board 01 site planpdf - Trail · 2017-06-05 · coloured elevations ms september 2016- ......

3
date scale drawn by sheet no. checked by revison no. rev no description date RENDERING MS SEPTEMBER 2016 - copyright reserved. these drawings and designs are and at all times remain the property of S.O.A to be used for the project shown and may not be reproduced without written consent. AIRPORT TERMINAL BUILDING 9019 BC-22A Trail, BC project name sheet title drawing file project no. SOA-1509 CURB SIDE MS s . o . a S t a n l e y O f f i c e of A r c h i t e c t u r e 709 Gore St. Nelson BC Canada V1L5C7 tel. 250.777.2328 eml. info@soahome.ca web. www.soahome.ca ISSUED FOR COORDINATION 17/01/04 NOT FOR CONSTRUCTION shown issued for DP 16/10/14 GENERAL NOTES: 1. THESE DRAWINGS TO BE READ IN CONJUNCTION WITH THE ARCHITECTURAL SPECIFICATIONS, GEOTECHNICAL, CIVIL, STRUCTURAL, PRE-ENGINEERED BUILDING, MECHANICAL AND ELECTRICAL DOCUMENTS. SEE THE ARCHITECTURAL SPECIFICATIONS FOR A 'SCOPE LETTER' THAT DELINEATES THE SCOPE OF THE PRE-ENGINEERED BUILDING DESIGN, SUPPLY AND INSTALLATION. 2. ALL WORK SHALL MEET ALL APPLICABLE BC BUILDING CODE, FIRE CODE, TRANSPORT CANADA REGULATIONS AND BYLAWS OF THE REGIONAL DISTRICT OF KOOTENAY BOUNDARY. 3. ALL DIMENSIONS INDICATED ARE TO CENTRE LINE OF STRUCTURE, FACE OF GIRTS OR FACE OF FRAMING, UNLESS NOTED OTHERWISE. 4. ADVISE ARCHITECT OF DISCREPANCIES, INACCURACIES AND CONFLICTS IN THE DRAWINGS. 5. ALL CONSTRUCTION EQUIPMENT TO REMAIN BELOW THE FOLLOWING ELEVATIONS*: - EL 448m when working 112 to 132m from runway centerline - EL 450m when working 132 to 152m from runway centerline -˚EL 452m when working greater than 152m from runway centerline * Operation of equipment above those elevations must be requested 72 hours in advance, and approved by the City of Trail. issued for BP 16/11/09 Pre-Tender Review 16/12/05 Pre-Tender Coordination 17/01/09 NOT FOR CONSTRUCTION issued for Presentation 17/02/20 TRAIL AIRPORT TERMINAL BUILDING - curbside.

Transcript of board 01 site planpdf - Trail · 2017-06-05 · coloured elevations ms september 2016- ......

Page 1: board 01 site planpdf - Trail · 2017-06-05 · coloured elevations ms september 2016- ... pre-tender coordination 17/01/09 not for construction coloured elevation - west scale: nts

date

scale

drawn by

sheet no.

checked by

revison no.

rev no description date

RENDERING

MS

SEPTEMBER 2016

-

copyright reserved. these drawings and designs are and at all times remain the property of S.O.A to be used for the project shown and may not be reproduced without written consent.

AIRPORT TERMINAL BUILDING9019 BC-22ATrail, BC

project name

sheet title

drawing file

project no. SOA-1509

CURB SIDE

MS

s . o . aS t a n l e y O f f i c e of A r c h i t e c t u r e

709 Gore St. Nelson BC Canada V1L5C7tel. 250.777.2328 eml. [email protected]

web. www.soahome.ca

ISSUED FOR COORDINATION17/01/04

NOT FORCONSTRUCTION

shown

issued for DP 16/10/14

GENERAL NOTES:

1. THESE DRAWINGS TO BE READ IN CONJUNCTION WITH THE ARCHITECTURAL SPECIFICATIONS, GEOTECHNICAL, CIVIL, STRUCTURAL, PRE-ENGINEERED BUILDING, MECHANICAL AND ELECTRICAL DOCUMENTS. SEE THE ARCHITECTURAL SPECIFICATIONS FOR A 'SCOPE LETTER' THAT DELINEATES THE SCOPE OF THE PRE-ENGINEERED BUILDING DESIGN, SUPPLY AND INSTALLATION.

