BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual...
Transcript of BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual...
![Page 1: BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual Variance Revenue $1,134,413 $1,460,844 $326K 28.8% Expense $3,237,690 $2,754,928 $482K](https://reader034.fdocuments.in/reader034/viewer/2022051918/600abf0b0233de0eab50549d/html5/thumbnails/1.jpg)
BOARD OF GOVERNORS MEETINGAugust 25, 2020
![Page 2: BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual Variance Revenue $1,134,413 $1,460,844 $326K 28.8% Expense $3,237,690 $2,754,928 $482K](https://reader034.fdocuments.in/reader034/viewer/2022051918/600abf0b0233de0eab50549d/html5/thumbnails/2.jpg)
Action Item
Approval of Minutes
July 28, 2020
2
![Page 3: BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual Variance Revenue $1,134,413 $1,460,844 $326K 28.8% Expense $3,237,690 $2,754,928 $482K](https://reader034.fdocuments.in/reader034/viewer/2022051918/600abf0b0233de0eab50549d/html5/thumbnails/3.jpg)
Financial Update
Janet ArsenaultSr. Director of Finance, GWCCA
![Page 4: BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual Variance Revenue $1,134,413 $1,460,844 $326K 28.8% Expense $3,237,690 $2,754,928 $482K](https://reader034.fdocuments.in/reader034/viewer/2022051918/600abf0b0233de0eab50549d/html5/thumbnails/4.jpg)
Financial Snapshot – July 2020
4
Budget Actual Variance
Revenue $1,134,413 $1,460,844 $326K28.8%
Expense $3,237,690 $2,754,928 $482K14.9%
Net Loss ($2,103,277) ($1,294,084) $809K38.5%
![Page 5: BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual Variance Revenue $1,134,413 $1,460,844 $326K 28.8% Expense $3,237,690 $2,754,928 $482K](https://reader034.fdocuments.in/reader034/viewer/2022051918/600abf0b0233de0eab50549d/html5/thumbnails/5.jpg)
5
Questions?
![Page 6: BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual Variance Revenue $1,134,413 $1,460,844 $326K 28.8% Expense $3,237,690 $2,754,928 $482K](https://reader034.fdocuments.in/reader034/viewer/2022051918/600abf0b0233de0eab50549d/html5/thumbnails/6.jpg)
Capital Projects Update
Otto Johnson, Director Project and Program Management, GWCCA
![Page 7: BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual Variance Revenue $1,134,413 $1,460,844 $326K 28.8% Expense $3,237,690 $2,754,928 $482K](https://reader034.fdocuments.in/reader034/viewer/2022051918/600abf0b0233de0eab50549d/html5/thumbnails/7.jpg)
Capital Projects Overview
7
EXHIBIT HALL BCTERRAZZO
REPLACEMENT LEVEL 7 BRIDGE
ORANGE DECK
AYIB PED MALL/ TRANSPORTATION
DEPOTGWCC ROOFING
![Page 8: BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual Variance Revenue $1,134,413 $1,460,844 $326K 28.8% Expense $3,237,690 $2,754,928 $482K](https://reader034.fdocuments.in/reader034/viewer/2022051918/600abf0b0233de0eab50549d/html5/thumbnails/8.jpg)
EXHIBIT HALL BC
Project Information
•Project Manager: Taylor White (PPM)
•Project Scope: 100K sf facility expansion that creates a fixed gateway between Buildings B and C exhibit halls, creating over 1M sf of contiguous exhibition floor space
•Project Location: Between B4/B5 and C3/C4 exhibit halls
•Project Budget and Source: $55 million / Bond Funds
Project Status
•Current Phase: Construction Close Out
•Construction Schedule: PROJECT COMPLETE
![Page 9: BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual Variance Revenue $1,134,413 $1,460,844 $326K 28.8% Expense $3,237,690 $2,754,928 $482K](https://reader034.fdocuments.in/reader034/viewer/2022051918/600abf0b0233de0eab50549d/html5/thumbnails/9.jpg)
Exhibit Hall BC
9
![Page 10: BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual Variance Revenue $1,134,413 $1,460,844 $326K 28.8% Expense $3,237,690 $2,754,928 $482K](https://reader034.fdocuments.in/reader034/viewer/2022051918/600abf0b0233de0eab50549d/html5/thumbnails/10.jpg)
Exhibit Hall BC
10
![Page 11: BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual Variance Revenue $1,134,413 $1,460,844 $326K 28.8% Expense $3,237,690 $2,754,928 $482K](https://reader034.fdocuments.in/reader034/viewer/2022051918/600abf0b0233de0eab50549d/html5/thumbnails/11.jpg)
Building CTerrazzo
Replacement
Project Information
• Project Manager: Taylor White (PPM)
• Project Scope: Replace existing Terrazzo with carpet
• Project Location: Building C Level 1 Concourse
• Project Budget and Source: $1 million / GWCCA
Project Status• COMPLETE
