Bree Beal Tech Pro CD Set - breedesigns.com

18
INTERIOR ELEVATION TAG SECTION TAG XX X X XX Room name 150 SF AREA TAG CENTER LINE WALL TYPE X DOOR TAG 101 DOUBLE SWING DOOR SINGLE SWING DOOR CEILING ELEVATION TAG DETAIL TAG X XX NORTH ARROW Project number Date Drawn by Checked by A100 TITLE SHEET 2017.01 Tenant Office Suite TechPro BREE BEAL E. SPECK ABBREVIATIONS SYMBOLS SHEET INDEX PROJECT INFORMATION CODES AND STANDARDS KEY PLAN STACKING DIAGRAM DISTRICT OF COLUMBIA CONSTRUCTION CODES Title 12 DCMR, DC Construction Codes Supplement (2013) DCMR 12 DC Construction Codes Supplement (2008) Amendment to DCMR 12 DC Construction Code Supplement (2008) 2013 District of Columbia Construction Codes: 2013 District of Columbia Building Code 2013 District of Columbia Property Maintenance Code 2013 District of Columbia Green Construction Code 2013 District of Columbia Energy Conservation Code 2013 District of Columbia Fire Code 2013 District of Columbia Mechanical Code 2013 District of Columbia Plumbing 2012 ICC Codes 2011 National Electrical Code TECHPRO TENANT OFFICE SUITE 1300 K STREET, NW WASHINGTON, DC 20007 CLASSIFICATION TYPE 2 OCCUPANCY TYPE BUSINESS OCCUPANCY FACTOR 100 GROSS OCCUPANCY LOAD 65 TENANT OFFICE AREA 6501 SF LEVEL 0 LEVEL 1 LEVEL 2 LEVEL 3 LEVEL 4 LEVEL 5 LEVEL 6 13TH STREET NW L STREET NW AFF Above Finish Floor BLDG Building NTS Not to Scale CLG Ceiling COL Column CTR Center DIA Diameter DIM Dimension DR Door DTL Detail DWG Drawing EL Elevation ELEC Electrical EMG Emergency EQ Equal EQP Equipment EXT Exterior FLR Floor GB Grab Bar GFIC Ground Fault Interrupter Circuit GYP BD Gypsum Board HDW Hardware HT Height HVAC Heating, ventilating, air conditioning LAV Lavatory MECH Mechanical MISC Miscellaneous NIC Not in Contract OC On Center PNT Paint PT Point PTN Partition PWD Plywood RCP Reflected Ceiling Plan RFL Reflected RR Restroom SCH Schedule SEC Section SF Square Footage SHT Sheet STD Standard SYS System TYP Typical VERT Vertical WC Water Closet WD Wood WH Wall Hung AL Aluminum BRZ Bronze GLS Glass GLZ Glazing HM Hollow Metal MTL Metal PT Paint SCW Solid Core Wood ST’L Steel WD Wood WD/G Wood + Glazing VNR Veneer MEANS OF EGRESS A101 LIFE SAFETY SYSTEMS A102 DEMO PLAN A103 FLOOR PLAN A104 DEMISING WALL PARTITION PLAN A105 PARTITION PLAN AND WALL DETAILS A106 DOOR SCHEDULE A107 WALL FINISH PLAN A108 ELEVATIONS AND FINISHES A109 FLOOR FINISH PLAN A110 MILLWORK AND DETAIL A111 FURNITURE PLAN A112 LIGHTING PLAN A113 REFLECTED CEILING PLAN A114 MECH PLANS - AIR FLOW A115 ELECTRICAL, POWER & DATA A116 4/27/2017 TEST FIT FULL TENANT FLOOR ADD 01 GENERAL NOTES 1. GENERAL CONTRACTOR SHALL NOTIFY THE DESIGNER IMMEDIATELY OF ANY INCONSISTANCIES OR DISCREPANCIES WITH THE PLANS IN RELATION TO THE EXISTING FIELD CONDITIONS. 2. WRITTEN DIMENSIONS ALWAYS TAKE PRECEDENCE OVER SCALE ON THE DOCUMENTS. 3. ALL DIMENSIONS ARE FROM THE FACE OF FINISHED WALL TO FACE OF FINISHED WALL UNLESS NOTED OTHERWISE. 4. ALL MANUFACTURED ARTICLES, MATERIALS, AND EQUIPMENT SHALL BE CONDITIONED, USED, APPLIED, INSTALLED, CONNECTED, AND CLEANED IN ACCORDANCE WITH THE MANUFACTURERS WRITTEN SPECIFICATIONS OR INSTRUCTIONS. 5. ALL PENETRATIONS OF FIRE RESISTIVE SHAFT WALLS SHALL BE PROTECTED BY MATERIALS AND INSTALLATION DETAILS THAT CONFORM TO UL STANDARDS FOR THROUGH PENETRATIONS. 6. SEAL AROUND ALL PENETRATIONS, (DUCTS, PIPES, CONDUIT, ETC.) AT NEW FIRE-RATED WALL AND CEILNG CONSTRUCTION. SEAL SHALL NOT DIMINISH RATING OF WALL OR CEILING. AT CONCRETE OR MASONRY, SEAL OFF OPENINGS WITH CONCRETE GROUT. AT PLASTER OR DRYWALL, DAM UP GAPS AND FILL WITH UL APPROVED FIRE RATED SEALAND OR PUTTY PER MANUFACTURERS RECOMMENDATIONS. 7. ALL FIRE RATED WALL, UNLESS NOTED OTHERWISE, SHALL BE CONSTRUCTED FROM FLOOR TO TIGHT TO DECK ABOVE. 8. LEVEL ALL FLOORS AS REQUIRED TO CONCEAL ANY DROPS OR RISES IN FLOOR THAT WOULD OTHERWISE BE SEEN WITH THE SCHEDULED FLOOR FINISHES. 9. PROVIDE SOLID WOOD BLOCKING WHEREVER COUNTER TOPS, GRAB BARS, TOILET PARTITIONS, AND TOILET FIXTURES ARE MOUNTED TO STUD AND GYP BY PARTITIONS. 10. NEW GYPSUM BOARD PARTITIONS TO BE 3 5/8” METAL STUDS, 16” O.C., 1/2” GYP BD EACH SIDE. 11. ALL OUTSIDE CORNERS AND BOTH SIDES OF THE TOP EDGE OF PARTITION SHALL RECEIVE METAL CORNER BEADS – OFFICE WALLS SHALL BE TAPED, BEDDED, PAINTED. GENERAL INTERIORS NOTES: 1. NOTES PERTAIN TO AREAS WITHIN THE SCOPE OF WORK ONLY. 2. REFER TO FINISH SCHEDULE AND PLAN FOR GENERAL FINISHES. REFER TO ALL INTERIOR FINISH NOTES AND INTERIOR DRAWINGS ( INCLUDING PLAN, ELEVATIONS, AND DETAILS) FOR COMPLETE INTERIORS INFORMATION. 3. IF COLOUR OR FINISH IS NOT SPECIFIED CONTACT BREE BEAL FOR CLARIFICATION. 4. CLEAN JOB SITE REMOVING SCAPS, DEBRIS, AND WASTE MATERIALS DAILY. 5. SUBMIT SAMPLES FOR APPROVAL PER MATERIAL SPECIFIED, LABEL EACH TO MATCH THE FINISH LEGEND DESIGNATION. INCLUDE PRODUCT DATA, SEAMING DIAGRAMS AND SHOP DRAWINGS PRIOR TO PROCUREMENT OR FABRICATION.

