harder to finish on time. But the team still work on it to make the tasks complete.
CostTo provide or develop and implement a computerized system, the project
team will need funding for the group’s budget to sustain needs in printing the
documentation and for providing the developer the devices that is necessary for
the development and completion of the project.
2.0 Data Design
The team use Java Netbeans, Java Netbeans is applied for the front end
of the system, for the Graphical User Interface is must be easy for the end user
to ease acquainted and utilize. And for the back end of the system, MS SQL is
General Ledger System with Asset AccountingPage 121
![Page 122: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/122.jpg)
Login
Main Screen
PrepareDocument
Journalizing GeneralJournal
FinancialReports
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon Cityused for an excellent Database in organizing information. Data design
correspond to the data structure, manipulation of data is the most important
aspect that must be specified correctly right from the proposal of a project. MS
SQL is a trusted Data Storage Platform use in data encryption and security
default setting and implemented password policy. A good data design and data
structure design can simplify the coding process and can lead to a very efficient
implementation.
2.1 Database Description
A database has big responsibilities in a software application, it holds or
keeps all the information that the software needs to store. The data are typically
organized to model relevant aspects of reality, in a way that supports processes
requiring thus information. Database Management System is a program that
enables the user to store, modifies, and extracts information in the database. The
developers use Database Management System as one of the theories in
developing the system.
3.0 Architectural and Component-Level Design
3.1 Program Structure
3.1.1 Overall
General Ledger System with Asset AccountingPage 122
PostIn Ledger
![Page 123: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/123.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City
Menu Items
The following shows the architecture of the main menu:
Preparing of Documents
Source Document
Bad Entry
Good Entry
Chart of Accounts
Asset
Liabilities
Equity
Revenue
Expenses
Journalizing
View save Documents
Edit Entries
General Journal
Posting into Ledger
Ledger
Financial Reports
General Ledger System with Asset AccountingPage 123
![Page 124: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/124.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City Trial Balance
Balance Sheet
Income Statement
3.1.2 Preparing of Documents
3.1.3 Chart of Accounts
3.1.4 Journalizing
General Ledger System with Asset AccountingPage 124
![Page 125: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/125.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City
3.1.5 General Journal
3.1.6 Posting in Ledger
3.1.7 Financial Reports
General Ledger System with Asset AccountingPage 125
![Page 126: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/126.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityDescription for Components
3.2 Description for Components
3.2.1. Switch UserMajor Form(s) : frmLogin
Major Action : Login
The form frmLogin will now appear. User enters the
desired username in txtusername and password in
txtpassword. Then the user will click the Login Button. The
user will now log in and will proceed in the main form if it is a
valid username and password. If the user clicks the cancel
button, the application will now terminated if they confirmed.
3.2.2 Preparing of DocumentsMajor Form(s) :frmPreparingofDocuments,
frmSourceDocument,frmSave
Major Action : Preparing of Documents, Source
Document
Prepared of DocumentsTo browse all supported menu to created documents for
journalizing, user can click button next to the
cmdSourceDocuments.
Source DocumentsObject Name: cmdSourceDocuments
To search all Documents from the entire transaction user
can click this to analyze the documents if its good or bad
entry. User can click cmdGoodEntry if it is approve by the
accountant and cmdBadEntry to dispose.
General Ledger System with Asset AccountingPage 126
![Page 127: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/127.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CitySaveObject name: cmdSave
The save button should be enabled to save those Good
Entry to jouranlize
3.2.3 Chart of AccountsMajor Form(s)
:frmChartofAccounts,frmAssets,frmLiabilities,frmEquit
y,frmRevenue,frmExpenses
Major Action : Chart of Accounts, Assets, Liabilities, Equity,
Revenue, Expenses
Chart of AccountsTo browse all supported menu to created documents for
journalizing, user can click button next to the txtAsset,
txtLiabilities, txtEquity, txtRevenue, txtExpenses.
AssetAnything tangible or intangible that is capable of being
owned or controlled to produce value and that is held to
have positive economic value is considered an asset.
LiabilitiesThis form refers to any cash or item of value that somebody
else has a proper cash claim on.
