    Item No. Particulars of Items Unit Estimated Qty Rate Amount

    6.01 Earthwork in excavation for structures in all types of

    soil and marshy soil excluding rock, including all lifts

    and leads as per drawings and TechnicalSpecifications Section 300.

    cum 11278 72 812016

    6.02 Earthwork in excavation for structures in ordinary

    rock, including all lifts and leads as per drawings and

    Technical Specifications Section 300.

    cum 32412 240 7778880

    6.03 Earthwork in excavation for structures in hard rock

    including all lifts and leads as per drawings and

    Technical Specifications Section 300 and Clause 'A7'

    of Additional Technical Specifications.

    With Controlled Blasting

    cum 74 290 21460

    6.04 Providing and laying in position selected imported

    granular materials of approved quality below structure

    including compaction in layers as per drawings andTechnical Specifications Clause 305 and section

    1000.

    Sand filling

    cum 525 180 94500

    6.05a Providing and laying in position Plain Cement

    Concrete in levelling course below open foundations,

    wing walls, curtain walls, toe walls and in inspection

    ladders and annular filling around foundation in rock

    as per drawings and Technical Specifications

    Sections 1700, 2100 and 2700.

    a) Grade M15

    cum 3424 2030 6950720

    6.05b Providing and laying in position Plain Cement

    Concrete in levelling course below open foundations,

    wing walls, curtain walls, toe walls and in inspection

    ladders and annular filling around foundation in rock

    as per drawings and Technical Specifications

    Sections 1700, 2100 and 2700.

    b) Grade M20

    cum 4550 2030 9236500

    6.06a Providing and laying in position cement concrete in

    RCC open foundations excluding reinforcement as

    per drawings and Technical Specifications Sections

    1500, 1700 and 2100.

    a) Grade M30

    cum 7917 2820 22325940

    6.06b Providing and laying in position cement concrete inRCC open foundations excluding reinforcement as

    per drawings and Technical Specifications Sections

    1500, 1700 and 2100.

    b) Grade M35

    cum 1590 2850 4531500

  • 8/2/2019 Bridge 2+470

    2/41

    6.07a Providing and laying in position Reinforced Cement

    Concrete grade M 35 in bored cast in situ concrete

    piles including boring for piling, cost of routine load

    test but excluding cost of steel reinforcement as per

    drawings and Technical Specifications Sections

    1100, 1700 and IRC 78-2000.

    For 1200 mm dia. piles in soil for all depthsa) In soil

    Lm 1540 7700 11858000

    6.07b Providing and laying in position Reinforced Cement

    Concrete grade M 35 in bored cast in situ concrete

    piles including boring for piling, cost of routine load

    test but excluding cost of steel reinforcement as per

    drawings and Technical Specifications Sections

    1100, 1700 and IRC 78-2000.

    For 1200 mm dia. piles in soil for all depths.

    b) In ordinary rock

    Lm 220 9800 2156000

    6.07c Providing and laying in position Reinforced CementConcrete grade M 35 in bored cast in situ concrete

    piles including boring for piling, cost of routine load

    test but excluding cost of steel reinforcement as per

    drawings and Technical Specifications Sections

    1100, 1700 and IRC 78-2000.

    For 1200 mm dia. piles in soil for all depths

    c) In hard rock

    Lm 50 14000 700000

    6.08 Carrying out Initial Load Tests both vertical and

    lateral, on test piles for bored cast in situ piles

    including cost of installation, Reinforced Cement

    Concrete of grade M 35, boring, arranging

    kentledge/anchor piles and all testing equipments,accessories etc. excluding reinforcement as per

    drawings and Technical Specifications Sections

    1100, 1700 and IRC: 78 -2000.

    Static load test

    Nr 8 1120000 8960000

    6.09 Providing and laying in position cement concrete in

    RCC pile caps excluding reinforcment as per

    drawings and Technical Specifications Sections

    1100, 1500 and 1700.

    Grade M 30

    cum 3240 2870 9298800

    6.10a Providing and laying in position cement concrete in

    RCC piers, pier caps, pedestals, cantilever/

    counterfort abutments, abutment caps, dirt walls,splayed wing walls, retaining walls, box returns,

    cantilever returns, screen walls, median walls,

    inspection ladders, box cell structures for

    underpasses etc. excluding reinforcment as per

    drawings and Technical Specifications Sections

    1500, 1700, and 2200.

    a) grade M 30

    cum 10761 3070 33036270

  • 8/2/2019 Bridge 2+470

    3/41

    6.10b Providing and laying in position cement concrete in

    RCC piers, pier caps, pedestals, cantilever/

    counterfort abutments, abutment caps, dirt walls,

    splayed wing walls, retaining walls, box returns,

    cantilever returns, screen walls, median walls,

    inspection ladders, box cell structures for

    underpasses etc. excluding reinforcment as perdrawings and Technical Specifications Sections

    1500, 1700, and 2200.

    b) grade M35

    cum 4350 3100 13485000

    6.11a Providing and laying in position cement concrete in

    RCC superstructure excluding reinforcment as per

    drawings and Technical Specifications Sections

    1500, 1700, 2300.

    a) Grade M 20 for box

    cum 2670 3360 8971200

    6.11b Providing and laying in position cement concrete in

    RCC superstructure excluding reinforcment as per

    drawings and Technical Specifications Sections

    1500, 1700, 2300.b) Grade M 30 in solid slab

    cum 10788 3760 40562880

    6.11c Providing and laying in position cement concrete in

    RCC superstructure excluding reinforcment as per

    drawings and Technical Specifications Sections

    1500, 1700, 2300.

    c) Grade M 35 in solid slab

    cum 90 3790 341100

    6.12 Providing & fixing in position thermomechanically

    treated (TMT) Fe 415 grade reinforcement bars in

    foundations, substructures, superstructures etc. as

    per drawings and Technical Specifications Section

    1600 .

    MT 5460 45600 2.49E+08

    6.13a Providing and laying in position cement concrete in

    PSC superstructure as per drawings and TechnicalSpecifications Sections 1500, 1700, 2300 and

    clause A-5.

    a) Grade M 40 box girder

    cum 602 3930 2365860

    6.13b Providing and laying in position cement concrete in

    PSC superstructure as per drawings and Technical

    Specifications Sections 1500, 1700, 2300 and

    clause A-5.

    b) Grade M 45 PSCT beam and slab

    cum 4255 3840 16339200

    6.13c Providing and laying in position cement concrete in

    PSC superstructure as per drawings and TechnicalSpecifications Sections 1500, 1700, 2300 and

    clause A-5.

    c) Grade M 45 Precast girders in superstructure

    cum 315 4010 1263150

  • 8/2/2019 Bridge 2+470

    4/41

    6.13d Providing and laying in position cement concrete in

    PSC superstructure as per drawings and Technical

    Specifications Sections 1500, 1700, 2300 and

    clause A-5.

    d) Grade M45 Solid Slab

    cum 780 3590 2800200

    6.14a) Supplying, providing and placing in position andprofiling high tensile steel (Class-II low relaxation)

    strands conforming to IS: 6006 of specified ultimate

    strength including cutting, threading, tying and

    providing necessary anchorage, sheathing, stressing

    grouting etc. including all materials, labour,

    equipment, staging etc., as per drawings and

    Technical Specifications Sections 1000 and 1800.

    a) for 12T13 cables

    MT 21 94000 1974000

    6.14b) Supplying, providing and placing in position and

    profiling high tensile steel (Class-II low relaxation)

    strands conforming to IS: 6006 of specified ultimatestrength including cutting, threading, tying and

    providing necessary anchorage, sheathing, stressing

    grouting etc. including all materials, labour,

    equipment, staging etc., as per drawings and

    Technical Specifications Sections 1000 and 1800.

    b) for 19T15 cables

    MT 220 96000 21120000

    6.15 Providing and laying cement concrete wearing coat in

    M-30 grade as per drawing and Technical

    Specifications Sections 1500, 1600, 1700, 2300 and

    2700.

    cum 1470 5380 7908600

    6.16A) Providing and fixing in position bearings true to line

    and level as per drawings and TechnicalSpecifications Section 2000, IRC : 83 (Part II) 1987,

    IRC : 83 (Part III) 2002.