Transcript of Bree Beal Tech Pro CD Set - breedesigns.com

Page 1: Bree Beal Tech Pro CD Set - breedesigns.com

INTERIOR ELEVATION TAG

SECTION TAG

XX X

X

XX

Room name150 SF

AREA TAG

CENTER LINE

WALL TYPEX

DOOR TAG101

DOUBLE SWING DOOR

SINGLE SWING DOOR

CEILING ELEVATION TAG

DETAIL TAGX

XX

NORTH ARROW

Project number

Date

Drawn by

Checked by

A100

TITLE SHEET

2017.01

Tenant Office SuiteTechPro

BREE BEALE. SPECK

ABBREVIATIONS SYMBOLS SHEET INDEX

PROJECT INFORMATION CODES AND STANDARDS KEY PLAN

STACKING DIAGRAM

DISTRICT OF COLUMBIA CONSTRUCTION CODESTitle 12 DCMR, DC Construction Codes Supplement (2013)DCMR 12 DC Construction Codes Supplement (2008)Amendment to DCMR 12 DC Construction Code Supplement (2008)

2013 District of Columbia Construction Codes:2013 District of Columbia Building Code2013 District of Columbia Property Maintenance Code2013 District of Columbia Green Construction Code2013 District of Columbia Energy Conservation Code2013 District of Columbia Fire Code2013 District of Columbia Mechanical Code2013 District of Columbia Plumbing2012 ICC Codes2011 National Electrical Code

TECHPRO TENANT OFFICE SUITE

1300 K STREET, NWWASHINGTON, DC 20007

CLASSIFICATION TYPE 2OCCUPANCY TYPE BUSINESSOCCUPANCY FACTOR 100 GROSSOCCUPANCY LOAD 65TENANT OFFICE AREA 6501 SF

LEVEL 0LEVEL 1LEVEL 2LEVEL 3LEVEL 4LEVEL 5LEVEL 6

13TH

STR

EET

NW

L STREET NW

AFF Above Finish FloorBLDG BuildingNTS Not to ScaleCLG CeilingCOL ColumnCTR CenterDIA DiameterDIM DimensionDR DoorDTL DetailDWG DrawingEL ElevationELEC ElectricalEMG EmergencyEQ EqualEQP EquipmentEXT ExteriorFLR FloorGB Grab BarGFIC Ground Fault Interrupter CircuitGYP BD Gypsum BoardHDW HardwareHT HeightHVAC Heating, ventilating, air conditioningLAV LavatoryMECH MechanicalMISC MiscellaneousNIC Not in ContractOC On CenterPNT PaintPT PointPTN PartitionPWD Plywood

RCP Reflected Ceiling PlanRFL ReflectedRR RestroomSCH ScheduleSEC SectionSF Square FootageSHT SheetSTD StandardSYS SystemTYP TypicalVERT VerticalWC Water ClosetWD WoodWH Wall Hung

AL AluminumBRZ BronzeGLS GlassGLZ GlazingHM Hollow MetalMTL MetalPT PaintSCW Solid Core WoodST’L SteelWD WoodWD/G Wood + GlazingVNR Veneer

MEANS OF EGRESS A101LIFE SAFETY SYSTEMS A102DEMO PLAN A103FLOOR PLAN A104DEMISING WALL PARTITION PLAN A105PARTITION PLAN AND WALL DETAILS A106DOOR SCHEDULE A107WALL FINISH PLAN A108ELEVATIONS AND FINISHES A109FLOOR FINISH PLAN A110MILLWORK AND DETAIL A111FURNITURE PLAN A112LIGHTING PLAN A113REFLECTED CEILING PLAN A114MECH PLANS - AIR FLOW A115ELECTRICAL, POWER & DATA A116

4/27/2017

TEST FIT FULL TENANT FLOOR ADD 01

GENERAL NOTES1. GENERAL CONTRACTOR SHALL NOTIFY THE

DESIGNER IMMEDIATELY OF ANY INCONSISTANCIES OR DISCREPANCIES WITH THE PLANS IN RELATION TO THE EXISTING FIELD CONDITIONS.