EquityThis form refers to the residual interest in the asset of the
entity after deducting all liabilities
Revenue
General Ledger System with Asset AccountingPage 127
![Page 128: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/128.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityThis form refers to the collective items and amounts of the
transaction
ExpensesAn expense may also be defined as a recurring payment of a
business to a vendor for a service or continued use of a
product or service.
Journalizing Major Form(s)
:frmViewSaveDocuments,frmSave,frmUpdate,frmPrint
Major Action(s) : View save documents, Save, Update,
View Save documentsTo browse all supported menu to created documents for
journalizing, user can click button next to the cmdSave,
cmdUpdate, cmdPrint.
SaveObject name: cmdSave
The save button should be enabled to save those Good
Entry to put on General Journal.
UpdateObject name: cmdUpdate
This updatebutton should be enabled to update those Entry
to put on General Journal.
General Ledger System with Asset AccountingPage 128
![Page 129: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/129.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityPrintObject name: cmdPrint
This print button should be enabled to print those Entry to
the General Journal
General JournalMajor Form(s) :frmGeneralJournal, frmViewGeneralJournal,
frmPrint
Major Action(s) : General Journal, Save, Update, Print
General JournalThis refers general journal is where double entry
bookkeeping entries are recorded by debiting one or more accounts
View General JournalTo view general journal where double entry bookkeeping entries
are recorded by debiting one or more accounts.
PrintObject name: cmdPrint
This print button should be enabled to
print those Entries to the General Journal
Post in Ledger
Major Form :frmPostinLedger, frnLedger,frmPrint
Major Action : Post in ledger, Ledger, Print
Post in LedgerRefers to the collection of an entire transaction of similar accounts in
double entry bookkeeping. Also called book of final entry
General Ledger System with Asset AccountingPage 129
![Page 130: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/130.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityLedgerCollection of an entire transaction of similar accounts in double entry
bookkeeping. Also called book of final entry
PrintObject name: cmdPrint
This print button should be enabled to
print those Entries to the Ledger
Financial Reports
Major Form :frmFinancialReports,
frmTrialBalance,frmBalanceSheet, frmIncomeStatement
Major Action : Financial Reports, Trial Balance, Balance Sheet,
Income Statement
Financial ReportsFinancial Statement and reports is a formal record of the financial
activities of a business, person, or other entity. Relevant financial
information is presented in a structured manner and in a form easy to
understand
Trial BalanceA trial balance is a list of the entire General ledger accounts both
revenue and capital contained in the ledger of a business. This list will
General Ledger System with Asset AccountingPage 130
![Page 131: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/131.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon Citycontain the name of the nominal ledger account and the value of that
nominal ledger account.
Balance SheetA balance sheet is used to inform a reader of the ending balances
in a company's asset, liability, and equity accounts as of the date stated
on the report.
Income StatementThe income statement presents the results of a business for a
stated period of time. The statement begins with revenues, from which
expenses are subtracted to arrive at a profit or loss.
4.0 User Interface Design
There will be about many interfaces in the program. The team can’t
design on the exact number of it yet. Because the clients still think over on
several interfaces, to see rather they can be combined some of the forms
or put some them in separated forms.
4.1 Description of the User Interface
Below are some of the screenshot of the program. After fire up the
program, the login form will appear. If the user enters the valid username
and password, it will immediately take the user into the main interface of
the General Ledger with Asset Accounting system.
4.1.1 Screen Images
On Process
General Ledger System with Asset AccountingPage 131
![Page 132: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/132.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City4.2 Interface Design Rules
Interface design focuses on three areas of concern:
1. The design of interfaces between software modules.
2. The design of interfaces between the software and other
nonhuman producers and consumers of information.
3. The design of the interface between a human (i.e the users)
and the computer.
Easy to learn
Readability
Easy to navigate between interfaces
4.3 Components Available
Since the project team are using Java Netbeans as our front end
development language these are a lot of ready-made components that are
available for us to use already. The following is a list of controls that will be
using this software.
4.3.1 Intrinsic Controls
TextboxA textbox control sometimes called a Text Field or Edit Control.