![Page 12: BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual Variance Revenue $1,134,413 $1,460,844 $326K 28.8% Expense $3,237,690 $2,754,928 $482K](https://reader034.fdocuments.in/reader034/viewer/2022051918/600abf0b0233de0eab50549d/html5/thumbnails/12.jpg)
Before and After
![Page 13: BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual Variance Revenue $1,134,413 $1,460,844 $326K 28.8% Expense $3,237,690 $2,754,928 $482K](https://reader034.fdocuments.in/reader034/viewer/2022051918/600abf0b0233de0eab50549d/html5/thumbnails/13.jpg)
Inclement Weather Bridge
Project Information
• Project Manager: Ken Stockdell (PPM)
• Project Scope: Renovate existing Inclement Weather Bridge (IWB) to a more modern and welcoming feel
• Project Location: Red Deck Level 7 into GWCC Building B Lobby from the IWB
• Project Budget and Source: $576K / GWCCA
Project Status
• COMPLETE
![Page 14: BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual Variance Revenue $1,134,413 $1,460,844 $326K 28.8% Expense $3,237,690 $2,754,928 $482K](https://reader034.fdocuments.in/reader034/viewer/2022051918/600abf0b0233de0eab50549d/html5/thumbnails/14.jpg)
Before and After: Entrance from Level 7
14
![Page 15: BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual Variance Revenue $1,134,413 $1,460,844 $326K 28.8% Expense $3,237,690 $2,754,928 $482K](https://reader034.fdocuments.in/reader034/viewer/2022051918/600abf0b0233de0eab50549d/html5/thumbnails/15.jpg)
Before and After: Entrance from Level 7
![Page 16: BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual Variance Revenue $1,134,413 $1,460,844 $326K 28.8% Expense $3,237,690 $2,754,928 $482K](https://reader034.fdocuments.in/reader034/viewer/2022051918/600abf0b0233de0eab50549d/html5/thumbnails/16.jpg)
Walk from IWB into Building B
16
![Page 17: BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual Variance Revenue $1,134,413 $1,460,844 $326K 28.8% Expense $3,237,690 $2,754,928 $482K](https://reader034.fdocuments.in/reader034/viewer/2022051918/600abf0b0233de0eab50549d/html5/thumbnails/17.jpg)
Building B entrance from IWB
17
![Page 18: BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual Variance Revenue $1,134,413 $1,460,844 $326K 28.8% Expense $3,237,690 $2,754,928 $482K](https://reader034.fdocuments.in/reader034/viewer/2022051918/600abf0b0233de0eab50549d/html5/thumbnails/18.jpg)
Orange Parking Deck
Project Information
•Project Manager: Taylor White (PPM)
•Project Scope: Six Level, 544 spaced parking deck with 12 EV Stations and 12 Truck Berths. Entry/Exit Points on AYIB, Home Depot Backyard, and Mangum Street.
•Project Location: Former GA Dome Slab
•Project Budget and Source: $27 million / Bond Funds
Current Status
•Current Phase: Construction Phase
•Construction Schedule: May 2018 – December 2020
![Page 19: BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual Variance Revenue $1,134,413 $1,460,844 $326K 28.8% Expense $3,237,690 $2,754,928 $482K](https://reader034.fdocuments.in/reader034/viewer/2022051918/600abf0b0233de0eab50549d/html5/thumbnails/19.jpg)
Orange Deck view from Mercedes-Benz Stadium
![Page 20: BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual Variance Revenue $1,134,413 $1,460,844 $326K 28.8% Expense $3,237,690 $2,754,928 $482K](https://reader034.fdocuments.in/reader034/viewer/2022051918/600abf0b0233de0eab50549d/html5/thumbnails/20.jpg)
Orange Deck view from drone
![Page 21: BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual Variance Revenue $1,134,413 $1,460,844 $326K 28.8% Expense $3,237,690 $2,754,928 $482K](https://reader034.fdocuments.in/reader034/viewer/2022051918/600abf0b0233de0eab50549d/html5/thumbnails/21.jpg)
Precast Schedule
Phase 3 Scope
• July 20th –Sept 4th
• 405 Pieces of precast
• Mangum St. and Gate 20 staging
Phase 4 Scope
• Sept 8th – Sept 21st
• 110 pieces of precast
• Gate 20 Staging
Phase 5 Scope
• Sept 22nd –Sept 24th
• 21 pieces of precast
Phase 6-7 Scope
• Sept-28th -Oct 9th
• Footing pour
• 6 pieces of precast
![Page 22: BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual Variance Revenue $1,134,413 $1,460,844 $326K 28.8% Expense $3,237,690 $2,754,928 $482K](https://reader034.fdocuments.in/reader034/viewer/2022051918/600abf0b0233de0eab50549d/html5/thumbnails/22.jpg)
22
Andrew Young Intl Blvd Pedestrian Mall
Project Information
• Project Manager: Ken Stockdell (PPM)
• Project Scope: Extend COP pedestrian experience to GWCC building entrances, eventually leading to GWCCA Hotel. Create a safer pedestrian experience through GWCCA Campus.
