Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.

30
Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015

Transcript of Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.

Page 1: Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.

Broad Beach Sand & Dune Habitat Restoration Project

Broad Beach Revetment OwnersAugust 29, 2015

Page 2: Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.

Proposed Broad Beach Restoration

MISSION:1. Restore historically wide beach by adding sand and restoring dune habitat 2. Maintain buried permanent revetment for future storm protection.

Page 3: Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.

Alternative 4C Highlights- Project Footprint: No nourishment west of 31380

Broad Beach Road

- Revetment Alignment: Affects 30760-30978 BB Rd

- Revised Dune Plan: 3:1 ratio of dunes restored to dunes impacted

- Septic Feasibility Study: Complete w/in 3 yrs of CDP

- Backpassing & Nourishment Triggers: Avoid lateral access easements

- Comprehensive Monitoring Plan & Science Advisory Panel: BBGHAD & CCC to share management

- Requested 20 year term: 10 yr + extension?

Page 4: Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.

Project Update

• Post 12/14: Extensive meetings with senior regulatory staff members

• Progress: overall Project concept, west end nourishment, revetment location and entitlement; sand source, spec, and logistics

• Alternative 4C: submitted 4/15

• CCC hearing: anticipated 10/15

• Army Corps & others: approx Fall 2015

• Proposed Construction Start: Early 2016?

Page 5: Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.

Beach Restoration: Photo Simulation- West

Page 6: Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.

Beach Restoration: Photo Simulation- Central

Page 7: Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.

Beach Restoration: Photo Simulation- Central from 31048

Page 8: Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.

Beach Restoration: Photo Simulation- East

Page 9: Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.

Typical Proposed Beach & Dune Cross Sections

31324 Broad Beach Road

30916 Broad Beach Road

Page 10: Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.

Revetment Realignment – 30760 to 30968

• Pullback contemplated since 2010 ECDP• BBGHAD contested & negotiated pullback mandated by CCC/

other agencies• Realignment may alter certain backyard improvements

Page 11: Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.

Revetment Realignment- updated 8/28/15

Page 12: Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.

Post Construction Condition Eastern End of Revetment

Pulled Back Revetment Covered with Dune Plants

Nourished Beach

Final dune design subject to approved dune restoration plan

Page 13: Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.

Existing Condition

Existing 2010 Revetment

As shown: 30860 Broad Beach Rd.

Page 14: Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.

BBGHAD Proposed RevetmentPullback

Nourished Beach Condition

Pulled Back Revetment Covered with Dune Plants

Nourished Beach

Existing Leach Fields

Future Leach Field

Final dune design subject to approved dune restoration plan

As shown:30860 Broad Beach Rd.

Page 15: Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.

BBGHAD Proposed RevetmentPullback

Nourished Beach Condition

Pulled Back Revetment Covered with Dune Plants

Nourished Beach

Existing Leach Fields

Future Leach Fields

Final dune design subject to approved dune restoration plan

As shown: 30866 Broad Beach Rd.

Page 16: Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.

BBGHAD Proposed Revetment Pullback

Nourished Beach Condition

Pulled Back Revetment Covered with Dune Plants

Nourished Beach

Existing Leach Fields

Future Leach Fields

Final dune design subject to approved dune restoration plan

As shown: 30952 Broad Beach Rd.

Page 17: Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.

BBGHAD Proposed RevetmentPullback

Nourished Beach Condition

Pulled Back Revetment Covered with Dune Plants

Nourished Beach

Existing Leach Fields

Future Leach Fields

As shown: 31022 Broad Beach Rd.

Final dune design subject to approved dune restoration plan

Page 18: Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.

Alternative 4C: Proposed Dune Footprint: West to Middle Area

Page 19: Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.

Alternative 4C: Proposed Dune Footprint: Middle to East End

Page 20: Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.

West End Nourishment Limitation

• Ends nourishment at 31380 Broad Beach Rd.• Preserves “boulder field” between 31444 and 31380• Limits depth of cover to approximately natural conditions west of

31380

Boulder Field

31380

Page 21: Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.

West End Sensitive Marine Resources31380 Broad Beach Rd

21

Page 22: Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.

Summary of West End Analyses

GOAL 1: Natural sedimentation levels determined- Spring accumulation varies up to 3 feet

- Fall accumulation up to 5 feet

GOAL 2: Project-related sand transport & burial determined- 3D mapping used to quantify Project burial exceeding natural levels

GOAL 3: Impacts to sensitive resources analyzed - No predicted impact to eelgrass and kelp

- Impacts to surfgrass predicted to be less than significant

- Impacts to lower intertidal boulder field predicted to be less than significant

- As expected, beach nourishment project adds sand to upper intertidal and sandy habitats

Page 23: Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.

Septic System Study

Proposed Compromise:

• 2 years after CDP becomes effective

• Implementation based on findings: 6+ yrs

Page 24: Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.

Proposed Backpassing & Renourishment TriggersActivity Triggered when…

Backpassing • West end beach less than 75’ for 3 months and sufficient sand at east end to backpass: likely 1-2x per 5 years

Interim Nourishment

• West end beach less than 30’ for 6 months• Add up to 75,000 cy: proposed assessment funds no more than 3

per 5 yrs.• Avoid summer placement• Discretionary

Erosion Nourishment

• Less that 10’ dry beach width fronting revetment• Place at least 75,000 cy / avoid summer placement• Not discretionary – GHAD commits to keep minimum 10’ beach

width fronting revetment instead of providing lateral access easements landward of revetment

• Maximum 3 erosion nourishments within 10-yr period

Page 25: Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.

BBGHAD’s Proposed Monitoring

• Resource Monitoring During Construction• Adaptive Management and Monitoring• Dune Habitat Restoration and Monitoring Plan• Long-term Marine Resources Monitoring, Reporting, and

Mitigation Plan• Public Access Management Program• Science Advisory Panel ("SAP“) • Cost: Approximately $3M/10 years

Page 26: Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.

Beach Width Monitoring “Transects”

Page 27: Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.

Primary Remaining Issues With CCC

1. Revetment Alignment & Duration

2. Dune footprint

3. Scope of public/lateral access

4. Permit term

5. SAP Details

6. Sand specification

Page 28: Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.

Moving Forward

1. Revised Engineer’s Report- Board adopted July 2015; Resolution No. 2015/03

2. Proposed New Assessment: $595/linear foot; 25% for those west of 31380

3. Property Owners’ vote on new assessment: ends 9/6/15 at 9:00 a.m.

4. Construction Schedule: Early 2016?

Page 29: Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.

END

Page 30: Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.

Predicted Westward Sand TransportAfter 75,000 cy “Interim Nourishment”