2. ALL WORK SHALL MEET ALL APPLICABLE BC BUILDING CODE, FIRE CODE, TRANSPORT CANADA REGULATIONS AND BYLAWS OF THE REGIONAL DISTRICT OF KOOTENAY BOUNDARY.

3. ALL DIMENSIONS INDICATED ARE TO CENTRE LINE OF STRUCTURE, FACE OF GIRTS OR FACE OF FRAMING, UNLESS NOTED OTHERWISE.

4. ADVISE ARCHITECT OF DISCREPANCIES, INACCURACIES AND CONFLICTS IN THE DRAWINGS.

5. ALL CONSTRUCTION EQUIPMENT TO REMAIN BELOW THE FOLLOWING ELEVATIONS*:

- EL 448m when working 112 to 132m from runway centerline- EL 450m when working 132 to 152m from runway centerline- EL 452m when working greater than 152m from runway centerline* Operation of equipment above those elevations must be requested 72 hours in advance, and approved by the City of Trail.

issued for BP 16/11/09

Pre-Tender Review 16/12/05

Pre-Tender Coordination 17/01/09

NOT FORCONSTRUCTION

issued for Presentation 17/02/20

TRAIL AIRPORT TERMINAL BUILDING - curbside.

Page 2: board 01 site planpdf - Trail · 2017-06-05 · coloured elevations ms september 2016- ... pre-tender coordination 17/01/09 not for construction coloured elevation - west scale: nts

date

scale

drawn by

sheet no.

checked by

revison no.

rev no description date

COLOURED ELEVATIONS

MS

SEPTEMBER 2016

-

copyright reserved. these drawings and designs are and at all times remain the property of S.O.A to be used for the project shown and may not be reproduced without written consent.

AIRPORT TERMINAL BUILDING9019 BC-22ATrail, BC

project name

sheet title

drawing file

project no. SOA-1509

MS

s . o . aS t a n l e y O f f i c e of A r c h i t e c t u r e

709 Gore St. Nelson BC Canada V1L5C7tel. 250.777.2328 eml. [email protected]

web. www.soahome.ca

ISSUED FOR COORDINATION17/01/04

NOT FORCONSTRUCTION

shown

issued for DP 16/10/14

GENERAL NOTES:

1. THESE DRAWINGS TO BE READ IN CONJUNCTION WITH THE ARCHITECTURAL SPECIFICATIONS, GEOTECHNICAL, CIVIL, STRUCTURAL, PRE-ENGINEERED BUILDING, MECHANICAL AND ELECTRICAL DOCUMENTS. SEE THE ARCHITECTURAL SPECIFICATIONS FOR A 'SCOPE LETTER' THAT DELINEATES THE SCOPE OF THE PRE-ENGINEERED BUILDING DESIGN, SUPPLY AND INSTALLATION.

2. ALL WORK SHALL MEET ALL APPLICABLE BC BUILDING CODE, FIRE CODE, TRANSPORT CANADA REGULATIONS AND BYLAWS OF THE REGIONAL DISTRICT OF KOOTENAY BOUNDARY.

3. ALL DIMENSIONS INDICATED ARE TO CENTRE LINE OF STRUCTURE, FACE OF GIRTS OR FACE OF FRAMING, UNLESS NOTED OTHERWISE.

4. ADVISE ARCHITECT OF DISCREPANCIES, INACCURACIES AND CONFLICTS IN THE DRAWINGS.

5. ALL CONSTRUCTION EQUIPMENT TO REMAIN BELOW THE FOLLOWING ELEVATIONS*:

- EL 448m when working 112 to 132m from runway centerline- EL 450m when working 132 to 152m from runway centerline- EL 452m when working greater than 152m from runway centerline* Operation of equipment above those elevations must be requested 72 hours in advance, and approved by the City of Trail.

issued for BP 16/11/09

Pre-Tender Review 16/12/05

Pre-Tender Coordination 17/01/09

NOT FORCONSTRUCTION

COLOURED ELEVATION - WESTScale: NTS

2

A

COLOURED ELEVATION - EASTScale: NTS

1

A

issued for Presentation 17/02/20

Page 3: board 01 site planpdf - Trail · 2017-06-05 · coloured elevations ms september 2016- ... pre-tender coordination 17/01/09 not for construction coloured elevation - west scale: nts

TIE INTO CONSTRUCTION SITE FENCE

SITE PLAN NOTES:

- THIS ARCHITECTURAL SITE PLAN INCLUDES SITE INFROMATION DERIVED FROM: HINTERLAND SURVEYING & GEOMATICS INC. PLAN SHOWING SITE INFORMATION ON TRAIL AIRPORT, WANETA HIGHWAY NO. 22 IN DISTRICT LOT 205, KOOTENAY DISTRICT. SEPTEMBER 19th, 2016

and

HINTERLAND SURVEYING & GEOMATICS INC. REFERENCE PLAN OF CONSOLIDATION OF LOTS. DECEMBER 1st, 2016.