    A) Tar paper bearings

    sqm 643 21 13503

    6.16B) Providing and fixing in position bearings true to line

    and level as per drawings and Technical

    Specifications Section 2000, IRC : 83 (Part II) 1987,

    IRC : 83 (Part III) 2002.

    B) Elastomeric bearings

    cucm 3223040 0.6 1933824

    6.16Cia) Providing and fixing in position bearings true to line

    and level as per drawings and Technical

    Specifications Section 2000, IRC : 83 (Part II) 1987,

    IRC : 83 (Part III) 2002.C) POT cum PTFE bearings

    (i) Fixed bearings

    (a) 250 T capacity

    Nr 1 25100 25100

  • 8/2/2019 Bridge 2+470

    5/41

    6.16Ciia) Providing and fixing in position bearings true to line

    and level as per drawings and Technical

    Specifications Section 2000, IRC : 83 (Part II) 1987,

    IRC : 83 (Part III) 2002.

    C) POT cum PTFE bearings

    (ii) Free / Guilded bearings

    (a) 250 T capacity free bearing

    Nr 2 34500 69000

    6.16Ciib) Providing and fixing in position bearings true to line

    and level as per drawings and Technical

    Specifications Section 2000, IRC : 83 (Part II) 1987,

    IRC : 83 (Part III) 2002.

    C) POT cum PTFE bearings

    (ii) Free / Guilded bearings

    (b) 250 T capacity guided bearing

    Nr 3 34500 103500

    6.17a) Providing and fixing in position Expansion Joints as

    per drawings and Technical Specifications Section

    2600.

    a) Filler type

    Lm 2184 2020 4411680

    6.17bi) Providing and fixing in position Expansion Joints asper drawings and Technical Specifications Section

    2600.

    b) Strip seal type capable of taking

    50 mm movement

    Lm 41 8040 329640

    6.17bii) Providing and fixing in position Expansion Joints as

    per drawings and Technical Specifications Section

    2600.

    b) Strip seal type capable of taking

    70 mm movement

    Lm 450 8200 3690000

    6.18 Providing and fixing in position drainage spouts as

    per drawings and Technical Specifications Clause

    2705.

    Nr 546 1680 917280

    6.19 Providing and fixing in position 100 mm dia HDPEdowntake and runner pipes including clamps joining

    with drainage spout pipe, providing couplers, bends

    etc. in ROBs, Grade separators and underpasses as

    per drawings.

    Lm 178 280 49840

    6.2 Providing and fixing in position MS pipe railing

    including vertical posts, providing three or more coats

    of epoxy paint of approved colour, make and quality

    over a coat of epoxy primer as per drawings and

    Technical Specifications Sections 1900 and 2700.

    For railing on bridge decks and walkways on pier

    caps

    Lm 6677 1810 12085370

    6.21 Providing and laying in position Reinforced Cement

    Concrete grade M 30 in approach slabs including

    reinforcement and bituminous joint filler with joint

    sealing compound between approach slabs and dirt

    walls / concrete pavements as per drawings and

    Technical Specifications Sections 1500, 1700 and

    2700.

    cum 1719 5070 8715330

  • 8/2/2019 Bridge 2+470

    6/41

    6.22 Providing and laying in position Reinforced Cement

    Concrete crash barrier excluding cost of

    reinforcement but including providing bituminous fiber

    board and Polysulphide joint filler at expansion

    joints/gap locations as per drawings and Technical

    Specifications Sections 1500, 1700 and 2700.

    (a) Grade M 40

    cum 2111 3790 8000690

    6.23a Providing and laying in position Reinforced Cement

    Concrete in kerbs/railing/median kerbs over bridges,

    grade separators, ROBs and their approaches

    excluding cost of reinforcement steel, as per

    drawings and Technical Specifications Sections 1700

    and 2300.

    a) grade M30

    cum 874 3820 3338680

    6.23b Providing and laying in position Reinforced Cement

    Concrete in kerbs/railing/median kerbs over bridges,

    grade separators, ROBs and their approaches

    excluding cost of reinforcement steel, as perdrawings and Technical Specifications Sections 1700

    and 2300.

    b) grade M35

    cum 167 3850 642950

    6.24 Providing weep holes in abutments, splayed wing

    wall, median wall,retaining wall or any other earth

    retaining structure as per drawings and Technical

    Specifications Clause 2706.

    Nr 9696 100 969600

    6.25 Painting of structure number span arrangement and

    flow directions as per drawings and Technical

    Specifications Section 800.

    Nr 156 330 51480

    6.26 Providing and laying back filling behind abutments,

    splayed wing walls, return wall or any other area with

    selected imported granular materials of approvedquality as per drawings and Technical Specifications

    Clause 305 and Appendix-6, IRC:78-2000 having

    following minimum properties :

    (a) c+0, (b) > = 30o, (c ) g = 1.8t/m3

    cum 31614 180 5690520

    6.27 Providing and laying filter media behind abutment,

    splayed wing wall, median wall, retaining wall and

    return wall as per drawings and Technical

    Specifications Section 2500.

    cum 5588 470 2626360

    6.28 Providing and laying stone apron as per drawing and

    Technical Specifications Clause 2500

    cum 500 280 140000

    6.29 Providing and laying in position hand packed boulderpitching on slopes of embankment, in front of

    abutments as per drawings and Technical

    Specifications Section 2500.

    cum 1767 280 494760

    6.30 Providing and laying filter material underneath stone

    pitching in slope as per drawing and Technical

    Specifications Section 2500.

    cum 729 470 342630

  • 8/2/2019 Bridge 2+470

    7/41

    6.31a) Carrying out sub soil investigation/confirmatory

    boreholes at specified foundations locations before

    commencement of construction, except in case of

    well foundations where confirmatory boring shall be

    carried out before bottom plugging for confirmation of

    strata at base of well foundation as per drawings and

    Technical Specifications section 2400.a) In soil

    Lm 174 1110 193140

    6.31b) Carrying out sub soil investigation/confirmatory

    boreholes at specified foundations locations before

    commencement of construction, except in case of

    well foundations where confirmatory boring shall be

    carried out before bottom plugging for confirmation of

    strata at base of well foundation as per drawings and

    Technical Specifications section 2400.

    b) In soft rock

    Lm 51 1950 99450

    6.31c) Carrying out sub soil investigation/confirmatoryboreholes at specified foundations locations before

    commencement of construction, except in case of

    well foundations where confirmatory boring shall be

    carried out before bottom plugging for confirmation of

    strata at base of well foundation as per drawings and

    Technical Specifications section 2400.

    c) In hard rock

    Lm 34 2210 75140

    6.32 Providing and painting of flood gauge onsub-structure

    in full height and 500mm width as per direction of

    Engineer

    Lm 31 230 7130

    6.33 Providing flat stone flooring as per drawing and

    Technical Specifications section 2500

    cum 48 890 42720

    TOTAL OF BILL NO.6 5.39E+08

  • 8/2/2019 Bridge 2+470

    8/41

    Item

    No.

