BRISBIMFEB2016 BIM TO TIM –DIGITAL ENGINEERING NEXT...

26
© Laing O’Rourke 2016, all rights reserved. New Generation Rolling Stock (NGRS) Project, Queensland, Australia. BIM TO TIM – DIGITAL ENGINEERING NEXT STEPS BRISBIM FEB 2016

Transcript of BRISBIMFEB2016 BIM TO TIM –DIGITAL ENGINEERING NEXT...

Page 1: BRISBIMFEB2016 BIM TO TIM –DIGITAL ENGINEERING NEXT STEPSbrisbim.com/wp-content/uploads/2017/03/BIM-to-Tim_Digital... · Ray O’Rourke KBE Chairman & Chief Executive O’Rourke

© Laing O’Rourke 2016, all rights reserved.

New Generation Rolling Stock (NGRS) Project, Queensland, Australia.

BIM TO TIM – DIGITAL ENGINEERING NEXT STEPSBRISBIM FEB 2016

Page 2: BRISBIMFEB2016 BIM TO TIM –DIGITAL ENGINEERING NEXT STEPSbrisbim.com/wp-content/uploads/2017/03/BIM-to-Tim_Digital... · Ray O’Rourke KBE Chairman & Chief Executive O’Rourke

© Laing O’Rourke 2015, all rights reserved

OUR VISION FOR DIGITAL ENGINEERING2

“..we need to look beyond the concept as a software interface for producing better geometric information, and focus on the rich content that populates it. Digital Engineering will deliver an integrated set of geometric models, data and documentation that builds over the life of a project to capture all knowledge related to that asset”

Ray O’Rourke KBE Chairman & Chief Executive

integrated set of geometric models, integrated set of geometric models, an

integrated set of geometric models, integrated set of geometric models, integrated set of geometric models, integrated set of geometric models, integrated set of geometric models, integrated set of geometric models, that builds that builds

integrated set of geometric models, integrated set of geometric models, that builds that builds that builds

over the life of a project to capture all over the life of a project to capture all data and documentationdata and documentationover the life of a project to capture all over the life of a project to capture all over the life of a project to capture all over the life of a project to capture all knowledge related to that knowledge related to that knowledge related to that knowledge related to that over the life of a project to capture all over the life of a project to capture all knowledge related to that knowledge related to that over the life of a project to capture all over the life of a project to capture all over the life of a project to capture all over the life of a project to capture all over the life of a project to capture all over the life of a project to capture all over the life of a project to capture all over the life of a project to capture all

asset”asset”asset”asset”asset”

O’Rourke KBE O’Rourke KBE Chairman & Chief ExecutiveChairman & Chief Executive

O’Rourke KBE O’Rourke KBE Chairman & Chief ExecutiveChairman & Chief ExecutiveChairman & Chief ExecutiveChairman & Chief Executive

Page 3: BRISBIMFEB2016 BIM TO TIM –DIGITAL ENGINEERING NEXT STEPSbrisbim.com/wp-content/uploads/2017/03/BIM-to-Tim_Digital... · Ray O’Rourke KBE Chairman & Chief Executive O’Rourke

© Laing O’Rourke 2015, all rights reserved

WHY USE DIGITAL ENGINEERING3

Page 4: BRISBIMFEB2016 BIM TO TIM –DIGITAL ENGINEERING NEXT STEPSbrisbim.com/wp-content/uploads/2017/03/BIM-to-Tim_Digital... · Ray O’Rourke KBE Chairman & Chief Executive O’Rourke

© Laing O’Rourke 2015, all rights reserved

THE DIGITAL FUTURES QUESTION4

Page 5: BRISBIMFEB2016 BIM TO TIM –DIGITAL ENGINEERING NEXT STEPSbrisbim.com/wp-content/uploads/2017/03/BIM-to-Tim_Digital... · Ray O’Rourke KBE Chairman & Chief Executive O’Rourke

© Laing O’Rourke 2015, all rights reserved

THE DIGITAL FUTURES QUESTION5

reserved

Page 6: BRISBIMFEB2016 BIM TO TIM –DIGITAL ENGINEERING NEXT STEPSbrisbim.com/wp-content/uploads/2017/03/BIM-to-Tim_Digital... · Ray O’Rourke KBE Chairman & Chief Executive O’Rourke

