BORAL QUARRIES TEVEN...CCC Terms of Reference and membership ˃ The original Boral Teven Quarry CCC...
Transcript of BORAL QUARRIES TEVEN...CCC Terms of Reference and membership ˃ The original Boral Teven Quarry CCC...
![Page 1: BORAL QUARRIES TEVEN...CCC Terms of Reference and membership ˃ The original Boral Teven Quarry CCC Terms of Reference were developed with community input and endorsed at the first](https://reader034.fdocuments.in/reader034/viewer/2022042406/5f20a2962d1710290c23b375/html5/thumbnails/1.jpg)
Build something great™
> Whole of Community Meeting
2019
BORAL
QUARRIES
TEVEN18 July 2019
Ballina RSL, Ballina
![Page 2: BORAL QUARRIES TEVEN...CCC Terms of Reference and membership ˃ The original Boral Teven Quarry CCC Terms of Reference were developed with community input and endorsed at the first](https://reader034.fdocuments.in/reader034/viewer/2022042406/5f20a2962d1710290c23b375/html5/thumbnails/2.jpg)
Agenda˃ Welcome and introductions, safety moment
˃ Previous Community Consultative Committee (CCC) meeting and matters arising˃ 1 November 2018
˃ Confirmation of CCC community representatives 2019-21 and Terms of Reference
review
˃ Quarry operations update 2017-19
˃ Environmental management update 2017-19
˃ Planning matters: future direction
˃ Community activities 2017-19 and general business
![Page 3: BORAL QUARRIES TEVEN...CCC Terms of Reference and membership ˃ The original Boral Teven Quarry CCC Terms of Reference were developed with community input and endorsed at the first](https://reader034.fdocuments.in/reader034/viewer/2022042406/5f20a2962d1710290c23b375/html5/thumbnails/3.jpg)
Welcome, administration and ‘safety moment’˃ Welcome and re-introductions
˃ Previous meeting of the Community Consultative Committee˃ 1 November 2018
˃ Note: Presentations and meeting notes from previous meetings are available from the quarry’s
website – www.boral.com.au/tevenquarry
˃ Any matters arising?˃ Letter to Council re delays in implementing roadworks when reported.
˃ Presentation on blasting by Orica.
˃ Others?
˃ Apologies for this meeting
˃ Safety moment
![Page 4: BORAL QUARRIES TEVEN...CCC Terms of Reference and membership ˃ The original Boral Teven Quarry CCC Terms of Reference were developed with community input and endorsed at the first](https://reader034.fdocuments.in/reader034/viewer/2022042406/5f20a2962d1710290c23b375/html5/thumbnails/4.jpg)
Build something great™
> Community Consultation
Committee 2019-21
BORAL
QUARRIES
TEVEN
![Page 5: BORAL QUARRIES TEVEN...CCC Terms of Reference and membership ˃ The original Boral Teven Quarry CCC Terms of Reference were developed with community input and endorsed at the first](https://reader034.fdocuments.in/reader034/viewer/2022042406/5f20a2962d1710290c23b375/html5/thumbnails/5.jpg)
CCC Terms of Reference and membership˃ The original Boral Teven Quarry CCC Terms of Reference were developed with
community input and endorsed at the first ‘whole of community’ meeting in 2011.
˃ The ToRs were re-endorsed at the 2013, 2015 and 2017 WoC meetings.
˃ When originally developed, the ToRs included a commitment from us to conduct
an ‘administrative review’ to ensure they remained relevant and up-to-date.
˃ We usually conduct this review prior to each WoC meeting. Our review this year
has once again not identified any changes are required, however your input is
requested.
![Page 6: BORAL QUARRIES TEVEN...CCC Terms of Reference and membership ˃ The original Boral Teven Quarry CCC Terms of Reference were developed with community input and endorsed at the first](https://reader034.fdocuments.in/reader034/viewer/2022042406/5f20a2962d1710290c23b375/html5/thumbnails/6.jpg)
CCC Terms of Reference and membership˃ At the WoC meeting of 19 May 2011, we committed to:
˃ Stage a WoC meeting every 18 to 24 months for all interested residents and stakeholders to
hear about progress at the operations, and
˃ Use the WoC meetings to elect/re-elect the community representatives to the CCC.