    Length Width Depth Quantity Unit

    6.01)

    MCW - A1 - LHS 1 X 1 12.067 7.300 2.349 206.921 Cum OGL=293.249m PCC Bed=290.900m D

    MCW - A1 - RHS 1 X 1 12.067 7.300 2.349 206.921 Cum OGL=293.249m PCC Bed=290.900m D

    MCW - A2 - LHS 1 X 1 12.067 7.300 1.920 169.131 Cum OGL=292.820m PCC Bed=290.900m D

    MCW - A2 - RHS 1 X 1 12.067 7.300 1.920 169.131 Cum OGL=292.820m PCC Bed=290.900m D

    Retaining Wall

    MCW - A1 - Median Wall 1 X 1 3.500 6.004 21.014 Cum

    MCW - A1 - Median Wall 1 X 1 3.500

    MCW - A1 - Median Wall 1 X 1 3.500 0.000

    MCW - A1 - Median Wall 1 X 1 3.500 0.000

    MCW - P1 - LHS 1 X 1 13.013 5.020 1.920 125.424 Cum OGL=292.8200m PCC Bed=290.900m D

    MCW - P1 - RHS 1 X 1 13.013 5.020 1.920 125.424 Cum OGL=292.820m PCC Bed=290.900m D

    Total Quantity for BOQ Item No. 6.01) 1023.966 Cum

    Earthwork in excavation for structures in all types of soil and marshy soil excluding rock, including all lifts and leads as per drawin

    Specifications Section 300.

    Abutment Wall Raft

    Pier Wall Raft

    Construction of 4-Lane Bypass on NH-76 at Kota on East-West Corridor in the State of Rajasthan

    Contract Package: EW-II(RJ-4) dated 08/02/2006

    No.

    Measurement Details of Bridge at Chainage 02+470.00 Refer Drawing No.

    Description Remark

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge 2+470

    9/41

    Item

    No.

    Length Width Depth Quantity Unit

    Construction of 4-Lane Bypass on NH-76 at Kota on East-West Corridor in the State of Rajasthan

    Contract Package: EW-II(RJ-4) dated 08/02/2006

    No.

    Measurement Details of Bridge at Chainage 02+470.00 Refer Drawing No.

    Description Remark

    6.02 Earthwork in excavation for structures in ordinary rock, including all lifts and leads as per drawings and Technical Specifications Section 300.

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge 2+470

    10/41

    Item

    No.

    Length Width Depth Quantity Unit

    Construction of 4-Lane Bypass on NH-76 at Kota on East-West Corridor in the State of Rajasthan

    Contract Package: EW-II(RJ-4) dated 08/02/2006

    No.

    Measurement Details of Bridge at Chainage 02+470.00 Refer Drawing No.

    Description Remark

    6.03 Earthwork in excavation for structures in hard rock including all lifts and leads as per drawings and Technical Specifications Section 300 and

    of Additional Technical Specifications.

    With Controlled Blasting

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge 2+470

    11/41

    Item

    No.

    Length Width Depth Quantity Unit

    Construction of 4-Lane Bypass on NH-76 at Kota on East-West Corridor in the State of Rajasthan

    Contract Package: EW-II(RJ-4) dated 08/02/2006

    No.

    Measurement Details of Bridge at Chainage 02+470.00 Refer Drawing No.

    Description Remark

    6.04 Providing and laying in position selected imported granular materials of approved quality below structure including compaction in layers as p

    and Technical Specifications Clause 305 and section 1000.

    Sand filling

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge 2+470

    12/41

    Item

    No.

    Length Width Depth Quantity Unit

    Construction of 4-Lane Bypass on NH-76 at Kota on East-West Corridor in the State of Rajasthan

    Contract Package: EW-II(RJ-4) dated 08/02/2006

    No.

    Measurement Details of Bridge at Chainage 02+470.00 Refer Drawing No.

    Description Remark

    6.05a)

    MCW - A1 - LHS 1 X 1 12.067 7.300 0.100 8.809 Cum

    MCW - A1 - RHS 1 X 1 12.067 7.300 0.100 8.809 Cum

    MCW - A2 - LHS 1 X 1 12.067 7.300 0.100 8.809 Cum

    MCW - A2 - RHS 1 X 1 12.067 7.300 0.100 8.809 Cum

    MCW - P1 - LHS 1 X 1 13.013 5.020 0.100 6.533 Cum

    MCW - P1 - RHS 1 X 1 13.013 5.020 0.100 6.533 Cum

    Retaining Wall

    MCW - A1 - Median Wall 1 X 1 3.300 6.004 0.100 1.981 Cum

    MCW - A2 - Median Wall 1 X 1 3.300 6.004 0.100 1.981 Cum

    Approach SlabMCW - A1 - LHS 1 X 1 6.186 9.650 0.100 5.969 Cum

    MCW - A1 - RHS 1 X 1 6.186 9.650 0.100 5.969 Cum

    MCW - A2 - LHS 1 X 1 6.186 9.650 0.100 5.969 Cum

    MCW - A2 - RHS 1 X 1 6.186 9.650 0.100 5.969 Cum

    A1 1 X 1 9.750 4.619 0.900 40.532 Cum

    A1 1 X 1 9.750 2.307 0.900 20.244 Cum

    P1 1 X 0.5 11.070 2.309 0.900 11.502 Cum

    A1 1 X 0.5 10.250 2.309 0.900 10.650 Cum

    A1 1 X 0.5 4.619 9.750 0.900 20.266 Cum

    A2 1 X 0.5 11.835 2.000 0.900 10.652 Cum

    Abutment Wall Raft

    Pier Wall Raft

    Providing and laying in position Plain Cement Concrete in levelling course below open foundations, wing walls, curtain walls, toe walls a

    ladders and annular filling around foundation in rock as per drawings and Technical Specifications Sections 1700, 2100 and 2700.

    a) Grade M15

    Annular Filling

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge 2+470

    13/41

    Item

    No.

    Length Width Depth Quantity Unit

    Construction of 4-Lane Bypass on NH-76 at Kota on East-West Corridor in the State of Rajasthan

    Contract Package: EW-II(RJ-4) dated 08/02/2006

    No.

    Measurement Details of Bridge at Chainage 02+470.00 Refer Drawing No.

    Description Remark

    A2 1 X 0.5 10.250 2.309 0.900 10.650 Cum

    A2 1 X 0.5 9.750 4.619 0.900 20.266 Cum

    Total Quantity for BOQ Item No. 6.05a) 220.902 Cum

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge 2+470

    14/41

    Item

    No.

    Length Width Depth Quantity Unit

    Construction of 4-Lane Bypass on NH-76 at Kota on East-West Corridor in the State of Rajasthan

    Contract Package: EW-II(RJ-4) dated 08/02/2006

    No.

    Measurement Details of Bridge at Chainage 02+470.00 Refer Drawing No.

    Description Remark

    6.06a)

    Abutment Wall RaftMCW - A1 - LHS 1 X 1 11.836 7.100 0.300 25.211 Cum Raft Width = = 7.

