WELL COME TOOPPORTUNITY BUSINESS
SEA WATER REVERSE OSMOSIS PLANTBASED ON BOT / BOO
by:
Tajuba Water [email protected]
hp. 0811151269wapp.62.21.89665255
![Page 2: BOT 2](https://reader036.fdocuments.in/reader036/viewer/2022081820/577cb24a1a28aba7118bf488/html5/thumbnails/2.jpg)
8/20/2019 BOT 2
http://slidepdf.com/reader/full/bot-2 2/5
PRELIMINARY PROPOSAL
Legal Aspects Legal Aspects
This proposal is made based on :
1. Memorandum of Understanding (MoU)between the PT RBSJ (local government owned
enterprises) with PT ME No. 010/RBSI/MOU/
X/2013 and No. 032/ME/MOU/X/ 2013 dated
October 3, 2013 on the Management of Sea
Water (desalination plant) to support the needs
of industry and society fresh water in RBG 2. Cooperation Agreement between PT
ME with PT RBSJ No. 011/RBSI/PKS/2013 and
No. 033/ME /PKS/X/2013 dated October 9,
2013 on the appointment of Drinking Water
Distributor.
PT ME looking for Business Partner PT ME looking for Business Partner
To realize the MOU and Cooperation Agreement
above, the PT ME wishes Joint Operation (JO)
with Business Partners who has experience of
Sea Water Reverse Osmosis (SWRO)
Engineering, Operating and Maintenance (OnM)
and Able to Invest.
Outline Form of Joint Operation (JO) offered by the PT ME are as follows:
Responsibilit ies of Business Partner Responsibilit ies of PT ME
1. Preparing Installation Work Plan to
develop SWRO Plant, Capacity 5.000
M3 per Day 2. Establishing SWRO Plant Installation in
accordance with the proposed
Engineering 3. Running Test to approve water
production stability and quality
4. Operating and Maintenance SWRO
Plant. 5. Validity periode of this Joint Operation
within 5 years.
1. Preparing Land Acquisition and
Permitting in accordance with the
requirements
2. Preparing Fresh Water Tank, Capacity
3.000 M3 3.
Approval production water stability and
quality 4. Accommodate and purchase at 5.000 M3
per day water production at Rp. 30.000
per M3 as JO mutual agreement. 5. Validity periode of this Joint Operation
within 5 years.
![Page 3: BOT 2](https://reader036.fdocuments.in/reader036/viewer/2022081820/577cb24a1a28aba7118bf488/html5/thumbnails/3.jpg)
8/20/2019 BOT 2
http://slidepdf.com/reader/full/bot-2 3/5
Estimated Water Cost CalculationSea water Reverse Osmosis , Capacity 5.000 M3 per DayRecovery 50%
1 Electrical Cost
Operat ional Electr ical Electr ical Cos t Product ion Electr ical
No. Item Vol KW per Day Consumption per Day per Day per Day Cos t per M3
(Hour) (Kw H) (Rp,) (M3) (Rp.)
