Borealis Borlink™ – Step change Wire&Cable innovation towards sustainable power supply Karl Ebner-Baumgartner / Wendy Loyens Borealis FlexPO Houston, USA Oct. 19-22, 2015
1
Major global challenges where Borealis makes a difference
1 |
Water
Health Food
Climate Energy
Waste/Recycling
Innovation without societal benefit is not innovation but rather simple gimmickry
FlexPO, Houston, 19-22.10.2015
2 2 |
Borealis Group Locations
Borealis L.A.T Locations
Borouge Locations
Borealis ‒ 2nd largest polyolefin producer
in Europe ‒ Headquarters in Vienna, Austria ‒ Sales of polyolefins, base
chemicals and fertilizers ‒ Revenues of EUR 8.3 billion
(2014) Borealis ownership structure ‒ 64% by IPIC, Abu Dhabi ‒ 36% by OMV, Austria Borouge ‒ Joint-venture with ADNOC ‒ World’s largest integrated
olefin/polyolefin complex ‒ Strong presence in the
Middle East and Asia
Borealis – Global presence with footprints in more than 20 countries (together with JV partner Borouge)
FlexPO, Houston, 19-22.10.2015
3 3 |
Borealis Innovation Centres combine state- of-the-art facilities with foresighted thinking Linz, Austria
International Innovation Headquarters
1 2
3
4
6
5
1
Schwechat, Austria Pilot plant
2
Stenungsund, Sweden Innovation Centre
3
Porvoo, Finland Innovation Centre, 2 pilot plants
4
United Arab Emirates Borouge Innovation Centre
5
Grand-Quevilly, France Competence Centre Fertilizer
6
FlexPO, Houston, 19-22.10.2015
4
Borealis – Dedicated to the Wire & Cable industry
15 years of unique
experience in HVDC
20 years of proven track
record in EHV
40 years of Superclean
XLPE for HV
> 300 000 km of HV cables
> 15 000 km of EHV cables
99% of extruded
HVDC projects
4 | FlexPO, Houston, 19-22.10.2015
Power generation will shift towards renewables and will become more remotely generated
Source : IEA 2012
Source : IEA 2013 @ EWEA 2013
FlexPO, Houston, 19-22.10.2015 6 |
Cables offer benefits vs. overhead lines for power transmission
- Very difficult to get approval for new overhead lines in densely populated areas
- Cannot be used offshore
Conclusion: Future power links will use even more high voltage power cables
7 | FlexPO, Houston, 19-22.10.2015
- Conductor
- Inner semicon
- Insulation
- Outer semicon
- Screen
- Water resistant layers
- Jacket
Borlink™ material solutions in modern power cables
Borlink™ material solutions
8 | FlexPO, Houston, 19-22.10.2015
Borstar® material solution
The path to excellence in cleanliness
Most important is to keep constant cleanliness levels over long time, consistency of quality = key
9 |
Source: Borealis internal data
FlexPO, Houston, 19-22.10.2015
Borlink™ technology provides leading material solutions for power cables
1. Proven track record of more than 45 years
2. Proprietary process to make high purity polymers
3. Closed and controlled product loop
4. Setting the industry quality standards
5. Continuous pace making innovations
10 | FlexPO, Houston, 19-22.10.2015
11 |
BorlinkTM provides the means to meet the energy challenges of tomorrow BorlinkTM provides an outstanding resource for meeting future challenges in the wire & cable industry.
Borlink is Borealis' and Borouge's industry-wide platform cross-linking the technology, products and expertise to connect networks and grids, as well as people and their access to energy.
FlexPO, Houston, 19-22.10.2015
Borlink™ material solutions used in 99% of global polyolefin based HVDC cable projects
0
100
200
300
400
500
0
500
1000
1500
2000
2500
Volta
ge (k
V)
Pow
er (M
W)
Power
Voltage
Gotland, Sweden 80 kV, 60 MW
Cross Sound, US 150 kV, 330 MW
Borwin1, Germany 150 kV, 400 MW
EW connector, IR-UK 200 kV, 500 MW
South West Link, Sweden 300 kV, 1200 MW Dolwin 3, Germany 320 kV, 900 MW INELFE, France-Spain 320 kV, 1000 MW
12 | FlexPO, Houston, 19-22.10.2015
Market need: Higher power transmission capacity
World record Borlink innovation: XLPE HVDC for 525 kV and > 2 GW
New world record: 525 kV extruded HVDC cable system made from Borlink™ compounds
13 |
Porjus
Stornorrfors Harsprånget
Letsi
Transmission capacity equal to more than the nominal capacity of the four biggest hydro power plants in Sweden
FlexPO, Houston, 19-22.10.2015
HVDC projects using Borlink™ material solutions - Proven track record with 15 years of experience
80kV, 60MW, 140km
Gotland, Sweden, 1998
9kV,80MW, 9km
Tjoerborg, Denmark, 2000
84kV, 180MW, 390km
Direct Link, Australia, 2000
150kV, 330MW, 84km
Cross Sound, USA, 2002
150kV, 200MW, 360km
Murraylink, Australia, 2002
60kV, 80MW, 68km
Troll A, Norway, 2004
150kV, 350MW, 105km
Estlink, Finland-Estonia, 2006
150kV, 400MW, 390km
Borkum 2, Germany, 2009
200kV, 400MW, 85km
Trans-bay, USA, 2010
200kV, 500MW, 512km
Eigrid, Ireland-UK, 2014
250kV, 576MW, 260km
Helwin 1, Germany, 2015
300kV, 800MW, 40okm
Borwin 2, Germany, 2015
320kV, 800MW, 330km
Dolwin 1, Germany, 2015
320kV, 1000MW, 504km
INELFE, France - Spain, 2015
160kV, 200MW, 37km
Nan’Ao Island, China, 2013
200kV, 1160MW, 294km
Zhoushan, China, 2013
In service/commisioned
14 | FlexPO, Houston, 19-22.10.2015
Source : http://atlanticwindconnection.com/
Atlantic Wind Connection
New Jersey – Virginia - Wind power - Offshore undersea
transmission line - Up to 6000 MW - Power for 2 mio homes - 320 kV HVDC cables
Champlain Hudson Power Express
Canada / USA border – New York - Hydropower - Underwater and underground
cable line - Up to 1000 MW - 333 miles
Source : http://www.chpexpress.com/
Prospected HVDC projects in the North America
FlexPO, Houston, 19-22.10.2015 15 |
16 |
Vision about future DC power grids – Examples: Europe, Asia
Europe
FlexPO, Houston, 19-22.10.2015
Asia
17
1. Energy demand is rising fast - Renewable energy will grow in importance for sustainable power supply
2. Borealis’ Borlink™ technology provides leading material solutions for power cables
3. Borlink™ material solutions enable new HVDC extruded cable systems for efficient long distance power transmission
4. Borlink™ material solutions used in 99% of polyolefin based HVDC cable projects
5. The latest innovation of Borlink™ compounds for 525 kV HVDC extruded cable systems sets a new world record
Take-Away Messages
FlexPO, Houston, 19-22.10.2015 17 |
Borealis – taking on the challenges of tomorrow for more than 50 years
18 |
Contact: [email protected] FlexPO, Houston, 19-22.10.2015 18 |
Thank you
A project by Borealis AG. The ideas documented in this presentation are the sole property of Borealis AG, and are subject to current copyright laws. Unauthorized use, reproduction in whole or in part, as well as transmission to third parties is not permitted.
19 | FlexPO, Houston, 19-22.10.2015