BRIEF SUMMARY AND CAPABILITY STATEMENT OF PT MINE …

15
MineGate BRIEF SUMMARY AND CAPABILITY STATEMENT OF PT MINE GATE INDONESIA 2021 PT MineGate Indonesia The East, 17 th Floor, Suite 1705 Jl Dr Ide Anak Agung Gde Agung Kav E3.2 No 1 Jakarta 12950, Indonesia P : +62 21 5793 8476 E : [email protected]

Transcript of BRIEF SUMMARY AND CAPABILITY STATEMENT OF PT MINE …

Page 1: BRIEF SUMMARY AND CAPABILITY STATEMENT OF PT MINE …

MineGate

BRIEF SUMMARY AND CAPABILITY STATEMENT OFPT MINE GATE INDONESIA

2021

PT MineGate IndonesiaThe East, 17th Floor, Suite 1705

Jl Dr Ide Anak Agung Gde Agung Kav E3.2 No 1

Jakarta 12950, Indonesia

P : +62 21 5793 8476 E : [email protected]

Page 2: BRIEF SUMMARY AND CAPABILITY STATEMENT OF PT MINE …

MineGate

INTRODUCTION

PT Mine Gate Indonesia (MineGate) is an Independent professional companybased in Jakarta, Indonesia, which provides mining consultancy and services forAsian and Australian mining industry, including foreign and local investors,commodity buyers, mine owners, mining contractors and other relevantstakeholders.

MineGate has capability to undertake the specialised mining projects as well asprovide solutions in the field of Resources and Reserves Statement Report inaccordance with JORC and KCMI Code, Mining Feasibility Study, IndependentTechnical Due Diligence / Review, Mining Project Improvement and Evaluation,Mine Planning Study and Supervision, and Additionally, Geological Explorationtogether with MineGate associate company or expertise.

MineGate advisory and technical team led by Mr Riandi Rachmawan and theAssociate Principal, Mr Terry Gray have intimate knowledge of the miningindustry landscape and have extensive experience in providing the types ofservices required to secure the key deliverables to the project.

Page 3: BRIEF SUMMARY AND CAPABILITY STATEMENT OF PT MINE …

MineGate

PROJECTS UNDERTAKEN

• MINING PROJECT IMPROVEMENT

• JORC / KCMI RESOURCES AND RESERVES REPORTING

• MINING PRE/ FEASIBILITY STUDY

• INDEPENDENT TECHNICAL DUE DILIGENCE

• MINE PLANNING SERVICES AND SUPERVISION

• MINING OPERATIONAL ASSISTANCE

• GEOLOGICAL EXPLORATION

Page 4: BRIEF SUMMARY AND CAPABILITY STATEMENT OF PT MINE …

MineGate

Effective and efficient mining operations and project management throughappropriate strategic planning are the key to obtain the competitive operational costfor either owner-operational or mining contractor method.

MineGate provides evaluations for the basic fundamentals of good mining practicesin respect of key technical and economical aspects which should be implemented inthe mining project /operation, together with appropriate management systems. Thisevaluation will provide a basis of the potential for improvement leverage

Based on the analysis of potential improvement leverages obtained, MineGate willprovide the realistic and reasonable action plan steps both short and long term,considering the continuous improvement principles for the client to eventuallyachieve the targeted level of mining operations and the cost efficiency.

PROJECTS DESCRIPTION

MINING PROJECT IMPROVEMENT

Page 5: BRIEF SUMMARY AND CAPABILITY STATEMENT OF PT MINE …

MineGate

Mineral / Coal Resources and Reserves Reporting in accordance with the recognisedReporting Code will provide reliable confidence levels on both commodity andassets for owners, investors, and relevant stakeholders alike. This also adds value tothe company in professionally reporting to an International Standard.

The Joint Ore Reserves Committee (JORC) Code published by The AustralasianInstitute of Mining and Metallurgy (AusIMM), The Australian Institute ofGeoscientist (AIG) and The Minerals Council of Australia (MCA) are collectively themost recognised code in the Asia and Australia Region and used as the basis for IPO,Banking and Investment purposes.

Particularly in Indonesia, the local Resources and Reserves Reporting Code has beenpublished and is being mandatorily implemented as the reporting code by theGovernment. This code, namely “Komite Cadangan Mineral Indonesia (KCMI) Code”is also widely recognised by the Indonesian Stock Exchange

MineGate has the Inhouse or Associate Competent Persons whom have significantexperience in the field of Resources and Reserves estimate and are capable to signand provide Resources and Reserves Reporting in accordance with both JORC andKCMI codes.