1 Intake Pump @ 150m3/hr, 5bar 4 33.75 20 2,700 2,565,000.00Rp 5,000 513.00Rp
2 Feed Pump @ 125m3/hr, 3bar 4 16.88 20 1,350 1,282,500.00Rp 5,000 256.50Rp
3 RO HP Pump, 125 m3/hr, 70bar 4 216.56 20 17,325 16,458,750.00Rp 5,000 3,291.75Rp
4 Dosing Pump 10 0.20 20 40 38,000.00Rp 5,000 7.60Rp
5 CIP/BF Pump @ 187.5m3/hr; 3Bar 4 25.31 20 2,025 1,923,750.00Rp 5,000 384.75Rp
6 Lightning, AC, komputer etc 1 7.20 24 173 164,160.00Rp 5,000 32.83Rp
4,486.43Rp
Elect. Pow er Elect. Pow er Elect. Pow er Water Production Elect, Pow er Cost
Electrical Power Cost (kw ) Cost per kw Cost per month per month per m3
1,294 32,400.00Rp 41,910,696.00Rp 152,083 275.58Rp
Elect. Pow er Elect. Consumption Total Elect. Cost PJU Cost PJU Cost
PJU Cost per month Cost per month per month 3% per m3
41,910,696Rp 682,311,533Rp 724,222,229Rp 21,726,666.88Rp 142.86Rp
4,904.87Rp
4% 196.19Rp
5,101.06Rp
VAT
TOTAL ELECTRICAL COST pe r M 3
TOTAL ELECTRICAL COST per M3 after VAT
2 Chemical Cost
No Item Unit Pr ice Chem ical Cos t
per Kg per m 3
1 NaOCl 2ppm 0.0010 kg 24,000.00Rp 24.00Rp
2 Alum Sulfat 30ppm 0.0150 kg 6,500.00Rp 97.50Rp
3 SMBS 5ppm 0.0025 kg 8,000.00Rp 20.00Rp
4 Anti Scalant 15ppm 0.0050 kg 180,000.00Rp 900.00Rp
5 PH ajust to 7~7,5 (0,02ppm NaOH) 0.0000 kg 6,000.00Rp 0.03Rp
6 Membrane Cleaning HCl 2ppm 0.0000 kg 4,500.00Rp 0.01Rp7 Membrane Cleaning NaOH 2ppm 0.0000 kg 6,000.00Rp 0.01Rp
8 Membrane Cleaning MC03 0.0005 kg 240,000.00Rp 115.14Rp
9 Membrane Cleaning MC11 0.0005 kg 240,000.00Rp 115.14Rp
1,271.82RpTotal Chem ical Cost per m 3
Hour ly Usage
3 Maintenance Cost
No Item Index Pr ice Total Pr ice Maintenance
per m onth per m onth Cost per m 3
1 Mechanical & Plumbing 1 ls 28,000,000.00Rp 28,000,000.00Rp 184.11Rp
2 Electrical 1 ls 20,000,000.00Rp 20,000,000.00Rp 21.92Rp
206.03Rp
Volume
Total Maintenance Cost p er m 3
![Page 4: BOT 2](https://reader036.fdocuments.in/reader036/viewer/2022081820/577cb24a1a28aba7118bf488/html5/thumbnails/4.jpg)
8/20/2019 BOT 2
http://slidepdf.com/reader/full/bot-2 4/5
4 Replacement Cost
No Item Unit Pr ice Total Pr ice Replacem ent
Cost per m3
I. Rep lacement
1 UF Membrane, 4@42DFU0870AD 168 pcs 28,140,000Rp 4,727,520,000Rp 863.47Rp
2 Bag Filter 5mkn, 4@125m3/hr 16 pcs 125,000Rp 2,000,000Rp 13.15Rp
3 Cartridge Filter 1mkn, 4@125m3/hr 40 pcs 125,000Rp 5,000,000Rp 32.88Rp
4 SW Membrane, 4@SW30HRLE400i 384 pcs 12,000,000Rp 4,608,000,000Rp 841.64Rp
1,751.15Rp
Volume
Total Replacement Cost p er m 3
5 Labour Cost
Total Total Cos t
Person per m onth
1 Manajer 1 15,000,000Rp 15,000,000Rp
2 Secretary & Supervisor 5 10,000,000Rp 50,000,000Rp
3 Operator 24 3,000,000Rp 72,000,000Rp
4 Technical M/E 4 7,500,000Rp 30,000,000Rp
5 Security 8 3,500,000Rp 28,000,000Rp
6 Administration and Cleaning 16 3,000,000Rp 48,000,000Rp
243,000,000Rp
1,597.81Rp
NO ITEM Cos t per Month
Total Labour Cost per m onth
Total Labour Cost per m 3
6 Cost Recapitulation per M3
No Item Total Cos t
per m3
