Brief Profile

AMS Engineers & Contractors

ISLAMABAD OFFICE

Office no. 01 2nd Floor, 89-Owais Centre-II

Main Commercial Markaz, PWDRoadPakistanTown,

Islamabad

Ph: +92515970852, 2374563 Mob: +923008673445

Fax: 051-2374562

Email: [email protected]

Rahim Yar Khan Office

Street No 1House No 13

ALI PARK

Rahim yar khan

Ph : +92 685874167, 5872634

Mob : +92 3008673031

Email: [email protected]

[email protected]

INTRODUCTION

M/s AMS Engineers & Contractors is a company with a focus on providing quality, high-end

construction works for both home and commercial purposes. AMS Engineers & Contractors based

Rahim YarKhan &in Islamabad, established in early 2005 by a group of highly trained and

experienced professionals. AMS Engineers & Contractors was created to construction services,

project engineering, estimating cost and scheduling control and field supervision, anytime,

anywhere in Pakistan.

AMS Engineers & Contractorsis highly capable in handling, civil& fabrication works and has a

strong team of highly qualified engineers and consultants. The company is glad to receive

continuous substantial support from many of our existing customers and business partners. Please

find below the brief introduction of AMS Engineers & Contractorsand its allied divisions. Themain

dimensions of business are as follow:

Civil works, Mechanical & Electrical Services

Buildings & infrastructure (Industrial, commercial & residential)

Heavy concrete structures including Tunnel Works

Earth works & Roads

Heavy Steel Structures, Pre engineering & Prefeb Structures

AMS Engineers & Contractors is registered with Pakistan Engineering Council in C-3 (uptoRs.

400 Million) Reg. no.4261.

M/s AMS is prequalified with,

Pakistan petroleum Ltd –(PPL )

Nestle Pakistan

Pakistan Atomic Energy Commission (MDP) Da of SPD

National Development Complex (NDC) DA of SPD

Frontier Works Organization (FWO) DA of SPD

C&W Punjab

Behria Town Rawalpindi

Best way Cement Chakwal

Siemens Pakistan

National Highway authority ( NHA )

China National chemical engineering corporation (CNCEC)

International Islamic University – Islamabad

TBEA China

University of Sargodha

Fauji Foundation

Fatima Fertilizer

Management & Expertise

Managing Director

Engr.Mazhar-ul-Islam Zafar (BSc. Civil Engineering)

Director Projects

Engr.Azhar-ul-Islam Zafar (BSc. Civil Engineering)

Sr.Consultant

Engr..Manzoor Ahmad (MSc. Chemical Engineering)

(SI)

AMS Management has been working in Saudi Arabia, UAE & Pakistan on various prestigious projects for

more than two decade .The Management strongly believes in efficient working to produce a quality

project. AMS have expertise of international standards in the following areas.

Buildings & infrastructure (Industrial & residential)

Heavy concrete structures

Earth works & Roads

Heavy Steel Structures& Prefab Buildings/structures

Tabulation of Projects / Work Experience

Project in Hand

Sr. No.

Name of owner

Name and location of

project

Name of main contractor (if

applicable)

Value of works

Completion Period Percentage

Completed

Nature of JOBS

Start Date

Finish Date

1

Wapda/NTDC

500/220/132 kV Grid Station at

SardargarhRahimyarkhan

TBEA-China

335.00 Million

Oct-11

ON-GOING

98%

Earthwork, Control building,

Mechanical service

building,132 kV relay building,

RCC cable.

2 Gulberg

Trade Center (Pvt.) Ltd

Gulberg Trade Center at Gulberg Green

Islamabad

N/A 300

Million Aug-14

ON-GOING

25% Contraction

of Commercial

3

Pakistan Atomic Energy

Commission

Classified N/A 250.00 Million

Aug-09 ON-Going 96%

Concrete Works Form

Works & Rebar

4

Al-Khidmat Foundation

Pakistan

Al-Kidmat Iman Hospital Talagang

District Chakwal

NA 32

Million Feb -15

ON-GOING

40% 3 Stories Hospital Building

5

Wapda/NTDC

CCPG

Associated Transmission line for Lahore

Central China Power Grid International Economic &

Trade Co. Ltd

40 Million

Jan-15 ON-GOING

65%

Civil works for

Transmission lines

6 Nahakki Tunnel

Concrete Lining Nahakki Tunnel

Yusaf Khail Mahmand

Agency FAATA

FWO 25

Million March-

15 ON-GOING

20%

Concrete Pouring

behind from work/shuttering for bed,

wall & crown

Project Completed

Sr. No

Name Of Owner

Name And Location of

Project

Name of Main

Contractor (if

Applicable)

Value of

Works

Completion Period

Percentage

Completed

Nature of JOBS

Start Date

Finish Date

1

Pakistan Atomic Energy

Commission

Classified N/A 9.076 Million

Dec-11

Sep-12

100%

Construction of

Prefabricated

Accommodation

2

Pakistan Atomic Energy

Commission

Classified N/A 27.00 Million

Feb-13 Dec-2014

100%

Prefab Structure & Fabrication

works 4

prefabration

3

Al-Khidmat Foundation

Pakistan

Raazi Hospital CBR Town Islambad.

