Brochure PSV

37
ENGINEERING IN DEEP FOUNDATIONS AND HARBOR WORKS INGENIERÍA EN CIMENTACIONES PROFUNDAS Y OBRAS PORTUARIAS

Transcript of Brochure PSV

  • ENGINEERING IN DEEP FOUNDATIONS AND HARBOR WORKS

    INGENIERA EN CIMENTACIONES PROFUNDAS Y OBRAS PORTUARIAS

  • PSV CONSTRUCTORES S.A. is a company that meets a professional staff with experience in Heavy Civil Building: Pilling, Deep Foundations, Industrial and Fishing Quay, Massive Concrete Works, Steel Structures, Coastal Defenses, Repairing and Maintenance of Steel and Concrete Structures from the phase of Engineering Development, Work Building and the project start-up.

    PSV CONSTRUCTORES S.A. has as an objective to convert its clients needs on Engineering solutions using the creativity, quality, economy and precise term.The objective of the current Brochure is shortly illustrate our capacity to apply technology on integral projects or in any given phase of it; in this way we can serve to a wide range of requirements formulated by who decide to trust on us.

    PSV CONSTRUCTORES S.A. es una empresa que rene el staff profesional con experiencia en Construccin Civil Pesada: Pilotaje, Cimentaciones Profundas, Muelles Industriales y Pesqueros, Obras de Concreto Masivo, Estructuras de Acero, Defensas Ribereas, Mantenimiento y Reparacin de Estructuras de Acero y Concreto.Desde las etapas de Desarrollo de la Ingeniera, Construccin de la Obra y Puesta en marcha.

    PSV CONSTRUCTORES S.A. tiene como objetivo convertir las necesidades de sus clientes en soluciones de ingeniera utilizando la creatividad, calidad economa y plazo preciso.

    El objetivo del presente Brochure es ilustrar brevemente nuestra capacidad para aplicar tecnologa en proyectos integrales o en cualquiera de sus etapas, sirviendo as a una extensa gama de requerimientos que formulen quienes deciden poner su confianza en nosotros.

    Diseo por camaleon-peru.com

  • MISIN

    Desarrollar Proyectos de cimentacin profunda, Obras martimas y montaje en general contando con profesionales de amplia experiencia brindando a nuestros clientes soluciones integrales de calidad basadas en creatividad, ingeniera y la tica profesional.

    VISIN

    Ser reconocidos como la Empresa Peruana referente en cimentaciones profundas, obras martimas y montaje, con destacada presencia en Sudamrica, que garantice servicios de alta calidad con estndar internacional a travs de los cuales se logre satisfacer las expectativas de clientes, colaboradores, accionistas y comunidad.

    MISSION

    Develop Projects of Deep Foundation, Maritime Works and General Assembly using professionals with wide experience so we can offer to our clients integral and quality solutions based on creativity, engineering and professional ethics.

    VISION

    Be recognized as the leader Peruvian Company on deep foundations, maritime works and assembly, with an outstanding presence in South America which assures high quality services and with international standard; all of this to satisfy the clients, collaborators, shareholders and the community expectations.

    SERVICIOS GENERALES

    Estudios de Factibilidad Tcnico Econmica. Ingeniera Bsica, de Detalle y Diseo. Gerencia de Proyectos. Construccin de las Obras de nuestra

    Especialidad.

    GENERAL SERVICES

    Technical and Economic Feasibility Studies. Basic, Detailed and Design Engineering. Project Management. Work Building of our Specialty.

    PERFIL INSTITUCIONAL

    PSV CONSTRUCTORES S.A. es una empresa que opera desde 1993, ao en que fue fundada por un grupo profesional multidisciplinario para desarrollar Diseos, Gerencia de Proyectos y Construccin de Obras Civiles y de Montaje.

    ACTIVIDADES DE NUESTRA EMPRESA

    Desarrollo de Proyectos en todas sus etapas. Proyectos, Diseos y Construccin de Obras

    Martimas Portuarias (Muelles, Varaderos, Caissons, Muros marinos, Obras de Defensa Riberea, Dragados, Lneas Submarinas, Recorrido de Amarraderos, Pilotaje Submarino, Mantenimiento y Reparacin de Estructuras Marinas, etc.).

    Diseo y Construccin de Cimentaciones Superficiales y Profundas para soportar todo tipo de estructuras: convencionales y de mquinas.

    Diseo y Construccin de Recalce de Estructuras que han tenido problemas de asentamiento.

    Diseo y Construccin de Estructuras Especiales de Acero.

    Diseo y Construccin de Estructuras Especiales Mixtas de Concreto y Acero.

    Diseo, Reparacin y Mantenimiento de Estructuras en Operacin de Concreto y Acero.

    INSTITUTIONAL PROFILE

    PSV CONSTRUCTORES S.A. is a Company that works from 1993, year in which was founded by a multidisciplinary professional group to develop Designs, Project Management and Civil Works Construction and Assembly.

    ACTIVITIES FROM OUR COMPANY

    Projects Development on all their stages. Projects, Design and Building of Harbor

    Maritime Works (Piers, Shipyards, Caissons, Maritime walls, Defense Coastal Works, Dredges, Submarine Lines, Moorings Path, Submarine Pilotage, Repairing and Maintenance of Marines Structures, etc.).

    Design and Building of Superficial and Deep Foundations to hold every kind of structures: from machinery and conventional.

    Design and Building of Underpinning Structures that have had settlement problems.

    Design and Building of Steel Special Structures made of Steel.

    Design and Building of Mixed Special Structures made of Steel and Concrete.

    Design, Repairing and Maintenance of operating Structures made of Concrete and Steel.

