Branding and Design Services for the Transformation of the ... · Assessment based on provision of...
Transcript of Branding and Design Services for the Transformation of the ... · Assessment based on provision of...
![Page 1: Branding and Design Services for the Transformation of the ... · Assessment based on provision of branding concept, design and decoration, implementation capability and executive](https://reader036.fdocuments.in/reader036/viewer/2022090519/6045c8c79fdb2235a0568d52/html5/thumbnails/1.jpg)
![Page 2: Branding and Design Services for the Transformation of the ... · Assessment based on provision of branding concept, design and decoration, implementation capability and executive](https://reader036.fdocuments.in/reader036/viewer/2022090519/6045c8c79fdb2235a0568d52/html5/thumbnails/2.jpg)
Disclaimer
•This reference material (i.e. presentation slides of the tender briefing on 24
September 2019) is for information ONLY and shall not form part of the tender
documents. In case of any inconsistency between the reference material and the
tender documents, the tender documents shall prevail.
![Page 3: Branding and Design Services for the Transformation of the ... · Assessment based on provision of branding concept, design and decoration, implementation capability and executive](https://reader036.fdocuments.in/reader036/viewer/2022090519/6045c8c79fdb2235a0568d52/html5/thumbnails/3.jpg)
The Environmental Resource Centre (ERC)
Located at 221 Queen’s Road East About 120 square metres A declared monument which
housed the Wan Chai Post Office from 1915 to 1992
A simple L-shaped and Chinese style double layer pan-and-roll tile pitched-roof structure with gable ends and mouldings
![Page 4: Branding and Design Services for the Transformation of the ... · Assessment based on provision of branding concept, design and decoration, implementation capability and executive](https://reader036.fdocuments.in/reader036/viewer/2022090519/6045c8c79fdb2235a0568d52/html5/thumbnails/4.jpg)
Interactive Learning
RoomInformation Gallery
Library
Environmental Garden
Store Room
Washroom
Reception Desk
Qu
ee
n’s R
oa
d E
ast
Wu Chung House
Location & Layout Plan
![Page 5: Branding and Design Services for the Transformation of the ... · Assessment based on provision of branding concept, design and decoration, implementation capability and executive](https://reader036.fdocuments.in/reader036/viewer/2022090519/6045c8c79fdb2235a0568d52/html5/thumbnails/5.jpg)
Interactive Learning Room
Information Gallery
Library
Current Services
![Page 6: Branding and Design Services for the Transformation of the ... · Assessment based on provision of branding concept, design and decoration, implementation capability and executive](https://reader036.fdocuments.in/reader036/viewer/2022090519/6045c8c79fdb2235a0568d52/html5/thumbnails/6.jpg)
Environmental Garden
Education Materials
Education Activities
Current Services
![Page 7: Branding and Design Services for the Transformation of the ... · Assessment based on provision of branding concept, design and decoration, implementation capability and executive](https://reader036.fdocuments.in/reader036/viewer/2022090519/6045c8c79fdb2235a0568d52/html5/thumbnails/7.jpg)
Make it Different
Promotional
Innovative
Functional
![Page 8: Branding and Design Services for the Transformation of the ... · Assessment based on provision of branding concept, design and decoration, implementation capability and executive](https://reader036.fdocuments.in/reader036/viewer/2022090519/6045c8c79fdb2235a0568d52/html5/thumbnails/8.jpg)
Promotional•Publicity window
•Informative
•Encourage active participation
![Page 9: Branding and Design Services for the Transformation of the ... · Assessment based on provision of branding concept, design and decoration, implementation capability and executive](https://reader036.fdocuments.in/reader036/viewer/2022090519/6045c8c79fdb2235a0568d52/html5/thumbnails/9.jpg)
Innovative•Attraction in the city
•Innovative
•Green and Lean lifestyle• Low carbon;
• Waste less;
• Ecologically friendly;
• Less is more, simple is beautiful
![Page 10: Branding and Design Services for the Transformation of the ... · Assessment based on provision of branding concept, design and decoration, implementation capability and executive](https://reader036.fdocuments.in/reader036/viewer/2022090519/6045c8c79fdb2235a0568d52/html5/thumbnails/10.jpg)
Functional•Multi-purpose
•Wide range of activities• Exhibition and displays;
• Talks;
• Workshops
•Theme may vary from time to time
![Page 11: Branding and Design Services for the Transformation of the ... · Assessment based on provision of branding concept, design and decoration, implementation capability and executive](https://reader036.fdocuments.in/reader036/viewer/2022090519/6045c8c79fdb2235a0568d52/html5/thumbnails/11.jpg)
Provision of Branding and Positioning Concept
Design and Decoration
BEAM Plus Interiors Certification
1
Services Required
2
+
![Page 12: Branding and Design Services for the Transformation of the ... · Assessment based on provision of branding concept, design and decoration, implementation capability and executive](https://reader036.fdocuments.in/reader036/viewer/2022090519/6045c8c79fdb2235a0568d52/html5/thumbnails/12.jpg)
1. Provision of Branding and Positioning Concept
• A brand building and positioning plan which meets the objectives and supported by a detailed design plan with decoration
• Forms a lasting impression, highlights the uniqueness and accommodates a fresh and welcoming image
• Prominent appearance of “Big Waster”
![Page 13: Branding and Design Services for the Transformation of the ... · Assessment based on provision of branding concept, design and decoration, implementation capability and executive](https://reader036.fdocuments.in/reader036/viewer/2022090519/6045c8c79fdb2235a0568d52/html5/thumbnails/13.jpg)
• Ride on the popularity of the “Big Waster”/ “Hanson”?
