Brig Caven Agh
-
Upload
opas-vichaikammart -
Category
Documents
-
view
232 -
download
0
Transcript of Brig Caven Agh
-
8/13/2019 Brig Caven Agh
1/49
Land Manoeuvre Systemsand theHardened and Networked Army
Defence and Industry Conference 2006
Canberra
Brigadier Grant Cavenagh
Director General Land Manoeuvre Systems
-
8/13/2019 Brig Caven Agh
2/49
The Hardened and Networked Army
Through the Hardened and Networked Army the Chief of Army will ensurethat Army meets its current commitments and prepares for the challenges ofthe future. The Chief of Army has stated:
Army requires a force with increased flexibility, adaptability and agility.Army must be adept at operating in rapidly changing structures where joint,
coalition and multi-agency operations are a matter of course.
The Hardened and Networked Army will enhance Armys protection,mobility, firepower and communications. We will be able to take a hit and
survive and then when we engage we will do it with discrimination and
precision.
-
8/13/2019 Brig Caven Agh
3/49
Key outcomes of a Hardened and Networked Army:
Increase survivability through combat weight, protected mobility and firepower
Increase sustainability by moving to an Army of Twos
Optimise capability coming from the DCP by adjusting plans for some new
systems Enhance training, education and doctrine
Increase land, joint and coalition interoperability through enhanced networking
Enhance readiness by increasing the size of Army and rebalancing capabilities
Make Army more capable and adaptable by moving from battalion groups tocombined arms battle groups
Enhance combat support and logistic capabilities
Optimise Armys base disposition
Minimise the long term cost of ownership
-
8/13/2019 Brig Caven Agh
4/49
Current Status 14 vehicles in the Middle East. All troop variants were delivered by 18 May
06. Command variant delivery hascommenced.
Troop variant is contractually fullycompliant
ADI Ltd through life support implemented
Overview Acquisition of 299 Infantry Mobility
Vehicles in six variants Deliveries from 2005 to 2007 Sole-source contract with ADI Limited Total Project value ~ $352m (Oct 05)
Delivery planned for Brisbane,Townsville, Darwin and RAAF
Project Land 116 Bushranger
-
8/13/2019 Brig Caven Agh
5/49
INFANTRY MOBILITY TROOP VARIANTINFANTRY MOBILITY COMMAND VARIANT
INFANTRY MOBILITY AMBULANCE VARIANT
-
8/13/2019 Brig Caven Agh
6/49
Acquistion Impacts andSustainment Impacts
A need to rewrite the fielding instruction,delivery plan and sequence.
Creation of new training courses
Re-scope and cost the Bushmaster Facilities.
A need to change the support service contractto include permanent support in theTownsville, Darwin and Hunter Valley regions,
although the centre for heavy grade repair willremain Brisbane.
Supply chain remains extant but more nodes.
Increased rotatables and repair part holdings.
-
8/13/2019 Brig Caven Agh
7/49
SUPPORT TO OPERATIONS
-
8/13/2019 Brig Caven Agh
8/49
-
8/13/2019 Brig Caven Agh
9/49
Land 106 M113 Upgrade Project - Background
Approved by Government June 2002
Contract with Tenix Defence signed 15 July 2002
350 upgraded vehicles
Enhanced mechanised capability for the Armys 1st
Brigade
-
8/13/2019 Brig Caven Agh
10/49
Land 106 - Key Deliverables 350 upgraded vehicles
171 M113AS4 Armoured Personnel Carriers 50 M113AS4 Armoured Logistic Vehicles 43 M577AS3 Armoured Command Vehicles 38 M113AS4 Armoured Fitters (maintenance) vehicles
12 M806AS4 Armoured Recovery Vehicles Light 21 M125AS3 Armoured Mortar Vehicles 15 M577AS3 Armoured Ambulances
Integrated Logistic Support
-
8/13/2019 Brig Caven Agh
11/49
-
8/13/2019 Brig Caven Agh
12/49
Land 106 - Highlights
Improved lethality
New electrically powered turret
Night fighting capable
Improved protection
Applique armour package
Internal spall curtains
Ballistic track shrouds Mine blast belly plate
-
8/13/2019 Brig Caven Agh
13/49
Land 106 - Highlights
Improved mobility
MTU 6V 199 TE Engine with ZFLSG1000 Transmission
Improved road and cross countryspeed
Improved habitability
lengthened by 667mm New stowage layouts
External fuel tanks
-
8/13/2019 Brig Caven Agh
14/49
Land 106 - Challenges
Australian environment
Design Test and Evaluation
Reliability Qualification Testing
-
8/13/2019 Brig Caven Agh
15/49
Current Status All 257 vehicles delivered to schedule
Standardisation over 60% complete All Remote Weapon Stations delivered Surveillance Prototype Acceptance
scheduled for Jul 07 Crew Procedural Trainers deliveries have
commenced
Overview Acquisition of 144 Phase 3 vehicles Standardisation of 113 Phase 2 vehicles Acquisition of 59 Remote Weapon
Stations and 9 Crew Procedural Trainers Acquisition of 18 surveillance suites
Sole-source contract with GeneralDynamics Land Systems Total Project value ~$1bn
Project Land 112 ASLAV
-
8/13/2019 Brig Caven Agh
16/49
ASLAV Standardisation Project
Upgrading 113 Phase 2 ASLAVs to thePhase 3 ASLAV build standard
Vehicle capability and logistical
commonality upgrade
Work conducted at General DynamicsLand Systems - Australia at Pooraka, SA
Cost to upgrade vehicles - $35M
Production commenced May 04 72 Vehicles upgraded to date
Due for completion by Oct 06
-
8/13/2019 Brig Caven Agh
17/49
ASLAV Behind Armour CommandersWeapon Station Project
Allows the commander to operate and fightthe vehicle, protected, by day and night,and in reduced visibility.