  • Terminales para Carga LquidaLiquid Cargo Terminals

    Terminales MultipropsitoMultipurpose Terminals

    Terminales PesquerosFishing Terminals

    Embarcaderos FluvialesRiver Piers

    Amarraderos FluvialesRiver Berths

    Amarraderos con Boyas y DolphinesBerths With Buoy And Dolphines

    Defensas de RiberaCoastal Defenses

    Espigones RompeolasBreakwaters Groins

    Abrigos PortuariosBreakwaters

    Encamisetados de PilotesPiles Casing

    Mejoramiento del Sistema de AtraqueBerth System Improving

    Mejoramiento del Sistema de AmarreMoore System Improving

    DragadosDredges

    OBRAS PORTUARIASHARBOR WORKS

    OBR

    AS

    PORT

    UARI

    AS

    76 Ingeniera en Cimentaciones Profundas y Obras Portuarias Engineering in Deep Foundations and Harbor Works

  • Details: Loading and Unloading Sulfuric Acid Pier. Length of 500 ml and width of 4 m. Mole Head with 30 m length and 20 m width.

    Supported on steel piles of D8 28, 32 and 34. Six lattices assembly of 40 m (22.09 ton). Nine Lattices assembly of 20 m (10.51 ton). Intertidal protection (RETROWRAP) on each pile.

    Client: Southern Peru Copper Corporation

    Maritime terminal to acid shipmentsulfuric in Tablones Bay Ilo

    2008 - 2010

    Detalles: Muelle de cargue y descargue de acido slfurico. Longitud de 500 ml y ancho 4 m. Cabezo de longitud 30 m y ancho 20 m. Apoyado en pilotes de D8 28, 32 y 34. Montaje de seis enrejados de 40 m (22.09 ton). Montaje de nueve enrejados de 20 m (10.51 ton). Proteccin intermarea (RETROWRAP) en cada pilote.

    Cliente: Southern Peru Copper Corporation

    Terminal martimo para embarque de cidoslfurico en Baha Tablones - Ilo

    2008 - 2010

    OBR

    AS

    PORT

    UARI

    AS

    98 Ingeniera en Cimentaciones Profundas y Obras Portuarias Engineering in Deep Foundations and Harbor Works

  • Details: Pier for ships of 24 000 DWT. Length of 182 m and width 3 m. Mole Head with 41 m length and 11 m width. Supported on concrete pile 0.35 x 0.35, L = 16 m. 2 moore dolphins.

    Client: Juan Pablo Quay Bayovar S.A.C.

    Multipurpose pier Juan Paulo Quay Bayovar Piura - Peru

    2005

    Detalles: Muelle para embarcaciones de 24 000 DWT. Longitud de 182 m y ancho 3 m. Cabezo de longitud 41 m y ancho 11 m. Apoyado en pilotes de C A 0.35 x 0.35, L =16 m. 2 dolphins de amarre.

    Cliente: Juan Pablo Quay Bayovar S.A.C.

    Muelle multiproposito Juan Pablo Quay BayovarPiura - Per

    2005

    OBR

    AS

    PORT

    UARI

    AS

    1110 Ingeniera en Cimentaciones Profundas y Obras Portuarias Engineering in Deep Foundations and Harbor Works

  • Detalles: Muelle de Alto Bordo para embarcaciones de

    30 000 DWT. Longitud de 434 m y ancho 4.40 m. Cabezo de longitud 46.48 m y ancho 2.40 m. Apoyado en pilotes de C A 0.35 x 0.35, L =20 m. Defensa y Plataforma de Embarque.

    Cliente: Ecuaingerconstructec CIA LTDA

    Muelle Ecudorian Navy Pier, San Lorenzo - Ecuador

    2006Client: Ecuaingerconstructec CIA LTDA

    Details: High Board Pier to Ships of 30 000 DWT. Length of 434 m and width of 4.40 m. Mole head with 46.48 m length and 2.40 m width. Supported on piles of CA 0.35 x 0.35, L = 20 m. Defense and Shipment Platform.

    Pier Ecuadorian Navy PierSan Lorenzo Ecuador

    2006

    Detalles: Muelle de Alto Bordo para embarcaciones de 25 000 DWT. Longitud de 200 ml y ancho 5.90 m. Apoyado en pilotes de C A 0.35 x 0.35, L =1 8 m. 02 Dolphins de Atraque y Amarre.

    Details: High Board Pier for 25 000 DWT ships. Length of 200 ml and width of 5.90 m. Supported on concrete pile 0.35 x 0.35, L = 18 m. 2 Berth and Moore Dolphins.

    Cliente: Suplycorp S.A.

    Client: Suplycorp S.A.

    Facilidad portuaria para acoderamiento de barco Power Barge IIPuerto Hondo, Ulyseas Guayas - Ecuador

    Harbor feasibility to the Power Barge II ship bearthingDeep Port, Ulyseas Guayas - Ecuador

    2005 - 2006

    2005 - 2006

    OBR

    AS

    PORT

    UARI

    AS

    1312 Ingeniera en Cimentaciones Profundas y Obras Portuarias Engineering in Deep Foundations and Harbor Works

  • Detalles: Compleo pesquero industrial. Longitud de puente de 250 m y ancho 8 m. Patio de carga y descarga con losas de CA de 1 700 m2. Defensa y plataforma de embarque.

    Details: Industrial fishing complex. Length of 250 m and width of 8 m. Loading and unloading pier with slabs of C A of 1 700 m2. Defense and shipment platform.

    Cliente: Complejo Industrial Perquera Sacramento S.A.

    Client: Complejo Industrial Perquera Sacramento S.A.

    Ampliacin de muelle de alto bordoVentanilla, Callao - Per

    High board pier extention Ventanilla, Callao - Peru

    2003

    2003

    Detalles: Muelle industrial para embarcaciones de 35 000 DWT. Longitud de 200 m y ancho 3.5 m. Cabezo de longitud 50 m y ancho 12 m. Apoyado en 156 pilotes de C A 0.375 x 0.375, L = 20 m. Defensa y Plataforma de embarque. 3 dolphins de amarre. 2 500 m2 de area Ganada al Mar.

    Details: Industrial pier to ships of 35 000 DWT. Length of 200 m and width of 3.5 m. Mole head with 50 m length and 12 m width. Supported on 156 concrete pile 0.375 x 0.375, L = 20 m. Defense and Shipment Platform. 3 moore dolphins. A 2 500 m2 area reclaimed to the sea.