Displays information entered at a design time entered by the user or
assigned to the control in code at run-time.
Label
General Ledger System with Asset AccountingPage 132
![Page 133: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/133.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityA label control is a graphical control you can use to display
text that a user can’t change directly.
ImageUse the Image control to display a graphic. An image control
can display a graphic from a bitmap, icon, or metafile, as
well as an enhance metafile, JPEG or GIF files.
List boxA list box control displays a list of items from which the user
can select one or more items. If the number of items
exceeds the number that can be displayed, a scroll bar is
automatically added to the list box.
Scroll BarsA scroll bar provides easy navigation through a long list of
items or a large amount of information. They can also
provide an analog representation of current position. You
can use a scroll bar as an indicator of speed or quantity.
Command ButtonUse a Command Button control to begin, interrupt or end a
process, when chosen, a command button appears pushed
in and so is sometimes a called a pushed button.
Menu
General Ledger System with Asset AccountingPage 133
![Page 134: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/134.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityA menu control displays a custom menu for your application.
A menu can include commands, submenus and separator
bar. Each menu you create can have up to four submenus.
Combo BoxA combo box control combines the features of a textbox
control and list box control- users can enter information in
the textbox portion or select an item from the list box portion
of the control.
Check BoxA check box control displays X when selected; the X
disappears when the checkbox is cleared. Use this control to
give the user a True/False or Yes/No option. You can use
checkbox controls in groups to display multiple choices from
which the user can select one or more option. You can also
set the value of a checkbox programmatically with the value
property.
Option ButtonAn Option Button control displays an option that can be
turned on or off.
4.3.2 ActiveX Controls
DateTimePickerThe date time picker control enables you to provide a
formatted date field that allows easy date selection. In
addition, users can select a date from a dropdown calendar
interface similar to the month view control.
General Ledger System with Asset AccountingPage 134
![Page 135: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/135.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityStatus Bar
A status bar control provides a window, usually at the
bottom of a parent form, through which an application can
display various kinds of status data. The Status bar can be
divided into a maximum of sixteen panel objects that are
contained in a panel’s collection.
ToolbarA toolbar control contains a collection of button
objects use to create a toolbar that is associated with an
application.
5.0 Restriction, Limitation and Constraints
Time
Time is so far the biggest restriction or constraints for our project as
the proponents only have three months to finish the entire project. It is
very important for us to watch the time the team spends over every phase
of the software development project. The proponents could have included
many more components to the software like online help menu but time
restricts us from doing it.
Employee Skills
Employees programming and design skills is also one of the
restriction. It does not have as big of an impact on the project as time but it
sure does limit use from doing more addition to the projects.
Insufficient Resources
Not having all the necessary instruments also is a problem for our
software. The proponents planned to use latest equipment for the project
General Ledger System with Asset AccountingPage 135
![Page 136: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/136.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon Citylike biometrics. But the employers cannot afford to provide such tools to all
their employees so the team had to abandon the plans.
6.0 Testing Issues
To validate the software the team needs to test the software during
the testing The proponents will be concerned about the inputs and
Expected outputs. The proponents emphasize on the testing where the
team will input the date and will compare the output with the expected
results. At this stage, the team are not concerned about the process; The
team are only looking for the correct outputs
6.1 Classes of test
The software s many additions and new interfaces or functions added
to it. The team will go through each of the new interfaces and other
software function t describes types and performed on them.
Login Window
The team will make use several different names to log in the system.
Team will use correct and incorrect Username and Password to access the
software and thus access to database. This software will not to be allowed to log
in using incorrect username and passwords and error message will be shown.
When correct username and password is presented the team will be able to log
in be able to the next window. The team will also test Login and Cancel Buttons
on this window by performing test above.
General Accounting Department– Java Netbeans (Design) Window
General Ledger System with Asset AccountingPage 136
![Page 137: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/137.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityThis main window that team will use to access the database
using Java NetBeans. The team will have several buttons in this
window. Prepared Documents, Chart of Accounts, Journalizing,
General Journal, Post in Ledger and financial Reports. The team
will try to use all the buttons and then different options available in
each of the window.