2. WRITTEN DIMENSIONS ALWAYS TAKE PRECEDENCE OVER SCALE ON THE DOCUMENTS.

3. ALL DIMENSIONS ARE FROM THE FACE OF FINISHED WALL TO FACE OF FINISHED WALL UNLESS NOTED OTHERWISE.

4. ALL MANUFACTURED ARTICLES, MATERIALS, AND EQUIPMENT SHALL BE CONDITIONED, USED, APPLIED, INSTALLED, CONNECTED, AND CLEANED IN ACCORDANCE WITH THE MANUFACTURERS WRITTEN SPECIFICATIONS OR INSTRUCTIONS.

5. ALL PENETRATIONS OF FIRE RESISTIVE SHAFT WALLS SHALL BE PROTECTED BY MATERIALS AND INSTALLATION DETAILS THAT CONFORM TO UL STANDARDS FOR THROUGH PENETRATIONS.

6. SEAL AROUND ALL PENETRATIONS, (DUCTS, PIPES, CONDUIT, ETC.) AT NEW FIRE-RATED WALL AND CEILNG CONSTRUCTION. SEAL SHALL NOT DIMINISH RATING OF WALL OR CEILING. AT CONCRETE OR MASONRY, SEAL OFF OPENINGS WITH CONCRETE GROUT. AT PLASTER OR DRYWALL, DAM UP GAPS AND FILL WITH UL APPROVED FIRE RATED SEALAND OR PUTTY PER MANUFACTURERS RECOMMENDATIONS.

7. ALL FIRE RATED WALL, UNLESS NOTED OTHERWISE, SHALL BE CONSTRUCTED FROM FLOOR TO TIGHT TO DECK ABOVE.

8. LEVEL ALL FLOORS AS REQUIRED TO CONCEAL ANY DROPS OR RISES IN FLOOR THAT WOULD OTHERWISE BE SEEN WITH THE SCHEDULED FLOOR FINISHES.

9. PROVIDE SOLID WOOD BLOCKING WHEREVER COUNTER TOPS, GRAB BARS, TOILET PARTITIONS, AND TOILET FIXTURES ARE MOUNTED TO STUD AND GYP BY PARTITIONS.

10. NEW GYPSUM BOARD PARTITIONS TO BE 3 5/8” METAL STUDS, 16” O.C., 1/2” GYP BD EACH SIDE.

11. ALL OUTSIDE CORNERS AND BOTH SIDES OF THE TOP EDGE OF PARTITION SHALL RECEIVE METAL CORNER BEADS – OFFICE WALLS SHALL BE TAPED, BEDDED, PAINTED.

GENERAL INTERIORS NOTES: 1. NOTES PERTAIN TO AREAS WITHIN THE

SCOPE OF WORK ONLY. 2. REFER TO FINISH SCHEDULE AND PLAN FOR

GENERAL FINISHES. REFER TO ALL INTERIOR FINISH NOTES AND INTERIOR DRAWINGS ( INCLUDING PLAN, ELEVATIONS, AND DETAILS) FOR COMPLETE INTERIORS INFORMATION.

3. IF COLOUR OR FINISH IS NOT SPECIFIED CONTACT BREE BEAL FOR CLARIFICATION.

4. CLEAN JOB SITE REMOVING SCAPS, DEBRIS, AND WASTE MATERIALS DAILY.

5. SUBMIT SAMPLES FOR APPROVAL PER MATERIAL SPECIFIED, LABEL EACH TO MATCH THE FINISH LEGEND DESIGNATION. INCLUDE PRODUCT DATA, SEAMING DIAGRAMS AND SHOP DRAWINGS PRIOR TO PROCUREMENT OR FABRICATION.

Page 2: Bree Beal Tech Pro CD Set - breedesigns.com

25'

29'

3'

9'

38'

33'

9'-6"

16'-10"

5'-6

"

43' 2'-3

"

16'-4

"

1. TO PRIMARY TENANT EXIT DOORS

3. TO SECONDARY TENANT EXIT DOORS

4. TO SECONDARY TENANT EXIT DOORS

LEGENDLINE OF TRAVEL DISTANCE

2. TO PRIMARY TENANT EXIT DOORS

PRIMARY TENANTEXIT DOORS

75'-6"

78'-6"

67'-7"

61'-7"

Scale

Project number

Date

Drawn by

Checked by

1/8" = 1'-0"

A101

MEANS OF EGRESS

2017.01

Tenant Office SuiteTechPro

2/28/2017BREE BEAL

E. SPECK

1/8" = 1'-0"1 Level 4 - EGRESS PLAN

4.

3.

2.

1.

Page 3: Bree Beal Tech Pro CD Set - breedesigns.com

SBR

SBR

SBR

SBR

SBR

SBR

SBR

SBR

SBR

SBR

SBR

SBR

SBR

SBR

SBR

SBR

SBR

SBR

SBR

SMOKE DETECTOR

WALL MOUNTED FIRE PULL @ 4' AFF

FF

F

F

F

FF

F

F

F AUDIO VISUAL (SOUND AND STROBE)

FE

CEILING-MOUNTED DIRECTIONAL EXIT SIGN

FE

MP

MP

MP

FE WALL MOUNTED FIRE EXTINGUISHER @ 4' AFF

F

EXIT SIGN

FEM

P

Scale

Project number

Date

Drawn by

Checked by

1/8" = 1'-0"

A102

LIFE SAFETY SYSTEMS

2017.01

Tenant Office SuiteTechPro

BREE BEALE. SPECK

1/8" = 1'-0"1 Level 4 - LIFE SAFETY PLAN

4/27/2017

Page 4: Bree Beal Tech Pro CD Set - breedesigns.com

Demo Key

Interior Partitions for Demo

All others to remain.