• Base camp, office, home ?
Big Waster
![Page 14: Branding and Design Services for the Transformation of the ... · Assessment based on provision of branding concept, design and decoration, implementation capability and executive](https://reader036.fdocuments.in/reader036/viewer/2022090519/6045c8c79fdb2235a0568d52/html5/thumbnails/14.jpg)
2. Design and Decoration
• Work out a design plan and complete the required decoration
• Both external and internal
• Multi-purpose usage
• Simple, energy-saving and environment-friendly
• Hardware and equipment
![Page 15: Branding and Design Services for the Transformation of the ... · Assessment based on provision of branding concept, design and decoration, implementation capability and executive](https://reader036.fdocuments.in/reader036/viewer/2022090519/6045c8c79fdb2235a0568d52/html5/thumbnails/15.jpg)
To foster publicity awareness, understanding and appreciation of Hong Kong's built heritage
• Prior approval of the proposed works from AMO should be obtained before works commencement• Completion of a Heritage Impact Assessment may be required
Requirement of the Antiquities and Monuments Office (AMO)
Hardwood Counter Stamp Dispenser Post Boxes
![Page 16: Branding and Design Services for the Transformation of the ... · Assessment based on provision of branding concept, design and decoration, implementation capability and executive](https://reader036.fdocuments.in/reader036/viewer/2022090519/6045c8c79fdb2235a0568d52/html5/thumbnails/16.jpg)
•Some minor alteration works to the non-historic fixtures toprovide a bare shell.
•The side areas of the ERC comprising mainly a toilet, astoreroom and a courtyard will also be maintained forcondition up keeping.
•Close liaison is required prior to the commencement of anyworks to discuss and document the measures to be adoptedfor the assessment under the BEAM Plus Interiors certificationscheme.
Works by the Architectural Services Department (ArchSD)
![Page 17: Branding and Design Services for the Transformation of the ... · Assessment based on provision of branding concept, design and decoration, implementation capability and executive](https://reader036.fdocuments.in/reader036/viewer/2022090519/6045c8c79fdb2235a0568d52/html5/thumbnails/17.jpg)
BEAM Plus Interiors Certification
• Adopt a range of best practices from the start
• Engage BEAM professional
• Gap analysis for Bronze or a higher rating
• Entire process of application, submission and
assessment
![Page 18: Branding and Design Services for the Transformation of the ... · Assessment based on provision of branding concept, design and decoration, implementation capability and executive](https://reader036.fdocuments.in/reader036/viewer/2022090519/6045c8c79fdb2235a0568d52/html5/thumbnails/18.jpg)
BEAM Plus Interiors Certification The ERC’s renovation should undergo a BEAM Plus Interiors assessment which applies to interiors fitting-out,renovation and refurbishment works:
https://www.hkgbc.org.hk/eng/beam-plus/beam-plus-interiors/index.jsp
1. To engage designated BEAM professionals with BEAM Pro qualification accredited by the Hong KongGreen Building Council to plan and fulfill the assessment criteria.
2. To conduct a gap analysis on the green measures required to achieve a BEAM Plus Interiors grading ofBronze or a higher rating.
3. To begin the BEAM Plus Interiors assessment process at an earlier stage before implementation of theworks.
4. To submit registration form and sign the assessment agreement.5. To prepare and submit of layout plans, documents, reports, checklists, manuals, figures, etc. and
perform checks and tests.6. To make changes to the design if necessary.