˃ The quarry’s updated consent still outlines the membership of the CCC.˃ CCC is to include at least two representatives of the local community.
˃ Also must include a representative of the Ballina Environment Society.
˃ The 2017-19 members were Peter Blackwood, Denis Perkins and Sam Henderson.
˃ President of the BES, Fiona Folan, has been the Society’s representative since 2011, although
the Society has not attended any CCC meetings since 2015.
˃ Nomination and confirmation of CCC
community representatives for 2019-21.
![Page 7: BORAL QUARRIES TEVEN...CCC Terms of Reference and membership ˃ The original Boral Teven Quarry CCC Terms of Reference were developed with community input and endorsed at the first](https://reader034.fdocuments.in/reader034/viewer/2022042406/5f20a2962d1710290c23b375/html5/thumbnails/7.jpg)
> Quarry operations update
2017-19
Build something great™
BORAL
QUARRIES
TEVEN
![Page 8: BORAL QUARRIES TEVEN...CCC Terms of Reference and membership ˃ The original Boral Teven Quarry CCC Terms of Reference were developed with community input and endorsed at the first](https://reader034.fdocuments.in/reader034/viewer/2022042406/5f20a2962d1710290c23b375/html5/thumbnails/8.jpg)
Quarry operations update 2017-19
˃ NOTE: Much of this information was
presented at the last CCC meeting (Nov
2018). It has been updated for re-
presentation given small attendance.
˃ Major projects and jobs˃ Highway upgrade – Pimlico to Teven
˃ Highway upgrade – Woolgoolga to Ballina
˃ Nearing the end of Harwood Bridge construction
˃ Local projects and jobs˃ Finished the construction of Ferngrove
residential estate
˃ Banyon Hill to Cumbalum Estate
˃ Avreus Skinners Head Estate
˃ Valley View Estate - Richmond Hill
˃ Ballina Indoor Stadium upgrade
˃ Emmanuel College upgrade
˃ Palm Lakes Retirement Village upgrade
˃ Internal supply to Boral Concrete plants
˃ Internal supply to Boral Asphalt plant
˃ Local civil construction companies
˃ Supply to Ballina Council
![Page 9: BORAL QUARRIES TEVEN...CCC Terms of Reference and membership ˃ The original Boral Teven Quarry CCC Terms of Reference were developed with community input and endorsed at the first](https://reader034.fdocuments.in/reader034/viewer/2022042406/5f20a2962d1710290c23b375/html5/thumbnails/9.jpg)
˃ Mobile crushing update˃ 55 days of mobile crushing in total 2017
year
˃ 64 days of mobile crushing 2018 year
˃ 14 days of mobile crushing so far this year
˃ Stripping campaign ˃ 1st campaign 160 000t moved
˃ 2nd campaign 220 000t moved
Quarry operations update 2017-19
![Page 10: BORAL QUARRIES TEVEN...CCC Terms of Reference and membership ˃ The original Boral Teven Quarry CCC Terms of Reference were developed with community input and endorsed at the first](https://reader034.fdocuments.in/reader034/viewer/2022042406/5f20a2962d1710290c23b375/html5/thumbnails/10.jpg)
Teven Quarry: National Award Winner
˃ On 20 September 2018, Teven Quarry won the inaugural Community Leadership
category at the National CCAA Innovation Awards.˃ Award recognised the success of our partnership with the Tintenbar-Teven Community Aid
Network (TinCAN) during the past six years.
˃ Nominees included all individual 2017 and 2018 State Award winners.
˃ Partnership had been named the NSW/ACT Award winner at the State ceremony in August.
˃ We are extremely proud of this achievement which we share not only with TinCAN, but the whole Teven and Tintenbar community.