To Remain

To Demo

4' -

11 1

/2"

1' - 6 1/2"

13' -

1 1

/2"

13' -

1 1

/2"

17' -

2"

17' -

2"

8' - 9"

17' -

3"

17' -

3" 11' -

2 1

/2" 4'

- 3"

1' - 1 1/2"

27' - 0"

2' -

5"

9' -

0 1/

2"

Scale

Project number

Date

Drawn by

Checked by

1/8" = 1'-0"

A103

DEMO PLAN

2017.01

Tenant Office SuiteTechPro

2/15/2017BREE BEAL

E. SPECK

1/8" = 1'-0"1 Level 4 - Demo Plan

Page 5: Bree Beal Tech Pro CD Set - breedesigns.com

20' -

8 1

/2"

11' -

0 1

/2"

11' - 0" 3' - 0" 3' - 0" 9' - 0 1/2" 12' - 1" 12' - 1" 4' - 3" 4' - 3"

RECEPTION & COPY458 SF

LARGE PRIVATE OFFICE317 SF

8' -

8 1/

2"18

' - 5

"2'

- 0"

2' -

6"1' -

9 1/

2"2'

- 9"

1' -

6"

3' -

5"2'

- 6"

2' -

6"6'

- 11

1/2

"

2' -

6 1/

2"0'

- 3"

2' -

1"2'

- 5"

2' -

6"

1' -

9 1/

2"0'

- 8

1/2"

7' -

3"

15' - 4" 2' - 6"

8' - 1 1/2" 1' - 0" 22' - 1 1/2"

3' - 0 1/2"

12' - 3 1/2" 4' - 6" 3' - 0" 16' - 2 1/2"

PRIVATE OFFICE214 SF

PRIVATE OFFICE184 SF

OPEN OFFICE1909 SF

TRAINING ROOM440 SF

MEETING ROOM613 SF

SERVER ROOM(NIC)

266 SF

MEETING ROOM212 SF

BREAK ROOM189 SF

PRIVATE OFFICE218 SF

PRIVATE OFFICE218 SF

PRIVATE OFFICE214 SF

PRIVATE OFFICE214 SF

Scale

Project number

Date

Drawn by

Checked by

1/8" = 1'-0"

A104

FLOOR PLAN

2017.01

Tenant Office SuiteTechPro

2/28/2017BREE BEAL

E. SPECK

1/8" = 1'-0"1 Level 4 - FLOOR PLAN

Page 6: Bree Beal Tech Pro CD Set - breedesigns.com

1

1

1

1

1

1

1

1

2

DEMISING WALL TYPES

NOTE: SEE WALL ASSEMBLY FOR DETAILS (A106)

TYPE X (1/2 HR.) GYP. BD.STC 48

METAL FURRING WITH TYPE X (1/2 HR.)GYP. BD. ON INTERIOR SIDE OF EXISTINGMASONRY FIRE BARRIER WALL.STC 25

1 2

Scale

Project number

Date

Drawn by

Checked by

1/8" = 1'-0"

A105

DEMISING WALLPARTITION PLAN

2017.01

Tenant Office SuiteTechPro

2/21/2017BREE BEAL

E. SPECK

1/8" = 1'-0"1 Level 4

Page 7: Bree Beal Tech Pro CD Set - breedesigns.com

2

2

2

2

2

2

1

2

1

1

1 1

1

22

1

1

1

1

2

3

3

2

2

2

2

2

2

2

1

ExistingChase Walls

ExistingChase Walls

33

Scale

Project number

Date

Drawn by

Checked by

1/8" = 1'-0"

A106

PARTITION PLAN AND WALL DETAILS

2017.01

Tenant Office SuiteTechPro

2/28/2017BREE BEAL

E. SPECK

1/8" = 1'-0"1 Level 4 - PARTITION PLAN AND WALL DETAILS

1 2

3

Page 8: Bree Beal Tech Pro CD Set - breedesigns.com

8

1

16

14

11

10

13

12

6

9

5

4 3

15

18

17

2

7

Type AType D

Type BType C

6' - 6"

6' - 0"

2' - 4" 2' - 4"

7' -

3"

7' -

0"

6' -

4"

0' - 4" 0' - 4"

3' - 7"

3' - 4 1/2"

6' -

10 1

/2"

6' -

9"

0' - 10"

2' -

5 1/

2"

0' -

8"1'

- 3

1/2"

GLASSPANELS

Scale

Project number

Date

Drawn by

Checked by

As indicated

A107

DOOR SCHEDULE

2017.01

Tenant Office SuiteTechPro

2/28/2017BREE BEAL

E. SPECK

1/8" = 1'-0"1 Level 4 - TechPro Tenant Office Plan

1/2" = 1'-0"Doors

Page 9: Bree Beal Tech Pro CD Set - breedesigns.com

P-1

P-2

F-1

F-2

F-2

F-2

F-3

F-3

F-3

F-3

F-3

F-3

F-4

SERVERROOM

NIC

P-3P-4

BREAKROOM

SMALLMEETING

ROOM

LARGEMEETING

ROOM

TRAININGROOM

PRIVATEOFFICE

PRIVATEOFFICE

PRIVATEOFFICE

PRIVATEOFFICE

PRIVATEOFFICE

PRIVATEOFFICE

F-3

P-3

P-4

P-4

P-5

P-5

P-5

P-5

P-6

VB-1

VB-2

P-6

P-6

P-6

P-6

P-5 P-5

PRESIDENT'SOFFICE

RECEPTIONAREA

F-4

F-4

P-3

Scale

Project number

Date

Drawn by

Checked by

1/8" = 1'-0"