NA 32

Million Sep - 13

Nov-2014

100%

5 Stories Hospital

Building (2 basement +

3)

4 Nestle

Pakistan KABIR WALA

Civil works at KABIRWALA

PLANT EKL

37.5 Million

July – 09

10-Jun 100%

Evaporator RCC

Building, Foundations , Officers

Guest house ,

Sewerage

5

Fatima Fertilizer

company Ltd /FFCL

Sadiqabad , Fatima Fertilizer

Project

China National Chemical

Engineering Company /CNCEC

65 Million

Dec-06 June- 2010 100%

Construction of Camp

building Control & Switching building

6

Fatima Fertilizer

company Ltd /FFCL

Fatima Fertilizer Project Sadiq Abad ,

NA 10

Million JUNE -

08 FEB - 2010 100%

Constructio

n of Box Culverts and pipe

culverts----60Nos

7 National

Development Complex NDC

Classified NA

Cumulative Value

101.5 Million

Nov-06 Nov-2011 100%

Concrete works,

Form work & Rebar

8

LOTTEE -PTA Bin Qasim Karachi

CIVL WORKS Catalyst

recovery unit (CRU)

China National Chemical

Engineering Company /CNCEC

5Million May-10

Jan - 2011

100%

Foundations Concrete

works , Form work & Rebar

9

Mirag Rebuild Factory --

MRF KAMARA

Construction of Aero Engine

test bed building - MRF

CENCO-Belgium / EKL

Lahore

24.5 Million

JUNE_08

JUNE- 09 100%

Building works

,Concrete works ,

Form work & Rebar , Acoustic Control Panals

10

Pakistan Petroleum ltd

----PPL/Ranhill

Berhard EPC

ADHI -LPG/NGL

plant 2 adhi

Ran hill berhard

More then

20mill Jan-05 Dec-06 100%

Control room ,

Switch gear room 45 main RCC

11 Bahria Town

ltd

Construction of safari villas at

phase 2 Rawalpindi.

NA 15

Million Apr-06 Feb-07 100% villas

12

National Highway

authority NHA

Resurfacing of N-5

_ 2

Million Feb-07 May-07 100%

Basement & surface treatment

13

Best way

cement ltd chakwal

Construction of Main-cafeteria

NA 1.9

Million Jun-05 Jan-06 100%

main cafeteria building

14

Pakistan

Engineers Forum

Quick build earth quake

resistive home NA

16 Million

Jan -06 Apr-06 100%

Quick build earth quake

resistant home

15

National Highway

authority NHA

Resurfacing of N-5

_ 3 Million Dec-07 Apr-08 100% Bitmac& surface

treatment

16 The Torch

Construction of” The Torch”

Plaza at Civic Center Phase –

4 Islamabad

NA 125

Million

June-13 To July-15

On Going 95%

Multi Stories

(Basement + 7)

M/s AMS Engineers & Contractors

Tabulation of AMS’s Key Personnel Experience

SR. NO

NAME DESIGNATION

TOTAL EXPERIENCE

MATRIC/INTER DEGREE/DIPLOMA (YEARS)