Weapon must be able to suppress threatsto dismounted personnel and provide selfprotection for the vehicle.
The Behind Armour Commanders Weapon
Station (BACWS) satisfies the project. 43 RWS have been fitted, 16 to be fitted
Positive feedback and reliability fromoperations
-
8/13/2019 Brig Caven Agh
18/49
ASLAV Surveillance Project
Provide mounted and dismountedsurveillance capability through theintegration of a radar, thermal imager, daycamera and laser range finder.
Contracted with DRS Systems &Electronics (USA) in Aug 05.
Prototype development progressing to
schedule.
Up to 18 suites will be procured for use byArmys Cavalry Regiments and trainingschool.
Introduction into service from 2008.
-
8/13/2019 Brig Caven Agh
19/49
Crew Procedural Trainer
Capability:The CPT will enable ASLAV crews to conduct thefull range of turret drills, gunnery skills and tacticaltraining to the highest level of simulated fidelity.
Scope:The ASLAV Crew Procedural Trainer (CPT)Project will acquire 9 x high-fidelity containerised
ASLAV turret simulators.
Schedule:The first batch of 3 x CPT have been delivered tothe School of Armour.The next two batches will be delivered to Army inlate 2006.
-
8/13/2019 Brig Caven Agh
20/49
21 x REMOTE WEAPON STATION (RWS)
55 x BAR ARMOUR SYSTEM (BAS)
52+ x SPALL
-
8/13/2019 Brig Caven Agh
21/49
Project Land 112 ASLAV
-
8/13/2019 Brig Caven Agh
22/49
Project Land 907 Tank Replacement
Current Status
Production progressing well Initial spares being delivered Logistics and training plans being
finalised Leopard disposal planning and
implementation progressing
Overview
Replace Leopard tank fleet withM1A1 Abrams
Acquisition mostly throughForeign Military Sales
Key Milestones: Delivery - Dec 06 to Nov 07 Initial capability - Dec 07
$557m (2006)
-
8/13/2019 Brig Caven Agh
23/49
59 M1A1 Abrams integrated management tanks,
Seven M88A2 HERCULES armoured recovery vehicles,
14 Heavy tank transporters,
Seven 10,000 litre fuel trucks,
Six advanced gunnery training simulators (AGTS),
One tank driver trainer (TDT),
A balanced logistic package, and
All of this by the end of 2007 - an aggressive schedule.
Land 907 - Key Deliverables
-
8/13/2019 Brig Caven Agh
24/49
-
8/13/2019 Brig Caven Agh
25/49
-
8/13/2019 Brig Caven Agh
26/49
Land 907- Highlights
Australian tanks are in being built byGeneral Dynamics Land Systems in Lima,Ohio.
M88A2s are in production by BAE Systems
plant in York, PA.
-
8/13/2019 Brig Caven Agh
27/49
Land 907 - Highlights
MAN truck with Drake trailer.
US Armys Force XXI Battle CommandBrigade and Below communication
system as a mature battlefieldmanagement system.
Advanced Gunnery Training System
and Tank Driver Trainer production onschedule to be shipped in June andoperational from early 2007.
