3
1 Liter = Time Total (Rp) (Cu M) (Jam) 1 Pengerukan Dermaga 1.1 TSD 3,415,847 146 3 ####### 158,104,918,286 3 1,464 1,550 73,518,787,003 158,104,918,286 73,518,787,003 46,286 21,523 CONSUMABLE / Cu M SUB TOTAL LABOUR COST EQUIPMENT SUB TOTAL CONSUMABLE EQUIPMENT / Cu M Breakdown Price Cutter suction UNIT PRICE EQUIPMENT CONSUMABLE Unit (Rp / Hari) Total (Rp) Unit No Total Price / Cu M Description No Spesification Volume Day Ltr / Jam LABOUR COST / Cu M SUB TOTAL LABOUR COST TOTAL PRICE

Transcript of Breakdown Price Sand Transport Belawan

1 Liter =

Time Total (Rp)

(Cu M) (Jam)

1 Pengerukan Dermaga 1.1 TSD 3,415,847 146 3 ####### 158,104,918,286 3 1,464 1,550 73,518,787,003

158,104,918,286 73,518,787,003

46,286 21,523 CONSUMABLE / Cu M

SUB TOTAL LABOUR COST EQUIPMENT SUB TOTAL CONSUMABLE

EQUIPMENT / Cu M

Breakdown Price Cutter suction

UNIT PRICE

EQUIPMENT CONSUMABLE

Unit (Rp / Hari) Total (Rp) Unit

No

Total Price / Cu M

Description No SpesificationVolume

Day

Ltr / Jam

LABOUR COST / Cu M

SUB TOTAL LABOUR COST

TOTAL PRICE

IDR

10,800

(RP)

231,623,705,289

###########

4,860,262,303

###########

1,423

69,231

Breakdown Price Cutter suction

Amount Price

IDR

Total

(RP)

1 Hydrographer 4.9 2 18,000,000 175,672,131

2 Surveyor 4.9 2 19,000,000 185,431,694

3 Dredging Master 4.9 2 15,000,000 146,393,443

4 Kapten Kapal 4.9 1 35,000,000 170,792,350

5 Site Manager 4.9 1 25,000,000 121,994,536

6 Engineer Support 4.9 4 17,000,000 331,825,137

7 Operator Tug Boat 4.9 2 15,000,000 146,393,443

8 Helper 4.9 10 7,000,000 341,584,700

4,860,262,303

1,423

Breakdown Price Labour Cost

No Description Bulan

TOTAL

LABOUR COST per Cu M

Unit (Rp / Bulan)