PROJECTS DESCRIPTION

JORC/KCMI RESOURCES AND RESERVES REPORTING

Page 6: BRIEF SUMMARY AND CAPABILITY STATEMENT OF PT MINE …

MineGate

Mining Feasibility Study is a fundamental key in the mine development stage prior tothe execution either in commencing the mine operations or increasing theproduction capacity. This study will mainly assess the Technical and Commercialaspects together with the key statutory requirements for the project sustainability

Based on the data accuracy and its level of confidence, the study can be categorisedas Pre-Feasibility Study and or Bankable/Definitive Feasibility Study. This study isalso being a mandatory requirements for Reserves Reporting in accordance withJORC 2012 Code Edition.

MineGate provides the Mining (Pre) Feasibility Study which is materially realistic,reasonable and trustable, prepared by the competent and experienced consultants inthe field of Feasibility Study Reporting.

PROJECTS DESCRIPTION

MINING (PRE) FEASIBILITY STUDY

Page 7: BRIEF SUMMARY AND CAPABILITY STATEMENT OF PT MINE …

MineGate

Independent Technical Due Diligence will assist investors, buyers, off-takers, andlenders in understanding the actual technical condition of the target entity/companyprior to deciding further strategic actions.

MineGate will structure the Due Diligence and determine the scope of work asrequired by the client such that it provides Independent and Reliable outcomes.

The major scope of MineGate Due Dilegences are (but not limited to) Resources andReserves Review, Mine Planning and Operational Review, Mining Logistics,Transportation and Infrastructure Review, Operating Costs, Capital Costs andFinancial Reviews.

PROJECTS DESCRIPTION

INDEPENDENT TECHNICAL DUE DILIGENCE

Page 8: BRIEF SUMMARY AND CAPABILITY STATEMENT OF PT MINE …

MineGate

Mine planning is one of the most important aspects underpinning best miningpractice implementation. This is a critical and essential component of effective andefficient mining operations.

Mine Planning provides the strategical outlook in achieving the optimum productionoutputs, optimising operational performance as well as cost efficiency.

MineGate provides Mine Planning Services as required by Clients such as long termand strategical mine planning, short to mid term planning, site supervision andassistance, development of company mine planning systems, coaching clinics andaudits of company mine planning processes for further improvement.

PROJECTS DESCRIPTION

MINE PLANNING SERVICES AND SUPERVISION

Page 9: BRIEF SUMMARY AND CAPABILITY STATEMENT OF PT MINE …

MineGate

Best Mining Operational Practices are the key to an effective and efficient miningoperation which ultimately can minimise the cost of operations.

MineGate also provides an advisory Mine Management Partnership and closemonitoring of mine site operations to manage mining method and steps undertaken,equipment productivity, equipment availability and utilisation, site reportingstandards, contractor management and mine planning implementation

PROJECTS DESCRIPTION

MINING OPERATIONAL ASSISTANCE

Page 10: BRIEF SUMMARY AND CAPABILITY STATEMENT OF PT MINE …

MineGate

A well managed exploration programme is the key to precisely achieve the “worth-spend” exploration capital expenditure.

MineGate can provide an accurate and effective exploration plan, through design andsupervision, in order to achieve the expected resources outcome in accordance witha recognised standard code/guideline .

MineGate is also in association with experienced exploration contractors to providethe field work resources; and are capable to manage and supervise an efficientexploration project.

PROJECTS DESCRIPTION

GEOLOGICAL EXPLORATION

Page 11: BRIEF SUMMARY AND CAPABILITY STATEMENT OF PT MINE …

MineGate

• The Griffin Coal Mining Pty Ltd (Australia)

• Oceania Resources Pty Ltd (Australia)

• Raifeissen Bank AG (Singapore)

• AXIS Bank Ltd (Dubai Branch)

• PAG Asia Ltd (Hong Kong)

• Smart Alliance Ltd (Hong Kong)

• Param Mitra Coal Resources Pte Ltd (Singapore)

• PT Krida Makmur Bersama(Indonesia)

• PT Rencana Mulia Baratama(Indonesia)

• PT Indo Bara Pratama (IBP)

• PT Kutai Bara Nusantara (Indonesia)

• PT Ade Putra Tanrajeng (Indonesia)

• PT Guruh Putra Bersama (Indonesia)

• PT Stania Bara Consulting (Indonesia)

• PT GeoXP (In association, Indonesia)

• PT J Resources Nusantara (Indonesia)

• The Syndicated Lenders of PT J Resources Nusantara (Led by Indonesia EximBank)

• PT Arutmin Indonesia (Indonesia)

• PT Bumi Resources Tbk (Indonesia)

• PT MEC Coal (Indonesia)

• Sainik Mining Group (India)

Our Valued Clients

Page 12: BRIEF SUMMARY AND CAPABILITY STATEMENT OF PT MINE …

MineGate

•Terry Gray has worked extensively in the Mining Industry inthe UK, Australia and Indonesia over a period of 40 years andhas been resident in Indonesia since 1994.