A108

WALL FINISH PLAN

2017.01

Tenant Office SuiteTechPro

2/27/2017BREE BEAL

E. SPECK

1/8" = 1'-0"1 Level 4 - WALL FINISH PLAN

FLOORS

F-1

F-2

F-3

F-4

MANUF. - DurkanSTYLE - Living Local Glue DownNUMBER: 332COLOR: Cedar

MANUF. - DurkanSTYLE - Resurgent Bad Attitude TileNUMBER: 859COLOR: Glory Days

MANUF. - DurkanSTYLE - Resurgent Bad Attitude TileNUMBER: 358COLOR: Thrill Seeker

MANUF. - DurkanSTYLE - Resurgent Bad Attitude TileNUMBER: 152COLOR: Living Fast

WALLS

P-1

P-2

P-3

P-4

MANUF. - Sherwin WilliamsSTYLE - EggshellNUMBER: SW 7511COLOR: Bungalow Biege

MANUF. - Sherwin WilliamsSTYLE - EggshellNUMBER: SW 7021COLOR: Simple White

MANUF. - Sherwin WilliamsSTYLE - Low LustreNUMBER: SW 6164COLOR: Svelte Sage

MANUF. - Sherwin WilliamsSTYLE - Low LustreNUMBER: SW 7024COLOR: Functional Gray

P-5

P-6

MANUF. - Sherwin WilliamsSTYLE - Low LustreNUMBER: SW 6004COLOR: Mink

MANUF. - Sherwin WilliamsSTYLE - Low LustreNUMBER: SW 6199COLOR: Rare Gray

VB-1MANUF. - RomoSTYLE - Shima Wide StripeNUMBER: W348/04COLOR: Chamois

VB-2MANUF. - RomoSTYLE - MosaicNUMBER: W339/02COLOR: Chamois

WALL BASE (THROUGHOUT)

MANUF. - Burke FlooringSTYLE - Elusive 3"NUMBER: 208COLOR: Light Gray

SCHEDULE

Page 10: Bree Beal Tech Pro CD Set - breedesigns.com

2' -

10 1

/2"

0' -

1 1/

2"0'

- 4" 1'

- 2"

2' -

6"

2' - 6" 2' - 6" 1' - 6"

2' - 6" 2' - 6" 1' - 6"

6' - 6"

9' -

0"

P-1

2' -

5" 3' -

0"

2' -

5"

7' -

3"

5' - 8 1/2" 5' - 2"4' - 1 1/2"

10' -

0"

4" BASEBOARD

WALL -MOUNTEDWHITEBOARD

(LRG)

WALL -MOUNTEDWHITEBOARD

(SM)

72" WALL-MOUNTED MONITOR

P-3

15' - 3 1/2"

4' -

0"

0' -

4"0'

- 4"

ALIGN BRANDINGGRAPHIC OC OF

RECEPTION DESK10

' - 0

"

2' -

0"

7' - 8"

P-6

2' -

5" 3' -

0"

2' - 11" 5' - 4"

4" BASEBOARD

72" WALL-MOUNTED MONITORWALL -MOUNTED

WHITEBOARD(LRG)

P-3

2' -

5" 3' -

0"

10' -

0"

5' - 4"5' - 5"

WALL -MOUNTEDWHITEBOARD

(LRG)

4" BASEBOARD

72" WALL-MOUNTED MONITOR

P-3

Scale

Project number

Date

Drawn by

Checked by

1/2" = 1'-0"

A109

ELEVATIONS ANDFINISHES

2017.01

Tenant Office SuiteTechPro

2/28/2017BREE BEAL

E. SPECK

1/2" = 1'-0"1 Elevation - Break Room 1/2" = 1'-0"2 Elevation - Large Conference Rm

1/2" = 1'-0"4 Elevation - Reception and Reprographics

1/2" = 1'-0"3 Elevation - Small Conference Room

1/2" = 1'-0"5 Elevation - Training Room

NOTES:1. PROVIDE BLOCKING TO 7’-0” AFF AT ALL

WALLS SCHEDULED FOR WALL HUNG EQUIPMENT, SYSTEMS FURNITURE, MARKER OR TACK BOARDS.

2. ALL FURNITURE (EQUIPMENT) IS OWNER FURNISHED/OWNER INSTALL, UNLESS NOTED OTHERWISE

Page 11: Bree Beal Tech Pro CD Set - breedesigns.com

Scale

Project number

Date

Drawn by

Checked by

1/8" = 1'-0"

A110

FLOOR FINISH PLAN

2017.01

Tenant Office SuiteTechPro

2/28/2017BREEBEAL

E. SPECK

1/8" = 1'-0"1 Level 4 - FLOOR FINISH PLAN

NOTES1. PROVIDE SHOP DRAWING LAYOUT

SHOWING ALL FLOOR PATTERN LOCATIONS, GRAIN DIRECTIONS AND SEAMING DIAGRAMS.

