Brad_Res_2 (2)

5
1 of 5 07/08/2016 Brad_Res_2 (2).doc High School: Charles Page high school (Sand Springs, Ok) Graduated 1988. College: Two years of engineering classes at Tulsa Junior College (1988-1989). Special: Two years of Computer Aided Drafting and Design on Autocad at Tulsa Vo-Tech (1986-88). Attended a Fieldworks class at a certified Intergraph training facility. Attended Inroads Cogo and Survey at a certified Intergraph training facility Two years of surveying (as a Rodman) TRC SOLUTIONS/WILLBROS ENGINEERS INC.: (918)-496-0400 2087 East 71st Street, P.O. Box 701650, Tulsa, OK, 74170-1650 Employed : 9-25-95 to Present. (Worked the first 6 months contract through Key Temporary. Hired direct on 3/25/96) Title: Designer 3, Drafting Coordinator, Survey Data Technician Coordinator Supervisor: Darrell Moore Responsibilities: Direct and Indirect employee supervision. Delegation of Work CAD Drafting Map/Pipeline Drafting Alignment sheets Geo referencing Property plots/plats Permit drawings River crossing drawings Residential construction drawings 3D layout and modeling drawings Electronic survey files/Field Survey Notes Aerial Photo Images (IRAS C) Scanned binary Files (IRAS B) Full size quad maps and quad excerpts Light electrical drafting Light piping drafting Familiar with ISO-9000 Plotting profiles Writing formulas in Excel Programming of data processing comp. Working with and pulling coordinates for field crews IT support and computer inventory Data Management Making of presentation maps for different client, governmental, engineering and landowner presentations Running closures on property plats and legal descriptions Downloading and uploading files into the Trimble TSC-1 data collector Processing of field survey data (RTK, Total Station and DGPS data) Working with different types of survey such as environmental, civil, as-built and preliminary Work with Registered Land surveyors to produce signed/sealed survey plats Special Skills: MicroStation, Microsoft Word, Microsoft Excel, Iras B, Iras C, networking, IT support, Windows NT 4.0, Windows 98, Windows 2000, Windows XP, Fieldworks, Inexpress, Geocalc, Iplot (Plotting on HP 750C/1055C and various other printers/plotters), Timetrax, Trimble Geomatics, TS Office, Pathfinder, Inroads Site, Inroads Survey, Light use of AutoCAD EDUCATION EMPLOYMENT HISTORY

Transcript of Brad_Res_2 (2)

Page 1: Brad_Res_2 (2)

1 of 5 07/08/2016

Brad_Res_2 (2).doc

High School: Charles Page high school (Sand Springs, Ok) Graduated 1988. College: Two years of engineering classes at Tulsa Junior College

(1988-1989).

Special: Two years of Computer Aided Drafting and Design on Autocad at Tulsa Vo-Tech (1986-88). Attended a Fieldworks class at a certified Intergraph training facility. Attended Inroads Cogo and Survey at a certified Intergraph training facility Two years of surveying (as a Rodman)

TRC SOLUTIONS/WILLBROS ENGINEERS INC.: (918)-496-0400 2087 East 71st Street, P.O. Box 701650, Tulsa, OK, 74170-1650 Employed : 9-25-95 to Present. (Worked the first 6 months contract through Key Temporary. Hired direct on 3/25/96) Title: Designer 3, Drafting Coordinator, Survey Data Technician Coordinator Supervisor: Darrell Moore Responsibilities: Direct and Indirect employee supervision. Delegation of Work CAD Drafting Map/Pipeline Drafting Alignment sheets Geo referencing Property plots/plats Permit drawings River crossing drawings Residential construction drawings 3D layout and modeling drawings Electronic survey files/Field Survey Notes Aerial Photo Images (IRAS C) Scanned binary Files (IRAS B) Full size quad maps and quad excerpts Light electrical drafting Light piping drafting Familiar with ISO-9000 Plotting profiles Writing formulas in Excel Programming of data processing comp. Working with and pulling coordinates for field crews IT support and computer inventory Data Management Making of presentation maps for different client, governmental, engineering and landowner presentations Running closures on property plats and legal descriptions Downloading and uploading files into the Trimble TSC-1 data collector Processing of field survey data (RTK, Total Station and DGPS data) Working with different types of survey such as environmental, civil, as-built and preliminary Work with Registered Land surveyors to produce signed/sealed survey plats Special Skills: MicroStation, Microsoft Word, Microsoft Excel, Iras B, Iras C, networking, IT

support, Windows NT 4.0, Windows 98, Windows 2000, Windows XP, Fieldworks, Inexpress, Geocalc, Iplot (Plotting on HP 750C/1055C and various other printers/plotters), Timetrax, Trimble Geomatics, TS Office, Pathfinder, Inroads Site, Inroads Survey,

Light use of AutoCAD

EDUCATION

EMPLOYMENT HISTORY

Page 2: Brad_Res_2 (2)

2 of 5 07/08/2016

Brad_Res_2 (2).doc

HEART’S DESIRE OF OKLAHOMA, INC.: (918)742-7387 4815 S. Harvard, Suite 300, Tulsa, OK, 74135 Employed: 11-91 to 9-18-95 Title: Vice-President, Operations Supervisor: Jeffrey S. Fields Responsibilities: Direct and indirect employee supervision Payroll, Purchasing Policies Customer Relations

Acquiring new vendors Research and Development, New store design and const. (AutoCAD Light) Store demolition Hiring and termination of employees Reconciliation of money Sales Traveling Writing of policy manuals Marketing

Worked 70 to 90 hours a week drafting and designing new facilities. This included bidding and purchasing.

