BSBPMG503A Manage Project Time Project Time – Covers all aspects of time and duration, from how...

12
BSBPMG503A Manage Project Time Project Time – Covers all aspects of time and duration, from how long it takes to complete one activity right through to the timeframe for the entire project Project Schedule - Comprises the planned dates for performing project activities, completing deliverables and meeting milestones Normally represented as a GANTT chart using MS Project or a similar project scheduling tool Project Time Management – The processes required to manage the timely completion of a project Definitions for Project Time Adapated from PMBOK 4 th Edition

Transcript of BSBPMG503A Manage Project Time Project Time – Covers all aspects of time and duration, from how...

BSBPMG503A Manage Project Time

Project Time –Covers all aspects of time and duration, from how long it

takes to complete one activity right through to the timeframe for the entire project

Project Schedule -Comprises the planned dates for performing project

activities, completing deliverables and meeting milestones

Normally represented as a GANTT chart using MS Project or a similar project scheduling tool

Project Time Management –The processes required to manage the timely completion of

a project

Definitions for Project Time

Adapated from PMBOK 4th Edition

BSBPMG503A Manage Project Time

What is a GANTT chart?

• Gantt charts are named after their creator, an American engineer Henry Laurence Gantt, who created the first bar charts in the early 1910’s.

• It converts the Work Breakdown Structure into a graphical display of a project schedule

• It displays the durations of all scheduled activities including the interdependencies

• Often also includes information on project milestones and resource allocation to activities

• It has become one of the most widespread project management tools due to the prevalence of MS project

BSBPMG503A Manage Project Time

Sample GANTT Charts

BSBPMG503A Manage Project Time

What is a PERT chart?

• PERT stands for Programme Evaluation and Review Technique

• It was created by a Naval scientist, Frederick Taylor, in the 1950’s

• It is a project management technique for determining how much time a project needs before it can be completed.

• Each activity is assigned a best, worst and most probable completion time estimate.

• These estimates are then used to determine the average completion time and are represented graphically in a network diagram

BSBPMG503A Manage Project Time

Sample PERT Charts

BSBPMG503A Manage Project Time

What is a Critical Path?

• Was developed in the 1950s by the Dupont Corporation • The Critical Path Method, abbreviated CPM, or Critical

Path Analysis, is a mathematically based algorithm for scheduling a set of project activities.

• It takes the activities in the Work Breakdown Structure, the durations and the interdependencies, and calculates the longest path through the project.

• It is the longest total duration of all the activities required to complete a project

BSBPMG503A Manage Project Time

Importance of Time

• Project Managers often cite delivering projects on time as one of their biggest challenges.

• Schedule issues are one of the main reason for conflicts on projects.

• There will be constant pressure from your Project Sponsor and other stakeholders to accelerate delivery

• In the relationship between Scope, Time, Cost and Quality, Time normally has the least

amount of flexibility

Cost

Scope Time

Quality

BSBPMG503A Manage Project Time

Staying on Schedule

To stay on schedule, Project Managers must –Diligently control Project Scope

Re-baseline the project schedule after any Change Requests are approved

Closely monitor the Critical Path activities

Urgently resolve or escalate risks and issues that relate to activities on the Critical Path

Renegotiate the baseline Project Schedule whenever it changes due to external factors

Manage stakeholder expectations closely

Evaluate performance against the agreed and re-baselined Project Schedule

BSBPMG503A Manage Project Time

An Analogy

• Staying on schedule is like piloting a plane that is on auto pilot

• You will always get from point A to point B but at any point in time you are normally off course

• You need to constantly correct your course

Point A

Point B

Most direct route

Critical Path given weatherand other air traffic

BSBPMG503A Manage Project Time

Characteristics of Project Time

• Project timeframes are one of the primary sources of conflict on projects

• Timeframes are often artificially imposed on projects due to other factors such as business plan cycles, sales targets, performance objectives etc

• Project timeframes are hard to predict when there is high risk

Changesneed to bemonitored

Assumptionsoften

requiredHigh levelbecoming detailed

Constraintswill beapplied

Measuresproject

success

Refined during

the project

BSBPMG503A Manage Project Time

Project Time Interrelationships

• Time is one of the “triple constraints” to Project Scope

• Normally the least flexible

• Often imposed on the project based business priorities and other dependencies

• When the timeframe is fixed then Scope and Quality will need to be sacrificed when additional time is required due to invalid assumptions, missed deadlines or additional effort

• High Risk projects normally exceed original timeframes!

Cost

Scope Time

Quality

BSBPMG503A Manage Project Time

Project Time Processes

• PMBOK Project Time Management Processes - 6.1 Define Activities

6.2 Sequence Activities

6.3 Estimate Activity Resources

6.4 Estimate Activity Duration

6.5 Develop Schedule

6.6 Control Schedule

• Related processes from Project Integration Management –

4.1 Develop Project Charter

4.2 Develop Project Management Plan