001 / 2 General Notes 1 1
- Structure at Span 7 shares pier with two prestressed concrete box approach spans. Southwest section framesinto G 805R going west and the east section frames into G2014 going east.
012-38
/ 2 Reinforced Concrete Deck/Slab 65799 sq ft 0 59219 6580
The deck soffit is not visible due to stay-in-place forms.- Deck surface exhibits longitudinal and transverse cracks open to 1/32" wide with isolated cracks open to 1/16"wide, some at less than 1' spacing in travel lanes (Photo 4).- Deck surface exhibits minor surface spalling.
104 / 2 Prestressed Concrete Closed Web/BoxGirder
233 ft 232 0 0 1
- The north fascia of the Span 8 girder web (first approach span) exhibits a full height vertical crack to 1/16" widewhich emanates from a construction joint in the girder overhang (Photo 5). Crack is approximately 3' from thehinge joint of juncture with G 805R.
107 / 2 Steel Open Girder/Beam 6486 ft 6486
Five Girder lines.- No significant deficiencies.
205 / 2 Reinforced Concrete Column/PileExtension
10 each 9 1
- The columns exhibits hairline cracking and honeycombing up to 1/4" deep.- Pier 3 column exhibits delamination to 10' L x 2' H in the east face (Photo 6).
215 / 2 Reinforced Concrete Abutment 43 ft 43
- The abutment backwall exhibits minor hairline cracking and honeycombing up to 1/4" deep.- Abutment 1 exhibits heavy water stains at the north end.
227 / 2 Reinforced Concrete Submerged Pile 12 each 12
- Element not visible for inspection.
234 / 2 Reinforced Concrete Pier Cap 301 ft 301
- The pier cap exhibits hairline cracking, honeycombing up to 1/4" deep, and isolated areas of water staining.
303 / 2 Assembly Joint with Seal 177 ft 0 134 0 43
- The expansion joint headers exhibit transverse cracks to 1/16" wide.- Abutment 1 expansion joint exhibits torn gland sections allowing leakage to the abutment (Photo 7).- Abutment 1 modular expansion joints show minor dirt and debris accumulation in shoulders.- Modular joints in Spans 8 and 9 exhibit moderate dirt and debris build up throughout.
310 / 2 Elastomeric Bearing 40 each 36 4
- Majority of bearing assemblies exhibit improperly tightened anchor bolt nuts, and missing square plate washers.- Bearing 3 at Pier 1 and Bearing 3 at Pier 6 are missing one nut.- The elastomeric pads exhibit minor longitudinal deflection.- The elastomeric pads at Pier 1 Bearings 1 - 4 exhibit separation from the pier cap to 3/8" at the north edge ofeach (Photo 8).
Elem/Env Element Description UOMQuantity Qty1 Qty2 Qty3 Qty4
Bridge Number I 806R
RMP 15S-E SPR MTN Over I 15, SPR MTN RD,RMP
Bridge Location
Inspection Date 11/13/2014
Element Condition Values
each (Photo 8).
321 / 2 Reinforced Concrete Approach Slab 1 each 0 1
- Approach slab exhibits longitudinal and transverse cracks to 1/16" wide.
331 / 2 Reinforced Concrete Bridge Railing 3060 ft 2560 500
- Parapets exhibit vertical cracks to 1/32" wide, and numerous impact scrapes and tire scuff marks.
515 / 2 Steel Protective Coating 9406 ft 8586 0 820
- Girders 1 and 2 in Spans 4 and 5 exhibit blistering paint in the bottom flange (Photo 9).
516 / 2 Concrete Coating 1 lumpsum
0 1
- Abutment 1 backwall exhibits heavy leakage stains at the north end.- Railing coating exhibits blistering at isolated locations.
517 / 2 Graffiti 1 lumpsum
0 0 1
- Girders and diaphragms exhibit moderate to heavy areas of graffiti coverage (Photo 10).
640 / 2 Deck Drainage System with Drop Inlets 3 each 0 3
- Deck drains exhibit moderate accumulations of dirt and debris with no loss of functionality (Photo 11).
660 / 2 Steel Diaphragms 292 each 290 2
- Splice connection in top flange of Girder 5, Span 2 exhibits a missing fastener, appears as constructed.- The top lateral bracing of Diaphragm 3 in Bay 3 of Span 2 near Girder 4 is bent which appears as constructed(Photo 12).
680 / 2 Reinforced Concrete Retaining Walls 130 ft 130
- The Abutment 1 wingwalls exhibit minor hairline cracking and honeycombing up to 1/4" deep.