1 Engr.MazharUl Islam Managing Director - Bsc. Civil 24

2 Engr.AzharUl Islam Director Projects - Bsc. Civil/MBA 22

3 Manzoor Ahmad Senior Consultant - Msc. Chemical 35

4 Basharat Islam Zafar Site Incharge - BA 10

5 Muhammad Ishtiaq Malik

Manager Finance & Admin

- MBA Finance &

ICMA Inter - 15

6 Asad Ali Assistant Manager Finance & Admin

- MSC Economics/

Finance 10

7 Sher Afzal Khan Admin / Account - Graduation 33

8 Tariq Ilyas Project Manager Bsc. Civil 16

9 Mohsin Rauf Assistant Manager - BE Mechanical 5

10 Yasir Saleem Asst. Manager Contract & Proposal

- Diploma Civil 15

11 Toqeer Ahmad Const. Manager - Diploma 22

12 Sajid Ali Const. Manager - Diploma 18

13 Abdul Kareem Site Engr - Diploma 9

14 AftabNasir Site Engr - Diploma 16

15 M.Tahir Site Engr - Diploma 8

16 Tariq Islam Site engr - Diploma 8

17 Mudassar Iqbal Site Supervisor - Diploma 6

18 Mohammad Tahir Site Supervisor FA - 4

19 Muhammad Khan Asst. Finance & Admin FA - 20

20 Najibullah Site Supervisor FA - 20

21 Mohammad Nawaz

Site Supervisor Metric -

15

22

Babar Sultan

civil supervisor

Metric

-

19

23 Saqib Tufail Site Supervisor - Diploma 2

24 Abdul Ahad Site Supervisor - Diploma 2

25 Ghayur Abbass Site Supervisor - Diploma 5

26 Saif Ullah Fab. Supervisor FA - 17

27 Zahoor Aziz Foreman Metric - 11

28 M. Ashraf

Foreman Metric - 28

29 M. Aziz

Foreman Metric - 31

30 Ali dad

Foreman Metric - 25

31 M. saber

Foreman Metric - 19

32 Muhammad Usman

Foreman Metric - 8

33 Maqsood Ahmad

Foreman Metric - 7

34 Munir Ahmed Store Keeper Metric - 10

35 SajidFarooq Store Keeper Metric - 7

LIST OF TOOLS & PLANTS

Sr.# Equipment’s ,Tools & Plants Quantity Condition Remarks

1 Concrete Batching Plant 1 Good

2 Concrete Transit Mixer 2 Good

3 Generator 110KV 1 Good

4 Loader 926 1 Good

5 Rooler 1 Ton 1 Good

6 Tractor trolley 3 Fair

7 Water Tankers 2 Fair

8 Water pressure pump with nozzles 3 Good

9 Dewatering pumps 3 Fair

10 Plate compactor/Jumper 2 Good

11 Concrete Mixer machines’’ 0.15 M3’’ 2 Fair

12 Wheel Borrows 20 Fair/Good

13 100mm water well Motor 1 Fair

14 50mm water wells Motors 1 Fair

15 25mm water wells Motors 2 Fair

16 Concrete Vibrators 8 Good

17 Bitumen Heating tank with sprayer 1 Fair

18 Welding Plant 1 Fair

19 Steel plate shuttering(SFT) 15000- SFT Good

20 Grinders, cutters, drill machines (heavy and light) 15 nos. Good

21 C channel forming machine 01 Good

22 Keys, jacks, wrenches and misc tools

Good

23

Capabilities available for press, sandwich panel forming machine and all kinds of fabrication/ machining jobs

Good

24 All types of safety gear

Good

25

Scaffolding pipes (Ft) with joints

45000RFT

Good

26 Joints 17500 NO Good/Fair

27 Wooden batons 1550 Fair

28 Rebar Cutting machine 3 Fair

29 Rebar Bending machine 2 Fair

30 Survey Total station 1 Good

31 Survey Theodolite 2 Good

32 Level equipment 4 Good

33 Office Containers 5 Good

34 Store Containers 2 Good

35 Hilti Concrete Cutter 3 Good

36 Steel Girder Beams for Roofs 53 Good

37 Generator 20KV 2 Good

38 Generator 7.5 KV 1 Fair

39 Cube crushing machine 1 Good

40 Sand equivalent test apparatus 1 Good Lab

41 Test cylinders 6 Good Lab

42 Sulpher capping machine 1 Good Lab

43 Cassegrandeapparatus 1 Good Lab

44

Sand Replacement Compaction test apparatus 1 Good Lab

Gulberg Trade Center at Gulberg Green Islamabad.

Gulberg Trade Center at Gulberg Green Islamabad.

The Torch Plaza (Civic Center Bahria Town Islamabad.)

The Torch Plaza (Civic Center Bahria Town Islamabad.)

Raazi Hospital (Alkhidmat Foundation) CBR Town Islamabad.

Raazi Hospital (Alkhidmat Foundation) CBR Town Islamabad.

Nahakki Road Tunnel(10m x 7.3m) Mohmand Agency FATA

Nahakki Road Tunnel(10m x 7.3m)Roa Mohmand Agency FATA

Nahakki Road Tunnel(10m x7.3m) Mohmand Agency FATA

Nahakki Road Tunnel (10m x 7.3m) Mohmand Agency FATA

Nahakki Road Tunnel (10m x 7.3m) Mohmand Agency FATA