Transcript of Book1dssa
8/20/2019 Book1dssa
http://slidepdf.com/reader/full/book1dssa 1/7
8/20/2019 Book1dssa
http://slidepdf.com/reader/full/book1dssa 2/7
Aktiviti Penyelenggaraan Lokasi
Pemeriksaan Visual
8/20/2019 Book1dssa
http://slidepdf.com/reader/full/book1dssa 3/7
Ciri-Ciri Prestasi
Pemeriksaan perlu mencari:
Pengesahan bahawa salur masuk udara tidak tersumbat
Bukti kelembapan dan / atau kotoran membina-up
Bunyi yang tidak biasa bocor meterai minyak atau getaran tinggi
!olok tahap minyak "#ika ada$ perlu diperiksa
Bukti kerosakan yang disebabkan oleh kotoran bahagianyang longgar atau asing
8/20/2019 Book1dssa
http://slidepdf.com/reader/full/book1dssa 4/7
Location Performance characteristics
Installed and off Ratio of the 10 minute IR to the 1 minute IR.
line (10 min IR / 1 min IR)
Determines condition of ground insulation
Test voltages similar to the IR test voltages
Accetance criteria ratio ! "
Installed and off
line
temerate correct and trend.
three hases
overhaul
resistance chec# condition of insulation on a $earing.
(if alica$le) Test voltage% &00 'dc
Accetance criteria% 1 megohm
overhaul
out (TIR) cause vi$ration issues.
Accetance criteria% 00 rm ma* .001 in
Insection and overhaul
$earing industr+ standards.
finish, itting, ru$$ing and corrosion.
overhaul Insection should loo# for%
coil movement
lugged vent holes
-aintenanceactivit+
Polariationinde* (PI)
indingresistance
A comarison of the line to line resistances of themotors
inding. This test should $e done at the motorterminals using
a meter caa$le of measuring lo resistance
(milliohms). At+ical ohm meter does not have ade2uate accurac+.Record,
3ach hase should $e ithin 4/5 (6 5 &6) of theaverage of all
7earinginsulation
8omleted similar to other IR (megger) test. 9sed toverif+
:haft totalindicated run
-easure the trueness of the shaft e*tension. A highvalue can
; 00 rmma* .00 in
Diameters of the fits should $e measured andcomared to
measurementsof $earing
<ournals andhousing fits 7rg <ournals and housing $ores should $e visuall+
insected for
:tator visualInsection
8/20/2019 Book1dssa
http://slidepdf.com/reader/full/book1dssa 5/7
soft or degraded insulation
coil $racing ade2uate and intact
lamination damage
artial discharge activit+
tightness of edges
overhaul Insection should loo# for%
Insection crac#s in rotor $ars
$alance eights roerl+ secured
signs of $ar movement
signs of rotor/stator ru$ or lamination damage
cooling ducts clear
ru$$ing mar#s on shaft
#e+a+ distortion
overhaul
aroriate.
overhaul and
ost overhaul
temerature correct and trend
-otor Test
voltage voltage('dc)
; 1000 &00 ! &
1000 5"&00 1000
"&015&000 "&00
! &000 &000
overhaul and
ost overhaul condition of ground insulation.
(10 min IR / 1 min IR)
Test voltages similar to the IR test voltages
Accetance criteria ratio ! "
Rotor / :haftvisual
8lean=, $a#e dr+and
All arts should $e cleaned and $a#ed dr+ to removeall dirt and
varnish (asneeded)
contamination. The indings should $e reinsulatedas
Insulationresistance
Perform IR chec# $eteen motor leads and ground.This
determines condition of the ground insulation.Record,
Acceta$le
reading
! 100megohm
! 100megohm
! 100
megohm
Polariationinde* (PI)
Ratio of the 1 minute IR to the 10 minute IR.Determines
8/20/2019 Book1dssa
http://slidepdf.com/reader/full/book1dssa 6/7
Location Performance characteristics
Installed and off
line
Installed and off
line
overhaul
resistance chec#
(if alica$le)
overhaul
out (TIR)
Insection and overhaul
overhaul
-aintenanceactivit+
Polariationinde* (PI)
indingresistance
7earinginsulation
:haft totalindicated run
measurementsof $earing
<ournals andhousing fits
:tator visualInsection
8/20/2019 Book1dssa
http://slidepdf.com/reader/full/book1dssa 7/7
overhaul
Insection
overhaul
overhaul and
ost overhaul
overhaul and
ost overhaul
Rotor / :haftvisual
8lean=, $a#e dr+and
varnish (asneeded)
Insulationresistance
Polariationinde* (PI)