• Project Location: Current sidewalks and traffic lanes along Andrew Young International Blvd from Marietta St. to Centennial Olympic Park Drive. Improvements also will be made to East Plaza.
• Project Budget and Source: $15 million / Bond Funds
Project Status
Current Phase:
• Design (Construction Documents): August 2020 – March 2021
• Construction (Structural Repairs): August – December 2020
• Estimated Construction Schedule: March – December 2021
![Page 23: BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual Variance Revenue $1,134,413 $1,460,844 $326K 28.8% Expense $3,237,690 $2,754,928 $482K](https://reader034.fdocuments.in/reader034/viewer/2022051918/600abf0b0233de0eab50549d/html5/thumbnails/23.jpg)
23 | GEORGIA WORLD CONGRESS CENTER AUTHORITY
Andrew Young Int. Blvd. Pedestrian Mall Overall View
![Page 24: BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual Variance Revenue $1,134,413 $1,460,844 $326K 28.8% Expense $3,237,690 $2,754,928 $482K](https://reader034.fdocuments.in/reader034/viewer/2022051918/600abf0b0233de0eab50549d/html5/thumbnails/24.jpg)
Andrew Young Int. Blvd. Pedestrian Mall Building B Entrance
![Page 25: BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual Variance Revenue $1,134,413 $1,460,844 $326K 28.8% Expense $3,237,690 $2,754,928 $482K](https://reader034.fdocuments.in/reader034/viewer/2022051918/600abf0b0233de0eab50549d/html5/thumbnails/25.jpg)
25
Andrew Young Intl Blvd Transportation DepotProject Information
• Project Manger: Ken Stockdell (PPM)
• Project Scope: Create a designated pick-up and drop-off area for all buses and taxi/rideshare vehicles. To improve traffic conditions by minimizing congestion and improving trip times. Create an alternative Red Deck entrance.
• Project Location: Current green space between International Plaza and State Farm Drive and current Red Deck entry and COP Drive.
• Project Budget and Source: $18 million / Bond Funds
Project Status
• Current Phase: Design Development Phase
• Estimated Construction Schedule: April 2021 – April 2022
![Page 26: BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual Variance Revenue $1,134,413 $1,460,844 $326K 28.8% Expense $3,237,690 $2,754,928 $482K](https://reader034.fdocuments.in/reader034/viewer/2022051918/600abf0b0233de0eab50549d/html5/thumbnails/26.jpg)
![Page 27: BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual Variance Revenue $1,134,413 $1,460,844 $326K 28.8% Expense $3,237,690 $2,754,928 $482K](https://reader034.fdocuments.in/reader034/viewer/2022051918/600abf0b0233de0eab50549d/html5/thumbnails/27.jpg)
![Page 28: BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual Variance Revenue $1,134,413 $1,460,844 $326K 28.8% Expense $3,237,690 $2,754,928 $482K](https://reader034.fdocuments.in/reader034/viewer/2022051918/600abf0b0233de0eab50549d/html5/thumbnails/28.jpg)
![Page 29: BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual Variance Revenue $1,134,413 $1,460,844 $326K 28.8% Expense $3,237,690 $2,754,928 $482K](https://reader034.fdocuments.in/reader034/viewer/2022051918/600abf0b0233de0eab50549d/html5/thumbnails/29.jpg)
29
GWCCA Roof Replacement Project InformationProject Manager: Taylor White (PPM)
Project Scope: Replacing sections of roof on Buildings A and B classified as in need of “urgent” replacement status; total of 513,000 square feet of replacement
Project Location: Sections of Building A and B roofs
Project Budget and Source: $12 million / Bond Funds
Current StatusCurrent Phase: Procurement Phase
Construction Schedule: TBD
![Page 30: BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual Variance Revenue $1,134,413 $1,460,844 $326K 28.8% Expense $3,237,690 $2,754,928 $482K](https://reader034.fdocuments.in/reader034/viewer/2022051918/600abf0b0233de0eab50549d/html5/thumbnails/30.jpg)
GWCCA “Urgent” Roof Replacement
Areas
• Area 1• Exhibit Halls B4 & B5
• Area 2• Main Lobby (Outside Reg Hall)
• Area 3• Building A Level 4
• Area 4 • Exhibit Hall A1
• Area 5• Building B Level 5
• Area 6• Exhibit Hall A3
30
1
6
5
3
24
![Page 31: BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual Variance Revenue $1,134,413 $1,460,844 $326K 28.8% Expense $3,237,690 $2,754,928 $482K](https://reader034.fdocuments.in/reader034/viewer/2022051918/600abf0b0233de0eab50549d/html5/thumbnails/31.jpg)
31
Questions?