1. File: When File Button is clicked user will be shown two
choices
Switch UserThe team will test the switch user button if it is properly
working. The team needs to make the log in screen will appear
and the main screen will be close. The team will test this by
choosing the switch user then log in again with another Valid
and registered user in the log in screen.
ExitThe team wants to make sure that the user is logged out or
is able to exit when exit button is being clicked or selected. The
team will test this by logging in as a user and then by utilizing
exit button to exit the application.
2. Prepared Documents
Source DocumentsThis menu is the evidence that a financial transaction occurred. If a company is
audited, source documents back up the accounting journals and general
ledger as an indisputable audit trail.
Save Documents
General Ledger System with Asset AccountingPage 137
![Page 138: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/138.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityWhen a source document is accurate to the transaction this document will be
save on the database
3. Chart of accounts
AssetWhen the user selects this the asset entries will be presented. The team will test
Selection by selecting on it to go to file result. The team wants to make sure that
the proper window is presented.
LiabilitiesWhen the user selects this the asset entries will be presented. The team
will test
Selection by selecting on it to go to file result. The team wants to make sure that
the proper window is presented.
Equity
When the user selects this the asset entries will be presented. The team
will test
Selection by selecting on it to go to file result. The team wants to make sure that
the proper window is presented.
RevenueWhen the user selects this the asset entries will be presented. The team
will test
Selection by selecting on it to go to file result. The team wants to make sure that
the proper window is presented.
Expenses
General Ledger System with Asset AccountingPage 138
![Page 139: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/139.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityWhen the user selects this the asset entries will be presented. The team
will test
Selection by selecting on it to go to file result. The team wants to make sure that
the proper window is presented.
4. JournalizingView Save Documents
The team wants to view the save documents record into the database
using the application that the team are developing. The team wants to know if the
data table is properly working. The team will test it by checking the connection to
the database is properly working.
UpdateThe team wants to update a documents record and also the team
wants to make sure that the update is properly working. The team wants
to make sure that the proper process will be presented
Save
The team wants to save a documents record and also the team
wants to make sure that the save documents is properly working. The
team wants to make sure that the proper process will be presented
General Ledger System with Asset AccountingPage 139
![Page 140: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/140.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityThe team wants to print save a documents record. The team
wants to make sure that the proper report will be presented
5. General Journal
View General Journal
The team wants to view the save documents record into the database
using the application that the teams are developing. The team wants to know if
the data table is properly working. The team will test it by checking the
connection to the database is properly working.
The team wants to print general journal. The team wants to make sure
that the proper report will be presented
6. Post in Ledger
Ledger
When the team select this the team will presented or post results.
The team test this to go to view Ledger. The team wants to make sure that the
proper ledger will be presented.
The team wants to print Ledger. The team wants to make sure that the
proper report will be presented
7. Financial Reports
General Ledger System with Asset AccountingPage 140
![Page 141: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/141.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityTrial Balance
When the team select this choice team will be presented with trial balance
results window. The team will test the button by clicking on it to go to trial balance
result window. The team wants to make sure that the proper report will be
presented
Balance Sheet
When the team select this choice team will be presented with balance
sheet results window. The team will test the button by clicking on it to go to
balance sheet result window. The team wants to make sure that the proper report
will be presented
Income Statement
When the team select this choice team will be presented with Income
Statement results window. The team will test the button by clicking on it to go to
Income statement result window. The team wants to make sure that the proper
report will be presented
6.1 Performance Bounds
The proponents have setup a certain criteria for the software application
so that the following criteria will be able to maintain its quality and user
friendliness of the software and to have fulfilled the desired goals and objective.
Response time of search FunctionBest Case Scenario > Immediate
Worst Case Scenario > 3 Seconds
Response time of browse function
General Ledger System with Asset AccountingPage 141
![Page 142: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/142.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityInserting of records in 0.3 Seconds
Done within 0.8 SecondsLog On
User should be log on within 0.1 Seconds
6.3 Identification of Critical Components
Module User Access
The project team also need to make sure that the user access works
correctly. The way software is designed to allowed permissions to only certain
users for some section of the software. The team want to make sure that the
manager has access to all sections of the software, but at the same time the
team have to make sure that inspector don’t have access of the sections. The
team also want to make sure that one inspector cannot change the inspection
report of another inspector.
