WHAT YOU NEED
FOR THE OPERATION
Cemover
Cemover Instrument
Cement plus cementation system
Drill
The range of accessories
for Cemover includes everything
necessary for an effective cement
removal procedure.
CEMOVER CONSISTS OF:A sterile single-use device
A plastic breather tube that allows removing
the air in the surgical cavity during bone cement
injection.
A
02 without 8 mmdrill bit
War
nin
gs:
The
dev
ice
requir
es t
he
com
ple
te s
pec
ific
inst
rum
ent
Bone cementextractorHip - Knee
o r t h o p a e d i c s
TECRES S. p. A.Via A. Doria, 6 - Sommacampagna - Verona (Italy)tel. +39 045 92 17 311 - fax +39 045 92 17 330www.tecres.it - [email protected]
distribuited by
CodeProduct
Reference for orders
Correct patient positionin a hip operation
2
3
5
6
9
10
11
121
2
3
4
5
6
7
8
REMOVING BONE CEMENT
78
9
11
REMOVING THE INTRAMEDULLARY PLUG
10
12
1
It is advisable to use
IDGENTA
The device comes in 3 lengths(120, 150 and 180 mm)
to be chosen basedon the length of the stem
4
Cemoveris a sterile single-usedevice for removalof bone cement
In cemented prosthesis revisions, the
cement may remain adherent to the bone.
Cemover, the innovative cement pull
extractor allows completely and accurately
removing residual cement.
The device consists of metamers
connected to each other that allow
segmental cement removal.
Perforate the plug with an 8 mm Drill using the special centringdevice. It is advisable to cool the 8 mm Drill by spraying thecanal with physiological saline solution
Fully and forcefully screw the Plug Remover Staff down into thehole made with the 8 mm Drill.
Remove the plug using the Plug Remover Staff
Remove the plug.If you have difficulties, connect the instrument used forremoval of the segments to the double-threaded junctionwith the Plug Remover Staff
Remove the prostheses
Mill the femoral canal
Remove and aspirate any fragments and dry thoroughly
Insert the Ventilation tube in the canal and fill it withlow viscosity bone cement
Immediately insert Cemover and wait for the new cement to polymerize
Assemble the instrument in the following order:1) Hammering Mass Staff2) Hammering Mass3) Double-Threaded junction4) Cemover Staff
Screw the instrument onto the first metamer
The metamer is removed by repeatedly acting on the Hammering Mass
screw the instrument onto the next metamer and repeat operation 7for all the metamers until complete removal.
Remove the prostheses
Mill the femoral canal
Remove and aspirate any fragments and dry thoroughly
Insert the Ventilation tube in the canal and fill it withlow viscosity bone cement
Immediately insert Cemover and wait for the new cement to polymerize
Assemble the instrument in the following order:1) Hammering Mass Staff2) Hammering Mass3) Double-Threaded junction4) Cemover Staff
Screw the instrument onto the first metamer
The metamer is removed by repeatedly acting on the Hammering Mass
screw the instrument onto the next metamer and repeat operation 7for all the metamers until complete removal.
BEFORE