    Cliente: Pesquera Santa Enma S.A. Client: Pesquera Santa Enma S.A.

    Muelle pesquera Santa Enma S.A.Tierra Colorada, Paita - Per

    Shipping pier Santa Enma S.A.Tierra Colorada, Paita Peru

    2007 2007

    OBR

    AS

    PORT

    UARI

    AS

    1514 Ingeniera en Cimentaciones Profundas y Obras Portuarias Engineering in Deep Foundations and Harbor Works

  • Detalles: Ingeniera bsica y de detalle del terminal martimo Caleta La Cruz. Demolicin controlada de cabezo actual de 72 x 13 m. Construccin de plataforma de carga 450 m2 ( 40 x 20 m). Construccin de puente: 250 m2 (50 x 5 m). Hincado de 70 pilotes de acero, 18 L = 16 m. 580 toneladas de montaje de estructuras prefabricadas. Losa para gra pedestal capacidad 50 ton aprox. Plataforma baja de embarque de personal. Sistema de defensas: 12 defensas de jebe tipo D, 2 bitas de amarre en plataforma de carga y 8 cornamusas. Instalacin de tubera diesel (acero al carbono 3) y de agua PVC 3. 2 pruebas de carga dinmica - PDA. Iluminacin en plataforma de carga.

    Details: Basic and detailled engineering of maritime terminal La Cruz Creek. Controlled demolition of the current concrete to piers head of 72 x 13 m. Construction of the Load platform 450 m2 ( 40 x 20 m). Construction of piers bridge 250 m2 (50 x 5 m). 70 Driving steel piles 18, L = 16 m. 580 ton of prefabricated structures assembly. Pedestal crane slab, 50 ton capacity. Low platform to board staff. Defenses system: 12 defenses D type, 2 mooring bollards in load platform and 8 bagpipes. Diesel (carbon steel 3) and water PVC 3 pipelines installation. 2 dynamic Load test PDA. Load platform lighting.

    Cliente: BPZ Exploracin & Produccin Client: BPZ Exploracin & Produccin

    Ampliacion del terminal maritimo Caleta La Cruz, BPZ Exploracin & Produccin S.R.L - Tumbes

    Expansion maritime of terminal La Cruz Creek, BPZ Exploracin & Produccin S.R.L Tumbes

    2011 2011

    OBR

    AS

    PORT

    UARI

    AS

    1716 Ingeniera en Cimentaciones Profundas y Obras Portuarias Engineering in Deep Foundations and Harbor Works

  • Vopak Barranquilla, detalles: Hincado desde barcaza de 08 pilote de acero 0.60 m

    dimetro, longitud 30 m, 3/8 de espesor rellenos de concreto armado de 5 000 psi a lo largo de 23 m.

    Construccin de cabezal de concreto armado de 5000 psi. 5 x 5 m, incluye sistema de disipacin de energa.

    El terreno donde se apoyan los pilotes es rocoso, por esa razn se realizaron perforaciones dentro de los tubos utilizando un equipo Track Drill con martillo de fondo.

    El hincado requiri el desalojo del material perforado bajo la punta del pilote utilizando el sistema Air Lift.

    Vopak Barranquilla, details: Driving pile from barge: 8 steel pile 0.60 m diameter,

    30 m length and 3/8 thick, reinforced with 5 000 psi concrete inside.

    Construction of 5 000 psi reinforced concrete head. 5 x 5 m, energy dissipation system includes.

    There is rock under the work area. So was necessary to drill inside the piles using a track Drill equipment.

    Driving pile required to evacuate detritus located at the bottom of the pile, using Air Lift system.

    Vopak Cartagena, detalles: Pilotes mixtos fundidos con sistema Tremie. Hincado desde barcaza, 4 pilotes de acero de 16

    y longitud 33 m, rellenos de concreto armado de 5 000 psi.

    Construccin de cabezal de concreto armado de 5000 psi.

    Bita de amarre para 50 ton. El hincado requiri demolicin de subsuelo bajo la

    punta del pilote utilizando trepano demoledor y evacuacin de detritos con sistema Air Lift.

    Vopak Cartagena, details: Mixed Piles with tremie system. Driven pile from barge: 4 steel piles 16, length 33 m,

    reinforced with 5 000 psi concrete. Construction of 5 000 psi reinforced concrete head. 50 ton mooring bollard. Driving pile required demolition of soil at the botton of

    the piles using a free fall mass and evacuation of detritus using Air Lift system.

    Cliente: VOPAK Client: VOPAK

    Construccin de pia de atraque en el muelle Vopak, Barranquilla y Pia de amarre Vopak, Cartagena Colombia

    Construction of ships berthings dolphin in Vopaks pier in Barranquilla and ships mooring dolphin in Cartagenas Vopak terminal

    2012 2012

    Barranquilla - Colombia

    Cartagena - Colombia

    OBR

    AS

    PORT

    UARI

    AS

    1918 Ingeniera en Cimentaciones Profundas y Obras Portuarias Engineering in Deep Foundations and Harbor Works

  • Detalles: Hincado de 153 tablestacas de acero modelo AZ900

    L = 18.5 m en 210 m de muelle. 31 tensores de acero. Hincado de 19 tablestacas de concreto armado. 210 ml de viga de coronacin. 2 100 m2 de losa de concreto. Montaje de 10 defensas tipo Lambda. Montaje de 16 bitas.

    Detalles: Driving steel sheet pile AZ900 type, 153 units, L = 18.5 m.

    for quay 210 m lengh. 31 units steel tensor. Driving concrete sheet pile. Construction of 210 m concrete head beam. Concrete slabs 2100 m2. Ten (10) defenses assembly Lamda type. 16 bollards assembly.