Test Specification
1.0 INTRODUCTION1.1 GOALS AND OBJECTS 1.2 STATEMENT OF SCOPE
General Ledger System with Asset AccountingPage 142
![Page 143: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/143.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City1.3 MAJOR CONSTRAINTS
2.0 TESTING PLAN 2.1 SOFTWARE (SCIS) TO BE TESTED
2.1.1 Interfaces2.2 TESTING STRATEGY
2.2.1 Unit Testing 2.2.2 Integration Testing2.2.3 Validation Testing2.2.4 High-order Testing
2.3 TESTING RESOURCES AND STAFFING 2.4 TEST RECORD KEEPING2.5 TESTING TOOLS AD ENVIRONMENT2.6 TEST SCHEDULE
3.0 TEST PROCEDURE3.1 SOFTWARE (SCIS) TO BE TESTED3.2 TESTING PROCEDURES
3.2.1 Unit Testing 3.2.2 Integration Testing3.2.3 Validation Testing3.2.4 High-order Testing3.3 TESTING RESOURCES AND STAFFING 3.4 TEST RECORD KEEPING AND LOG
Test Specification
1.0 Introduction
General Ledger System with Asset AccountingPage 143
![Page 144: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/144.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityThis section gives a general overview of the test Specification for the
General Ledger with Asset Accounting system.
1.1 Goals and Objectives
The project goal is to develop a general ledger system and create possible
solutions for the problem that the hotel experiencing currently and to achieve the
benefits lead by this system. The system will cover up the general ledger
components and activities which makes the work easy for the accounting
department.
The team will undergo a test specification to counter any difficulties that may
impact the development and the future performance of the software. The team
goal is to develop a strategy to deal with any errors.
1.2 Statement of the ScopeAn overall plan for integration of the software and a description of specific
tests are documented in this section. Below are the different kinds of tests that
are team will take ensuring the quality of the software.
Unit Testing
Desktop Application
Database
Integration Testing
Desktop Application
Database
Validation Testing
The team will test software as a whole, so all units of the user will be included
Desktop Application
Database
General Ledger System with Asset AccountingPage 144
![Page 145: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/145.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City High-order Testing
The software will be tested for several test method. Units to be tested are.
Desktop Application
Database
1.3 Major Constraints
1. The team actually out of the schedule and the time become
short to make all tasks fulfill. The teams have a limited
knowledge which is disadvantage because the tasks distributed
to each member are very crucial which makes it harder to finish
on time. But the team still work on it to make the tasks
complete.
2. To provide or develop and implement a computerized system,
the project team will need funding for the group’s budget to
sustain needs in printing the documentation and for providing
the developer the devices that is necessary for the development
and completion of the project.
2.0 Testing Plan
The project team wants the product to be bug free. The team also
want to make sure that there are no defects in the 3product. So the team
will be spending large amount of the total software development time on
testing below is the description of the testing procedure and strategy. The
team will also be presenting the timing and scheduled of the test to be
carried out.
2.1 Software (SCIs) to be tested
2.1.1 Interfaces
General Ledger System with Asset AccountingPage 145
![Page 146: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/146.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityThe tests to be carried on these interface windows are described below.
Login Window
The project team will make use different names to log in to the
system, so the team will be testing login window. The team will also test
Login and Cancel buttons on this by performing test above.
Switch User
The function of this is to switch between the users
General Accounting Department- Java Netbeans[Design] Window
This is the main window that the team will use to access the database
using
Netbeans. The team will have several different drop-down menus in
window. Source Documents, Chart of accounts, Journal Entry, General
Journal, Posting and Financial statements such as trial balance, Balance
sheet, Income statement reports.
Source Documents:
When a button click a source document will collect for all
transaction in accounting phase. And Determine the Bad entry and Good
Entry of the transaction.