![Page 19: Branding and Design Services for the Transformation of the ... · Assessment based on provision of branding concept, design and decoration, implementation capability and executive](https://reader036.fdocuments.in/reader036/viewer/2022090519/6045c8c79fdb2235a0568d52/html5/thumbnails/19.jpg)
Tendering Approach
•A two-envelope system.
•Presentation of technical proposal required.
•Past experience in similar projects not an essential requirement.
•Assessment based on provision of branding concept, design and
decoration, implementation capability and executive plan.
•No passing mark for any of the assessment criteria and the total marks.
•Marks are reserved for assessing innovative suggestions which can
improve the service delivery or bring about positive values.
![Page 20: Branding and Design Services for the Transformation of the ... · Assessment based on provision of branding concept, design and decoration, implementation capability and executive](https://reader036.fdocuments.in/reader036/viewer/2022090519/6045c8c79fdb2235a0568d52/html5/thumbnails/20.jpg)
Technical ProposalBranding,
Positioning and Design
Concept
Details of Decoration
Works
Works Plan and Implementation
Time Table
Work Plan on BEAM Plus
Interiors Certification
![Page 21: Branding and Design Services for the Transformation of the ... · Assessment based on provision of branding concept, design and decoration, implementation capability and executive](https://reader036.fdocuments.in/reader036/viewer/2022090519/6045c8c79fdb2235a0568d52/html5/thumbnails/21.jpg)
1. Branding, Positioning and Design Concept (3 pages)
• Propose plan to brand, position, design and transform the ERC to an iconic spot.
• Stimulate and sustain public interest in the environment.
• Provide creative ideas.
• Create a storyline with “Big Waster”.
• Attract a wide spectrum of the community.
• Propose a new venue name.
![Page 22: Branding and Design Services for the Transformation of the ... · Assessment based on provision of branding concept, design and decoration, implementation capability and executive](https://reader036.fdocuments.in/reader036/viewer/2022090519/6045c8c79fdb2235a0568d52/html5/thumbnails/22.jpg)
2. Details of Decoration Works (5 pages)
• Highlights of key decoration.
• Provide information on special furniture, boards, panels, partitions and other fixtures, etc.
![Page 23: Branding and Design Services for the Transformation of the ... · Assessment based on provision of branding concept, design and decoration, implementation capability and executive](https://reader036.fdocuments.in/reader036/viewer/2022090519/6045c8c79fdb2235a0568d52/html5/thumbnails/23.jpg)
3. Works Plan and Implementation Time Table (1 page)
• Provide information on job steps, timelines and works arrangements.
![Page 24: Branding and Design Services for the Transformation of the ... · Assessment based on provision of branding concept, design and decoration, implementation capability and executive](https://reader036.fdocuments.in/reader036/viewer/2022090519/6045c8c79fdb2235a0568d52/html5/thumbnails/24.jpg)
4. Work Plan on BEAM Plus Interiors Certification
(1 page)
• Information on the provision of BEAM professionals to undertake the assessment.
• Provide plan on implementing green measures and go through the assessment process.
![Page 25: Branding and Design Services for the Transformation of the ... · Assessment based on provision of branding concept, design and decoration, implementation capability and executive](https://reader036.fdocuments.in/reader036/viewer/2022090519/6045c8c79fdb2235a0568d52/html5/thumbnails/25.jpg)
Time Frame
+12 months maintenance period
Completed by August 2021
![Page 26: Branding and Design Services for the Transformation of the ... · Assessment based on provision of branding concept, design and decoration, implementation capability and executive](https://reader036.fdocuments.in/reader036/viewer/2022090519/6045c8c79fdb2235a0568d52/html5/thumbnails/26.jpg)
Payment Stages
10%
• ard of Contract
30% 50% 10%
• Feb 2020 -Agreement from AMO for works
• Aug 2020 -Completion of all the services specified under the contract
• Aug 2021 -After 1 year maintenance period counting from the soft opening
• Jan 2020 -After completion of registration for BEAM Plus Interiors Certification
![Page 27: Branding and Design Services for the Transformation of the ... · Assessment based on provision of branding concept, design and decoration, implementation capability and executive](https://reader036.fdocuments.in/reader036/viewer/2022090519/6045c8c79fdb2235a0568d52/html5/thumbnails/27.jpg)
![Page 28: Branding and Design Services for the Transformation of the ... · Assessment based on provision of branding concept, design and decoration, implementation capability and executive](https://reader036.fdocuments.in/reader036/viewer/2022090519/6045c8c79fdb2235a0568d52/html5/thumbnails/28.jpg)