BOWIE MILL ROAD BIKEWAY: FACILITY PLANNING STUDY
1
OCTOBER 2018 BOWIE MILL ROAD BIKEWAY: FACILITY PLANNING STUDY SCALE: 1” = 100’ 0’ 50’ 100’ 200’ 400’ SHEET 2 of 4 OFF-ROAD FACILITY: SHARED USE PATH
Transcript of BOWIE MILL ROAD BIKEWAY: FACILITY PLANNING STUDY
OctOber 2018
BOWIE MILL ROAD BIKEWAY: FACILITY PLANNING STUDY
SCALE: 1” = 100’
0’ 50’ 100’ 200’ 400’SHEET 2 of 4
OFF-ROAD FACILITY: SHARED USE PATH