2. INSTALL DIRECTIONAL FLOORING ORIENTED AS SPECIFIED IN THE FINISH PLAN.

3. CONDUCT MOISTURE TESTS ON ALL CONCRETE SLABS WHERE FINISH MATERIALS ARE SCHEDULED. RECORD PASSING MOISTURE LEVELS PRIOR TO START OF INSTALLATION. REFERENCE MANUFACTURERS INSTALLATION SPECIFICATION FOR EACH FLOOR FINISH TYPE TO VERIFY REQUIREMENTS.

4. ALIGN TRANSITION OF FLOOR MATERIAL WITH CENTER OF HINGE IN DOORWAY.

Bree
Line
Bree
Line
Bree
Line
Bree
Line
Bree
Line
Bree
Line
Page 12: Bree Beal Tech Pro CD Set - breedesigns.com

A1092

2 ADJUSTABLE SHELVES - 3/4" MDF

FINISH UNDERSIDE CABINETRY TO MATCH VERTICAL SURFACES

CUSTOM COUNTERTOP WITH ATTACHED BACKSLASH AND 1" LIP

4-1/2" STAINLESS STEEL DRAWPULLS (SEE FINISH HARDWARE SCHEDULE)

CABINET DOORS AND KICKBASE - 3/4" MDF

DRAWER EXTERIOR - 3/4" MDF

4-1/2" STAINLESS STEEL DRAWPULL (SEE FINISH HARDWARE SCHEDULE)

0' -

5"2'

- 6"

0' -

1 1/

2"0'

- 4"

REVEAL - PAINT BLACK

1' -

2"2'

- 5

1/2"

0' -

1"2'

- 5

1/2"

1' - 0"

2' - 0"

0' -

4"

0' -

5"

0' -

5"

0' -

7 1/

2"

SINGLE ADJUSTABLE SHELF - 3/4" MDF

0' -

3"0'

- 3"

0' -

3"0'

- 6

1/2"

0' -

5"0'

- 5"

0' -

5"

CABINET BACKING - 5/8" MDF

FLOOR

CEILING

0' -

3"

0' -

1"

Scale

Project number

Date

Drawn by

Checked by

As indicated

A111

MILLWORK ANDDETAIL

2017.01

Tenant Office SuiteTechPro

4/20/2017BREE BEAL

E. SPECK

1 1/2" = 1'-0"1 Break Room - Cabinet Section 6" = 1'-0"2 Break Room Section Detail

NOTE:1/2" SCREW-MOUNT ASSEMBLY.CAREFUL NOT TO PUNCTUREBACKSIDE OF CABINET DOOR.

Page 13: Bree Beal Tech Pro CD Set - breedesigns.com

8' - 9"

4" from window wall (typ.)

1' - 5 1/2"

1' - 0"

2' - 8"

0' - 7 1/2"

1' - 4 1/2"

4' - 4"5' - 1"

5' - 4 1/2"

4' - 7"

5' - 4"

4in. from wall (typ.)

4' -

4 1/

2"

1' - 10"

6' - 1 1/2" 11' -

1 1

/2"

2in from wall (typ.)

7' - 6 1/2"6'

- 4"

7' - 0"

4' - 11"

A108.2

4

A108.21

A108.2 2

A108.2

5

A108.23

Scale

Project number

Date

Drawn by

Checked by

1/8" = 1'-0"

A112

FURNITURE PLAN

2017.01

Tenant Office SuiteTechPro

3/30/2017BREE BEAL

E. SPECK

1/8" = 1'-0"1 Level 4 - TechPro Office - Furniture Plan

NOTES:1. PROVIDE BLOCKING TO 7’-0” AFF AT ALL

WALLS SCHEDULED FOR WALL HUNGEQUIPMENT, SYSTEMS FURNITURE,MARKER OR TACK BOARDS.

2. ALL FURNITURE (EQUIPMENT) IS OWNERFURNISHED/OWNER INSTALL, UNLESSNOTED OTHERWISE.

3. CAULK COUNTERS WHERE THEY ABUTWALLS WITH CLEAR CAULK.

4. PROVIDE LAMINATE AT ALL EXPOSEDCASEWORK INTERIORS, UNLESS NOTEDOTHERWISE.

5. PLASTIC LAMINATE AND SOLD SURFACECOLORS SHALL BE VERIFIED ON ALLAPPORVED MILLWORK SHOPDRAWINGS.

6. FOR SUBMITTALS; ON SPECIFIEDACTUAL WOOD SURFACES, PROVIDETHREE 4” X 8” SAMPLES OF NATURALAND STAINED WOOD FINISHES. LABELAND IDENTIFY EACH AS TO LOCATIONAND APPLICATION.

7. MILLWORK FINISHES ON SHOPDRAWINGS MUST BE APPROVED BYDESIGNER PRIOR TO PRODUCTION.

Page 14: Bree Beal Tech Pro CD Set - breedesigns.com

10' - 0"

9' - 0"

10' - 0"

GYP. BD.

ACT SYS.

2' - 0" TYP.

2' - 0"

2' -

6"

9' - 0"

ACT SYS.

GYP. BD.

1' -

4"

2' -

0"

1' - 10"

1' -

8"

1' - 4"

1' -

6"

1' - 4"

1' -

4"

1' - 10"

1' -

5"

1' - 10"

1' -

8"

1' -

9"

2' - 0"

10' - 0"ACT SYS.

9' - 0"GYP. BD.

TYP.

3' - 6"

10' - 6"

20' -

10"

7' -

5"

5' -

0"5'

- 0"

5' -

0"3'

- 6"

O.C

. TIL

E TY

P.

9' - 0"10' - 0"

10' - 0"ACT SYS.

9' - 0"GYP. BD.

10' - 0"ACT SYS.