690 / 2 Substructure Scour and Erosion 10 each 10
694 / 2 Debris on Seats 8 each 7 1
- Bearing seat at Abutment 1 exhibits transient debris (Photo 13).
750 / 2 Relief Joints 43 ft 0 43
- Relief joint compression seals exhibit localized adhesion failure, deterioration, and minor dirt and debrisaccumulation (Photo 14).
761 / 2 Reinforced Concrete Approach Barrier Rail 2 each 0 2
- Approach rails exhibit vertical cracking up to 1/32" wide.
770 / 2 Cement Concrete Approach Pavement 1 lumpsum
0 0 0 1
- The approach concrete pavement at the west end exhibits a 1" wide gap along the north panel joints (Photo 15).- The approach concrete pavement exhibits minor edge spalling along the concrete panel edges.- The shoulder areas of the concrete approach pavement exhibit cracking up to 1/16" wide.
Elem/Env Element Description UOMQuantity Qty1 Qty2 Qty3 Qty4
Bridge Number I 806R
RMP 15S-E SPR MTN Over I 15, SPR MTN RD,RMP
Bridge Location
Inspection Date 11/13/2014
Element Condition Values
- The approach concrete pavement at the west end exhibits a 1" wide gap along the north panel joints (Photo 15).- The approach concrete pavement exhibits minor edge spalling along the concrete panel edges.- The shoulder areas of the concrete approach pavement exhibit cracking up to 1/16" wide.
775 / 2 Approach Roadway Embankment 1 lumpsum
1
- No significant deficiencies.
Elem/Env Element Description UOMQuantity Qty1 Qty2 Qty3 Qty4
Bridge Number I 806R
RMP 15S-E SPR MTN Over I 15, SPR MTN RD,RMP
Bridge Location
Inspection Date 11/13/2014
Element Condition Values
Photo 1: South elevation
I 806R
11/13/2014
Bridge No.:
Date:
Photo 2: West approach
I 806R
11/13/2014
Bridge No.:
Date:
State of Nevada
Department of Transportation
Photo 3: West general
I 806R
11/13/2014
Bridge No.:
Date:
Photo 4: Typical cracking in the concrete deck
I 806R
11/13/2014
Bridge No.:
Date:
State of Nevada
Department of Transportation
Photo 5: Vertical crack in Span 8 girder web
I 806R
11/13/2014
Bridge No.:
Date:
Photo 6: Delaminated concrete in east face of Pier 3 column
I 806R
11/13/2014
Bridge No.:
Date:
State of Nevada
Department of Transportation
Photo 7: Torn and deteriorated expansion joint seal at Abutment 1
I 806R
11/13/2014
Bridge No.:
Date:
Photo 8: Separation between elastomeric bearing and pier cap
I 806R
11/13/2014
Bridge No.:
Date:
State of Nevada
Department of Transportation
Photo 9: Blistered paint on bottom flange of Girder 2, Span 4
I 806R
11/13/2014
Bridge No.:
Date:
Photo 10: Typical heavy graffiti on superstructure
I 806R
11/13/2014
Bridge No.:
Date:
State of Nevada
Department of Transportation
Photo 11: Partially clogged deck drain at the northwest corner
I 806R
11/13/2014
Bridge No.:
Date:
Photo 12: Damaged diaphragm in Span 2, Bay 3
I 806R
11/13/2014
Bridge No.:
Date:
State of Nevada
Department of Transportation
Photo 13: Transient debris on the Abutment 1 seat
I 806R
11/13/2014
Bridge No.:
Date:
Photo 14: Deterioration of relief joint in the west approach
I 806R
11/13/2014
Bridge No.:
Date:
State of Nevada
Department of Transportation
State of Nevada
Department of Transportation
Photo 15: Separation of concrete panels in the west approach roadway
I 806R
11/13/2014
Bridge No.:
Date:
CriticalityTiming Item Code Description UnitsStd.Unit
CostQuantity Unit Cost Total Cost
2 - Perform action with next 1 year
1 - Minor 7502503250EACHClean Expansion JointsD92
- Clean expansion joints.Notes:
1 - Minor 430010043100LINFTRemove and Replace
Strip Seal GlandD22
- Replace expansion joint glands at Abutment 1.Notes:
CriticalityTiming Item Code Description UnitsStd.Unit
CostQuantity Unit Cost Total Cost
3 - Perform action within next 2 years
1 - Minor 24001220012LINFTSeal Crack in Concrete
Approach PanelR153
- Seal cracks and separation between panels in the west concrete approach pavement.Notes:
1 - Minor 12004003400EACHClean Deck DrainsD403
- Clean deck drains.Notes:
1 - Minor 670001670001SQFTSeal Deck/Slab Cracks
(Pourable Sealant)D103
- Seal the concrete deck and approach slab.Notes:
CriticalityTiming Item Code Description UnitsStd.Unit
CostQuantity Unit Cost Total Cost
4 - Perform action when time and moneypermit
1 - Minor 800108010EACHReplace/Tighten Anchor
Bolt Nuts in BearingAssemblies
Super54
- Tighten bearing anchor bolt nuts, and install square plate washers.Notes:
1 - Minor 001--LSEradicate Graffiti on
Superstructure MembersSuper154
- Eradicate graffiti on girders and diaphragms.Notes:
Bridge Number I 806R
RMP 15S-E SPR MTN Over I 15, SPR MTN RD,RMP
Bridge Location
Inspection Date 11/13/2014
Maintenance Inspection Work Items and Costs Report
1 - Minor 92002340023SQFTSpot Clean and PaintSteel Beams/Bearing
AssembliesSuper94
- Spot clean and paint blistered paint in Girders 1-2 in Spans 4-5.Notes:
1 - Minor 001--LSClean Debris from
Abutment/Pier SeatSub204
- Remove transient debris from Abutment 1.Notes:
Bridge Number I 806R
RMP 15S-E SPR MTN Over I 15, SPR MTN RD,RMP
Bridge Location
Inspection Date 11/13/2014
Maintenance Inspection Work Items and Costs Report
[REV. 7/01]
ANALYSIS BY: K. Mockenhaupt/CH2M Hill DATE: 11/27/2007
CHECKED BY: S. Jirschele/CH2M Hill DATE: 11/30/2007
Method of Analysis:
With existing
INVENTORY RATING = HS 35.8 = 58.4 Metric Tons
OPERATING RATING = HS 59.8 = 97.6 Metric Tons
PERMIT TRUCK COLOR CAPACITY = PPPPP
With future
INVENTORY RATING = HS --- = ---- Metric Tons
OPERATING RATING = HS --- = ---- Metric Tons
PERMIT TRUCK COLOR CAPACITY =
11/29/2004 17 Feet
Type: Bridgemaster 3 3/4 Inches
8
7 ----
8 45
NA No
COMMENTS: Seal and Signature
2. Shear studs do not meet continuous requirements of 2003 CurvedGirder Guide Specs.3. LL deflection exceeds L/800 in many spans for permit loadingsP9 and P13. See MDX runs for comprehensive information.4. Uplift, per Section 3.17.1(a) of the Standard Specifications, occursunder permit loadings P9 and P13 at Pier 2. Bearings have no provisions to prevent/resist such uplift.
Report by: DATE: 11/27/2007
0 inch overlay
___ inch AC Overlay
ROUTE
CONTRACT NUMBER(S)
2779
COUNTY
Clark
STRUCTURE NUMBER
BRIDGE LOAD RATING
1. Shear studs fail in fatigue for cycles > 2MM all load cases, all girders.
MDX Version 6.3
I-806R
YEAR CONSTRUCTED
1999
DEPTH ft-in
4'-9" to 8'-0" (web, varies)
MILEPOST
I 15 OFF RAMP
DISTRICT
1
WIDTH ft-in
43'-0"
LENGTH ft-in
1294' - 5 5/8"
LOCAL NAME
Spring Mountain Flyover
TYPE
Cont., Multi-span, Curved, Composite, Steel Plate Girder
A.) Existing Condition
Rating By Load Factor Method
B.) Modified Condition
Rating By Load Factor Method
CONDITION RATING Date of Inspection:
CULVERT RATING: STRUCTURE POSTED? [Yes/No]:
Note: Ratings above are NBI Ratings from inspection report weighted for structural items only
MIN. VERTICAL CLEARANCE
CHANNEL RATING:
EST. REMAINING LIFE [Years]:
K. Mockenhaupt/CH2M Hill
State of Nevada
Department of Transportation
Load Rating Report
This report was prepared in accordance with AASHTO "Manual for Condition Evaluation of Bridges, 1994 Second Edition"
with revisions by Nevada Department of Transportation.
DECK RATING:
SUPERSTRUCTURE RATING:
SUBSTRUCTURE RATING:
[Summarized from the Structure Inspection Report]
[REV. 8/05]
Deck/---- Girders/ ---- Original Bridge:
Concrete F'c (psi)= 4000 NA
Reinforcing Steel Fy (psi)= 60000 NA
Structural Steel Fy (psi)= NA 50000 Widenings:
Prestressing Steel F's (psi) NA NA
NA NA
- Rating performed using LFD and 1993 AASHTO Guide Specifications for Horizontally Curved Highway Bridges
- Analyzed structure under "existing" conditions
- Permit trucks allowed in all lanes simultaneously
- Girder naming convention in MDX model is opposite to reference drawings, ie: G1 model is G5 in plans, etc.