Chart of accounts
General Ledger System with Asset AccountingPage 146
![Page 147: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/147.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityThe function of this chart of accounts is a listing of the names of
the accounts that a company has identified and made available for
recording transactions in its general ledger. A company has the flexibility
to tailor its chart of accounts to best suit its needs, including adding
accounts as needed.
Journal Entry
Preparing journal entry, in accounting, is a logging of transactions
into accounting journal items. The journal entry can consist of several
recordings, each of which is either a debit or a credit.
General Journal
This function general journal is where double entry
bookkeeping entries are recorded by debiting one or more accounts
and crediting another one or more accounts with the same total amount.
Posting in ledger
Collection of an entire transaction of similar accounts in double
entry bookkeeping. Also called book of final entry.
Financial Statements
Financial Statement and reports is a formal record of the financial
activities of a business, person, or other entity. Relevant financial
information is presented in a structured manner and in a form easy to
understand. Such as Trail balance, balance Sheet and Income Statement.
2.2 Testing Strategy
In the following section the project team will describe the testing
strategy. The teams have four different methods to test the software.
General Ledger System with Asset AccountingPage 147
![Page 148: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/148.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City2.2.1 Unit Testing
In the unit test case the team will be testing the separate modules
of the software. The team will carry out testing where each module or
component of the software is tested individually. The team will test the
components by passing data through it and the team will be monitoring
data to find the errors
2.2.2 Integration Testing
The purpose of integration testing is to verify functional,
performance, and reliability requirements placed on major design items.
These design items. Assemblages or groups of units are exercised
through their interfaces using black box testing, success and error cases
being simulated via appropriate parameter and data inputs. Simulated
usage of shared data areas and inter-process communication is tested
and individual subsystems are exercised through their input interface.
2.2.3 Validation Testing
The process of evaluating software during the development
process or at the end of the development process to determine whether it
satisfies specified client’s needs. Validation Testing ensures that the
product actually meets the client's needs. It can also be defined as to
demonstrate that the product fulfills its intended use when deployed on
appropriate environment.
2.2.4 High-order Testing
In this test method the team will combine several different other
types of the testing. The team will test for several different conditions by
following several different test methods.
General Ledger System with Asset AccountingPage 148
![Page 149: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/149.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City
Security Testing
The external specification will usually have been derived
From the objectives by developing a security model that constrains
the flow ofinformation from one area of the system to another. System
testing shouldidentify any flaws in moving from objectives to a behavioral
specification. Inaddition the objectives may include a list of common
threats that we shoulddemonstrate are dealt with in the external
specification.
Performance TestingMany systems will have throughput objectives. These
may be express statistically in terms of rates and likelihood of failure. The
system should be instrumented to allow these objectives to by subjected
test
when the system is in the field.
RecoveryAssessing the mean time to repair a fault is often a critical
Objective of a system
Stress TestingIn this method the team want to monitor tress caused to system
and the software due to simultaneous use. The team want to make sure
that the system does not break down under the extreme use conditions.
General Ledger System with Asset AccountingPage 149
![Page 150: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/150.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City
2.3 Testing Resources and Staffing
The team will use several different resources to carry on the test on
our software. Since the time constraint for us a team will try to use help
from everyone that team can. Following none detailed description of the
test resources.
- GL Staff
- GL Resources
- Computer Recourses
- Bug Resource Report
2.4 Test Record KeepingTest record keeping and test work Products are described in section 3.4 of
Test Specifications Document. For Information regarding these topics, please
refer to section 3.4 of the Test Specification Document.
2.5 Testing Tools ad EnvironmentIt is beneficial have the workload management configured and operational
when you establish tools for testing the tools and environment. Examples of
these testing tools are discussed in creating a simple routing environment. The
minimum testing environment consists of a request driver and a suitable tools
application.
2.6 Test ScheduleOn process
3.0 Test Procedure
General Ledger System with Asset AccountingPage 150
![Page 151: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/151.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityIn this section the team will try to describe over all software specification.
The team will describe the methods for all the different test to be performed and
will also declare the expected outputs.
