BREIF INTRODUCTON

8

description

BREIF INTRODUCTON. - PowerPoint PPT Presentation

Transcript of BREIF INTRODUCTON

Page 1: BREIF INTRODUCTON
Page 2: BREIF INTRODUCTON

BREIF INTRODUCTONBREIF INTRODUCTON

Welcome to Smart Cargo Vietnam Representative office, Let me show you around our big family. We are an international logistics which was established in Qingdao on 2002, we have totally 12 branchesincludesShanghai/Qingdao/Beijing/Tianjin/Shenzhen/Ningbo/Dalian/Jinan/Zibo/Chongqing/Xinjiang/Vietnam, besides, we also have three branches in Africa includes Durban, Beira and Dar-es-salaam and one heavy lift haulage company in Zambia. Backed to Vietnam Representative office, established on Jun. 2011, have successfully handled ACL- PRESTRESSED CONCRETE CYLINDER PIPE for FORMOSA Ha Tinh Steel Corporation started from Dec.2012

Page 3: BREIF INTRODUCTON

PROJECT INTRODUCTIONPROJECT INTRODUCTION

ProjectProject :: PCCP FOR FORMASA NA TINH STEELPCCP FOR FORMASA NA TINH STEEL

Cargo VolumeCargo Volume :: ABOUT 3100PIPES VIA 13 BB VEABOUT 3100PIPES VIA 13 BB VESSELSSEL

ScheduleSchedule :: FROM 2012.12 TO 2013.12FROM 2012.12 TO 2013.12

Pol:Shanghai,China Pod:Vung Ang, VietnamPol:Shanghai,China Pod:Vung Ang, Vietnam

Page 4: BREIF INTRODUCTON

PROJECT INTRODUCTIONPROJECT INTRODUCTION• Till Nov.2013, CJSmartcargo Vietnam office has successfullTill Nov.2013, CJSmartcargo Vietnam office has successfull

y handled twelve shipments for the prestressed concrete pipy handled twelve shipments for the prestressed concrete pipes project, the main work covered negotiate with the shippines project, the main work covered negotiate with the shipping agency and port bureau regarding the berthing issue; atteg agency and port bureau regarding the berthing issue; attend the meeting with the related parties in FHS office for the nd the meeting with the related parties in FHS office for the arrangement of unloading; instruct the stevedores to operatarrangement of unloading; instruct the stevedores to operate properly and solve the emergency problem so that to make properly and solve the emergency problem so that to make sure the unloading work could be finished in free days(3de sure the unloading work could be finished in free days(3days); assist with ACL people to supervise the unloading and ays); assist with ACL people to supervise the unloading and take the recorder for each pipes; attend the closing meeting take the recorder for each pipes; attend the closing meeting in FHS office for discussing the cargo quality the problem din FHS office for discussing the cargo quality the problem during the loading and the unloading, distinguish the responsuring the loading and the unloading, distinguish the responsibility for the abandoned pipes; cooperate with ACL people tibility for the abandoned pipes; cooperate with ACL people to repair the damaged pipes and recheck with FHS people.o repair the damaged pipes and recheck with FHS people.

Page 5: BREIF INTRODUCTON

PROJECT INTRODUCTIONPROJECT INTRODUCTION

Page 6: BREIF INTRODUCTON

VUNG ANG PORTVUNG ANG PORT

Vung Ang port haveVung Ang port have

four berth totally and ofour berth totally and only No.1 and No.2 berth nly No.1 and No.2 berth could be used accept could be used accept

the vessel the vessel

which is about to 200Mwhich is about to 200M 。。

Page 7: BREIF INTRODUCTON

VUNG ANG PORTVUNG ANG PORT

Page 8: BREIF INTRODUCTON

For more details, please contact withFor more details, please contact with

MEET YOUR REQUESTSMEET YOUR REQUESTS

KK Wang  (  Chief Representative)Ellvanie. He ( Assistant)                             

Address: Abacus Tower, Floor 8th , 58 Nguyen Dinh Chieu Street, Da Kao Ward, District 1, HCMC, Viet NamTel : +848 62915779 / 62915772Fax: +848 62915776Mobile: +84 (0)906 620221E-mail: [email protected] ID: kkwang820827Website:www.cjsmartcargo.com