Special Skills: Autocad light, Microsoft Word, Act 2, Light use of Microsoft Excel, Light use of Turbo CAD,

Light use of Design Cad, Microsoft Project Manager, Windows For Workgroups, DOS, and SCSI Tape Backup Systems

WILLBROS ENGINEERING, INC. (MOHAWK STEEL DIVISION): (918)-428-7100 3210 N. Lewis, Tulsa, OK, 7411

Employed: 2-88 to 5-91 Title: Draftsman and Blue Print Room Supervisor Supervisor: Ron Foshee Responsibilities:

CAD Drafting on MicroStation Supervision of activities in the blueprint room Assisting project managers Assisting the Purchasing agent Filing Document control

Field assignments delivering drawings

Marine Biology, Hunting, Fishing, Design Drafting, 3D drafting, Sports, Paleontology, and Geology.

I am a self-motivated and committed employee looking for a stable company that I can grow with. I still have much to learn, but I am willing to work as hard and as much time as necessary to acquire the knowledge and the skills to do the job.

Jeff Fields – Former Senior Vice-President of Heart’s Desire of Oklahoma, Inc. (918)-743-6380 Raymond Carey – Vice President DDSI Cell (918)-237-5006 Doug Fisher – Directional Drill Engineer Cell (918)-269-6346 Wayne Burnett – Chief Surveyor, Williams Company/Gulfstream Pipeline Project Cell (908)-451-5866 Dan Pease – IT Manager, Tulsa County Cell (918)-978-5360

INTERESTS

REFERENCES

OBJECTIVES

Page 3: Brad_Res_2 (2)

3 of 5 07/08/2016

Brad_Res_2 (2).doc

Parco - Drawing of logic diagrams and redline corrections of civil drawings for Jeff Wann and Garlinda Rhodabush. Plotting of drawings and creation of some concrete drawing.

Great Lakes - Worked with binary raster images. Took scanned images, cleaned them up, rebuilt them, and made engineer corrections. PSE&G - Detailed anchor blocks with rebar and concrete for Bruce Orvis. Inland Petroleum Distribution Systems - Primary designer for Jim Ault to draw 3D-fuel parts for fast deployment fuel systems for the military. Computer designing layout of fuel systems. Draw Fuel parts and systems @ 1:1 scale to check compatibility of all parts. Create, Print and put together drawings for presentations. Great Lakes - Worked with Jim Ellis on stream crossings for a project in Illinois. Drew 30 stream crossings from field notes. KN Energy - Help build alignment sheets and quad maps for FERC submittal. Extracted, combined and rotated imagery for the alignment sheets through Iras-b and MBI/IRASC in MicroStation. Also worked on Geobases for alignment sheets. Tenneco/Maritime Northeast - Worked on all aspects of a pipeline project for Gary Soward. Worked on the complete building of alignment sheets, site-specific drawings, river permit drawings, residential construction drawings, quad maps, wetland construction drawings, creation of the environmental geobase, worked on all other geobases, and creation of misc. other drawings. TriState - Worked as a designer for Mac Arnett. Worked on all aspects of the pipeline project including: geobases, troubleshooting, river crossing drawings, alignment sheets, training, photo imagery, ISO-9000 compliance, creation of forms and procedures, creation of environmental geobases, and created level-lists and procedures for accepting environmental data from the environmentalists. Northern Border - Worked for Noel Smith as a Drafting Coordinator of the stream and river crossing permit and construction drawings. Supervised 15 drafters and designers to produce drawings for FERC, Construction and as-built. Also supervised the collation of all drawings for the construction bid package. I also took care of ISO-9000 compliance for the drawings I was responsible for. Palmetto/South System Expansion - Worked in the field in Columbia, South Carolina and Montgomery, Alabama, as a field data technician for Gary Soward. My responsibilities included: survey data processing, computer administration, drawing creation, computer training, survey data technician training, procedure creation, form creation, troubleshooting, data management, engineering support, office support, and working directly with the surveyors to improve the quality of data both by the drafting and survey departments. Gulfstream - Worked in the field in Lakeland and Sebring, Florida as the lead field survey data technician for David Hairston, Mark Nider, Tom Alexander, Darrell Moore and Gary Soward. My responsibilities included: survey data processing for as many as 20 survey crews (civil and environmental), property plats, computer administration, IT support, drawing creation, computer training, procedure creation, form creation, troubleshooting, working directly with the surveyors to improve the quality of data both by the drafting and survey departments, data management, drawing translation, engineering support, environmental support, right-of-way support and office support. 100’s of operation and maintenance projects - Processing survey data into CAD via an intense QA/QC process. Have overseen data management on numerous operation and maintenance projects from small line replacements to complete system replacements. Taking data from field operations to the final GIS and materials deliverables. This work has been performed for numerous clients Managed personnel to complete projects fromt eh beginning to the final client deliverables. South System Expansion - Created Data management plan to streamline the survey data processing. Using several different software's, created a data management system for this 200 mile project. Worked in the field with the survey crews to streamline the processes to the GIS techs.