National AwardsNSW/ACT Awards
![Page 11: BORAL QUARRIES TEVEN...CCC Terms of Reference and membership ˃ The original Boral Teven Quarry CCC Terms of Reference were developed with community input and endorsed at the first](https://reader034.fdocuments.in/reader034/viewer/2022042406/5f20a2962d1710290c23b375/html5/thumbnails/11.jpg)
Quarry Operations update: Kids Quarry Day 2018
![Page 12: BORAL QUARRIES TEVEN...CCC Terms of Reference and membership ˃ The original Boral Teven Quarry CCC Terms of Reference were developed with community input and endorsed at the first](https://reader034.fdocuments.in/reader034/viewer/2022042406/5f20a2962d1710290c23b375/html5/thumbnails/12.jpg)
Quarry Operations update: Personnel changes
˃ Notable changes during the 2017-19 period˃ Rod Wallace left his role with Boral Land & Property to become the new Environment Manager
(NSW/ACT) during 2018. Planning duties taken up by Adnan Voloder who joined us at the end of
2017.
˃ Changes in Quarry Supervisor role/personnel across the last two years.
˃ And the changes to come…˃ Richard Tomkins will be finishing up with Boral during mid August to pursue his career with another
company as a General Manager. Brad Doyle, Manager at Grafton and Macksville Quarries, will act
in Richard’s role until it is filled.
˃ Scott Gillieatt will be finishing up with Boral the end of August to pursue his career with another company as an Operations Manager. Scott’s replacement is to be confirmed.
![Page 13: BORAL QUARRIES TEVEN...CCC Terms of Reference and membership ˃ The original Boral Teven Quarry CCC Terms of Reference were developed with community input and endorsed at the first](https://reader034.fdocuments.in/reader034/viewer/2022042406/5f20a2962d1710290c23b375/html5/thumbnails/13.jpg)
> Environmental management
update 2017-19
Build something great™
BORAL
QUARRIES
TEVEN
![Page 14: BORAL QUARRIES TEVEN...CCC Terms of Reference and membership ˃ The original Boral Teven Quarry CCC Terms of Reference were developed with community input and endorsed at the first](https://reader034.fdocuments.in/reader034/viewer/2022042406/5f20a2962d1710290c23b375/html5/thumbnails/14.jpg)
Site water management
Sediment basins operating well
Electric pumps with float valves
Clean water diversion at the NW
end of the quarry
Grated drain across the quarry
entrance
![Page 15: BORAL QUARRIES TEVEN...CCC Terms of Reference and membership ˃ The original Boral Teven Quarry CCC Terms of Reference were developed with community input and endorsed at the first](https://reader034.fdocuments.in/reader034/viewer/2022042406/5f20a2962d1710290c23b375/html5/thumbnails/15.jpg)
Areas worked
Weed management
Works ongoing
Main focus areas
Average 40hrs per month
Approximately 20K per annum
![Page 16: BORAL QUARRIES TEVEN...CCC Terms of Reference and membership ˃ The original Boral Teven Quarry CCC Terms of Reference were developed with community input and endorsed at the first](https://reader034.fdocuments.in/reader034/viewer/2022042406/5f20a2962d1710290c23b375/html5/thumbnails/16.jpg)
Noise bund
3500 tonnes of material been placed at 4.6 metres high to create a noise bund on the
eastern side of the workshop
560 native trees and shrubs planted with walls grass seeded
![Page 17: BORAL QUARRIES TEVEN...CCC Terms of Reference and membership ˃ The original Boral Teven Quarry CCC Terms of Reference were developed with community input and endorsed at the first](https://reader034.fdocuments.in/reader034/viewer/2022042406/5f20a2962d1710290c23b375/html5/thumbnails/17.jpg)
Native seedlings growing really
well on earth bund in basalt pit
1550 trees and grasses planted
in October 2014
The trees today, some standing
around 4 metres tall, providing
a great visual barrier
