BROADWAY PEDESTRIAN IMPROVEMENTS...Jun 08, 2015  · Hourly 24-Hr Weekday Volume @ Broadway & 5. th....

11
LOWER BROADWAY PILOT PEDESTRIAN IMPROVEMENTS Metro Public Works June 8, 2015

Transcript of BROADWAY PEDESTRIAN IMPROVEMENTS...Jun 08, 2015  · Hourly 24-Hr Weekday Volume @ Broadway & 5. th....

Page 1: BROADWAY PEDESTRIAN IMPROVEMENTS...Jun 08, 2015  · Hourly 24-Hr Weekday Volume @ Broadway & 5. th. Avenue . 1215 1471 1527 554 . 1187 . 1485 . 933 . 0. 200. 400. 600. 800. 1000.

LOWER BROADWAY PILOT PEDESTRIAN IMPROVEMENTS

Metro Public Works June 8, 2015

Page 2: BROADWAY PEDESTRIAN IMPROVEMENTS...Jun 08, 2015  · Hourly 24-Hr Weekday Volume @ Broadway & 5. th. Avenue . 1215 1471 1527 554 . 1187 . 1485 . 933 . 0. 200. 400. 600. 800. 1000.

EXISTING CONDITIONS

• High Pedestrian Volumes (Day & Night) • Long Crossing Distances • Limited Pedestrian Space • Congested Sidewalks

• 6 Travel Lanes + Curb Parking/Loading • 1,500 during PM peak hour (2-way) • 15,000 Vehicles Per Day • Low Vehicular Volumes Vs. Capacity

Page 3: BROADWAY PEDESTRIAN IMPROVEMENTS...Jun 08, 2015  · Hourly 24-Hr Weekday Volume @ Broadway & 5. th. Avenue . 1215 1471 1527 554 . 1187 . 1485 . 933 . 0. 200. 400. 600. 800. 1000.

EXISTING CONDITIONS

Lower Broadway Cross-Section

80’

106’ Only 16% of ROW =

Effective Pedestrian Space

Page 4: BROADWAY PEDESTRIAN IMPROVEMENTS...Jun 08, 2015  · Hourly 24-Hr Weekday Volume @ Broadway & 5. th. Avenue . 1215 1471 1527 554 . 1187 . 1485 . 933 . 0. 200. 400. 600. 800. 1000.

Hourly 24-Hr Weekday Volume @ Broadway & 5th Avenue

1215 1471

1527

554

1187

1485

933

0

200

400

600

800

1000

1200

1400

1600

1800

12:0

0 A

M

3:00

AM

6:00

AM

9:00

AM

12:0

0 PM

3:00

PM

6:00

PM

9:00

PM

12:0

0 A

M

Peds Cars

Daily Vehicles @ Intersection = 21,000 Daily Pedestrians = 16,000

Page 5: BROADWAY PEDESTRIAN IMPROVEMENTS...Jun 08, 2015  · Hourly 24-Hr Weekday Volume @ Broadway & 5. th. Avenue . 1215 1471 1527 554 . 1187 . 1485 . 933 . 0. 200. 400. 600. 800. 1000.

BROADWAY - PILOT PROJECT GOALS

• Expand & Enhance Pedestrian Zone

• Eliminate On-Street Parking on Broadway

• Universal Loading Zone: – Freight – Musician – Carriage – Taxi – Valet

Confusing Regulations

Double Parking/Loading

Page 6: BROADWAY PEDESTRIAN IMPROVEMENTS...Jun 08, 2015  · Hourly 24-Hr Weekday Volume @ Broadway & 5. th. Avenue . 1215 1471 1527 554 . 1187 . 1485 . 933 . 0. 200. 400. 600. 800. 1000.

How Can We Reallocate ROW For All Users on Broadway?

Dedicate Curb Lane to Pedestrians Use Outside Lane for

Loading

Maintain 4 Travel Lanes

Page 7: BROADWAY PEDESTRIAN IMPROVEMENTS...Jun 08, 2015  · Hourly 24-Hr Weekday Volume @ Broadway & 5. th. Avenue . 1215 1471 1527 554 . 1187 . 1485 . 933 . 0. 200. 400. 600. 800. 1000.

LOWER BROADWAY PILOT PEDESTRIAN IMPROVEMENTS

5TH AVENUE TO 1ST AVENUE • Remove On-street Parking • Maintain 2 Travel Lanes in Each Direction • Expand Pedestrian Zone into Parking Lane • Designate Outside Lane for Universal Loading • Use Temporary Movable Fencing between

Expanded Pedestrian Space and Loading Zone • Optional: Painted Curbs

Page 8: BROADWAY PEDESTRIAN IMPROVEMENTS...Jun 08, 2015  · Hourly 24-Hr Weekday Volume @ Broadway & 5. th. Avenue . 1215 1471 1527 554 . 1187 . 1485 . 933 . 0. 200. 400. 600. 800. 1000.

TEMPORARY PILOT STUDY

Lower Broadway Cross-Section

80’

106’

30% of ROW = Effective Pedestrian Space

Page 9: BROADWAY PEDESTRIAN IMPROVEMENTS...Jun 08, 2015  · Hourly 24-Hr Weekday Volume @ Broadway & 5. th. Avenue . 1215 1471 1527 554 . 1187 . 1485 . 933 . 0. 200. 400. 600. 800. 1000.

BROADWAY PILOT PLAN

FENCE GAPS

Page 10: BROADWAY PEDESTRIAN IMPROVEMENTS...Jun 08, 2015  · Hourly 24-Hr Weekday Volume @ Broadway & 5. th. Avenue . 1215 1471 1527 554 . 1187 . 1485 . 933 . 0. 200. 400. 600. 800. 1000.

BENEFITS OF PILOT CONCEPT • Established Pedestrian Zone 24/7 • Balanced ROW Utilization for All Users • Eliminates Confusing Loading Regulations

with Universal Loading Zone • Maintains Same # Effective Travel Lanes • Eliminates Pedestrians from “Hiding”

between Parked Cars

• MORE SPACE FOR PEOPLE • PLENTY OF LANES LEFT FOR CARS • PLACE MAKING FOR LOWER BROADWAY

Page 11: BROADWAY PEDESTRIAN IMPROVEMENTS...Jun 08, 2015  · Hourly 24-Hr Weekday Volume @ Broadway & 5. th. Avenue . 1215 1471 1527 554 . 1187 . 1485 . 933 . 0. 200. 400. 600. 800. 1000.

NEXT STEPS • Implement Pilot Study – Mid-August • Monitor Conditions • Receive Public Input & Evaluate • Collect Additional Data during Pilot Study • Evaluate Long-term Treatment

LET’S SEE HOW IT WORKS!