“Outside the Box” Public Involvement
Brian Moore, PE | Paul Pickett, PE
Massillon Rd. Improvements Project
![Page 2: Brian Moore, PE | Paul Pickett, PE “Outside the Box” …...“Outside the Box” Public Involvement Brian Moore, PE | Paul Pickett, PE Massillon Rd. Improvements Project Agenda](https://reader034.fdocuments.in/reader034/viewer/2022042803/5f456d9c40a14b3d40499487/html5/thumbnails/2.jpg)
Agenda
Introduction to Massillon Rd. Public Involvement Preferred Alternative Funding
![Page 3: Brian Moore, PE | Paul Pickett, PE “Outside the Box” …...“Outside the Box” Public Involvement Brian Moore, PE | Paul Pickett, PE Massillon Rd. Improvements Project Agenda](https://reader034.fdocuments.in/reader034/viewer/2022042803/5f456d9c40a14b3d40499487/html5/thumbnails/3.jpg)
Massillon Rd
![Page 4: Brian Moore, PE | Paul Pickett, PE “Outside the Box” …...“Outside the Box” Public Involvement Brian Moore, PE | Paul Pickett, PE Massillon Rd. Improvements Project Agenda](https://reader034.fdocuments.in/reader034/viewer/2022042803/5f456d9c40a14b3d40499487/html5/thumbnails/4.jpg)
A Model for Public Involvement
Multimodal Solution Safer Intersection Pedestrian and Bicycle Accommodations Public Support
Richland Ave. – Athens, Ohio
![Page 5: Brian Moore, PE | Paul Pickett, PE “Outside the Box” …...“Outside the Box” Public Involvement Brian Moore, PE | Paul Pickett, PE Massillon Rd. Improvements Project Agenda](https://reader034.fdocuments.in/reader034/viewer/2022042803/5f456d9c40a14b3d40499487/html5/thumbnails/5.jpg)
Massillon Rd. Corridor Improvements
![Page 6: Brian Moore, PE | Paul Pickett, PE “Outside the Box” …...“Outside the Box” Public Involvement Brian Moore, PE | Paul Pickett, PE Massillon Rd. Improvements Project Agenda](https://reader034.fdocuments.in/reader034/viewer/2022042803/5f456d9c40a14b3d40499487/html5/thumbnails/6.jpg)
Public Involvement Process
Two public meetings and various stakeholder meetings Engaged early before any ideas were generated First meeting presented what the project team identified as issues Had a workshop to ask and listen to public concerns
![Page 7: Brian Moore, PE | Paul Pickett, PE “Outside the Box” …...“Outside the Box” Public Involvement Brian Moore, PE | Paul Pickett, PE Massillon Rd. Improvements Project Agenda](https://reader034.fdocuments.in/reader034/viewer/2022042803/5f456d9c40a14b3d40499487/html5/thumbnails/7.jpg)
Public Meeting 1
![Page 8: Brian Moore, PE | Paul Pickett, PE “Outside the Box” …...“Outside the Box” Public Involvement Brian Moore, PE | Paul Pickett, PE Massillon Rd. Improvements Project Agenda](https://reader034.fdocuments.in/reader034/viewer/2022042803/5f456d9c40a14b3d40499487/html5/thumbnails/8.jpg)
Existing Cross Section
![Page 9: Brian Moore, PE | Paul Pickett, PE “Outside the Box” …...“Outside the Box” Public Involvement Brian Moore, PE | Paul Pickett, PE Massillon Rd. Improvements Project Agenda](https://reader034.fdocuments.in/reader034/viewer/2022042803/5f456d9c40a14b3d40499487/html5/thumbnails/9.jpg)
No Bicycle/ Pedestrian Accommodations
Bicyclists use existing inconsistent shoulder Pedestrians must walk in road or grass
![Page 10: Brian Moore, PE | Paul Pickett, PE “Outside the Box” …...“Outside the Box” Public Involvement Brian Moore, PE | Paul Pickett, PE Massillon Rd. Improvements Project Agenda](https://reader034.fdocuments.in/reader034/viewer/2022042803/5f456d9c40a14b3d40499487/html5/thumbnails/10.jpg)
Crashes
Rear‐end crashes at intersections Angle crashes at intersections Driveway related crashes Congestion related
![Page 11: Brian Moore, PE | Paul Pickett, PE “Outside the Box” …...“Outside the Box” Public Involvement Brian Moore, PE | Paul Pickett, PE Massillon Rd. Improvements Project Agenda](https://reader034.fdocuments.in/reader034/viewer/2022042803/5f456d9c40a14b3d40499487/html5/thumbnails/11.jpg)
Safety Issues
Driveways too closely spaced 24 drives along Massillon Rd.
![Page 12: Brian Moore, PE | Paul Pickett, PE “Outside the Box” …...“Outside the Box” Public Involvement Brian Moore, PE | Paul Pickett, PE Massillon Rd. Improvements Project Agenda](https://reader034.fdocuments.in/reader034/viewer/2022042803/5f456d9c40a14b3d40499487/html5/thumbnails/12.jpg)
Safety Issues
Sight Distance Two vertical curves (hills)
Difficult to see stopped or approaching vehicles
![Page 13: Brian Moore, PE | Paul Pickett, PE “Outside the Box” …...“Outside the Box” Public Involvement Brian Moore, PE | Paul Pickett, PE Massillon Rd. Improvements Project Agenda](https://reader034.fdocuments.in/reader034/viewer/2022042803/5f456d9c40a14b3d40499487/html5/thumbnails/13.jpg)
Congestion Issues
A typical two‐lane road can accommodate 10k vehicles/day
Massillon Rd. is currently carrying 19k
...and is projected to carry 28.8k by 2035
![Page 14: Brian Moore, PE | Paul Pickett, PE “Outside the Box” …...“Outside the Box” Public Involvement Brian Moore, PE | Paul Pickett, PE Massillon Rd. Improvements Project Agenda](https://reader034.fdocuments.in/reader034/viewer/2022042803/5f456d9c40a14b3d40499487/html5/thumbnails/14.jpg)
Public Involvement Process
Public confirmed issues Identified access issues Used questionnaires and online survey to gather input Aired on public access channel
![Page 15: Brian Moore, PE | Paul Pickett, PE “Outside the Box” …...“Outside the Box” Public Involvement Brian Moore, PE | Paul Pickett, PE Massillon Rd. Improvements Project Agenda](https://reader034.fdocuments.in/reader034/viewer/2022042803/5f456d9c40a14b3d40499487/html5/thumbnails/15.jpg)
Public Responses (Meeting 1)
Received over 100 responses
Add additional thru lanes
Accommodate pedestrians and bicyclists
Difficulty turning in/ out of driveways
Flatten two hills
Reduce speed
Miscellaneous
![Page 16: Brian Moore, PE | Paul Pickett, PE “Outside the Box” …...“Outside the Box” Public Involvement Brian Moore, PE | Paul Pickett, PE Massillon Rd. Improvements Project Agenda](https://reader034.fdocuments.in/reader034/viewer/2022042803/5f456d9c40a14b3d40499487/html5/thumbnails/16.jpg)
Key Meeting in Process
Public felt like they were part of the process Identified issues with the number of driveways Suggested solutions such as driveway consolidation Asked for additional lanes
![Page 17: Brian Moore, PE | Paul Pickett, PE “Outside the Box” …...“Outside the Box” Public Involvement Brian Moore, PE | Paul Pickett, PE Massillon Rd. Improvements Project Agenda](https://reader034.fdocuments.in/reader034/viewer/2022042803/5f456d9c40a14b3d40499487/html5/thumbnails/17.jpg)
Project Goals
Increase safety of corridor (reduce crashes)
Provide sufficient capacity
Accommodate pedestrians and bicyclists
Improve visual character of corridor
Minimize R/W Impacts
![Page 18: Brian Moore, PE | Paul Pickett, PE “Outside the Box” …...“Outside the Box” Public Involvement Brian Moore, PE | Paul Pickett, PE Massillon Rd. Improvements Project Agenda](https://reader034.fdocuments.in/reader034/viewer/2022042803/5f456d9c40a14b3d40499487/html5/thumbnails/18.jpg)
Concept Consideration
Developed nine concepts with City staff Based on technical analysis and public input Screened concepts against goals Three concepts best met the goals established
![Page 19: Brian Moore, PE | Paul Pickett, PE “Outside the Box” …...“Outside the Box” Public Involvement Brian Moore, PE | Paul Pickett, PE Massillon Rd. Improvements Project Agenda](https://reader034.fdocuments.in/reader034/viewer/2022042803/5f456d9c40a14b3d40499487/html5/thumbnails/19.jpg)
Public Meeting 2
Second public meeting held Shared three alternatives Introduced streetscape concepts Workshop to seek input on alternatives
![Page 20: Brian Moore, PE | Paul Pickett, PE “Outside the Box” …...“Outside the Box” Public Involvement Brian Moore, PE | Paul Pickett, PE Massillon Rd. Improvements Project Agenda](https://reader034.fdocuments.in/reader034/viewer/2022042803/5f456d9c40a14b3d40499487/html5/thumbnails/20.jpg)
Alt 1 - Signals
Advantages
Minimal R/W impacts at intersections
Minimizes left turn locations
Access roads in place for future development
Disadvantages
Access roads will be costly and very difficult to implement
![Page 21: Brian Moore, PE | Paul Pickett, PE “Outside the Box” …...“Outside the Box” Public Involvement Brian Moore, PE | Paul Pickett, PE Massillon Rd. Improvements Project Agenda](https://reader034.fdocuments.in/reader034/viewer/2022042803/5f456d9c40a14b3d40499487/html5/thumbnails/21.jpg)
Alt 2 - Roundabouts
Advantages Provides sufficient capacity
Nearly eliminates all left turns
Eliminates need for access road system
Roundabouts proven to be safer than traffic signals
“Greener” corridor
Manages speeding
Disadvantages
R/W impacts at intersections
![Page 22: Brian Moore, PE | Paul Pickett, PE “Outside the Box” …...“Outside the Box” Public Involvement Brian Moore, PE | Paul Pickett, PE Massillon Rd. Improvements Project Agenda](https://reader034.fdocuments.in/reader034/viewer/2022042803/5f456d9c40a14b3d40499487/html5/thumbnails/22.jpg)
Alt 3 - Hybrid
Advantages Lessens R/W impact at Raber Rd. Provides sufficient capacity Safer driveway access (reduces
direct left turns) Nearly eliminates need for access
road system Roundabouts proven to be safer
than traffic signals “Greener” corridor Manages speeding
Disadvantages R/W impacts at intersections Less convenient left out of
Speedway
![Page 23: Brian Moore, PE | Paul Pickett, PE “Outside the Box” …...“Outside the Box” Public Involvement Brian Moore, PE | Paul Pickett, PE Massillon Rd. Improvements Project Agenda](https://reader034.fdocuments.in/reader034/viewer/2022042803/5f456d9c40a14b3d40499487/html5/thumbnails/23.jpg)
Streetscape Layout
![Page 24: Brian Moore, PE | Paul Pickett, PE “Outside the Box” …...“Outside the Box” Public Involvement Brian Moore, PE | Paul Pickett, PE Massillon Rd. Improvements Project Agenda](https://reader034.fdocuments.in/reader034/viewer/2022042803/5f456d9c40a14b3d40499487/html5/thumbnails/24.jpg)
Public Responses (Meeting 2)
Over 200 responses received
Have met with stakeholders in the corridor to address concerns
Continuing to engage public on details such as driveway configurations
![Page 25: Brian Moore, PE | Paul Pickett, PE “Outside the Box” …...“Outside the Box” Public Involvement Brian Moore, PE | Paul Pickett, PE Massillon Rd. Improvements Project Agenda](https://reader034.fdocuments.in/reader034/viewer/2022042803/5f456d9c40a14b3d40499487/html5/thumbnails/25.jpg)
Recommended Alternative
Modification of Alternative 3 Increases safety of corridor Provides sufficient capacity Accommodates pedestrians
and bicyclists Improves visual character of
corridor Minimizes R/W Impacts
![Page 26: Brian Moore, PE | Paul Pickett, PE “Outside the Box” …...“Outside the Box” Public Involvement Brian Moore, PE | Paul Pickett, PE Massillon Rd. Improvements Project Agenda](https://reader034.fdocuments.in/reader034/viewer/2022042803/5f456d9c40a14b3d40499487/html5/thumbnails/26.jpg)
Next Steps
![Page 27: Brian Moore, PE | Paul Pickett, PE “Outside the Box” …...“Outside the Box” Public Involvement Brian Moore, PE | Paul Pickett, PE Massillon Rd. Improvements Project Agenda](https://reader034.fdocuments.in/reader034/viewer/2022042803/5f456d9c40a14b3d40499487/html5/thumbnails/27.jpg)
Funding
Project Cost EstimateDollars
Total Project Costs (design, R/W, construction, inspection)
$12.4‐million
Current FundingFunding Source Dollars Obtained
Safety Funding (ODOT) $3.36‐million
4TA7/ AM04 (AMATS) $5.12‐million
Total Funding Obtained $8.48‐million
![Page 28: Brian Moore, PE | Paul Pickett, PE “Outside the Box” …...“Outside the Box” Public Involvement Brian Moore, PE | Paul Pickett, PE Massillon Rd. Improvements Project Agenda](https://reader034.fdocuments.in/reader034/viewer/2022042803/5f456d9c40a14b3d40499487/html5/thumbnails/28.jpg)
Public Involvement Success
• Started with blank slate with public
• Asked and listened to concerns throughout entire process
• Multiple meeting times for each meeting
• Well published in the paper, web and social media
• Engaging meetings• Online survey