![Page 18: BORAL QUARRIES TEVEN...CCC Terms of Reference and membership ˃ The original Boral Teven Quarry CCC Terms of Reference were developed with community input and endorsed at the first](https://reader034.fdocuments.in/reader034/viewer/2022042406/5f20a2962d1710290c23b375/html5/thumbnails/18.jpg)
Averaging
Period g/m2/montha
Deposited Dustb Annual 4.00
a – Maximum total deposited dust level
b – Dust is assessed as insoluble solids as defined by
AS3580.10.1-1991 (AM-19) (At the nearest existing or
likely future off-site sensitive receptor)
Source: Table 7.1 (Page 28) of the Approved Methods
for the Modelling and Assessment of Air Pollutants in
NSW – DEC 2005
Average Dust Deposition (Insoluble Solids)
Site 1 0.61 g/m2
Site 2 0.86 g/m2
Site 3 2.54 g/m2
Site 4 0.88 g/m2
As of February 2015 the Environmental Analysis
Laboratory (EAL) at Southern Cross University has
been collecting and analysing the Deposited Dust
sample bottles at the Boral Teven Quarry
![Page 19: BORAL QUARRIES TEVEN...CCC Terms of Reference and membership ˃ The original Boral Teven Quarry CCC Terms of Reference were developed with community input and endorsed at the first](https://reader034.fdocuments.in/reader034/viewer/2022042406/5f20a2962d1710290c23b375/html5/thumbnails/19.jpg)
Annual Average Dust Deposition (Insoluble Solids) 0.61 g / m2 / month
![Page 20: BORAL QUARRIES TEVEN...CCC Terms of Reference and membership ˃ The original Boral Teven Quarry CCC Terms of Reference were developed with community input and endorsed at the first](https://reader034.fdocuments.in/reader034/viewer/2022042406/5f20a2962d1710290c23b375/html5/thumbnails/20.jpg)
Annual Average Dust Deposition (Insoluble Solids) 0.86 g / m2 / month
![Page 21: BORAL QUARRIES TEVEN...CCC Terms of Reference and membership ˃ The original Boral Teven Quarry CCC Terms of Reference were developed with community input and endorsed at the first](https://reader034.fdocuments.in/reader034/viewer/2022042406/5f20a2962d1710290c23b375/html5/thumbnails/21.jpg)
Annual Average Dust Deposition (Insoluble Solids) 2.54 g / m2 / month
![Page 22: BORAL QUARRIES TEVEN...CCC Terms of Reference and membership ˃ The original Boral Teven Quarry CCC Terms of Reference were developed with community input and endorsed at the first](https://reader034.fdocuments.in/reader034/viewer/2022042406/5f20a2962d1710290c23b375/html5/thumbnails/22.jpg)
Annual Average Dust Deposition (Insoluble Solids) 0.88 g / m2 / month
![Page 23: BORAL QUARRIES TEVEN...CCC Terms of Reference and membership ˃ The original Boral Teven Quarry CCC Terms of Reference were developed with community input and endorsed at the first](https://reader034.fdocuments.in/reader034/viewer/2022042406/5f20a2962d1710290c23b375/html5/thumbnails/23.jpg)
![Page 24: BORAL QUARRIES TEVEN...CCC Terms of Reference and membership ˃ The original Boral Teven Quarry CCC Terms of Reference were developed with community input and endorsed at the first](https://reader034.fdocuments.in/reader034/viewer/2022042406/5f20a2962d1710290c23b375/html5/thumbnails/24.jpg)
Water quality limits for Boral Teven Quarry from EPA Licence No 2261
5.5
6
6.5
7
7.5
8
8.5
9
19-Jul-18 07-Sep-18 27-Oct-18 16-Dec-18 04-Feb-19 26-Mar-19 15-May-19 04-Jul-19
Surface Water Quality - pH
pH pH Lower Limit pH Upper Limit
05
1015202530354045505560
19/07/2018 7/09/2018 27/10/2018 16/12/2018 4/02/2019 26/03/2019 15/05/2019 4/07/2019
Surface Water Quality - Total Suspended Solids (TSS)
TSS (mg/L) TSS Limit (mg/L)
![Page 25: BORAL QUARRIES TEVEN...CCC Terms of Reference and membership ˃ The original Boral Teven Quarry CCC Terms of Reference were developed with community input and endorsed at the first](https://reader034.fdocuments.in/reader034/viewer/2022042406/5f20a2962d1710290c23b375/html5/thumbnails/25.jpg)