1 Energy / Electrical 5,101.06Rp
2 Chemical 1,271.82Rp
3 Maintenance 206.03Rp
4 Replacement 1,751.15Rp
5 Labour 1,597.81Rp
9,927.86Rp
4,963.93Rp
14,891.79Rp
Risk Overhead & Profit
Total OnM Cost per m3
Sub Tot al biaya OnM
![Page 5: BOT 2](https://reader036.fdocuments.in/reader036/viewer/2022081820/577cb24a1a28aba7118bf488/html5/thumbnails/5.jpg)
8/20/2019 BOT 2
http://slidepdf.com/reader/full/bot-2 5/5
Estimated Investment CostSea water Reverse Osmosis , Capacity 5.000 M3 per DayRecovery 50%
Estimated 5 Years Cash Flow Projection
Sea water Reverse Osmosis , Capacity 5.000 M3 per DayRecovery 50%
Jakarta, 12.06.2014by
Suharnadi Argadikusuma
No, Index
I 5,000 m3/d 1,200$ $ 6,000,000
II
1 Intake Plant 25% $ (1,500,000)
2 Ul trafi l tration Plant 15% $ (900,000)
3 SWRO Plant 40% $ (2,400,000)
4 CIP Plant 5% $ (300,000)
5 Electrical Power, Panel & Wiring 10% $ (600,000)
6 Others 4% $ (240,000)
99% $ 60,000Total
Sea water Reverse Osmosis, 5.000 m3/day
Description Volume Total Price
Budget Plan for SWRO
Budget Structure:
Rp. X 1.000
INSTALATION
12 month 1st 2nd 3th 4th 5th
1. Working Hours per Day (Hrs) 20 20 20 20 20 20
2. Working days per Year (Days) 365 365 365 365 365 365
3. Production per Hour (M3) 250 250 250 250 250 250
4. Total Production per Year (M3) 1,825,000 1,825,000 1,825,000 1,825,000 1,825,000 1,825,000
5. Production Cost / m3 14.892Rp 14.892Rp 15.636Rp 16.418Rp 17.239Rp 18.101Rp
6. BOT Contract Value per M3 30.000Rp 30.000Rp 31.500Rp 33.075Rp 34.729Rp 36.465Rp
7. BOT Sales Contract 100% 100% 100% 100% 100% 100%
1 Income from JO Contract 54,750,000Rp 57,487,500Rp 60,361,875Rp 63,379,969Rp 66,548,967Rp
2 (27,177,521)Rp (28,536,397)Rp (29,963,216)Rp (31,461,377)Rp (33,034,446)Rp
3 Net cash flows of operating activities 27,572,479Rp 28,951,103Rp 30,398,659Rp 31,918,591Rp 33,514,521Rp
1 25% (18,000,000)Rp
2 15% (10,800,000)Rp
3 40% (28,800,000)Rp
4 5% (3,600,000)Rp
5 10% (7,200,000)Rp
6 4% (2,880,000)Rp
7 Total Cash Fl ow of Investm ent Acti vit ie s (7 1,2 80, 00 0)Rp
1. Capital Investment Loan 72,000,000Rp
1 Interest of Capital Investment 0% -Rp -Rp -Rp -Rp -Rp
2 Repayment of Capital Invest. 5 (14,400,000)Rp (14,400,000)Rp (14,400,000)Rp (14,400,000)Rp (14,400,000)Rp
2. Cash flow of Financing Activities -Rp (14,400,000)Rp (14,400,000)Rp (14,400,000)Rp (14,400,000)Rp (14,400,000)Rp
a. Cash Increase / Decrease 720,000Rp 13,172,479Rp 14,551,103Rp 15,998,659Rp 17,518,591Rp 19,114,521Rp
b. Cash at beginning of period -Rp 720,000Rp 13,892,479Rp 28,443,583Rp 44,442,241Rp 61,960,833Rp
c. Cash at end of period 720,000Rp 13,892,479Rp 28,443,583Rp 44,442,241Rp 61,960,833Rp 81,075,354Rp
Production Cost
CASH FLOW of OPERATING ACTIVITIES
CASH FLOW of INVESTMENT ACTIVITIES
CASH FLOW of FINANCING ACTIVITIES
Cash Flow Analysis B ased on 5.000 M3 per Day
Intake Plant
Ultrafiltration Plant
SWRO Plant
CIP Plant
Electrical Power, Panel & Wiring
No. ACTIVITIES UNIT
YEAR
PRODUCTION & SALES ACTIVITIES
Others