Breakout 2: Neighborhood Connections

14
Michigan Street Corridor Plan Community Forum #4 October 29, 2012 Breakout #2 Neighborhood Connections: Belknap to Monroe North to Michigan Street Wes Steer, OCBA Howard Hansen, Monroe North Lou Canfield, Belknap Neighbors SuLin Kotowicz, OCBA Dennis Kent, MDOT Shaun Biel, Monroe North

Transcript of Breakout 2: Neighborhood Connections

Page 1: Breakout 2: Neighborhood Connections

Michigan Street Corridor PlanCommunity Forum #4October 29, 2012

Breakout #2

Neighborhood Connections:Belknap to Monroe North to

Michigan StreetWes Steer, OCBA

Howard Hansen, Monroe NorthLou Canfield, Belknap Neighbors

SuLin Kotowicz, OCBADennis Kent, MDOTShaun Biel, Monroe North

Page 2: Breakout 2: Neighborhood Connections

MOBL NOBL Plan

Page 3: Breakout 2: Neighborhood Connections

Monroe North Area Specific Plan

Page 4: Breakout 2: Neighborhood Connections

Belknap AreaSpecific Plan

Page 5: Breakout 2: Neighborhood Connections

Overall Plan

Page 6: Breakout 2: Neighborhood Connections

Hastings Linear Park ‐ 1

Page 7: Breakout 2: Neighborhood Connections

Hastings Linear Park ‐ 2

Page 8: Breakout 2: Neighborhood Connections

Hastings Linear Park Elevated Walkway

Page 9: Breakout 2: Neighborhood Connections

Division Avenue Plan ‐ 1

Page 10: Breakout 2: Neighborhood Connections

Division Avenue Plan ‐ 2

Page 11: Breakout 2: Neighborhood Connections

Bond AvenueAlternatives

Page 12: Breakout 2: Neighborhood Connections

Newberry StairsAnd Crosswalk

Page 13: Breakout 2: Neighborhood Connections

Belknap Park

Page 14: Breakout 2: Neighborhood Connections

Thank you!

Wes [email protected]

Howard [email protected]

Lou [email protected]

Please fill out a short feedback survey on the back of your forum agenda and leave it in the box at the front of the room.

Take some time in the central atrium area to explore the other sessions. Parking & bus passes will be available at the name tag table.

SuLin [email protected]

Dennis [email protected]

Shaun [email protected]