Date Time Overpressure [dB] Peak Vibration [mm/s]
Monday, 9 July 2018 14:37:00 112.8 2.5
Friday, 10 August 2018 10:25:00 110.6 2.2
Thursday, 30 August 2018 13:10:00 107.5 3.4
Tuesday, 11 September 2018 10:19:00 106.5 2.4
Monday, 5 November 2018 15:27:00 107 1.4
Tuesday, 11 December 2018 9:14:00 108.8 2.5
Tuesday, 11 December 2018 9:14:00 108.8 2.6
Thursday, 20 December 2018 14:19:00 109.9 2.1
Thursday, 31 January 2019 14:06:00 110.9 2.3
Monday, 4 March 2019 15:02:00 102.8 2.5
Monday, 15 April 2019 13:37:00 109.2 4.1
Friday, 31 May 2019 12:54:00 107 3.1
Boral Teven Quarry Blast
Limits;
• Only 1 blast per day
• Only blast between 9am to
4pm Monday to Friday
• Vibration limits
•5mm/s 95%
•10mm/s 100%
• Overpressure Limits
• 115dB 95%
• 120dB 100%
![Page 26: BORAL QUARRIES TEVEN...CCC Terms of Reference and membership ˃ The original Boral Teven Quarry CCC Terms of Reference were developed with community input and endorsed at the first](https://reader034.fdocuments.in/reader034/viewer/2022042406/5f20a2962d1710290c23b375/html5/thumbnails/26.jpg)
Water quality limits for Boral Teven Quarry from EPA Licence No 2261
![Page 27: BORAL QUARRIES TEVEN...CCC Terms of Reference and membership ˃ The original Boral Teven Quarry CCC Terms of Reference were developed with community input and endorsed at the first](https://reader034.fdocuments.in/reader034/viewer/2022042406/5f20a2962d1710290c23b375/html5/thumbnails/27.jpg)
> Planning matters: future
directions
Build something great™
BORAL
QUARRIES
TEVEN
![Page 28: BORAL QUARRIES TEVEN...CCC Terms of Reference and membership ˃ The original Boral Teven Quarry CCC Terms of Reference were developed with community input and endorsed at the first](https://reader034.fdocuments.in/reader034/viewer/2022042406/5f20a2962d1710290c23b375/html5/thumbnails/28.jpg)
Teven Quarry into the 2020s
˃ NOTE: Some of this information was presented at the last CCC meeting (Nov
2018) but due to its importance has been updated for re-presentation.
˃ With the completion of the Pacific Highway works expected next year, we’re
assessing our plans for the future of our North Coast sites.
˃ The quarry serves a steadily growing area, so operations will need to revert to
a ‘normal’ mode after all the recent ‘peak’ years supporting the highway.
˃ The quarry’s consent remains in place until June 2026.
CREDITS:
Wikipaedia
Aurecon Group
ABC
Northern Star
![Page 29: BORAL QUARRIES TEVEN...CCC Terms of Reference and membership ˃ The original Boral Teven Quarry CCC Terms of Reference were developed with community input and endorsed at the first](https://reader034.fdocuments.in/reader034/viewer/2022042406/5f20a2962d1710290c23b375/html5/thumbnails/29.jpg)
Teven Quarry into the 2020s
˃ We know there is more rock available at the northern end of the current
operations, both inside and outside the current approved extraction footprint.
˃ Seeking approval to extract this rock and/or extend beyond the current
consented area will trigger the provisions of State Significant Development
(SSD) under NSW planning legislation.
˃ An SSD application is like a development application (DA) you put to Council,
but far more detailed and with a large range of supporting studies required.
˃ SSDs are assessed by the NSW Department of Planning and Environment.
![Page 30: BORAL QUARRIES TEVEN...CCC Terms of Reference and membership ˃ The original Boral Teven Quarry CCC Terms of Reference were developed with community input and endorsed at the first](https://reader034.fdocuments.in/reader034/viewer/2022042406/5f20a2962d1710290c23b375/html5/thumbnails/30.jpg)
Teven Quarry into the 2020s
˃ The studies required for the SSD (mostly environmentally focussed) require
data to be collected over an extended period (eg two years).