- Cross frames are constructed from AASHTO M270 Grade 36 steel, Fy = 36000 psi.
- Design speed assumed as 55 MPH for superelevation effects
- Full superelevation assumed full length of structure ie, transitions ignored
- 15 psf allowance included for Stay-in-Place deck forms
-
Analysis by: K. Mockenhaupt/CH2M Hill Date: 11/27/2007
Checked by: S. Jirschele/CH2M Hill Date: 11/30/2007
Rating Method Deck NA
Girders MDX Version 6.3
Special Items - MDX Version 6.3
Loads HS20 = AASHTO HS20-44 Truck Load or Lane Load whichever is greatest
P5/P9/P13 = Caltrans permit trucks P5, P9, and P13 applied separately with same wheel lines per girder as for HS20
Overlays-
Controlling Girder Action
Deck Girders Analysis Point Critical Action Rating Item/ Action
NA 1.79 G5(MDX) @ P5 Bending NA NA
NA 2.99 G5(MDX) @ P5 Bending NA NA
3.17 G2(MDX) @ P3 Shear 2.33 X-Frame
2.12 G5(MDX) Sp 1 Bending 1.59 X-Frame
1.72 G5(MDX) Sp 4 Bending 1.31 X-Frame
INVENTORY RATING = HS 35.8 = 58.4 Metric Tons
OPERATING RATING = HS 59.8 = 97.6 Metric Tons
Overlays-
Controlling Girder Action
Deck Girders Analysis Point Critical Action Rating Item/ Action
INVENTORY RATING = HS --- = --- Metric Tons
OPERATING RATING = HS --- = --- Metric Tons
-.-- / -.-- /-.-- /-.-- /-.--Rating Factors for P5 / P7/ P9/ P11/ P13 =
RATING FACTOR for HS20 =
INVENTORY RATING:
OPERATING RATING:
RATING FACTOR for P13 =
Special Rating Items
RATING FACTOR for P5 =
RATING FACTOR for P9 =
Department of Transportation 11/27/2007
3.17/2.65/2.12/1.92/1.72
ROUTE
LOAD RATING- Existing Condition 0 inch overlay
COUNTY
I 15 OFF RAMP
Cont., Multi-span, Curved, Composite, Steel Plate Girder
RATING FACTOR for HS20 =
Rating for P7 and P11 interpolated
RATING FACTOR for P13 =
Rating Factors for P5 / P7/ P9/ P11/ P13 =
LOAD RATING- w/ Modified Condition
Standard Rating Items
State of Nevada
ANALYSIS CRITERIA:
BRIDGE DATAMATERIAL PROPERTIES:
Spring Mountain Flyover I-806R
DATE
None
Load Rating Summary Sheet
RATING FACTOR for P9 =
Special Rating Items
RATING FACTOR for HS20 =
RATING FACTOR for P5 =
Standard Rating Items
OPERATING RATING:
RATING FACTOR for HS20 =
INVENTORY RATING:
Clark
LOCAL NAME STRUCTURE NUMBER
ANALYSIS METHOD & RESULTS:
75A. Type Of Work
3 (On Free Road)
1 (1-way traffic)
9. Location
36 ° 07 ' 36.80 "
00
17. Longitude
41. Posting Status A (Open)
16
1 (Highway, with or w/out pedestrian)
0 (No median)
0 (None)
44B. Appr. Span Design
11. Milepoint
LAS VEGAS
0.000
40000 (Las Vegas)
01 (District 01)
329 (Nevada)
7. Facility Carried
2491. Frequency
93A. FC Inspection Date
30. Year of ADT
Structure Inventory and Appraisal
Bridge No.: I 806R
3. County 003 (Clark)
6. Feature Intersected I 15, SPR MTN RD, RMP
2. District
98A. Border Bridge Code (Not Applicable)
99. Border Bridge No.
43A. Main Span Material 4 (Steel continuous)
43B. Main Span Design 02 (Stringer/Multi-beam or Girder)
45. No. of Spans Main Unit 7
44A. Appr. Span Material 6 (Prestressed Concrete Continuous)
06 (Box Beam or Girders)
46. No. of Appr. Spans 2
107. Deck Type
108A. Wearing Surface
48. Length Max Span
49. Structure Length
34. Skew 99 degrees
50. Curb/Sdwk Width LT
51. Width Curb to Curb
32. Appr. Roadway Width
33. Median
35. Structure Flared
10. Min Vertical Clearance
0
47. Horiz. Clearance
99.99 ft.