© Laing O’Rourke 2015, all rights reserved

BIM TO TECHNOLOGY INFORMATION MANAGEMENT (TIM)6

https://www.linkedin.com/pulse/demise-bim-manager-ronan-collins?trk=prof-post

Page 7: BRISBIMFEB2016 BIM TO TIM –DIGITAL ENGINEERING NEXT STEPSbrisbim.com/wp-content/uploads/2017/03/BIM-to-Tim_Digital... · Ray O’Rourke KBE Chairman & Chief Executive O’Rourke

© Laing O’Rourke 2015, all rights reserved

DIGITAL ENGINEERING PROCESSES & DELIVERY

Basic Advanced

Page 8: BRISBIMFEB2016 BIM TO TIM –DIGITAL ENGINEERING NEXT STEPSbrisbim.com/wp-content/uploads/2017/03/BIM-to-Tim_Digital... · Ray O’Rourke KBE Chairman & Chief Executive O’Rourke

© Laing O’Rourke 2015, all rights reserved

WHAT ARE CLIENTS ASKING FOR ? (PART 2)8

© Laing O’Rourke 2015, all rights reserved

McKinsey & Co Survey (2016)• Data capture & analytics• 3d information linked to cost &

schedule• Collaborative platforms• Lifecycle approach

Laing O’Rourke response the trends is currently delivered through the DE menu and 5 steps

© Laing O’Rourke 2015, all rights © Laing O’Rourke 2015, all rights

Page 9: BRISBIMFEB2016 BIM TO TIM –DIGITAL ENGINEERING NEXT STEPSbrisbim.com/wp-content/uploads/2017/03/BIM-to-Tim_Digital... · Ray O’Rourke KBE Chairman & Chief Executive O’Rourke

© Laing O’Rourke 2015, all rights reserved

THE DIGITAL ENGINEERING STRATEGY9

Page 10: BRISBIMFEB2016 BIM TO TIM –DIGITAL ENGINEERING NEXT STEPSbrisbim.com/wp-content/uploads/2017/03/BIM-to-Tim_Digital... · Ray O’Rourke KBE Chairman & Chief Executive O’Rourke

© Laing O’Rourke, all rights reserved

100 Mount St, North Sydney, NSW

100 MOUNT STREETPROJECT

Page 11: BRISBIMFEB2016 BIM TO TIM –DIGITAL ENGINEERING NEXT STEPSbrisbim.com/wp-content/uploads/2017/03/BIM-to-Tim_Digital... · Ray O’Rourke KBE Chairman & Chief Executive O’Rourke

© Laing O’Rourke 2015, all rights reserved

11

100 MOUNT STREET TOWER, SYDNEY

Page 12: BRISBIMFEB2016 BIM TO TIM –DIGITAL ENGINEERING NEXT STEPSbrisbim.com/wp-content/uploads/2017/03/BIM-to-Tim_Digital... · Ray O’Rourke KBE Chairman & Chief Executive O’Rourke

© Laing O’Rourke 2015, all rights reserved

12

100 MOUNT STREET TOWER, SYDNEY

Page 13: BRISBIMFEB2016 BIM TO TIM –DIGITAL ENGINEERING NEXT STEPSbrisbim.com/wp-content/uploads/2017/03/BIM-to-Tim_Digital... · Ray O’Rourke KBE Chairman & Chief Executive O’Rourke

© Laing O’Rourke 2015, all rights reserved

13

100 MOUNT STREET TOWER, SYDNEY

Page 14: BRISBIMFEB2016 BIM TO TIM –DIGITAL ENGINEERING NEXT STEPSbrisbim.com/wp-content/uploads/2017/03/BIM-to-Tim_Digital... · Ray O’Rourke KBE Chairman & Chief Executive O’Rourke

© Laing O’Rourke 2016, all rights reserved.© Sydney Opera House Trust

Sydney Opera House, NSW

RENEWAL PROJECT ECIJOAN SUTHERAND THEATREJOAN SUTHERAND THEATRE

Page 15: BRISBIMFEB2016 BIM TO TIM –DIGITAL ENGINEERING NEXT STEPSbrisbim.com/wp-content/uploads/2017/03/BIM-to-Tim_Digital... · Ray O’Rourke KBE Chairman & Chief Executive O’Rourke