PIPELINE PROJECTS

Page 4: Brad_Res_2 (2)

4 of 5 07/08/2016

Brad_Res_2 (2).doc

Overland Pass - Responsible for all field and office GIS techs for all survey phases of the project. Responsible for data management, custom procedure development and problem solving for issues arising from the 700 mile project. Elba Express - Supervised QA/QC data management. Communicated with Field crews as to what was required and pushed the data through the different project phases to the client GIS system. The project was 125 miles in length. Millennium Pipeline - Supervised field and office data techs for all phases of the project. Completed QA/QC effort over all phases to the final client GIS new construction deliverable for the on-land portion of the project, which was approximately 200 Miles. Supervised As-Built drawing functions. Problem solved daya to day issues and prepared the data for the GIS data load. Colonial Excel - Responsible for all field and office GIS techs for the preliminary survey phase of the project. Responsible for data management, custom procedure development and problem solving for issues arising from the 450 mile project. Organized and pushed data to a database warehouse for preparation into GIS. Ruby Pipeline - Managed all field collected data. Merged all project phases into the final client deliverable. QA/QC'd survey data on a real time as-builting of the project. Stationed, profiled, managed material and verified construction of the 680 mile Ruby project. Have developed feature code libraries to be compatible with client GIS systems. Managed a project team to complete the project within the client guidelines and cost. Elk Hills - Supervised the QA/QC data management process. Linked the material documentation to the final client deliverable through the final client GIS system. Project is 40 miles in length. Data delivered in a GIS deliverable and material deliverable. Line 300-2 - Supervised QA/QC of survey data from both field and office operations. Tracked materials and delivered a new construction database as the deliverable for the 125 mile project. Have developed feature code libraries to be compatible with client GIS systems. Managed a project team to complete the project within the client guidelines and cost. Texas Express - Data management supervision to QA/QC data process the data from all phases of project survey through the final GIS deliverable. The project is 580 miles. NSD Project - Supervised the QA/QC data management process. Linked the material documentation to the final client deliverable through the final client GIS system. Project is 8 miles in length. Have developed feature code libraries to be compatible with client GIS systems. Managed a project team to complete the project within the client guidelines and cost. Raton Project - Supervised data management of survey data through QA/QC process from the field operations to teh client GIS system. We used a material matching process against the MTR data to fulfill the GIS requirements. Project was 120 Miles long. NEUP Project - Supervised the QA/QC data management process. Linked the material documentation to the final client deliverable through the final client GIS system. Database wharehousing data to be combined with all phases of the project to complete the data records integrity deliverable and the GIS deliverable. Project is 45 miles in length. Have developed feature code libraries to be compatible with client GIS systems. Managed a project team to complete the project within the client guidelines and cost. MPP Project - Supervised the QA/QC data management process. Linked the material documentation to the final client deliverable through the final client GIS system. Project is 7 miles in length. Data delivered in a GIS deliverable to ISAT data model and material deliverable. Have developed feature code libraries to be compatible with client GIS systems. Managed a project team to complete the project within the client guidelines and cost. 100's of Gathering Projects - Processing survey data into CAD via an intense QA/QC process. Have overseen data management on numerous gathering projects for Marathon Oil and other companies. Taking data from field operations to the final GIS and materials deliverables. Managed personnel and created processes to manage projects from the beginning to the end. Have developed feature code libraries to be compatible with client GIS systems. Managed a project team to complete the project within the client guidelines and cost.

Page 5: Brad_Res_2 (2)

5 of 5 07/08/2016

Brad_Res_2 (2).doc

I have spent my time since 1999 researching and programming ways to streamline survey data processing from the stage of collection to the stage of drawing completion; through programming feature code libraries, in Trimble Geomatics and Inroads I have been able to make the process much more efficient and cost affective. Since the Gulfstream project completion in 2003 I have worked as a Survey Data Technician Coordinator on countless projects, learning new ways to take the information collected in the field and use the data for GIS tables, station and offset reports, traverse reports, DOT reports, X-ray reports, as-built weld and pi calculations, as well as drawings, constantly finding innovative ways to meet client demands. I have written numerous procedures to help remove the human error in data collection, data QA/QC and data post processing.

ADDITIONAL INFORMATION