3.1 Software (SCIs) to be testedFor detailed list of the software component items please refer to section 2.1 from
the Test Specification document
3.3.1 Unit Testing
In this method of testing team will test the smallest unit of the software
called modules. The team will be testing all the important paths to find errors
within the boundary module. So here the team will apply to sort of white box
search. The team will be testing parts of the software rather than the entire
software. The modules are as follows.
Login WindowThe team will make use several different names to log in the system.
Team will use correct and incorrect Username and Password to access the
software and thus access to database. This software will not to be allowed to log
in using incorrect username and passwords and error message will be shown.
When correct username and password is presented the team will be able to log
in be able to the next window. The team will also test Login and Cancel Buttons
on this window by performing test above.
General Accounting Department– Java Netbeans (Design) Window
This main window that team will use to access the database using
Java NetBeans. The team will have several buttons in this window.
Prepared Documents, Chart of Accounts, Journalizing, General Journal,
General Ledger System with Asset AccountingPage 151
![Page 152: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/152.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityPost in Ledger and financial Reports. The team will try to use all the
buttons and then different options available in each of the window.
File: When File Button is clicked user will be shown two choices
Switch UserThe team will test the switch user button if it is properly
working. The team needs to make the log in screen will appear
and the main screen will be close. The team will test this by
choosing the switch user then log in again with another Valid
and registered user in the log in screen.
ExitThe team wants to make sure that the user is logged out or
is able to exit when exit button is being clicked or selected. The
team will test this by logging in as a user and then by utilizing
exit button to exit the application.
Prepared DocumentsSource Documents
This menu is the evidence that a financial transaction occurred. If a
company is audited, source documents back up the
accounting journals and general ledger as an indisputable audit trail.
Save DocumentsWhen a source document is accurate to the transaction this
document will be save on the database
Chart of accounts
Asset
General Ledger System with Asset AccountingPage 152
![Page 153: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/153.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityWhen the user selects this the asset entries will be presented. The team
will test
Selection by selecting on it to go to file result. The team wants to make
sure that the proper window is presented.
LiabilitiesWhen the user selects this the asset entries will be presented. The team
will test
Selection by selecting on it to go to file result. The team wants to make
sure that the proper window is presented.
EquityWhen the user selects this the asset entries will be presented. The team
will test
Selection by selecting on it to go to file result. The team wants to make
sure that the proper window is presented.
RevenueWhen the user selects this the asset entries will be presented. The team
will test
Selection by selecting on it to go to file result. The team wants to make
sure that the proper window is presented.
ExpensesWhen the user selects this the asset entries will be presented. The team
will test
Selection by selecting on it to go to file result. The team wants to make
sure that the proper window is presented.
General Ledger System with Asset AccountingPage 153
![Page 154: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/154.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityJournalizingView Save Documents
The team wants to view the save documents record into the
database using the application that the team are developing. The team
wants to know if the data table is properly working. The team will test it by
checking the connection to the database is properly working.
UpdateThe team wants to update a documents record and also the
team wants to make sure that the update is properly working.
The team wants to make sure that the proper process will be
presented
Save
The team wants to save a documents record and also the
team wants to make sure that the save documents is properly
working. The team wants to make sure that the proper process
will be presented
The team wants to print save a documents record. The team
wants to make sure that the proper report will be presented
General Journal
View General Journal
The team wants to view the save documents record into the database
using the application that the team are developing. The team wants to know if the
General Ledger System with Asset AccountingPage 154
![Page 155: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/155.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon Citydata table is properly working. The team will test it by checking the connection to
the database is properly working.
The team wants to print general journal. The team wants to make sure
that the proper report will be presented
Post in Ledger
LedgerWhen the team selects this the team will presented or post results.
The team tests this to go to view Ledger. The team wants to make sure that the
proper ledger will be presented.
The team wants to print Ledger. The team wants to make sure that the
proper report will be presented
Financial Reports
Trial Balance
When the team select this choice team will be presented with trial balance
results window. The team will test the button by clicking on it to go to trial balance
result window. The team wants to make sure that the proper report will be
presented
Balance Sheet
General Ledger System with Asset AccountingPage 155
![Page 156: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/156.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityWhen the team select this choice team will be presented with balance
sheet results window. The team will test the button by clicking on it to go to
balance sheet result window. The team wants to make sure that the proper report
will be presented
Income Statement
When the team select this choice team will be presented with Income
Statement results window. The team will test the button by clicking on it to go to
Income statement result window. The team wants to make sure that the proper
report will be presented.