© Laing O’Rourke 2015, all rights reserved

15

SYDNEY OPERA HOUSE, JST RENEWAL PROJECT

Copyright Sydney Opera House Trust

Page 16: BRISBIMFEB2016 BIM TO TIM –DIGITAL ENGINEERING NEXT STEPSbrisbim.com/wp-content/uploads/2017/03/BIM-to-Tim_Digital... · Ray O’Rourke KBE Chairman & Chief Executive O’Rourke

© Laing O’Rourke 2015, all rights reserved

16

SYDNEY OPERA HOUSE, JST RENEWAL PROJECT

SOH/Consultant model v’s point cloud (clear differences)

Arup 2003-2010 historic model v’s point cloud Accurate to +- 5mm

Copyright Sydney Opera House Trust

Copyright Sydney Opera House TrustCopyright Sydney Opera House Trust

Page 17: BRISBIMFEB2016 BIM TO TIM –DIGITAL ENGINEERING NEXT STEPSbrisbim.com/wp-content/uploads/2017/03/BIM-to-Tim_Digital... · Ray O’Rourke KBE Chairman & Chief Executive O’Rourke

© Laing O’Rourke 2015, all rights reserved

17

SYDNEY OPERA HOUSE, JST RENEWAL PROJECT

Arup 2003-2010 model v’s point cloud Accurate to +- 2mmCopyright Sydney Opera House Trust

Page 18: BRISBIMFEB2016 BIM TO TIM –DIGITAL ENGINEERING NEXT STEPSbrisbim.com/wp-content/uploads/2017/03/BIM-to-Tim_Digital... · Ray O’Rourke KBE Chairman & Chief Executive O’Rourke

© Laing O’Rourke, all rights reserved

The Francis Crick Institute, London, UK

TECHNOLOGY INFORMATIONMANAGEMENT & DE

Page 19: BRISBIMFEB2016 BIM TO TIM –DIGITAL ENGINEERING NEXT STEPSbrisbim.com/wp-content/uploads/2017/03/BIM-to-Tim_Digital... · Ray O’Rourke KBE Chairman & Chief Executive O’Rourke

© Laing O’Rourke 2015, all rights reserved

19

PROPER PREPARATION PREVENTS POOR PERFORMANCE

• infrastructure industry ‘BIM’ protocols

• Software agnostic

• Industry readiness assessed

• 3D components library

© Laing O’Rourke 2015, all rights reserved

Page 20: BRISBIMFEB2016 BIM TO TIM –DIGITAL ENGINEERING NEXT STEPSbrisbim.com/wp-content/uploads/2017/03/BIM-to-Tim_Digital... · Ray O’Rourke KBE Chairman & Chief Executive O’Rourke

© Laing O’Rourke 2015, all rights reserved

20

INFORMATION ACCESS WITH THE END IN MIND

Estimating Document ControlQuality DeliveryHSEC Commissioning and

Asset management

Planning and Progress

MeasurementProject ControlsProcurement Contract

Administration FinanceEngineering and Design

Project Functions (information producers and consumers)(information producers and consumers)(information producers and consumers)(information producers and consumers)(information producers and consumers)

Estimating Document ControlQuality DeliveryHSEC Commissioning and

Asset management

Planning and Progress

MeasurementProject ControlsProcurement Contract

Administration FinanceEngineering and Design

Project FunctionsProject Functions (information producers and consumers)(information producers and consumers)(information producers and consumers)(information producers and consumers)(information producers and consumers)(information producers and consumers)

Project ControlsProject Controls

(information producers and consumers)(information producers and consumers)(information producers and consumers)(information producers and consumers)(information producers and consumers)(information producers and consumers)(information producers and consumers)

FinanceAdministration

Page 21: BRISBIMFEB2016 BIM TO TIM –DIGITAL ENGINEERING NEXT STEPSbrisbim.com/wp-content/uploads/2017/03/BIM-to-Tim_Digital... · Ray O’Rourke KBE Chairman & Chief Executive O’Rourke

© Laing O’Rourke 2015, all rights reserved

21

• 2D Drawings

• Possibly 3D bearing positioning

• Possibly 3D TIN of existing ground

Industry Business as Usual… …LOR DE

• Fully Modelled coordinated Structure

• Volume & Set out Checks

• WBS & Estimate attributes

• Drawing Links

TRADITIONAL TO DIGITAL ENGINEERING VIA GIS

positioningpositioningPossibly 3D bearing Possibly 3D bearing positioningpositioning