-
8/13/2019 Brig Caven Agh
28/49
-
8/13/2019 Brig Caven Agh
29/49
QUESTIONS
-
8/13/2019 Brig Caven Agh
30/49
Quick overview of other important
projects and support activities
-
8/13/2019 Brig Caven Agh
31/49
Joint Project 141/2087 Incident Response Regiment Capability
Current Status
Base level achieved Jan 04
Mature Capability completed Dec05
Post maturity upgrade by Dec 07
Overview
Acquire specialist Chemical, Biological,Radiological, Nuclear and Explosive (CBRNE)equipment response capabilities
Manufacturer Variety of local and overseassuppliers
Project Value $52m for a wide range of
specialist equipment
-
8/13/2019 Brig Caven Agh
32/49
Heavy Remote Positioning VehicleHeavy Remote Positioning Vehicle
ECHIDNA ReplacementECHIDNA Replacement
Current Status
Contract placed mid 2005All systems delivered
Overview
Replace Echidna RemotePositioning Vehicle (RPVs) for
current users Manufactured by Telerob GMBH(Germany)
Project Value - $18M
-
8/13/2019 Brig Caven Agh
33/49
Minor Project - Medium GraderReplacement
Current Status
Contract Signed 31 March 2006 withHitachi Construction Machinery
(Australia) - local distributors ofJohn Deere ConstructionEquipment
Equipment Delivery starts Jul 06
Project Value - $16m
Overview
40 Medium Graders John Deere 672D - 6 wheel drive 10 machines to also include grade
control systems
-
8/13/2019 Brig Caven Agh
34/49
Medium Bulldozer Replacement
Current Status
Contract Signed 31 March 2006 withHitachi Construction Machinery
(Australia) - local distributors ofJohn Deere Construction Equipment
Equipment Delivery commences Jul06
Project Value - $16m
Overview 39 Medium Bulldozers
30 Bull Blade with Rippers
9 Bull Blade with Winch
John Deere 850J Model
-
8/13/2019 Brig Caven Agh
35/49
Bridge Erection and Propulsion Boat (BEPB)
Current Status
DMO delivered 24 BEPB : 5 eachto:
School (SME)
3 Combat Engineer Regiment
1 Combat Engineer Regiment
2 Combat Engineer Regiment
4 spare/rotational stock
Overview
The Boat is the propulsion systemfor the Army in-service FloatingSupport Bridge. Each bridge canspan a 100m gap or act as fixed or
floating ferry
-
8/13/2019 Brig Caven Agh
36/49
Joint Project 126 Phase 2- Joint Theatre
Distribution
Current Status First Pass approval occurred
- 19 Apr 05
Assisting CDG inpreparation for Second Passapproval
Second pass approval duelate 07
Overview Optimise the ADFs capability
to deliver combat services injoint operations.
Phase 2 - Physical Capabilities Acquisitions expected to be
COTS or MOTS Project Value ~ $126m
-
8/13/2019 Brig Caven Agh
37/49
Joint Project 2059 Phase 2 - Bulk LiquidDistribution - Fuel
Current Status
In contract. Deliveries complete FY 05/06 -06/07
Additional contracts to be established FY06/07
Project Value - $60M
Manufacturer - Various local and International
Overview
JP2059 Phase 2 will satisfy the bulk fueland water distribution requirements of aBrigade based Joint Task Force, theconcurrent deployment of a BattalionGroup on independent operations andthe unit-line refuelling requirements ofthe Armed Reconnaissance Helicopter
(ARH).
-
8/13/2019 Brig Caven Agh
38/49
Joint Project 2059 Phase 3 Water Purification and Desalination
Current Status In contract with Pall Australia to procure:
14 x water purification units (Army)
13 x reverse osmosis water purificationunits medium (Army)
3 x reverse osmosis water purificationunits heavy (Army)
Equipment will be delivered Aug 06 - Sep 08
Overview
JP 2059 Phase 3 Water Purification and
Desalination seeks to provide the ADF withthe capability to produce potable waterfrom a wide range of poor quality sourcewater
Manufacturer - Various
Project Value- $30M
-
8/13/2019 Brig Caven Agh
39/49
-
8/13/2019 Brig Caven Agh
40/49
Field Refrigeration
Storage & Distribution
Current Status
Project commenced Mar 06 Cost - $20.095M Manufacturer - Yet to go to
contract.
Overview
60 x 20 Refrigeration Units
125 x 10 Refrigeration Units
250 x Insulated Small LoadUnits
1500 x Small Load Units
-
8/13/2019 Brig Caven Agh
41/49
Special Forces Vehicles
Refurbishment of 39 Special Forces Patrol Vehicles Replacement of 4 x 4 and 6 x 6 ATVs Replacement of Off Road Motorcycles
-
8/13/2019 Brig Caven Agh
42/49
Special Forces Long Range Sustainment Vehicle
-
8/13/2019 Brig Caven Agh
43/49
Hardened Mack Cabin
-
8/13/2019 Brig Caven Agh
44/49
Protection for ADF Personnel
Deployed on Operations
Conversion of Mack Trucks to Tankers
15 x Hardened Cabins for ADF Unimogs Fitting similar Cabins to Mack Trucks Provides Small Arms and Mine Protection Manufactured in Australia by Valir Pty Ltd
11 x Truck Conversions to satisfy Army criticalrequirements (new capabilities)
Being undertaken by Mack Australia
-
8/13/2019 Brig Caven Agh
45/49
Air Defence Vehicle Upgrade Project
Deliver 84 Vehicles (4 x Variants) by mid 2007
-
8/13/2019 Brig Caven Agh
46/49
Other Vehicle Based Acquisitions
-
8/13/2019 Brig Caven Agh
47/49
Joint Project 2095 Aviation Fire Trucks
Current Status
Industry Brief conducted RFT in progress How many 16 Manufacturer still to do to
tender
Overview Replace RAAF Aircraft
Rescue and Fire Fighting(ARFF) fleet.
In Service Date of Dec 08 to
cover AIR 5402 Multi RoleTanker Transport Aircraft.
-
8/13/2019 Brig Caven Agh
48/49
Land Manoeuvre Systems
Defence and Industry Conference 2006
Canberra
Brigadier Grant CavenaghDirector General Land Manoeuvre Systems
-
8/13/2019 Brig Caven Agh
49/49