    Cliente: Abocol Client: Abocol

    Reparacin muelle marginal puerto Bellavista Nueva pantalla con tablestaca de acero, Abocol Cartagena Colombia

    Repair of marginal pier Puerto BellavistaNew steel pile sheet, Abocol Cartagena colombia

    2011 2011

    OBR

    AS

    PORT

    UARI

    AS

    2120 Ingeniera en Cimentaciones Profundas y Obras Portuarias Engineering in Deep Foundations and Harbor Works

  • Hincados de Concreto PrefabricadosPrefabricated Concrete Driving

    Hincado de Acero EstructuralStructural Steel Driving

    Hincado de Concreto CentrifugadoCentrifugated Concrete Driving

    Hincados VibradosPile Driving and Vibrating

    PILOTES HINCADOSDRIVED PILES

    PILO

    TES

    HIN

    CAD

    OS

    2322 Ingeniera en Cimentaciones Profundas y Obras Portuarias Engineering in Deep Foundations and Harbor Works 22 Ingeniera en Cimentaciones Profundas y Obras Portuarias

  • Detalles: Pilotes de C A 0.40 x 0.40, L = 22 m. Pilotes de acero 20 e = 3/8, L = 22 m.

    Details: Concrete piles of 0,40 X 0,40 m, L = 22 m. Steel piles 20 e = 3/8, L = 22 m.

    Cliente: Conrisa S.A. - Interoceanica Sur - Tramo 3 Client: Conrisa S.A. - Interoceanica Sur - Stretch 3

    Construccin muelle de apoyo provisional para lanzamiento de super estructura billinghurst ambas mrgenesPuerto Maldonado - Per

    Provisional Support Pier Building For Super Structure Launching Billinghurst Bridge Both Margings Puerto Maldonado - Peru

    2010 2010

    PILO

    TES

    HIN

    CAD

    OS

    2524 Ingeniera en Cimentaciones Profundas y Obras Portuarias Engineering in Deep Foundations and Harbor Works

  • Detalles: Hincado de pilotes de acero 148 unid.

    Cliente: Siderperu - Gerdau

    Hincado de pilotes metlicos al interior del nuevo horno elctrico de 30 ton.Chimbote - Per

    2010

    Details: Metallic piles driving 148 units.

    Client: Siderperu - Gerdau

    Metalic piles driving to the interior of the new electrical oven of 30 ton.Chimbote - Peru

    2010

    PILO

    TES

    HIN

    CAD

    OS

    2726 Ingeniera en Cimentaciones Profundas y Obras Portuarias Engineering in Deep Foundations and Harbor Works

  • Detalles: Hincado de pilotes de C A 0.45 x 0.45, L = 12 m c/ un barrenado preliminar.

    Cantidad de 167 unid.

    Details: Concrete pile driving 0.45 x 0.45, L = 12 m with a preliminary drilling.

    Quantity of 167 units.

    Cliente: Odebrecht Per Ingeniera y Construccin S.A.C. Client: Odebrecht Peru Ingenieria y Construccion S.A.C.

    Edificio administrativo nuevo terminal contenedores del terminal portuario del Callao - Zona ZurCallao - Per

    New terminal containers administrative building of the harbor terminal of Callao South Zone Callao - Peru

    2009 2009

    PILO

    TES

    HIN

    CAD

    OS

    2928 Ingeniera en Cimentaciones Profundas y Obras Portuarias Engineering in Deep Foundations and Harbor Works

  • Detalles: Hincado de pilotes de acero 18, L = 10-15 m. Cantidad 384 unid. Prueba de carga dinmica P trabajo = 70 ton. Cimentacin de reservorios R3, R4, R8, R9 y R10 del

    sistema de Agua Potable.

    Details: Steel piles driving 18, L = 10-15 m. Quantity of 384 units. Dynamic P work load test = 70 ton. Reservoirs foundation R3, R4, R8, R9 and R10 of the

    Drinking Water System.

    Cliente: Odebrecht Per Ingeniera y Construccin S.A.C.

    Client: Odebrecht Per ingeniera y Construccin S.A.C.

    Mejoramiento del sistema de agua potable Iquitos

    Iquitos drinkingwater system improvement

    2006 - 2007

    2006 - 2007

    PILO

    TES

    HIN

    CAD

    OS

    3130 Ingeniera en Cimentaciones Profundas y Obras Portuarias Engineering in Deep Foundations and Harbor Works

  • Detalles: Hincado de 4 760 pilotes tubulares de C A centrifugado 12. 51 pruebas de carga dinmica a compresin PDA.

    Details: Driving of 4 760 12 CA centrifuged tubular piles. 51 dynamic load tests to PDA compression.

    Cliente: China Internacional Water & Electric Corp. Peru Client: China Internacional Water & Electric Corp. Peru

    Hincado de 4.760 pilotes tubulares de concreto 12 para la obra de mejoramiento y ampliacin del sistema de alcantarillado e instalacin de PTAR Iquitos - Per

    4.760 concrete 12 tubular piles driving for the extention and improvement work of the sewer system and PTAR installingIquitos - Peru

    2010 2010

    PILO

    TES

    HIN

    CAD

    OS

    3332 Ingeniera en Cimentaciones Profundas y Obras Portuarias Engineering in Deep Foundations and Harbor Works

  • Detalles: Pilotes hincados de CA de seccin 0.40 x 0.40 m, Long 26.10 y 32.10 m. La ampliacin de la planta contempla 5 zonas:

    HVC N4: 90 Pilotes, 2 cuerpos, L = 26.10 m. SILOS: 90 pilotes, 2 cuerpos, L = 32.10 m. SECADOR N2: 127 pilotes, 2 cuerpos, L = 32.10 m. MOLINO DE CEMENTO N3: 130 pilotes, 2 cuerpos, L = 30 m. MOLINO DE CRUDO: 116 pilotes, 3 cuerpos, L = 30 m.

    Pruebas de carga esttica: 5 a compresin y 2 a traccin.