•Mr. Gray previously worked in Indonesia for a majorinternational contract mining service provider and wasinvolved in all of their major mining operations in his 10 yearservice. During that period he held a number of key seniorroles, including Mining Operations Manager. Additionally, healso jointly owned and managed the Britmindo Group, whichprovides mining consultancy services as a Director duringthe period 2006 – 2015. More recently he has been assistinga leading bank in managing a mining project in Australia.

•Mr. Gray has an intimate knowledge of the local miningindustry and has dealt closely with major internationalmining companies operating in Indonesia and Australia. Hehas conducted a substantial amount of technical andoperational studies at both large and small IndonesianMines.

•Mr. Gray holds a Diploma in Engineering from DoncasterCollege of Mines, UK and is a Member of the AustralasianInstitute of Mining and Metallurgy (MAusIMM).

TERRY GRAY

•Riandi Rachmawan has been working in the Miningindustry for over 12 years. He has significant experience inthe field of Mine Planning and Mine Operations. Hepreviously worked for Geomechanics Laboratory ITB, PTArutmin Indonesia and PT Britmindo. Out of his majoremployer, He had also worked as an External ProfessionalConsultant working in conjunction with AT KearneyIndonesia. Recently, He leads MineGate in the mine planningimprovement work at an Australian Coal Mine.

•During this time, he has been significantly exposed tonumerous major mining technical studies, mine planningprojects, mining economical evaluations, mining projectimprovement, and JORC and KCMI reserves assessments. Hehas experiences in the use of most major pit optimisationsoftware, mine planning and scheduling systems.

•Mr. Rachmawan graduated from Bandung Institute ofTechnology, Bandung, Indonesia, majoring in MiningEngineering, He is a Member of the Australasian Institute ofMining and Metallurgy (MAusIMM) and is an IndonesianCompetent Person of “Perhimpunan Ahli PertambanganIndonesia” (CPI-PERHAPI), also registered as ProfessionalEngineer at The Institution of Engineers Indonesia (IPM-PII)

RIANDI RACHMAWAN

THE KEY TEAM

Associate Principal PM – Mining and Technical Services

Page 13: BRIEF SUMMARY AND CAPABILITY STATEMENT OF PT MINE …

MineGate

•Golden Ricky Sihombing has been working in theIndonesian Mining industry for over 15 years and hassignificant experience in the field of Exploration andResources Assessment. He has worked for PT MandiriSumber Perkasa, PT Surya Metro Persada Group, PTStania Bara Consulting and Britmindo Group.

•During his career, he has either managed orcontributed significantly to numerous explorationprograms for coal, nickel, and gold, coal mapping, wellsite management, geological modeling, estimations andevaluations of coal resources at many projects. He isexperienced in the use of geological database andmodeling systems.

•Mr. Sihombing graduated from PadjadjaranUniversity, Bandung, Indonesia, majoring in Geology.

GOLDEN RICKY SIHOMBING

•Mardiansyah has been working in the Mining industryfor over 11 years. He has significant experience in thefield of Mine Planning, Mine Operation, and MiningContract. He has worked for PT Kaltim Prima Coal, andPT Petrosea Tbk

•During this time he has had significant exposure tonumerous major mine design projects, minescheduling, mining operational improvement andevaluations of mining contract. He is experienced in theuse of most major mine planning and schedulingsystems, mining operational, and mining contract.

•Mr. Mardiansyah graduated from Bandung Institute ofTechnology, Bandung, Indonesia, majoring in MiningEngineering, He is a Member of the PERHAPI and wasonce the vice chairman Kutai Timur PERHAPI.

MARDIANSYAH

THE KEY TEAM

Deputy PM (Geology) Deputy PM (Mining)

Page 14: BRIEF SUMMARY AND CAPABILITY STATEMENT OF PT MINE …

MineGate

THE KEY TEAM

•Farah Susanti experienced in the field of Mine Planningand Geotechnical and has previously worked for PTAdaro Indonesia for over 3 years.

•During her career she has had significant exposure tonumerous major mine design projects, mine scheduling,mining operational improvement, slope stability analysisand various geotechnical projects.

•Ms Farah graduated from Bandung Institute ofTechnology, Bandung, Indonesia, majoring in MiningEngineering, During her study, she spent most of her timein Geomechanical and Mine Equipment Laboratory asProject Assistant.

FARAH SUSANTI