3.2.2 Integration TestingIn this method of testing the team will implement the software at the client
locations and will run it. So the team will be testing the product on client’s
network. The team will using following Top-down model to test. The team will
start the test with login window and then Java Netbeans window. After the Java
Netbeans Window the team will be testing each and every sub component or
functions of the software.
The team will be using Stubs to perform test. Stubs are dummy function
that will ne use to test the separate modules. Each of the modules to be tested
will have its own distinct stub; the stub will be created depending on the functions
of the each software component. Sub will help us to test the product without
actually having all the functions of the software. As part of testing, will be looking
for any signs of the collisions between our software components and those of the
clients. The team wants to make sure there is no confusion among the
application on the network when they are running simultaneously.
Each of the software (SCIs) items will be the test case for the integration testing.
So each form as whole will be a test case. The team will be testing each form
and every form for all the errors that logically can occur in it
General Ledger System with Asset AccountingPage 156
![Page 157: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/157.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon City
3.2.3 Validation Testing
This test is performed to validate the software. The test in known as black
box testing where the entire software will be created and will test all the
component of the software together. The team will working with clients to show
them the software and reach agreements about the completion or failure of the
software. The team will have a person or a team of the inspectors forms the
General Accounting Department with us when the project team perform test. The
team perform black box test where the team will have software as whole with us
and the team will along with General Accounting Department to test the software.
The team will enter predetermined data with expected results. The team will
compare predicted results with those that software gives us and will determine if
the software is valid or not.
3.2.4 High- order Testing
In this test method the team will combine several different other types of
the testing. The team will test for several different conditions by following several
different test methods.
Security TestingIn this testing the external specification will usually have been
derived
From the objectives by developing a security model that constrains
the flow of
Information from one area of the system to another. System testing
should
Identify any flaws in moving from objectives to a behavioral
specification. In
Addition the objectives may include a list of common threats that
we shoulddemonstrate are dealt with in the external specification.
General Ledger System with Asset AccountingPage 157
![Page 158: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/158.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityUser Account Login
The team will try to log in using invalid username and password.
The team will also test the software to see if it allows access without any
identification what so over. The team will also test the software so that
password in not saved in any way within computer for others to view.
Performance TestingMany systems will have throughput objectives. These
may be express statistically in terms of rates and likelihood of failure. The
System should be instrumented to allow these objectives to by subjected
testwhen the system is in the field.
RecoveryAssessing the mean time to repair a fault is often a critical
Objective of a system
Stress TestingIn this method the team want to monitor tress caused to system and the
software due to simultaneous use. The team want to make sure that the
system does not break down under the extreme use conditions.
Testing Resources and Staffing
Resources-General Accounting department
The team will take help of the General Accounting Staff of the General
Ledger with Asset Accounting to help us test the product. The team allow
General Accounting Department Staff member or members to test the
product as part of validation testing. The team will have general
accounting department staff record any errors found in the software and
will correct them before the delivery of the software.
-Bug Resource Reports
General Ledger System with Asset AccountingPage 158
![Page 159: bsit-4110.weebly.combsit-4110.weebly.com/uploads/3/1/6/...general_ledger_sys… · Web viewChapter 1:Project Charter. Project Name: General Ledger with Asset Accounting "Hotel Management](https://reader034.fdocuments.in/reader034/viewer/2022052012/6027b2ebac05e819616756e1/html5/thumbnails/159.jpg)
BESTLINK COLLEGE OF THE PHILIPPINES College of Information Technology
Novaliches, Quezon CityThe team will use bug resource report where the team will identify the
bugs found during the testing and will try to identify the reason for their
occurrence. This will help teams that may work on the product latter to
identify the soft spots for the bugs and will help them to come up with way
to design products so that bugs are avoided.
General Ledger System with Asset AccountingPage 159