    Details: Driven concrete piles, section 0.40 x 0.40 m, L = 26.10 and 32.10 m. The expansion plant includes 5 areas:

    HVC N4: 90 piles of 2 sections, L = 26.10 m. SILOS: 90 piles of 2 sections, L = 32.10 m. SECADOR N2: 127 piles of 2 sections, L = 32.10 m. CEMENT MILLS N3: 130m piles of 2 sections, L = 30 m. OIL MILLS: 116 piles of 3 sections, L = 30 m.

    Estatic load test: 5 compression and 2 traction.

    Cliente: Cementos Selva S.A. Client: Cementos Selva S.A.

    Hincado de pilotes en los molinos de cemento y crudo, Cementos Selva S.A. Rioja San Martn

    Drived piles in the cement and oil mills Cementos Selva S.A. Rioja San Martin

    2011 2011

    PILO

    TES

    HIN

    CAD

    OS

    3534 Ingeniera en Cimentaciones Profundas y Obras Portuarias Engineering in Deep Foundations and Harbor Works

  • Detalles: Tablestacado 213 unidades de tablestaca tipo AU25,

    L = 15 ml.

    Details: Sheet pile AU 25 Type, L = 15 ml, 213 units.

    Cliente: Constructora Cheves S.A.C. SN Power

    Client: Constructora Cheves S.A.C. SN Power

    Tablestacado represa Checras y Huaura, Churin Provincia de Oyon, Lima

    Driven sheet pile of Checras and Huaura storage dam, Churin Provincia de Oyon, Lima

    Detalles: Hincado de pilotes de acero tubular de 20, espesor 12 mm y longitud 24 m. Carga ltima de cada pilote 180 ton.

    Details: Steel tubular piles driving of 20, thickness of 12 mm and 24 m length. Ultimate load of each pile 180 ton.

    Cliente: JJC Contratistas Generales S.A.

    Client: JJC Contratistas Generales S.A.

    Reforzamiento del muelle del centro minero ShougangHierro Per San Nicols de Marcona

    Pier reinforcement of the Shougang mining center Hierro Peru San Nicolas de Marcona

    PILO

    TES

    HIN

    CAD

    OS

    3736 Ingeniera en Cimentaciones Profundas y Obras Portuarias Engineering in Deep Foundations and Harbor Works

  • Excavados Vaciados en Sitio con Sistema TremieIn site drained excavates with the tremie system

    Sistema KellyKelly Bar

    Tornillo Continuo (CFA)Continuous Flight Auger (CFA)

    Muro PantallaSlurry Wall

    DRILLED PILES PRE EXCAVATED

    PILOTESBARRENADOS - PRE ExCAVADOS P

    ILO

    TES

    BARR

    ENA

    DO

    S - P

    RE E

    XCAV

    AD

    OS

    3938 Ingeniera en Cimentaciones Profundas y Obras Portuarias Engineering in Deep Foundations and Harbor Works 3938 Ingeniera en Cimentaciones Profundas y Obras Portuarias Engineering in Deep Foundations and Harbor Works

  • Detalles: 21 Pilotes en el pilar central y 18 pilotes en el escribo izq. Funda estructural de acero de espesor 12 mm. Diametro 600 mm. Longitud total de funda de acero 15 m. y fundido de concreto 13 m. 2 pruebas de carga dinmica.

    Details: 21 Piles on the central pillar and 18 piles on the left scribe. Steel structural cover of 12 mm thickness. Diameter of 600 mm. Total length of the steel molten is 15 m. and concrete molten is 13 m. 2 dynamic load tests.

    Cliente: Gobierno Regional de Puno Cliente: Regional Government of Puno

    Pilotes mixtos: pilotes de concreto armado con funda estructural 600 mm para cimentaciones profundas del puente Azangaro - Puno

    Mixed piles: reinforced concrete piles with structural case 600 mm for deep foundations of the Azangaro bridge Puno

    2010 2010

    PILO

    TES

    BARR

    ENA

    DO

    S - P

    RE E

    XCAV

    AD

    OS

    4140 Ingeniera en Cimentaciones Profundas y Obras Portuarias Engineering in Deep Foundations and Harbor Works

  • Detalles: Pilotes excavados de C A de 1.18 m. 6 pruebas de carga dinmica. 46 pruebas de integridad.

    Details: Excavated concrete pile 1.18 m. 6 dynamic load tests. 46 integrity tests.

    Cliente: Intersur Concesiones S.A. Cliente: Intersur Concesiones S.A.

    Pilotes excavados - puente Asillo y Macusani,Asillo y Macusani, Puno - PerCorredor vial interocenico sur Per Brasil - tramo 4

    Excavated piles Asillo And Macusani bridge, Asillo and Macusani, Puno - Peru Interoceanic road corridor south Peru Brasil stretch 4

    2010 2010

    PILO

    TES

    BARR

    ENA

    DO

    S - P

    RE E

    XCAV

    AD

    OS

    4342 Ingeniera en Cimentaciones Profundas y Obras Portuarias Engineering in Deep Foundations and Harbor Works

  • Cliente: Constructora Irsa Norte - MTC Cliente: Cordusa - MTC Client: Cordusa - MTCClient: Constructora Irsa Norte - MTC

    Puente Shimbiyo Pucaquebrada, Tioyaco y ConventoTarapoto - Per

    Construccin de pre-excavados puente independenciaLa Arena, Piura - Per

    Pre excavated building, independencia bridge La Arena, Piura - Peru

    Shimbiyo Pucaquebrada, Tioyaco and Convento BridgeTarapoto - Peru

    2006 - 2007 2006 20062006 - 2007

    Detalles: Pilotes pre - excavados de C A, diametro 0.60 m y

    Longitud 18 m, cantidad 108 ml. Colocacin de concreto con sistema tremie. 1 prueba de carga dinmica.

    Details: Pre excavated concrete pile, 0.60 m diameter and 18 m

    length, quantity 108 ml. Concrete placement with the tremie system. 1 dynamic load test.

    Detalles: Pilotes Barrenados: 0.60 m, L variable. Puente Shimbiyo: 0.60 m, L = 8.50 m. Puente Pucaquebrada: 0.60 m, L = 14.50 m. Puente Tioyacu: 0.60 m, L = 13 m. Puente Convento: 0.60 m, L = 6.50 m.