1' - 8"

0' -

9"

2' -

0"

2' - 0

"

9' - 0"

10' - 0"

GYP. BD.

ACT SYS.

2' - 0" 2' - 0"

2' - 0"10' - 0"ACT SYS.

9' - 0"GYP. BD.

9' - 0"ACT SYS. 9' - 0"

9' - 0"

9' - 0"

9' - 0"10' - 0"

ACT SYS.

ACT SYS.

ACT SYS.

ACT SYS.ACT SYS.

0' - 6"

TILE(TYP.)

2' -

0"

9' - 0"GYP. BD.

10' - 0"ACT SYS.

WALL

WALLGRID

WALLTILE

WALLTILE

WALLGRID

WALLGRID

WALLGRID

TILE (TYP.)

TILE(TYP.)

WALLGRID

WALLGRID

WALLGRID

WALLTILE

Scale

Project number

Date

Drawn by

Checked by

As indicated

A113

LIGHTING PLAN

2017.01

Tenant Office SuiteTechPro

BREE BEALE. SPECK

1/8" = 1'-0"1 Level 4 - TechPro Office - LIGHTING PLAN

1/4" = 1'-0"LIGHTING LEGEND

LED 6" CAN DOWNLIGHT (30W - 19 CT.)

LED 6" WALL WASH (30W - 3 CT.)

LED 48" LINEAR PENDANT LIGHT (39.4W - 39 CT.)

LED 2X2 TROFFER LIGHT (28.4W - 14 CT.)

LED 2X4 TROFFER LIGHT (30.7W - 36 CT.)

TOTAL WATTAGE

TOTAL TENANT SF

=3,699.9 W

5,101 SF

= .725

THE LIGHTING PLAN COMPLIES WITHCURRENT ENERGY CODES (< .8)

4/19/2017

NOTES:1. INSTALL LIGHT FIXTURES IN

ACCORDANCE WITH THE MANUFACTURER’S INSTRUCTIONS AND THE LATEST EDITION OF THE NEC.

2. ALL FIXTURES TO BE PROVIDED BY, RECEIVED, STORED, AND INSTALLED BY THE ELECTRICAL CONTRACTOR.

3. ALL FIXTURE LAMPS SHALL BE SUPPLIED AND INSTALLED BY THE ELECTRICAL CONTRACTOR.

4. ALL FIXTURES TO BE CENTREED IN CEILING TILE, 2X2 GRID.

5. ELECTRICAL CONTRACTOR SHALL SUPPLY 10% ADDITIONAL SPARE LAMPS FOR ALL LAMP TYPES.

Page 15: Bree Beal Tech Pro CD Set - breedesigns.com

1A111.3

10' - 0"

9' - 0"

10' - 0"

GYP. BD.

ACT SYS.

9' - 0"

ACT SYS.

GYP. BD.

10' - 0"ACT SYS.

9' - 0"GYP. BD.

9' - 0"10' - 0"

10' - 0"ACT SYS.

9' - 0"GYP. BD.

10' - 0"ACT SYS.

9' - 0"

10' - 0"

GYP. BD.

ACT SYS.

10' - 0"ACT SYS.

9' - 0"GYP. BD.

9' - 0"ACT SYS. 9' - 0"

9' - 0"

9' - 0"

9' - 0"10' - 0"

ACT SYS.

ACT SYS.

ACT SYS.

ACT SYS.ACT SYS.

TYP.

9' - 0"GYP. BD.

10' - 0"ACT SYS.

R R R RRRR

RR

R R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R R

R

R

R

NOTE:

SEE SECTION FOR AIR SUPPLY LOCATION IN WALLS.

SPRINKLERS TO BE DETERMINED BY LIFE SAFETY ENGINEER.

R

LEGEND

RETURN

Scale

Project number

Date

Drawn by

Checked by

1/8" = 1'-0"

A114

REFLECTED CEILINGPLAN

2017.01

Tenant Office SuiteTechPro

BREE BEALE. SPECK

1/8" = 1'-0"1 Level 4 - Reflected Ceiling Plan

4/19/2017

NOTES:1. PROVIDE A SMOOTH LEVEL ? DRYWALL

FINISH ON ALL GYPSUM BOARD CEILING, UNLESS NOTED OTHERWISE

2. CENTER CEILING GRID AND CEILING TILE LAYOUT IN EACH ROOM, UNLESS NOTED OTHERWISE. DO NOT INSTALL LESS THAN 2” CEILING TILE.

Page 16: Bree Beal Tech Pro CD Set - breedesigns.com

SUPPLY

SUPPLY

RETURNRETURN

Scale

Project number

Date

Drawn by

Checked by

1/2" = 1'-0"

A115

MECH PLANS - AIRFLOW

2017.01

Tenant Office SuiteTechPro

BREE BEALE. SPECK

1/2" = 1'-0"1 Section - Air Flow

4/20/2017

NOTES:1. ALL WORK IS BASED UPON SHELL

CONSTRUCTION OF THE FOURTH FLOOR.2. WORK WILL INCLUDE CODE REQUIRED

FIRE ALARM AND EMERGENCY LIGHTING.3. UTILIZING THE NEW HVAC EQUIPMENT

FOR TEMPORARY HEATING, VENTILATION AND AIR CONDITIONING DURING THE FINISHING TRADES WORK IS REQUIRED FOR A DURATION OF TWO MONTHS. START UP, TESTING, AND OPERATION OF THE EQUIPMENT FOR THIS DURATION IS REQUIRED. CLEANING, FILTER CHANGE OUT AND EXTENDED WARRANTY COSTS ARE INCLUDED.