Possibly 3D TIN of existing groundPossibly 3D TIN of existing ground

Possibly 3D bearing Possibly 3D bearing

Possibly 3D TIN of existing groundPossibly 3D TIN of existing groundPossibly 3D TIN of existing groundPossibly 3D TIN of existing ground

Page 22: BRISBIMFEB2016 BIM TO TIM –DIGITAL ENGINEERING NEXT STEPSbrisbim.com/wp-content/uploads/2017/03/BIM-to-Tim_Digital... · Ray O’Rourke KBE Chairman & Chief Executive O’Rourke

© Laing O’Rourke 2015, all rights reserved

22

TRADITIONAL TO DIGITAL ENGINEERING VIA GIS

Uncoordinated Bridge length

Overlapping scope

Drainage design on obsolete alignment

Industry Business as Usual… …LOR DEOverlapping Overlapping scopescope

Page 23: BRISBIMFEB2016 BIM TO TIM –DIGITAL ENGINEERING NEXT STEPSbrisbim.com/wp-content/uploads/2017/03/BIM-to-Tim_Digital... · Ray O’Rourke KBE Chairman & Chief Executive O’Rourke

© Laing O’Rourke 2015, all rights reserved

23

THE TANGIBLE BENEFITS OF DIGITAL ENGINEERING

FME has the following benefits:Scope – Allow data transformation on many time of formats, including projections, colouring, image analysis, terrain

modelling etc.

Batch Processing – FME can process large number of files through different operations, particularly good at GIS like

format or file sizes

Library / Knowledge centre – FME has a good online knowledge base with example for most common tasks, and an

excellent support team

No Code Writing – ‘Visual’ Scripting

Page 24: BRISBIMFEB2016 BIM TO TIM –DIGITAL ENGINEERING NEXT STEPSbrisbim.com/wp-content/uploads/2017/03/BIM-to-Tim_Digital... · Ray O’Rourke KBE Chairman & Chief Executive O’Rourke

© Laing O’Rourke 2015, all rights reserved

24

THE TANGIBLE BENEFITS OF DIGITAL ENGINEERING

© Laing O’Rourke 2015, all rights reserved

Actual Design Cost

today

Planned Design Cost

DESIGNCONSTRUCTION

Possible Design Cost

Less expensive (tools & protocols are developed, team are

trained etc.)

More expensive (designers know better) in particular areas

such as GIS / CDE

Set up coordination and design review meetings around

models, as primary method of collaboration

Reduce drawings requirements up until IFC, by reducing the

abortive progressive drawing production allows better model

development

Quantities take off ownership, clear articulation on model

structure and development to allow this to happen

Dimension Control from models, this is contractual issue on

responsibilities of setting out that really needs to be resolved

Page 25: BRISBIMFEB2016 BIM TO TIM –DIGITAL ENGINEERING NEXT STEPSbrisbim.com/wp-content/uploads/2017/03/BIM-to-Tim_Digital... · Ray O’Rourke KBE Chairman & Chief Executive O’Rourke

© Laing O’Rourke 2015, all rights reserved

IN CONCLUSION25

• Digital Engineering is a Laing O’Rourke

committed project deliverable and therefore

a project team commitment;

• Digital Engineering is a Laing O’Rourke

Differentiator;

• Digital Engineering is NOT BIM;

• Digital Engineering is a ‘whole of project’

process;

• We use Digital Engineering as our ‘business

as usual’ approach on all project.

Page 26: BRISBIMFEB2016 BIM TO TIM –DIGITAL ENGINEERING NEXT STEPSbrisbim.com/wp-content/uploads/2017/03/BIM-to-Tim_Digital... · Ray O’Rourke KBE Chairman & Chief Executive O’Rourke

© Laing O’Rourke 2016, all rights reserved.© Laing O’Rourke 2015, all rights reserved.

26

Stuart BullStuart BullDigital Engineering Hub Digital Engineering Hub Leader

[email protected]

THANK YOU FOR YOUR ATTENTIONTHANK YOU FOR YOUR ATTENTION