    Details: Drilled Piles: 0.60 m, variable L. Shimbiyo Bridge: 0.60m, L = 8.50 m. Pucaquebrada Bridge: 0.60m, L = 14.50 m. Tioyacu Bridge: 0.60m, L = 13 m. Convento Bridge: 0.60m, L = 6.50 m.

    PILO

    TES

    BARR

    ENA

    DO

    S - P

    RE E

    XCAV

    AD

    OS

    4544 Ingeniera en Cimentaciones Profundas y Obras Portuarias Engineering in Deep Foundations and Harbor Works

  • Detalles: Pilotes pre - excavados 1 m, L = 25 m.

    Detalles: Pilotes barrenados 1 000 mm, L = 27 m.v.

    Details: Pre excavated piles 1 m, L = 25 m.

    Details: Drilled piles 1 000 mm, L = 27 m.v.

    Cliente: Sima Chimbote - MTC

    Cliente: Sima Per S.A. - MTC

    Client: Sima Chimbote - MTC

    Client: Sima Peru S.A. - MTC

    Pilotes pre - excavados, puente Carrasquillo Morropon, Chulucanas, Piura - Per

    Pilotes Barrenados en el Puente Rubio Zorritos, Tumbes - Per

    Pre excavated piles Carrasquillo bridge Morropon, Chulucanas, Piura - Peru

    Drilled Piles in the Rubio BridgeZorritos, Tumbes - Peru

    2006

    2007

    2006

    2007

    PILO

    TES

    BARR

    ENA

    DO

    S - P

    RE E

    XCAV

    AD

    OS

    4746 Ingeniera en Cimentaciones Profundas y Obras Portuarias Engineering in Deep Foundations and Harbor Works

  • Detalles: Centro comercial Mega Plaza Chimbote, (Saga, Sodimac, Ripley y Tottus), se ha realizado la

    cimentacin profunda con 1186 pilotes entre Barrenados, Mixtos, Hincados y Micro Pilotes.

    Barrenados: Pilotes pre excavados de 8 a 15 m. y de = 75 cm. 436 unidades.

    Mixtos: Pilotes de concreto armado fundidos en sitio, de 12 a 15 m con fundas de acero estructural

    de = 75 cm y L = 9 m. Solucin recomendada por PSV para incrementar la produccin y aumentar la capacidad de carga al doble. 447 unidades.

    Hincados: Pilotes prefabricados de concreto armado de 35 x 35 cm y de 40 x 40 cm, L = 6 a 9 m en

    los sectores de Abastecimiento Sodimac y Ripley de Mega Plaza. 31 unidades.

    Cliente: Megaplaza Cliente: Megaplaza

    Cimentaciones profundas en la obra Megaplaza Chimbote, Altek Trading Sac. Chimbote Ancash

    Deep Foundations In The Project Megaplaza Chimbote, Altek Trading Sac. Chimbote Ancash

    2011 2011

    Details: Mall Megaplaza Chimbote, (Saga, Sodimac, Ripley y Tottus) was performed with the deep

    foundation piles between drilled, mixed, driven piles and micropiles.

    Drilled-Piles: Drilled piles of 8 to 15 m and = 75 cm. 436 units.

    Mixed: Drilled and concrete in situ piles, of 12 to 15 m, with provisional steel pipes = 75 cm,

    L = 9 m. Solution recommended by PSV to increase production and increase piles capacity twice. 447 units.

    Driven piles: Prefabricated concrete piles 35 x 35 cm and 40 x 40 cm, section L = 6 to 9 m.

    In the areas Sodimac and Ripley of Megaplaza. 31 units.

    PILO

    TES

    BARR

    ENA

    DO

    S - P

    RE E

    XCAV

    AD

    OS

    4948 Ingeniera en Cimentaciones Profundas y Obras Portuarias Engineering in Deep Foundations and Harbor Works

  • Detalles: Cimentacin con pilotes pre excavados de 20, Long 15 m. Vigas capitel 37 m3. Losas de alivio 329 m3. 24 pruebas de integridad. 6 pruebas de carga dinmica (PDA).

    Details: Pre excavated pile 20, L = 15 m. Head beams 37 m3. Concrete slabs 329 m3. 24 Pile integrity test (PIT Pile integrity testing). 6 Dynamic load test (PDA Pile driving analyser).

    Cliente: Minera Yanacocha S.R.L Client: Minera Yanacocha S.R.L

    Servicio de reforzamiento de tneles bypass Cerro Negro, Minera Yanacocha S.R.L. Cajamarca

    Reinforcement of tunnels to bypass Cerro Negro, Minera Yanacocha S.R.L Cajamarca

    2011 2011

    PILO

    TES

    BARR

    ENA

    DO

    S - P

    RE E

    XCAV

    AD

    OS

    5150 Ingeniera en Cimentaciones Profundas y Obras Portuarias Engineering in Deep Foundations and Harbor Works

  • MicropilotesMicropiles

    Anclajes para Muros Pantalla Wall Anchorings

    Anclajes pasivos para Contencin de TaludesPasive Anchorings for Slope Retention

    Anclajes ProvisionalesTemporal Anchorings

    Pantallas con Pilotes YuxtapuestosPanels with Yuxtaposed Piles

    Pantalla con Tablestacas de ConcretoPanels with Concrete Sheet Pilings

    Pantalla con Tablestacas de AceroPanels with Steel Sheet piling

    Perforaciones Diamantinas y de Aire ReversaDiamond Core and Reverse air Drilling

    ANCLAJES /MICROPILOTES /PILOTES TIPO RAZANCHORAGES /MICROPILES / ROOT PILES

    AN

    CLA

    JES

    / M

    ICRO

    LIO

    TES

    / PI

    LOTE

    S TI

    PO R

    AIZ

    5352 Ingeniera en Cimentaciones Profundas y Obras Portuarias Engineering in Deep Foundations and Harbor Works 52 Ingeniera en Cimentaciones Profundas y Obras Portuarias Engineering in Deep Foundations and Harbor Works

  • Micro Pilotes: Pilotes tipo raz inyectados y bombeados de L = 8 a 15 m y = 25 cm, se us

    en el reforzamiento de estructuras existentes y en la cimentacin profunda de los sectores Cisterna y Sub estacin de Mega Plaza. 272 unidades.