    MCW - A1 - LHS 1 X 1 11.836 4.100 0.900 43.675 Cum Average Width = ( 7.1 + 1.1) /2 = 4.

    MCW - A1 - RHS 1 X 1 11.836 7.100 0.300 25.211 Cum Raft Width = = 7.

    MCW - A1 - RHS 1 X 1 11.836 4.100 0.900 43.675 Cum Average Width = ( 7.1 + 1.1) /2 = 4.

    MCW - A2 - LHS 1 X 1 11.836 7.100 0.300 25.211 Cum Raft Width = = 7.

    MCW - A2 - LHS 1 X 1 11.836 4.100 0.900 43.675 Cum Average Width = ( 7.1 + 1.1) /2 = 4.

    MCW - A2 - RHS 1 X 1 11.836 7.100 0.300 25.211 Cum Raft Width = = 7.

    MCW - A2 - RHS 1 X 1 11.836 4.100 0.900 43.675 Cum Average Width = ( 7.1 + 1.1) /2 = 4.

    Pier Wall Raft

    MCW - P1 - LHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width = = 4.

    MCW - P1 - LHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2 = 2.MCW - P1 - RHS 1 X 1 12.783 4.820 0.300 18.484 Cum Raft Width = = 4.

    MCW - P1 - RHS 1 X 1 12.783 2.820 0.900 32.443 Cum Average Width = ( 4.82 + 0.82) /2 = 2.

    Median Wall Raft

    MCW - A1 - BHS 1 X 1 3.460 6.004 0.300 6.232 Cum

    MCW - A1 - BHS 1 X 1 3.460 3.406 0.400 4.714 Cum

    MCW - A2 - BHS 1 X 1 3.460 6.004 0.300 6.232 Cum

    MCW - A2 - BHS 1 X 1 3.460 3.406 0.400 4.714 Cum

    Total Quantity for BOQ Item No. 6.06a) 399.290 Cum

    Providing and laying in position cement concrete in RCC open foundations excluding reinforcement as per drawings and Technic

    Sections 1500, 1700 and 2100.

    a) Grade M30

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge 2+470

    15/41

    Item

    No.

    Length Width Depth Quantity Unit

    Construction of 4-Lane Bypass on NH-76 at Kota on East-West Corridor in the State of Rajasthan

    Contract Package: EW-II(RJ-4) dated 08/02/2006

    No.

    Measurement Details of Bridge at Chainage 02+470.00 Refer Drawing No.

    Description Remark

    6.10a)

    Abutment wall up to bottom of Cap level

    MCW - A1 - LHS 1 X 1 11.836 0.910 4.478 48.231 Cum Average Width = ( 1.1 + 0.72) /2 = 0

    MCW - A1 - RHS 1 X 1 11.836 0.910 4.478 48.231 Cum Average Width = ( 1.1 + 0.72) /2 = 0

    MCW - A2 - LHS 1 X 1 11.836 0.910 4.478 48.231 Cum Average Width = ( 1.1 + 0.72) /2 = 0

    MCW - A2 - RHS 1 X 1 11.836 0.910 4.478 48.231 Cum Average Width = ( 1.1 + 0.72) /2 = 0

    Abutment Cap

    MCW - A1 - LHS 1 X 1 11.836 0.720 0.300 2.557 Cum

    MCW - A1 - RHS 1 X 1 11.836 0.720 0.300 2.557 Cum

    MCW - A2 - LHS 1 X 1 11.836 0.720 0.300 2.557 Cum

    MCW - A2 - RHS 1 X 1 11.836 0.720 0.300 2.557 Cum

    Return Wall

    MCW - A1 - LHS 1 X 1 4.619 0.600 6.323 17.524 Cum Average Width = ( 0.6 + 0.6) /2 = 0

    MCW - A1 - RHS 1 X 1 4.619 0.600 6.323 17.524 Cum Average Width = ( 0.6 + 0.6) /2 = 0

    MCW - A2 - LHS 1 X 1 4.619 0.600 6.323 17.524 Cum Average Width = ( 0.6 + 0.6) /2 = 0

    MCW - A2 - RHS 1 X 1 4.619 0.600 6.323 17.524 Cum Average Width = ( 0.6 + 0.6) /2 = 0

    Return Wall Cantilever part

    MCW - A1 - LHS 0.5 X 1 2.309 0.600 1.539 1.066 Cum Average Width = ( 0.6 + 0.6) /2 = 0

    MCW - A1 - RHS 0.5 X 1 2.309 0.600 1.539 1.066 Cum Average Width = ( 0.6 + 0.6) /2 = 0

    MCW - A2 - LHS 0.5 X 1 2.309 0.600 1.539 1.066 Cum Average Width = ( 0.6 + 0.6) /2 = 0

    MCW - A2 - RHS 0.5 X 1 2.309 0.600 1.539 1.066 Cum Average Width = ( 0.6 + 0.6) /2 = 0

    Return Wall Top

    MCW - A1 - LHS 1 X 1 6.928 0.600 0.300 1.247 Cum Average Width = ( 0.6 + 0.6) /2 = 0

    Providing and laying in position cement concrete in RCC piers, pier caps, pedestals, cantilever/ counterfort abutments, abutment caps,

    wing walls, retaining walls, box returns, cantilever returns, screen walls, median walls, inspection ladders, box cell structures for

    excluding reinforcment as per drawings and Technical Specifications Sections 1500, 1700, and 2200.

    a) grade M 30

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge 2+470

    16/41

    Item

    No.

    Length Width Depth Quantity Unit

    Construction of 4-Lane Bypass on NH-76 at Kota on East-West Corridor in the State of Rajasthan

    Contract Package: EW-II(RJ-4) dated 08/02/2006

    No.

    Measurement Details of Bridge at Chainage 02+470.00 Refer Drawing No.

    Description Remark

    MCW - A1 - RHS 1 X 1 6.928 0.600 0.300 1.247 Cum Average Width = ( 0.6 + 0.6) /2 = 0.6

    MCW - A2 - LHS 1 X 1 6.928 0.600 0.300 1.247 Cum Average Width = ( 0.6 + 0.6) /2 = 0.6

    MCW - A2 - RHS 1 X 1 6.928 0.600 0.300 1.247 Cum Average Width = ( 0.6 + 0.6) /2 = 0.6Return Wall Haunch

    MCW - A1 - LHS 1 X 1 7.862 Cum

    MCW - A1 - RHS 1 X 1 7.862 Cum

    MCW - A2 - LHS 1 X 1 7.862 Cum

    MCW - A2 - RHS 1 X 1 7.862 Cum

    Pier Wall (Straight part) up to Cap level

    MCW - P1 - LHS 1 X 1 11.963 0.820 4.778 46.871 Cum Average Width = ( 0.82 + 0.82) /2 = 0.8

    MCW - P1 - RHS 1 X 1 11.963 0.820 4.778 46.871 Cum Average Width = ( 0.82 + 0.82) /2 = 0.8

    Pier Wall (Round edge) up to Cap level

    MCW - P1 - LHS 2 X 0.5 0.528 Area 4.778 2.522 Cum Wall width=0.820

    MCW - P1 - RHS 2 X 0.5 0.820 Area 4.778 3.918 Cum Wall width=0.820

    Dirt Wall

    MCW - A1 - LHS 1 X 1 11.836 0.300 0.968 3.437 Cum

    MCW - A1 - RHS 1 X 1 11.836 0.300 0.968 3.437 Cum

    MCW - A2 - LHS 1 X 1 11.836 0.300 0.968 3.437 Cum

    MCW - A2 - RHS 1 X 1 11.836 0.300 0.968 3.437 Cum

    Dirt Wall (Bracket)

    MCW - A1 - LHS 1 X 1 11.836 0.200 0.240 0.568 Cum

    MCW - A1 - RHS 1 X 1 11.836 0.200 0.240 0.568 Cum

    MCW - A2 - LHS 1 X 1 11.836 0.200 0.240 0.568 Cum

    MCW - A2 - RHS 1 X 1 11.836 0.200 0.240 0.568 Cum

    Median Wall Raft

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge 2+470

    17/41

    Item

    No.

    Length Width Depth Quantity Unit

    Construction of 4-Lane Bypass on NH-76 at Kota on East-West Corridor in the State of Rajasthan

    Contract Package: EW-II(RJ-4) dated 08/02/2006

    No.

    Measurement Details of Bridge at Chainage 02+470.00 Refer Drawing No.

    Description Remark

    MCW - A1 - BHS 1 X 1 3.460 0.562 6.438 12.508 Cum

    MCW - A1 - BHS 1 X 1 3.460 0.562 1.100 2.137 Cum

    MCW - A2 - BHS 1 X 1 3.460 0.562 6.438 12.508 Cum

    MCW - A2 - BHS 1 X 1 3.460 0.562 1.100 2.137 Cum

    Total Quantity for BOQ Item No. 6.10a) 427.992 Cum

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge 2+470

    18/41

    Item

    No.

    Length Width Depth Quantity Unit

    Construction of 4-Lane Bypass on NH-76 at Kota on East-West Corridor in the State of Rajasthan

    Contract Package: EW-II(RJ-4) dated 08/02/2006

    No.

    Measurement Details of Bridge at Chainage 02+470.00 Refer Drawing No.

    Description Remark

    6.11b

    Deck Slab

    MCW - A1-P1 - LHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00 E

    Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum

    MCW - A1-P1 - RHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00 E

    Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum

    MCW - P1-A2 - LHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00 E

    Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum

    MCW - P1-A2 - RHS 1 X 1 12.009 10.250 0.850 104.628 Cum Bridge Span=10.400 Skewness=30.00 E

    Edge Thickning (Both Support) 1 X 2 10.250 0.400 0.153 1.251 Cum

    Total Quantity for BOQ Item No. 6.11b 423.516 Cum

    Providing and laying in position cement concrete in RCC superstructure excluding reinforcment as per drawings and Technical Specificati

    1500, 1700, 2300.

    b) Grade M 30 in solid slab

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge 2+470

    19/41

    Item

    No.

    Length Width Depth Quantity Unit

    Construction of 4-Lane Bypass on NH-76 at Kota on East-West Corridor in the State of Rajasthan

    Contract Package: EW-II(RJ-4) dated 08/02/2006

    No.

    Measurement Details of Bridge at Chainage 02+470.00 Refer Drawing No.

    Description Remark

    6.15

    Wearing Coat Over Deck Slab

    MCW - A1-P1 - LHS 1 X 1 12.009 8.500 0.065 6.635 Cum Bridge Span=10.400 Skewness=30.00 E

    MCW - A1-P1 - RHS 1 X 1 12.009 8.500 0.065 6.635 Cum

    MCW - P1-A2 - LHS 1 X 1 12.009 8.500 0.065 6.635 Cum

    MCW - P1-A2 - RHS 1 X 1 12.009 8.500 0.065 6.635 Cum

    Wearing Coat Over Approach Slab

    MCW - A1 - LHS 1 X 1 = 6.285 8.500 0.065 3.472 Cum Average Length = ( 3.5 + 9.07) /2 = 6.2

    MCW - A1 - RHS 1 X 1 6.285 8.500 0.065 3.472 Cum Average Length = ( 3.5 + 9.07) /2 = 6.2

    MCW - A2 - LHS 1 X 1 6.285 8.500 0.065 3.472 Cum Average Length = ( 3.5 + 9.07) /2 = 6.2

    MCW - A2 - RHS 1 X 1 6.285 8.500 0.065 3.472 Cum Average Length = ( 3.5 + 9.07) /2 = 6.2

    Wearing Coat Over Dirt Wall

    MCW - A1 - LHS 1 X 1 0.300 8.500 0.065 0.166 Cum

    MCW - A1 - RHS 1 X 1 0.300 8.500 0.065 0.166 Cum

    MCW - A2 - LHS 1 X 1 0.300 8.500 0.065 0.166 Cum

    MCW - A2 - RHS 1 X 1 0.300 8.500 0.065 0.166 Cum

    Total Quantity for BOQ Item No. 6.15 41.092 Cum

    Providing and laying cement concrete wearing coat in M-30 grade as per drawing and Technical Specifications Sections 1500, 1600, 1700, 2

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge 2+470

    20/41

    Item

    No.

    Length Width Depth Quantity Unit

    Construction of 4-Lane Bypass on NH-76 at Kota on East-West Corridor in the State of Rajasthan

    Contract Package: EW-II(RJ-4) dated 08/02/2006

    No.

    Measurement Details of Bridge at Chainage 02+470.00 Refer Drawing No.

    Description Remark

    6.16A)

    MCW - A1-P1 - LHS 1 X 2 11.836 0.400 9.469 SqmMCW - A1-P1 - RHS 1 X 2 11.836 0.400 9.469 Sqm

    MCW - P1-A2 - LHS 1 X 2 11.836 0.400 9.469 Sqm

    MCW - P1-A2 - RHS 1 X 2 11.836 0.400 9.469 Sqm

    Total Quantity for BOQ Item No. 6.16A) 37.876 Cum

    6.17A)

    MCW - A1 - BHS Raft 2 X 1 6.004 12.008 Lm

    MCW - A2 - BHS Raft 2 X 1 6.004 12.008 Lm

    MCW - A1 - BHS Wall 1st 2 X 1 1.500 3.000 Lm

    MCW - A1 - BHS Wall 2nd 2 X 1 1.400 2.800 Lm

    MCW - A2 - BHS Wall 1st 2 X 1 1.500 3.000 Lm

    MCW - A1 - BHS Wall 3rd 2 X 1 1.350 2.700 Lm

    MCW - A1 - BHS Wall 4th 2 X 1 1.150 2.300 Lm

    MCW - A2 - BHS Wall 2nd 2 X 1 0.850 1.700 Lm

    MCW - A2 - BHS Wall 3rd 2 X 1 1.150 2.300 Lm

    MCW - A1-P1 - LH Slab 2 X 1 11.835 23.670 Lm

    MCW - A2 - LHS Wall 4th 2 X 1 1.150 2.300 Lm

    MCW - P1-A2 - LH Slab 2 X 1 11.835 23.670 Lm

    MCW - A1-P1 - RH Slab 2 X 1 11.835 23.670 Lm

    MCW - P1-A2 - RH Slab 1 X 1 11.835 11.835 Lm

    MCW - A1 - BHS Wall Final 2 X 1 0.778 1.556 Lm

    MCW - A2 - BHS Wall 5th 2 X 1 1.200 2.400 Lm

    Providing and fixing in position bearings true to line and level as per drawings and Technical Specifications Section 2000, IRC : 83 (Part II)

    (Part III) 2002.

    A) Tar paper bearings

    Providing and fixing in position Expansion Joints as per drawings and Technical Specifications Section 2600.

    a) Filler type

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge 2+470

    21/41

    Item

    No.

    Length Width Depth Quantity Unit

    Construction of 4-Lane Bypass on NH-76 at Kota on East-West Corridor in the State of Rajasthan

    Contract Package: EW-II(RJ-4) dated 08/02/2006

    No.

    Measurement Details of Bridge at Chainage 02+470.00 Refer Drawing No.

    Description Remark

    MCW - A2 - LHS 1 X 1 1.250 1.250 Lm

    MCW - A2 - LHS Wall Final 1 X 1 11.835 11.835 Lm

    MCW - P1-A2 - RH 1 X 1 1.250 1.250 Lm

    MCW - A2 - RHS Wall Final 1 X 1 11.835 11.835 Lm

    MCW - A2 - BHS Wall Final 2 X 1 0.628 1.256 Lm

    MCW - A2 - LHS 1 X 1 0.750 0.750 Lm

    MCW - A1 - RHS 1 X 1 0.750 0.750 Lm

    Total Quantity for BOQ Item No. 6.17A) 159.843 Cum

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge 2+470

    22/41

    Item

    No.

    Length Width Depth Quantity Unit

    Construction of 4-Lane Bypass on NH-76 at Kota on East-West Corridor in the State of Rajasthan

    Contract Package: EW-II(RJ-4) dated 08/02/2006

    No.

    Measurement Details of Bridge at Chainage 02+470.00 Refer Drawing No.

    Description Remark

    6.18

    MCW - A1-P1 - LHS 1 X 2 2.000 Nos

    MCW - A1-P1 - RHS 1 X 2 2.000 NosMCW - P1-A2 - LHS 1 X 2 2.000 Nos

    MCW - P1-A2 - RHS 1 X 2 2.000 Nos

    Total Quantity for BOQ Item No. 6.18 8.000 Nos

    Providing and fixing in position drainage spouts as per drawings and Technical Specifications Clause 2705.

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge 2+470

    23/41

    Item

    No.

    Length Width Depth Quantity Unit

    Construction of 4-Lane Bypass on NH-76 at Kota on East-West Corridor in the State of Rajasthan

    Contract Package: EW-II(RJ-4) dated 08/02/2006

    No.

    Measurement Details of Bridge at Chainage 02+470.00 Refer Drawing No.

    Description Remark

    6.21

    MCW - A1 - LHS 1 X 1 6.286 9.650 0.300 18.197 Cum

    MCW - A1 - RHS 1 X 1 6.286 9.650 0.300 18.197 Cum

    MCW - A2 - LHS 1 X 1 6.286 9.650 0.300 18.197 Cum

    MCW - A2 - RHS 1 X 1 6.286 9.650 0.300 18.197 Cum

    Total Quantity for BOQ Item No. 6.21 80.788 Nos

    Providing and laying in position Reinforced Cement Concrete grade M 30 in approach slabs including reinforcement and bituminous joint

    sealing compound between approach slabs and dirt walls / concrete pavements as per drawings and Technical Specifications Sections 15

    2700.

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge 2+470

    24/41

    Item

    No.

    Length Width Depth Quantity Unit

    Construction of 4-Lane Bypass on NH-76 at Kota on East-West Corridor in the State of Rajasthan

    Contract Package: EW-II(RJ-4) dated 08/02/2006

    No.

    Measurement Details of Bridge at Chainage 02+470.00 Refer Drawing No.

    Description Remark

    6.22

    Crash Barrier on Median SideTypical Cross Section Area of Crash Barrier

    1 X 1 0.450 0.165 0.074 Sqm

    1 X 1 0.363 0.250 0.091 Sqm Average of (0.450+0.275)=0.363

    1 X 1 0.228 0.500 0.114 Sqm Average of (0.275+0.180)=0.228

    1 X 1 0.180 0.175 0.032 Sqm

    1 X 1 0.155 0.025 0.004 Sqm Average of (0.180+0.130)=0.228

    Total Area 0.314 Sqm

    MCW - A1-P1 - LHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009

    MCW - A1-P1 - RHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009

    MCW - P1-A2 - LHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009

    MCW - P1-A2 - RHS 1 X 1 12.009 0.314 Area 3.771 Cum Effective Length 12.009Crash Barrier on Shoulder Side

    Typical Cross Section Area of Crash Barrier

    1 X 1 0.450 0.100 0.045 Sqm

    1 X 1 0.363 0.250 0.091 Sqm Average of (0.450+0.275)=0.363

    1 X 1 0.228 0.500 0.114 Sqm Average of (0.275+0.180)=0.228

    1 X 1 0.180 0.175 0.032 Sqm

    1 X 1 0.155 0.025 0.004 Sqm Average of (0.180+0.130)=0.228

    Total Area 0.285 Sqm

    MCW - A1-P1 - LHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009

    MCW - A1-P1 - RHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009

    MCW - P1-A2 - LHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009

    Providing and laying in position Reinforced Cement Concrete Crash barrier excluding cost of reinforcement but including providing bitum

    and Polysulphide joint filler at expansion joints/gap locations as per drawings and Technical Specifications Sections 1500, 1700 and 2700

    (a) Grade M 40

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge 2+470

    25/41

    Item

    No.

    Length Width Depth Quantity Unit

    Construction of 4-Lane Bypass on NH-76 at Kota on East-West Corridor in the State of Rajasthan

    Contract Package: EW-II(RJ-4) dated 08/02/2006

    No.

    Measurement Details of Bridge at Chainage 02+470.00 Refer Drawing No.

    Description Remark

    MCW - P1-A2 - RHS 1 X 1 12.009 0.285 Area 3.420 Cum Effective Length 12.009

    Total Quantity for BOQ Item No. 6.22 28.764 Cum

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge 2+470

    26/41

    Item

    No.

    Length Width Depth Quantity Unit

    Construction of 4-Lane Bypass on NH-76 at Kota on East-West Corridor in the State of Rajasthan

    Contract Package: EW-II(RJ-4) dated 08/02/2006

    No.

    Measurement Details of Bridge at Chainage 02+470.00 Refer Drawing No.

    Description Remark

    6.23a

    Typical Cross Section Area of Footpath1 X 1 0.500 0.353 0.176 Sqm Average of (0.360+0.345)=0.353

    1 X 1 0.750 0.323 0.242 Sqm Average of (0.345+0.300)=0.323

    Total Area 0.418 Sqm

    MCW - A1-P1 - LHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009

    MCW - A1-P1 - RHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009

    MCW - P1-A2 - LHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009

    MCW - P1-A2 - RHS 1 X 1 12.009 0.418 Area 5.021 Cum Effective Length 12.009

    Total Quantity for BOQ Item No. 6.23a 20.084 Cum

    Providing and laying in position Reinforced Cement Concrete in kerbs/railing/median kerbs over bridges, grade separators, ROBs and the

    excluding cost of reinforcement steel, as per drawings and Technical Specifications Sections 1700 and 2300.

    a) grade M30

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge 2+470

    27/41

    Item

    No.

    Length Width Depth Quantity Unit

    Construction of 4-Lane Bypass on NH-76 at Kota on East-West Corridor in the State of Rajasthan

    Contract Package: EW-II(RJ-4) dated 08/02/2006

    No.

    Measurement Details of Bridge at Chainage 02+470.00 Refer Drawing No.

    Description Remark

    6.24 Providing weep holes in abutments, splayed wing wall, median wall,retaining wall or any other earth retaining structure as per drawings and Tec

    Specifications Clause 2706.

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge 2+470

    28/41

    Item

    No.

    Length Width Depth Quantity Unit

    Construction of 4-Lane Bypass on NH-76 at Kota on East-West Corridor in the State of Rajasthan

    Contract Package: EW-II(RJ-4) dated 08/02/2006

    No.

    Measurement Details of Bridge at Chainage 02+470.00 Refer Drawing No.

    Description Remark

    6.25 Painting of structure number span arrangement and flow directions as per drawings and Technical Specifications Section 800.

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge 2+470

    29/41

  • 8/2/2019 Bridge 2+470

    30/41

    Item

    No.

    Length Width Depth Quantity Unit

    Construction of 4-Lane Bypass on NH-76 at Kota on East-West Corridor in the State of Rajasthan

    Contract Package: EW-II(RJ-4) dated 08/02/2006

    No.

    Measurement Details of Bridge at Chainage 02+470.00 Refer Drawing No.

    Description Remark

    6.27

    MCW - A1 - LHS 1 X 1 11.143 0.600 4.176 27.920 Cum

    MCW - A1 - RHS 1 X 1 11.143 0.600 4.166 27.853 Cum

    MCW - A2 - LHS 1 X 1 11.143 0.600 4.566 30.527 Cum

    MCW - A2 - RHS 1 X 1 11.143 0.600 4.556 30.461 Cum

    Total Quantity for BOQ Item No. 6.27 116.761 Cum

    Providing and laying filter media behind abutment, splayed wing wall, median wall, retaining wall and return wall as per drawings and Techn

    Specifications Section 2500.

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge 2+470

    31/41

    Item

    No.

    Length Width Depth Quantity Unit

    Construction of 4-Lane Bypass on NH-76 at Kota on East-West Corridor in the State of Rajasthan

    Contract Package: EW-II(RJ-4) dated 08/02/2006

    No.

    Measurement Details of Bridge at Chainage 02+470.00 Refer Drawing No.

    Description Remark

    6.28 Providing and laying stone apron as per drawing and Technical Specifications Clause 2500

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge 2+470

    32/41

    Item

    No.

    Length Width Depth Quantity Unit

    Construction of 4-Lane Bypass on NH-76 at Kota on East-West Corridor in the State of Rajasthan

    Contract Package: EW-II(RJ-4) dated 08/02/2006

    No.

    Measurement Details of Bridge at Chainage 02+470.00 Refer Drawing No.

    Description Remark

    6.29 Providing and laying in position hand packed boulder pitching on slopes of embankment, in front of abutments as per drawings and Technical

    Specifications Section 2500.

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge 2+470

    33/41

    Item

    No.

    Length Width Depth Quantity Unit

    Construction of 4-Lane Bypass on NH-76 at Kota on East-West Corridor in the State of Rajasthan

    Contract Package: EW-II(RJ-4) dated 08/02/2006

    No.

    Measurement Details of Bridge at Chainage 02+470.00 Refer Drawing No.

    Description Remark

    6.30 Providing and laying filter material underneath stone pitching in slope as per drawing and Technical Specifications Section 2500.

    for ITD CEMINDIA (JV)

  • 8/2/2019 Bridge 2+470

    34/41

    1

    2 A1 A1 A2 A2 A1 A23 MCW MCW MCW MCW MCW MCW

    4 LHS RHS LHS RHS

    5 30 30 30 30 30 30

    6 2% 2% 2% 2% 0% 0%

    7 298.138 298.138 298.138 298.138 298.138 298.1388 293.249 293.249 292.82 292.82 293.249 292.82

    9 291.000 291.000 291.000 291.000 291.000 291.000

    10 0.100 0.100 0.100 0.100 0.100 0.100

    11 0.100 0.100 0.100 0.100 0.100 0.100

    12 0.065 0.065 0.065 0.065 0.065 0.065

    13 298.073 298.073 298.073 298.073 298.073 298.073

    14 0.850 0.850 0.850 0.850

    15 Wall Top Level 296.978 296.978 296.978 296.978

    16 Cap Depth 0.300 0.300 0.300 0.300

    17 No No No No

    18 10.250 10.250 10.250 10.250 5.200 3.500

    19 11.836 11.836 11.836 11.836 6.004 4.04120 Return Wall Length 4.000 4.000 4.000 4.000

    21 Cantilever Return Wall Length 2.000 2.000 2.000 2.000

    22 Slab Span 10.400 10.400 10.400 10.400

    23 Slab Width 10.250 10.250 10.250 10.250

    24 1 Exc Length 12.067 12.067 12.067 12.067 3.500 3.500

    25 2 Exc Width 7.300 7.300 7.300 7.300 6.004 6.004

    26 3 Exc Depth 293.249 293.249 292.820 292.820

    27 4 Exc Depth 2 290.900 290.900 290.900 290.900

    28 5 Exc Depth1 2.349 2.349 1.920 1.920

    29 6 PCC Length 12.067 12.067 12.067 12.067

    30 7 PCC Width 7.300 7.300 7.300 7.300

    31 8 PCC Depth 0.100 0.100 0.100 0.100 0.100 0.100

    32 9 Raft Length 11.836 11.836 11.836 11.83633 10 Raft Width 7.100 7.100 7.1 7.1

    34 11 Raft Width 2 1.100 1.100 1.1 1.1

    35 12 Raft Depth 0.300 0.300 0.300 0.300

    36 13 Raft Depth 2 0.900 0.900 0.900 0.900

    37 14 Wall Length 11.836 11.836 11.836 11.836

    38 15 Wall Width 1.100 1.100 1.100 1.100

    39 16 Wall Width 2 0.720 0.720 0.720 0.720

    40 17 Wall Depth 4.478 4.478 4.478 4.478 6.438 6.438

    41 18 Cap Length 11.836 11.836 11.836 11.836

    42 19 Cap Width 0.720 0.720 0.720 0.720

    43 20 Cap Depth 0.300 0.300 0.300 0.300

    44 21 Return wall BottoLength 4.619 4.619 4.619 4.61945 22 Return wall BottoWidth 0.600 0.600 0.600 0.600

    46 23 Return wall BottoDepth 6.323 6.323 6.323 6.323

    47 24 Cant Return wall Length 2.309 2.309 2.309 2.309

    48 25 Cant Return wall Width 0.600 0.600 0.600 0.600

    49 26 Cant Return wall Depth 1.539 1.539 1.539 1.539

    50 27 Return wall Top Length 6.928 6.928 6.928 6.928

    51 28 Return wall Top Width 0.600 0.600 0.600 0.600

    52 29 Return wall Top Depth 0.300 0.300 0.300 0.300

    Effective Length

    Length

    Round edge of wall

    Depth of Slab

    Deck slab Top Level

    PCC Thickness

    Wearing Coat Thickness

    FRL

    Abutment A1

    PCC Projection

    Bridge Skewness

    PCC Top level

    OGL

    Abutment A2 Retaining Wall

    Camber

  • 8/2/2019 Bridge 2+470

    35/41

    53 30 Dirt Wall Length 11.836 11.836 11.836 11.836

    54 31 Dirt Wall Width 0.300 0.300 0.300 0.300

    55 32 Dirt Wall Depth 0.968 0.968 0.968 0.968

    56 33 Approach Slab Length 6.286 6.286 6.286 6.286

    57 34 Approach Slab Width 9.650 9.650 9.650 9.650

    58 35 Approach Slab Depth 0.300 0.300 0.300 0.300

    59 36 Back Filling Length 11.143 11.143 11.143 11.14360 37 Back Filling Width 1.948 1.943 2.129 2.124

