Transcript of Breakdown Price Sand Transport Belawan
1 Liter =
Time Total (Rp)
(Cu M) (Jam)
1 Pengerukan Dermaga 1.1 TSD 3,415,847 146 3 ####### 158,104,918,286 3 1,464 1,550 73,518,787,003
158,104,918,286 73,518,787,003
46,286 21,523 CONSUMABLE / Cu M
SUB TOTAL LABOUR COST EQUIPMENT SUB TOTAL CONSUMABLE
EQUIPMENT / Cu M
Breakdown Price Cutter suction
UNIT PRICE
EQUIPMENT CONSUMABLE
Unit (Rp / Hari) Total (Rp) Unit
No
Total Price / Cu M
Description No SpesificationVolume
Day
Ltr / Jam
LABOUR COST / Cu M
SUB TOTAL LABOUR COST
TOTAL PRICE
IDR
10,800
(RP)
231,623,705,289
###########
4,860,262,303
###########
1,423
69,231
Breakdown Price Cutter suction
Amount Price
IDR
Total
(RP)
1 Hydrographer 4.9 2 18,000,000 175,672,131
2 Surveyor 4.9 2 19,000,000 185,431,694
3 Dredging Master 4.9 2 15,000,000 146,393,443
4 Kapten Kapal 4.9 1 35,000,000 170,792,350
5 Site Manager 4.9 1 25,000,000 121,994,536
6 Engineer Support 4.9 4 17,000,000 331,825,137
7 Operator Tug Boat 4.9 2 15,000,000 146,393,443
8 Helper 4.9 10 7,000,000 341,584,700
4,860,262,303
1,423
Breakdown Price Labour Cost
No Description Bulan
TOTAL
LABOUR COST per Cu M