    Micropiles Injected and pumped root piles of L = 8 to 15 m, = 25 cm, was used in

    the reinforcement of existing structures and in the deep foundation of the sectors: Megaplazas Tank and substation. 272 units.

    Cliente: Megaplaza Client: Megaplaza

    Cimentaciones profundas en la obra Megaplaza Chimbote, Altek Trading S.A.C. Chimbote Ancash

    Micropiles in the project Megaplaza Chimbote, Altek Trading S.A.C. Chimbote Ancash

    2011 2011

    AN

    CLA

    JES

    / M

    ICRO

    LIO

    TES

    / PI

    LOTE

    S TI

    PO R

    AIZ

    5554 Ingeniera en Cimentaciones Profundas y Obras Portuarias Engineering in Deep Foundations and Harbor Works

  • Detalles: Recalce de estructura existente con micropilotes. Ubicados en el sector D1 y D2 (Bancos). Micropilotes de L = 8 a 10 m, 10 de diametro.

    Micropiles Existing structure underpinning with micropiles. Located in the area D1 and D2 (banks). Micropiles of L = 8 to 10 m, diameter 10.

    Cliente: Megaplaza Client: Megaplaza

    Recalce de estructura existente en la obra Megaplaza Chimbote, Altek Trading S.A.C. Chimbote Ancash

    Underpinning of existing structure in the projectMegaplaza Chimbote, Altek Trading S.A.C. Chimbote Ancash

    2011 2011

    AN

    CLA

    JES

    / M

    ICRO

    LIO

    TES

    / PI

    LOTE

    S TI

    PO R

    AIZ

    5756 Ingeniera en Cimentaciones Profundas y Obras Portuarias Engineering in Deep Foundations and Harbor Works

  • Pruebas de Integridad de Pilotes - Pit (ASTM D5882)Piles Integrity Tests Pit (ASTM D5882)

    Pruebas de Carga Dinmica - PDA (ASTM D4945) Pile Driving Analyser - PDA (ASTM D4945)

    Pruebas de Carga Esttica (ASTM D1143)Estatic Load Tests (ASTM D1143)

    Martillos para Prueba de Carga Capacidad ltima de pilotes hasta 600 mtHammers For Load Test Ultimate Capacity Of Piles Up To 600 mt

    PRUEBAS DE CARGALOAD TESTS

    PRU

    EBA

    S D

    E CA

    RGA

    5958 Ingeniera en Cimentaciones Profundas y Obras Portuarias Engineering in Deep Foundations and Harbor Works

  • Detalles: Prueba de carga dinmica en pilotes tubulares de 32 segn norma ASTM 4945. Espesor de 14 mm y longitud de 30 m. Fondo marino de formacin rocosa tipo metamrfico intemperizado con empotramiento 4.00 m. Martillo de hincado DELMAG D-44 con 11000 kg-m de enerda de impacto nominal. Prueba de carga estatica a compresin - 600 Ton. - ASTM D1143. Pruebas de carga esttica a traccin - 325 Ton. - ASTM D3689. ww.pdi.com.pe

    Details: Pile Driving Analyser - PDA and static loads tests in tubular 32 piles according to the ASTM 4945 norm. 14 mm thickness and 30 m length. Rocky seabed metamorphic type weathered with Embedding 4.00 m. Driving Hummer DELMAG D-44 with 11000 kg-m of nominal impact energy. Static load test to compression - 600 ton. - ASTM D1143. Static load test to traction - 325 ton. - ASTM D3689. www.pdi.com.pe

    Cliente: Southern Per Cooper Corporation Client: Southern Per Cooper Corporation

    Pruebas de Carga Dinmica - PDA y pruebas de carga estticaterminal martimo para embarque de cido sulfricoen bahia tablones - Ilo

    Pile Driving Analyser - PDA and static load test maritime terminal for sulfuric acid loadingin tablones bay - Ilo

    2008-2010 2008-2010

    Prueba de carga estatica - static load test

    PRU

    EBA

    S D

    E CA

    RGA

    6160 Ingeniera en Cimentaciones Profundas y Obras Portuarias Engineering in Deep Foundations and Harbor Works

  • Montajes mecnico - elctricoMechanic electric assembly

    Naves industriales Industrial ships

    Super estructuras metlicasMetalic superstructures

    Super estructuras de C A prefabricadoPrefabricated CA superstructures

    OBRAS CIVILES Y MONTAJE MECNICO - ELCTRICOCIVIL WORKS AND MECHANIC ELECTRIC ASSEMBLY

    OBR

    AS

    CIV

    ILES

    6362 Ingeniera en Cimentaciones Profundas y Obras Portuarias Engineering in Deep Foundations and Harbor Works 62 Ingeniera en Cimentaciones Profundas y Obras Portuarias Engineering in Deep Foundations and Harbor Works

  • Detalles: Hincado de pilotes de acero 12 c/ aplicacin de grouting. Montaje de motobombas tipo tornillo. Montaje de las lneas de succin y descarga de las motobombas. Confeccin e instalacin de soportes para las lneas de succin y descarga. Anlisis vibracional de las motobombas en operacin. Pruebas, puesta en marcha y comisionado del sistema de Bombeo.

    Detalles: Movimiento de tierras 250 000 m3. Siete pabellones. Anfiteatro para 3 000 personas tipo anden. Cisterna de 200 m3. Helipuerto y una capilla.

    Details: Land movement 250 000 m3. Seven halls. Walk type amphitheater for 3 000 people. Cistern of 200 m3. Heliport and a chapel.