53. Min. Vert. Clearance Over
55A. Min. Lat. Underclear Right
56. Min. Lat. Underclear Left
38. Navigation Control N (Not applicable, no waterway)
111. Pier Protection
39. Vertical Clearance
40. Horiz. Clearance
16. Latitude
H (Highway beneath structure)
90. Inspection Date 11/13/2014
92A. FC Frequency
93B. UW Inspection Date
92B. UW Frequebcy
93C. SI Date
92C. SI Frequency
58. Deck 6 (Satisfactory Condition (minor deterioration))
59. Superstructure 8 (Very Good Condition (no problems noted))
60. Substructure 7 (Good Condition (some minor problems))
61. Channel/Channel Prot N (Not Applicable)
62. Culvert N (Not Applicable)
67. Struc Eval 7 (Better than present minimum criteria)
68. Deck Geometry 9 (Superior to present desirable criteria)
69. Underclearance,Vert & Horiz
7 (Better than present minimum criteria)
71. Waterway Adequacy N (Not Applicable)
72. Approach Alignment 8 (Equal to present desirable criteria)
36A. Bridge Railings 1 (Meets acceptable standards)
36B. Transitions 1 (Meets acceptable standards)
36C. Approach Guardrail 1 (Meets acceptable standards)
36D. Approach GuardRail Term 1 (Meets acceptable standards)
113. Scour Critical Bridges N (Not over waterway)
31. Design Load 6 (MS 18+Mod / HS 20+Mod)
64. Operating Rating 99.8
66. Inventory Rating 64.3
70. Posting 5 (Equal to or above legal loads)
27. Year Built 1999
106. Year Reconstructed
42A. Type of Service On 1 (Highway)
28A. Lanes On 2
29. Avg Daily Traffic 16500
109. Truck ADT 2 %
19. Detour Length
112. Bridge Length Y
26. Functional Class 11 (Urban)
100. STRAHNET 1 (Is on an Interstate STRAHNET route)
101. Parallel Structure N (No parallel structure)
102. Direction of Traffic
22. Owner 01 (State Highway Agency)
21. Maintenance Resp 01 (State Highway Agency)
37. Historical Significance 5 (Not eligible)
65. Rating Method 1 (Load Factor (LF))
28B. Lanes Under
2012
8. Structure No. I 806R
RMP 15S-E SPR MTN
63. Rating Method 1 (Load Factor (LF))1. State Code
1170001505. Inventory Route
4. Place Code
12. Base Hwy Network 1 (Inventory Route is on the Base Network)
13A. LRS Inv Route 0000000015
13B. Subroute No.
98B. % Responsibility
1 (Monolithic Concrete (concurrently placed with structural deck))
1 (Concrete Cast-in-Place)
108B. Deck Membrane
0 (None)108C. Deck Protection
RT
H (Highway beneath structure)54A. Min. Vert. Underclear
54B. Min. Vert. Underclear
55B. Min. Lat. Underclear Right
116. Min Nav Vert Clear
42B. Type of Service Under
75B. Work Done By
$ 094. Bridge Impr Cost
76. Len of Struc Impr
95. Rdwy Impr Cost $ 0
96. Total Proj Cost $ 0
97. Year of Impr Cost
114. Future ADT 15000
115. Year Future ADT 2031
20. Toll
103. Temp Structure
104. Hwy Sys Inv Route 1 (Structure/Route is on NHS)
105. Fed Lands Hwys 0 (Not Applicable)
110. Desig National Net 1 (Inventory route on National Truck Network)
0 ft.
1.2
39.7 ft.
0.0 ft.
0.0 ft.
39.6 ft.
205.1 ft.
1530.2 ft.
0.00 ft.
0.00 ft.
39.7 ft.
52. Deck Width Out to Out 43.0 ft.
328 ft.
16.4 ft.
14.4 ft.
3.2 ft.
0.0000 ft.
201. Contract Number
202. Seismic Risk
203. Structure Name
204. Culvert Barrel Height
205. Culvert Barrel Width
206. Culvert Barrel Length
207. Total Deck Area 65799 sq ft.
92A-1. FC Required
92B-1. UW Required
92C-1. SI Required
N
N
N
Last Modified: 01/13/2015
208. Last AccessRequired Inspection Date
209. Access RequiredInspection Frequency
11/13/2014
24
210. Date of Next AccessRequired
11/13/2016
211. Bridge InventoryDirection
West to East
115 ° 10 ' 51.30 "
NSD:NFO:97.20Sufficiency Rating: