Transcript of Brian Martinez Chase Beatty Mohammed Ramadan Noe Caro.
![Page 1: Brian Martinez Chase Beatty Mohammed Ramadan Noe Caro.](https://reader035.fdocuments.in/reader035/viewer/2022062717/56649e5d5503460f94b55e12/html5/thumbnails/1.jpg)
Brian Martinez
Chase Beatty
Mohammed Ramadan
Noe Caro
*AERO Design
![Page 2: Brian Martinez Chase Beatty Mohammed Ramadan Noe Caro.](https://reader035.fdocuments.in/reader035/viewer/2022062717/56649e5d5503460f94b55e12/html5/thumbnails/2.jpg)
*Description/Responsibilities
*SAE AERO group 2012 competition
*Van Nuys, California
*March 16-18
*Chase Beatty: Team Leader
*Brian Martinez: Organizer
*Mohammed Ramadan: Financial Officer
*Noe Caro: Historian
![Page 3: Brian Martinez Chase Beatty Mohammed Ramadan Noe Caro.](https://reader035.fdocuments.in/reader035/viewer/2022062717/56649e5d5503460f94b55e12/html5/thumbnails/3.jpg)
*Customer Description
*Dr. John Tester
*SAE advisor since 2000
*Judges at AERO competition
![Page 4: Brian Martinez Chase Beatty Mohammed Ramadan Noe Caro.](https://reader035.fdocuments.in/reader035/viewer/2022062717/56649e5d5503460f94b55e12/html5/thumbnails/4.jpg)
*Project Description*Design and build an airplane
*Combined dimensions cannot exceed 225”
*Take off within 200ft
*Land and stop within 400ft
*Payload and airplane cannot exceed 55lbs
*Fly in a circle at least once
*No lighter than air aircrafts or helicopters
Takeoff within 200’
Land within 400’
![Page 5: Brian Martinez Chase Beatty Mohammed Ramadan Noe Caro.](https://reader035.fdocuments.in/reader035/viewer/2022062717/56649e5d5503460f94b55e12/html5/thumbnails/5.jpg)
*Project Description cont.
*Propeller cannot be made out of metal
*Fiber-Reinforced Plastic is prohibited
*No fuel pump
*Cannot used gear boxes—gear ratio
*Fuel supplied by competition
*No gyroscope
*Must raise our own funds
![Page 6: Brian Martinez Chase Beatty Mohammed Ramadan Noe Caro.](https://reader035.fdocuments.in/reader035/viewer/2022062717/56649e5d5503460f94b55e12/html5/thumbnails/6.jpg)
*Preliminary Project Schedule
![Page 7: Brian Martinez Chase Beatty Mohammed Ramadan Noe Caro.](https://reader035.fdocuments.in/reader035/viewer/2022062717/56649e5d5503460f94b55e12/html5/thumbnails/7.jpg)
*Materials
*Balsa Wood
*Fuel Tank
*Bass Wood
*Engine
*Heat Shrink Plastic Film
*Wood Glue
*Reicever
![Page 8: Brian Martinez Chase Beatty Mohammed Ramadan Noe Caro.](https://reader035.fdocuments.in/reader035/viewer/2022062717/56649e5d5503460f94b55e12/html5/thumbnails/8.jpg)
*Preliminary Research
*Wings
*Eppler airfoil
*Rectangular Planform
*Tail
*Conventional tail
*Fuselage
*Round
*Square
![Page 9: Brian Martinez Chase Beatty Mohammed Ramadan Noe Caro.](https://reader035.fdocuments.in/reader035/viewer/2022062717/56649e5d5503460f94b55e12/html5/thumbnails/9.jpg)
* Preliminary Research cont.
*Landing Gears
*Tricycle
*Tail dragger
*Retractable
*Engine System
*Propulsion
*O.S 61FX w/E-4010 muffler
![Page 10: Brian Martinez Chase Beatty Mohammed Ramadan Noe Caro.](https://reader035.fdocuments.in/reader035/viewer/2022062717/56649e5d5503460f94b55e12/html5/thumbnails/10.jpg)
*Conclusion
*Solidworks model
*Software for airfoil analysis
*Regular meetings to keep group on track
*Goal: Build aircraft in time for competition and practice real life engineering