4. “CLEAN BUILD” PROTOCOL MUST BE FOLLOWED.

Page 17: Bree Beal Tech Pro CD Set - breedesigns.com

J

J

J

J

J

J

J

J

J

J J

J

J

8' - 9"

1' - 5 1/2"

1' - 0"

2' - 8"

0' - 7 1/2"

1' - 4 1/2"

6' - 1 1/2" 11' -

1 1

/2"

8' - 3 1/2"6'

- 4"

1' -

10"

7' -

6"

@ 4

4" A

FF

@ 22" AFF

@ 2

2" A

FF

4'-7" fromwindow wall(typ.)

4'-7" from wall (typ.)4' - 11" 10' - 4"

4' - 4"

4' -

0"

13' - 9"

8' -

10 1

/2"

2' - 6"

5' - 0"

10' - 0"

6' -

0"

1' - 4 1/2"

7' -

6"

8' - 10 1/2"

6' - 9" 5' - 7 1/2"

1' -

6"3'

- 0"

7' -

0"10

' - 0

"

2' - 6"

6' - 0"

3' -

0"3'

- 0"

9' -

0"12

' - 0

"

3' -

0"3'

- 0"

3' -

0"3'

- 0"

6' - 0"

4' -

0"1'

- 0"

R

2' -

0"

3' -

0"

10' - 0" 5' - 11"

3' - 0" 3' - 0"

6' - 4" 6' - 6"

6' - 7"

5' - 0"

10' - 0"2' - 9"

7' -

11"

6' -

7"

6' -

7"

8' -

0"

SERVER ROOM

NIC

BREAK ROOM

MEETING ROOM #1

PRIVATE OFFICE

PRIVATE OFFICE

PRIVATE OFFICE

PRIVATE OFFICE

PRIVATE OFFICE PRIVATE OFFICE

PRIVATE OFFICE

MEETING ROOM #2

TRAINING ROOM

SYSTEMS FURNITURE GROUPS

RECEPTION/COPY/MAIL

1' - 9"

Outlet - Duplex

Outlet - Quad

Junction Box (includes Telephone and Data )

Dual Telephone and Data

Data

Scale

Project number

Date

Drawn by

Checked by

As indicated

A116

Electrical, Power &Data

2017.01

Tenant Office SuiteTechPro

3/28/2017BREE BEAL

E. SPECK

1/8" = 1'-0"1 Level 4 - TechPro Office - TD&E Plan

1/4" = 1'-0"Legend

NOTES:1. ELECTRICAL WORK SHALL CONFORM TO

NEC STATE AND LOCAL JURISDICTIONAL ORDINANCES.

2. REGARDLESS OF THE EXISTING CIRCUITING, IT IS THE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR TO PROPERLY BALANCE ALL BRANCH PHASES OF THE ELECTRICAL PANEL TO WITHIN 10% OF EACH OTHER

3. MAXIMUM LOAD OF BRANCH CIRCUIT SHALL BE 75% OF RATED CAPACITY.

4. ALL LIGHTING FIXTURE WORK SHALL BE WIRED PER ARTICLE 410 NEC

5. SUPPOT WIRES FOR CEILING ITEMS MUST NOT BE CONNECTED TO ANY O FTHE MECHANICAL, ELECTRICAL, PLUMBING OR FIRE PROTECTION PIPING OR EQUIPMENT

6. ELECTRICAL CONTRACTOR TO RUN CONDUIT AT DECK HEIGHT AND DROP DOWN FEEDS AS REQUIRED TO FIXTURES.

7. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR CODE COMPLIANCE. ENSURE ALL ELECTRICAL IS IN COMPLIANCE WITH ELECTRICAL CODE.

8. GENERAL CONTRACTOR IS RESPONSIBLE FOR SUPPLYING AND INSTALLING ALL SMOKE DETECTION SYSTEMS TO MEEL LOCAL CODE.

9. COORDINATE FIXTURE JUNCTION BOX REQUIREMENTS WITH FIXTURE VENDOR.

10. REFER TO EQUIPMENT INSTALLATION MANUALS FOR ADDITIONAL DETAILS

Page 18: Bree Beal Tech Pro CD Set - breedesigns.com

3587 SFTotal Area

6501 SFTotal Area

109'-

8"

Children's Organization (Make -A-Wish)

Req. Area

Occupancy Factor (Business) = 100 grossOccupancy Load = 36Requires 1 Tenant ExitNote: This tenant also has sole access to 859 SF terrace.

Software/Training/Tech Support

Req. Area

Occupancy Factor (Business) = 100 grossOccupancy Load = 65Requires 2 tenant exits (doors) at least 49.4 ft apart OC(Longest diagonal divided by 3 for sprinklered building)

148'-4"

6500 SF

3600 SF

4301 SFArea

Professional Education (Accreditation)

Req. Area

Occupancy Factor (Business) = 100 grossOccupancy Load = 36Requires 1 Tenant Exit

4300 SF

126'-6"

62'-4"

859 SFTerrace Area

1971 SFCorridor Area

Fire Exit 2

Fire Exit 1

Door 1

Door 2

Door 3

Door 4

Door # FE1 FE2Door 1 62'-2" 159'-6"Door 2 28'-0" 172'-5"Door 3 116'-7" 78'-9"Door 4 87'-8" 118'-0"

Distance to Fire Exits by Door

Scale

Date

Drawn By

Checked By

Project Number

1/8" = 1'-0"

ADD 01

TEST FIT FULL TENANT FLOOR

TechPro

Tenant Office Suite

E. SPECKBREE BEAL

2/8/20172017.01

1/8" = 1'-0"1 Level 4 - Full Floor Test Fit