    Details: Steel 12 piles driving with grouting application. Screw type moto pumps assembly. Assembly of the moto pumps suction and download lines. Supports confection and installation for the suction and download lines. Vibration analysis of the operating moto pumps. Start and commissioning tests of the pumping system.

    Cliente: Petroperu S.A.

    Cliente: Ecuaingerconstructec CIA LTDA. Client: Ecuaingerconstructec CIA LTDA.

    Client: Petroperu S.A.

    Instalacin de motobombas tipo tornillo en estacin Andoas y Moronda del oleoducto ramal norteAndoas, Morona, Loreto - Per

    Hospital Diospy SuyanaCurahuasi, Cusco - Per

    Diospy Suyana HospitalCurahuasi, Cusco - Peru

    Screw type motor pump installation in the Andoas and Morona station of the north branch pipeline Andoas, Morona, Loreto - Peru

    2008

    2005 2005

    2008

    OBR

    AS

    CIV

    ILES

    6564 Ingeniera en Cimentaciones Profundas y Obras Portuarias Engineering in Deep Foundations and Harbor Works

  • Detalles: Hincado de pilotes: Pilotes 8, L = 515 ml. Pilotes 12, L = 120 ml. Pilotes 18, L = 75 ml. Piping de 10 y 8 para el transporte de crudo, L = 600 ml. Piping de 6 para el transporte de agua, L = 240 ml. Piping de 4 para el transporte de diessel, L = 374 ml. Dolphins con perfiles H 12 x 12.

    Cliente: Petroperu S.A.

    Construccin del ponton N4 estacin N1 del oleoducto norte PeruanoSaramuro, Loreto - Per

    2004

    Details: Piles Driving: Piles 8, L = 515 ml. Piles 12, L = 120 ml. Piles 18, L = 75 ml. Piping of 10 and 8 for the crude oil transportation, L = 600 ml. Piping of 6 for the water transportation, L = 204 ml. Piping of 4 for the diesel transportation, L = 374 ml. Dolphins with H 12 x 12 profiles.

    Client: Petroperu S.A.

    N4 gate building, station N1 of the north Peruvian pipelineSaramuro, Loreto - Peru

    2004

    OBR

    AS

    CIV

    ILES

    6766 Ingeniera en Cimentaciones Profundas y Obras Portuarias Engineering in Deep Foundations and Harbor Works

  • Detalles: Edificios administrativos. Losa de Co Ao en un rea de 50 000 m2. Cerco perimtrico de 1 170 ml y altura 5 m. Instalacin de redes elctricas 1 560 ml. Instalacin de redes agua de lavado 25 ml y desage. Canaletas de drenaje, 60 ml. Balanza y postes de iluminacin.

    Details: Administrative buildings. Concrete slab in a 50 000 m2 area. Perimeter fence of 1 170 ml and 5 m height. Electric network installation 1 560 ml. Wash water network installation 25 ml and drainage. Drainage gutters 60 ml. Scale and lighting poles.

    Cliente: LSA Enterprises Per S.A.C. Client: LSA Enterprises Per S.A.C.

    Terminal logstico para almacen de contenedoresLSA Enterprises Per S.A.C.Fundo Oquendo, Callao - Per

    Logistic terminal for storage containerLSA Enterprises Peru S.A.C.Fundo Oquendo, Callao - Peru

    2009 2009

    OBR

    AS

    CIV

    ILES

    6968 Ingeniera en Cimentaciones Profundas y Obras Portuarias Engineering in Deep Foundations and Harbor Works

  • Detalles:Sector San Juan: Instalacin de tubera de PVC agua potable, L = 3 200 m. Instalacin de vlvulas de compuerta, 4, 2, 1 , 3/4 y 1,223 unid. Sistema Contra incendio, 500 ml.Sector Carrin: Instalacin de tubera de PVC agua potable, L = 1750 m. Instalacin de vlvulas de compuerta, 4, 2, 1 , 3/4 y 1, 16 unid. Sistema contra incendio, 50 ml.

    Detalles:Hincado de 2650 pilotes de acero 8.Soporte H de tuberia de eje Paita - Talara. Montaje de lnea nueva de 600 mm: Talara - El Alto 20 km. Talara - Negritos 10 km. Paita - Talara 50 km. Colocacin de accesorios; vlvulas, codos, bridas, etc. Pruebas hidrostticas y radiogrficas.

    Details Driving of 2650 steel 8 piles. H pile support of the Paita shaft Talara. New line assembly of 600 mm: Talara - El Alto 20 km. Talara - Negritos 10 km. Paita - Talara 50 km. Accessories location: valves, elbows, flanges, etc. Hydrostatic and radiographic tests.

    Details:San Juan Sector: Installation of the PVC pipeline for drinking water, L = 3 200 m. Installation of gate valves 4, 2, 1 , and 1, 223 units. Fire protection system, 500 ml.Carrion Sector: Installation of the PVC pipeline for drinking water L = 1750 m. Installation of gate valves 4, 2, 1 , and 1, 16 units. Fire protection system, 50 ml.

    Cliente: Gobierno Regional del Callao Cliente: Pronap

    Client: Regional Government of Callao Client: Pronap

    Mejoramiento del sistema de agua y desague del Hospital Daniel Alcides Carrin - Callao

    Reparacin y mejoramiento de la lnea de 600 mm del sistema de agua potable, eje Paita - Talara

    Water and drainage system improvement of the Daniel Alcides Carrion Hospital Callao

    600 mm line repairing and improvement of the drinking water system, Paita shaft Talara

    2009 2001

    2009 2001

    OBR

    AS

    CIV

    ILES

    7170 Ingeniera en Cimentaciones Profundas y Obras Portuarias Engineering in Deep Foundations and Harbor Works

  • Centro Empresarial Torrepinar, oficina 1103.

    Urb. Chacarilla, Surco, Lima - Per.

    Telf: (51 1) 221 6246 Fax: (51 1) 222 3632

    e-mail: [email protected]

    w w w. p s v. c o m . p e