WHAT HAPPENED ON THEDEEPWATER HORIZONOn April 20, Deepwater Horizon was two days away from temporarily capping the oil well it haddrilled and handing off the pumping of the oil to a production platform or pipeline. But duringthis disconnection process the rig suffered a blowout, caught fire and sank to the bottom.
Here is what went wrong:
DEEPWATERHORIZON
RISER
BOP
WELL
OIL LAYER
GULF OFMEXICO
EMMETT MAYER III AND DAN SHEA / THE TIMES-PICAYUNE
Note: Man shown for scale.BOP is located on the seafloor 5,000 feet below thesurface.
THE CEMENT FAILS
THE WAYIT ISSUPPOSEDTO WORK: SEAWATER IN THE RISER
THE BLOWOUT
PREVENTER FAILS
Oil is 18,000feet belowthe sea floor
Well is locatedin 5,000 feetof water
In a properlycapped welltwo largecement plugsseparated by
drilling mudare in place
Thin line ofcement encasesa steel well pipe
Riser adapter
Drill bit
Until the well iscompletely plugged,the pressure froma column of thickdrilling mud keepsnatural gas and oilin the ground
DRILL PIPE
BOTTOMPLUG
TOPPLUG
3
2
3
2
1
1
DRILL PIPE ASIT DRILLS DOWNTO OIL LAYER
Mud is pumpeddown the drillpipe from the rig
The mud thenrises back tothe rig carryingshavings with it
Casing
Casing
Cement Cementplug
Drillingmud
Drillpipe
Cement
Cement
Note: Vertical height of water and sediment layers is to scale. Rig and drilling components are not. Source: Staff research
Deepwater Horizon had begun toremove the heavy column of drillingmud that is the primary means ofcontrolling pressure inside a well.
Cement is supposed to protect theoutside of the well pipe and is usedto seal off a well when needed.
PROBLEM:Either the primary or secondarycementing failed, pushing a hugecolumn of natural gas into thewell pipe.
PROBLEM:When the cement failed, thenatural gas rocketed to thesurface, as the weakened mixtureof mud and seawater did not havethe pressure necessary to holdthe gas back. The gas exploded the
rig, killing 11 men and destroyingthe rig.
PROBLEM: With only seconds to react, rigoperators fired off the shearram, but it only partiallysheared the drill pipe. A jointmay have been in the way, or
the ram was fouled by pieces ofcasing or cement from theblowout. For days, remotelyoperated robots tried to fire offthe ram manually, but failed.
Cement is pushed between the wellcasings and the sediment layers that havebeen drilled through. It protects the metalwall from gas pressure and from gasleaking up the outside of the well pipe.
Primary
When a well is to be temporarilyabandoned, two plugs are cemented inwith drilling fluid between them.Sometimes more plugs are used.
THE CEMENTING PROCESS:
The BOP stack is a 450-ton series ofvalves developed to prevent agusher if the mud control isoverwhelmed.
SHEAR RAM: The finalfail safe, it is designedto close the well bycutting through andsealing the drill pipe.But they are notdesigned to cut through
joints where two drillpipe sections connect.
FOUR BLIND RAMS: Can withstand more
pressure thanannular valves overopen holes. Not usedwith a drill pipe inplace. Two metalblocks close on eachother, sealing thewell.
TWO ANNULAR VALVES: Closes in and seals on thedrill pipe. Or if the drillpipe is not in use, it closesthe open hole.
THE USES OF MUD:
Ú During drilling, mud is pumpeddown the riser and well to the tip ofthe drill. The mud then flows back upto rig, taking the drill shavings with it.
Ú The weight of the mud maintainswell pressure so the oil does notrise to the surface.
Ú The thickness of the mud can beadjusted to deal with a “kick,” asudden surge of gas pressure.
Secondary
Flex joint
Yellowcontrolpod
Bluecontrol
pod
Drill pipe
Wellheadconnector