Bolt Tightening Inspection Report Format Final

2
BUS BAR BOLT TIGHTENIN Project Name: Project name: 2x150 MW CFB COAL FIRED POWER PLANT Report No.: Elevation No.: Date: NO. SYSTEM Required Torque Value (N.m) 1 2 3 HPCC1 DMCI-Operation Department DM DATE NAME SIGNATURE 150MW-C-022-0 BOLT DIA. (mm) Actual Torque Value Max (100%) N.m

description

asd

Transcript of Bolt Tightening Inspection Report Format Final

000000

&A&P

BT Insp. ReportBUS BAR BOLT TIGHTENING REPORTProject Name:Project name: 2x150 MW CFB COAL FIRED POWER PLANTReport No.:Elevation No.:Date:Page No.:NO.SYSTEMBOLTDIA.(mm)Required Torque Value (N.m)Actual TorqueValueMax (100%) N.mREMARKSNO.SYSTEMBOLTDIA.(mm)Remarks123HPCC1DMCI-Operation DepartmentDMCI-QA/QC DepartmentDATEDATENAMESIGNATURE150MW-C-022-0D.M. Consunji, Inc.