![Page 32: BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual Variance Revenue $1,134,413 $1,460,844 $326K 28.8% Expense $3,237,690 $2,754,928 $482K](https://reader034.fdocuments.in/reader034/viewer/2022051918/600abf0b0233de0eab50549d/html5/thumbnails/32.jpg)
Action Item: Motorola Service Agreement
Paul Guerrucci, Chief of Police Department of Public Safety, GWCCA
![Page 33: BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual Variance Revenue $1,134,413 $1,460,844 $326K 28.8% Expense $3,237,690 $2,754,928 $482K](https://reader034.fdocuments.in/reader034/viewer/2022051918/600abf0b0233de0eab50549d/html5/thumbnails/33.jpg)
Snapshot: Motorola 2017
33
Prior to 2017, the Federal Communications Commission (FCC) mandated State and Local Governments (Project 25) improve Public Safety radio spectrum and efficiency through implementing digital technologies that:
✓ Improved voice quality and coverage
✓ Provided secure interoperability between public safety agencies (they can easily talk to each other)
✓ Be effective, efficient, and reliable
✓ Allow for encryption and data (secure communications, can’t be hacked)
In 2017, the Authority contracted with the City of Atlanta and their Motorola system to fulfill this need. This has allowed our department many communication advantages:
✓ Avoids radio spectrum congestion of too many users on too few channels (critical during large events or emergencies; was instrumental during the recent riots for command and control)
✓ Superior voice quality over the entire campus and structures, as well as the entire metro Atlanta area
✓ Recorded radio traffic for investigations or legal issues as needed
✓ We can talk with all supporting public safety/ mutual aid departments as we have now shared channel programming
![Page 34: BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual Variance Revenue $1,134,413 $1,460,844 $326K 28.8% Expense $3,237,690 $2,754,928 $482K](https://reader034.fdocuments.in/reader034/viewer/2022051918/600abf0b0233de0eab50549d/html5/thumbnails/34.jpg)
Motorola 2017-2019 Initial Investment
34
2017 Motorola Communication Project• System completed, activated on April 27, 2018
• System maintenance was included in the original contract for a warranty period of one year (April 2018 – April 2019)
• Year two of maintenance covered May 2019 – April 2020 at a cost of $54,914.48
• A bridge contract was executed for maintenance and covered May 01, 2020 – June 30, 2020
• Modifications were made to accommodate for the installation microwave path on an existing tower off Huff Road
• Ongoing system maintenance and upgrade coverage agreements are a standard requirement of using the system
$1,450,000.00
Total initial two-year system price
![Page 35: BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual Variance Revenue $1,134,413 $1,460,844 $326K 28.8% Expense $3,237,690 $2,754,928 $482K](https://reader034.fdocuments.in/reader034/viewer/2022051918/600abf0b0233de0eab50549d/html5/thumbnails/35.jpg)
Motorola 2020
35
$1,104,528
Total cost of proposed 10-year maintenance contract
$110,552.00
Average cost per year
MaintenanceNetwork Updates
Microwave
Included in contract
![Page 36: BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual Variance Revenue $1,134,413 $1,460,844 $326K 28.8% Expense $3,237,690 $2,754,928 $482K](https://reader034.fdocuments.in/reader034/viewer/2022051918/600abf0b0233de0eab50549d/html5/thumbnails/36.jpg)
Resolution: Motorola Solutions, Inc.
With this Resolution, the Board essentially would authorize the Executive Director to contract with Motorola Solutions, Inc. for the provision of such services.
36
![Page 37: BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual Variance Revenue $1,134,413 $1,460,844 $326K 28.8% Expense $3,237,690 $2,754,928 $482K](https://reader034.fdocuments.in/reader034/viewer/2022051918/600abf0b0233de0eab50549d/html5/thumbnails/37.jpg)
37
Questions?
![Page 38: BOARD OF GOVERNORS MEETING...2020/08/08 · Financial Snapshot –July 2020 4 Budget Actual Variance Revenue $1,134,413 $1,460,844 $326K 28.8% Expense $3,237,690 $2,754,928 $482K](https://reader034.fdocuments.in/reader034/viewer/2022051918/600abf0b0233de0eab50549d/html5/thumbnails/38.jpg)
Next Scheduled Board Meeting
GWCCA Board Planning RetreatSeptember 17, 2020