    61 38 Back Filling Width 2 0.000 0.000 0.000 0.000

    62 39 Back Filling Depth 4.176 4.166 4.566 4.556

    63

    64

    65

    66

    67

    68

    69 1 A1MCWL A1MCWR A2MCWL A2MCWRHSExcLength

    70 2 A1MCWL A1MCWR A2MCWL A2MCWRHSExcWidth

    71 3 A1MCWL A1MCWR A2MCWL A2MCWRHSExcDepth72 4 A1MCWL A1MCWR A2MCWL A2MCWRHSExcDepth 2

    73 5 A1MCWL A1MCWR A2MCWL A2MCWRHSExcDepth1

    74 6 A1MCWL A1MCWR A2MCWL A2MCWRHSPCCLength

    75 7 A1MCWL A1MCWR A2MCWL A2MCWRHSPCCWidth

    76 8 A1MCWL A1MCWR A2MCWL A2MCWRHSPCCDepth

    77 9 A1MCWL A1MCWR A2MCWL A2MCWRHSRaftLength

    78 10 A1MCWL A1MCWR A2MCWL A2MCWRHSRaftWidth

    79 11 A1MCWL A1MCWR A2MCWL A2MCWRHSRaftWidth 2

    80 12 A1MCWL A1MCWR A2MCWL A2MCWRHSRaftDepth

    81 13 A1MCWL A1MCWR A2MCWL A2MCWRHSRaftDepth 2

    82 14 A1MCWL A1MCWR A2MCWL A2MCWRHSWallLength

    83 15 A1MCWL A1MCWR A2MCWL A2MCWRHSWallWidth

    84 16 A1MCWL A1MCWR A2MCWL A2MCWRHSWallWidth 285 17 A1MCWL A1MCWR A2MCWL A2MCWRHSWallDepth

    86 18 A1MCWL A1MCWR A2MCWL A2MCWRHSCapLength

    87 19 A1MCWL A1MCWR A2MCWL A2MCWRHSCapWidth

    88 20 A1MCWL A1MCWR A2MCWL A2MCWRHSCapDepth

    89 21 A1MCWL A1MCWR A2MCWL A2MCWRHSReturn wall Botto

    90 22 A1MCWL A1MCWR A2MCWL A2MCWRHSReturn wall Botto

    91 23 A1MCWL A1MCWR A2MCWL A2MCWRHSReturn wall Botto

    92 24 A1MCWL A1MCWR A2MCWL A2MCWRHSCant Return wallL

    93 25 A1MCWL A1MCWR A2MCWL A2MCWRHSCant Return wall

    94 26 A1MCWL A1MCWR A2MCWL A2MCWRHSCant Return wallD

    95 27 A1MCWL A1MCWR A2MCWL A2MCWRHSReturn wall TopLe

    96 28 A1MCWL A1MCWR A2MCWL A2MCWRHSReturn wall TopW97 29 A1MCWL A1MCWR A2MCWL A2MCWRHSReturn wall TopD

    98 30 A1MCWL A1MCWR A2MCWL A2MCWRHSDirt WallLength

    99 31 A1MCWL A1MCWR A2MCWL A2MCWRHSDirt WallWidth

    100 32 A1MCWL A1MCWR A2MCWL A2MCWRHSDirt WallDepth

    101 33 A1MCWL A1MCWR A2MCWL A2MCWRHSApproach SlabLe

    102 34 A1MCWL A1MCWR A2MCWL A2MCWRHSApproach SlabWi

    103 35 A1MCWL A1MCWR A2MCWL A2MCWRHSApproach SlabDe

    104 36 A1MCWL A1MCWR A2MCWL A2MCWRHSBack FillingLength

  • 8/2/2019 Bridge 2+470

    36/41

    105 37 A1MCWL A1MCWR A2MCWL A2MCWRHSBack FillingWidth

    106 38 A1MCWL A1MCWR A2MCWL A2MCWRHSBack FillingWidth

    107 39 A1MCWL A1MCWR A2MCWL A2MCWRHSBack FillingDepth

    108

    109 Back Filling Calculation

    110 FRL (Center) 298.138 298.138 298.138 298.138

    111 Camber 2% 2% 2% 2%112 Width 10.250 11.250 14.250 15.250

    113 FRL (End) 297.933 297.913 297.853 297.833

    114 Average FRL 298.036 298.026 297.996 297.986

    115 PQC / (BC-DBM) 0.310 0.310 0.310 0.310

    116 DLC / WMM 0.150 0.150 0.150 0.150

    117 GSB 0.150 0.150 0.150 0.150

    118 BF Top Level 297.426 297.416 297.386 297.376

    119 Ground Level 293.249 293.249 292.820 292.820

    120 Depth 4.176 4.166 4.566 4.556

    121 Back filling Angle from horizontal 65.000 65.000 65.000 65.000

    122 Top Width 1.948 1.943 2.129 2.124

  • 8/2/2019 Bridge 2+470

    37/41

    P1 P1MCW MCW

    LHS RHS

    30 30

    2.0% 2.0%

    298.138 298.138292.82 292.82

    291.000 291.000

    0.100 0.100

    0.100 0.100

    0.065 0.065

    298.073 298.073

    0.850 0.850

    296.978 296.978

    1015

    Yes Yes

    11.07 11.07

    12.783 12.783

    10.400 10.400

    10.250 10.250

    13.013 13.013

    5.020 5.020

    292.820 292.820

    290.900 290.900

    1.920 1.920

    13.013 13.013

    5.020 5.020

    0.100 0.100

    12.783 12.7834.82 4.82

    0.82 0.82

    0.300 0.300

    0.900 0.900

    11.963 11.963

    0.820 0.820

    0.820 0.820

    4.778 4.778

    11.963 11.963

    0.820 0.820

    0.000 0.000

    Pier P1

  • 8/2/2019 Bridge 2+470

    38/41

    P1MCWL P1MCWRHSExcLength

    P1MCWL P1MCWRHSExcWidth

    P1MCWL P1MCWRHSExcDepthP1MCWL P1MCWRHSExcDepth 2

    P1MCWL P1MCWRHSExcDepth1

    P1MCWL P1MCWRHSPCCLength

    P1MCWL P1MCWRHSPCCWidth

    P1MCWL P1MCWRHSPCCDepth

    P1MCWL P1MCWRHSRaftLength

    P1MCWL P1MCWRHSRaftWidth

    P1MCWL P1MCWRHSRaftWidth 2

    P1MCWL P1MCWRHSRaftDepth

    P1MCWL P1MCWRHSRaftDepth 2

    P1MCWL P1MCWRHSWallLength

    P1MCWL P1MCWRHSWallWidth

    P1MCWL P1MCWRHSWallWidth 2P1MCWL P1MCWRHSWallDepth

    P1MCWL P1MCWRHSCapLength

    P1MCWL P1MCWRHSCapWidth

    P1MCWL P1MCWRHSCapDepth

    Length

    Width

    Depth

    ngth

    idth

    epth

    ngth

    idthpth

    gth

    th

    th

  • 8/2/2019 Bridge 2+470

    39/41

    2

  • 8/2/2019 Bridge 2+470

    40/41

  • 8/2/2019 Bridge 2+470

    41/41