˃ Groundwater bores were established after drilling during January and February
to start the collection of water related data. ˃ Data is used to guide the future quarry pit design.
˃ Expecting to commence other necessary studies toward the end of this
year/early 2020.˃ Includes flora and fauna, pit design effects on water flows, air and noise effects, aesthetics.
˃ We are not yet committed to any firm timeline, however in theory the SSD could
be lodged in the second half of 2020 if complete focus is given now. ˃ No mapping of the area has been completed as yet, nor consideration given by the business as
to what changes if any might be included in the SSD.
˃ Information to be presented at next CCC meeting (hoping
to have Adnan in attendance) and also shared around
neighbourhood (eg newsletter).
˃ Consultation will continue: opportunity for you to raise
more things for us to think about well in advance of starting
on the application.
![Page 31: BORAL QUARRIES TEVEN...CCC Terms of Reference and membership ˃ The original Boral Teven Quarry CCC Terms of Reference were developed with community input and endorsed at the first](https://reader034.fdocuments.in/reader034/viewer/2022042406/5f20a2962d1710290c23b375/html5/thumbnails/31.jpg)
Build something great™
> Community activities 2017-19
and general business
BORAL
QUARRIES
TEVEN
![Page 32: BORAL QUARRIES TEVEN...CCC Terms of Reference and membership ˃ The original Boral Teven Quarry CCC Terms of Reference were developed with community input and endorsed at the first](https://reader034.fdocuments.in/reader034/viewer/2022042406/5f20a2962d1710290c23b375/html5/thumbnails/32.jpg)
Community participation
˃ During 2017-19, we’ve continued to ensure we stay an active part of our
community through direct contribution to events and initiatives:˃ TinCAN ‘bus trip’ program – whole period, CCAA Award wins.
˃ TinCAN Art Show – back for 2019.
˃ Tintenbar Community Hall - ‘Pledge a Plank’ campaign 2018.
˃ Immune Deficiency Australia Children’s Christmas Party – 2017 and 2018.
˃ Ballina Lions Club World Festival of Magic Children’s Christmas Party – 2017 and 2018.
˃ Ongoing association with Teven-Tintenbar Primary School (eg 2018 Country Fair).
˃ Sponsorship of junior touch football.
˃ Richmond River Clay Target Association – donation of materials.
![Page 33: BORAL QUARRIES TEVEN...CCC Terms of Reference and membership ˃ The original Boral Teven Quarry CCC Terms of Reference were developed with community input and endorsed at the first](https://reader034.fdocuments.in/reader034/viewer/2022042406/5f20a2962d1710290c23b375/html5/thumbnails/33.jpg)
Bangalow Billycart Derby 2018
![Page 34: BORAL QUARRIES TEVEN...CCC Terms of Reference and membership ˃ The original Boral Teven Quarry CCC Terms of Reference were developed with community input and endorsed at the first](https://reader034.fdocuments.in/reader034/viewer/2022042406/5f20a2962d1710290c23b375/html5/thumbnails/34.jpg)
General business and contacts
˃ Items of general business
˃ Next meeting of the Community Consultative Committee ˃ Likely around early to mid November 2019.
˃ Boral Teven Quarry contacts:
˃ Scott Gillieatt Quarry Manager (until end Aug 2019)
6687 8360 / [email protected]
˃ Tylah Drochmann Quarry Supervisor
6687 8360 / [email protected]
˃ Paul Jackson Stakeholder Relations Manager
0401 894 097 / [email protected]
˃ www.boral.com.au/tevenquarry
˃ Facebook: @Boral Australia
![Page 35: BORAL QUARRIES TEVEN...CCC Terms of Reference and membership ˃ The original Boral Teven Quarry CCC Terms of Reference were developed with community input and endorsed at the first](https://reader034.fdocuments.in/reader034/viewer/2022042406/5f20a2962d1710290c23b375/html5/thumbnails/35.jpg)
Build something great™
> Thank you for your attendance
BORAL
QUARRIES
TEVEN