RWL

NE

WA

CC

ES

SR

OU

TE

6.0

3.0

NEW HYDRANT

NEW PATH OF TRAVEL

60.13

HYDRANT TO DOOR

EXIT

ENTRY/EXIT

BENCH

RWL 2.0

LINE OF ROOFOVERHANGS ANDCANOPIES.SHOWN DASHED.

LINE OFEXTERIOR WALLS.

ENTRY/EXIT

T/O FIN. FLOOR = 435.50T/O SLAB VARIES, SEE STRUCTURAL.

TRAIL ATB1 STOREY

BUILDING AREA= 408 sqm. (4,395 sqft)

26.34

HYDRANT TO DOOR

NEWHYDRANT

RWL

RWL

T/O CONC.435.49

T/O CONC.435.55

T/O CONC.435.37

RWL

NEW FENCE & ACCESS.

SEE CIVIL FORSEPTIC,

SEWER ANDWATER IN THIS

AREA.

RWL

M&E EQUIPMENT AREA.MECHANICAL, ELECTRICAL AND

CIVIL DRAWINGS.

T/O CONC.435.49

FENCE & ACCESS

2.5

CONC. SIDEWALKAROUND BUILDING

NEW ASPHALT TOEDGE OF BUILDING SIDEWALK.SEE CIVIL.

1.9

CONC. SIDEWALKAROUND BUILDING

2.5

CONC. SIDEWALKAROUND BUILDING

NEW CONC. SIDEWALK (SEE CIVIL)

NEW CONC. STAIRON GRADE

R.12.0m

R.12.

0m

NEW PARKING, SIGNAGE,GRADING & CURBING.

SEE ELECT FOR LIGHTING.

1.5

NEW PARKING, SIGNAGE,GRADING & CURBING.

SEE ELECT FOR LIGHTING.

NEW DROP-OFF / LOAD ZONE (SEE CIVIL)

EXISTINGHANGAR1 STOREY

PROPERTY LINE

EXISTINGFUEL

STATION

EDGE OF EXISTING ASPHALT

NEW FENCE &ACCESS

NEW FENCE &ACCESS.

EXISTINGAPRON 1

NEW FENCE (SEE CIVIL)

SITE PLANScale: 1:250

1

A1.2

NEW PLANTINGAREA

NEW PLANTINGAREA

NEW PLANTING AREA

NEW PLANTINGAREA

NEW PLANTINGAREA

NEW PLANTINGAREA

NEW PLANTING AREA (SEE CIVIL)

HIGHWAY 22A

EXISTING VEGETATIONTO BE MAINTAINED

(TYP.)

SLOPE CONC. SIDEWALKMIN 2% AWAY FROM BLDG. (TYP)SEE CIVIL FOR GRADING AROUND BUILDING.

EXISTING FENCE

EXISTING FENCE

CONSTRUCTIONLAYDOWN AREA.

COORDINATEACCESS w/AIRPORT

OPERATIONS

5.51

NEW TEMPORARY FENCING

SE

TB

AC

K

T/O CONC.435.49

T/O CONC.435.49

- SHADED AREA REFERS TO NEW WORK DESCRIBED IN THE ARCHITECTURAL, STRUCTURAL, PRE-ENGINEERED BUILDING, MECHANICAL AND ELECTRICAL DRAWINGS HEREIN. FOR ALL OTHER WORK, SEE CIVIL DRAWINGS AND THE ELECTRICAL SITE PLAN HEREIN.

- HATCHED AREA SHOWS THE BOUNDARY OF THE TERMINAL BUILDING'S EXTERIOR Z-GIRTS.

N

date

scale

drawn by

sheet no.

checked by

revison no.

rev no description date

SITE PLAN

MS

SEPTEMBER 2016

A1.2

copyright reserved. these drawings and designs are and at all times remain the property of S.O.A to be used for the project shown and may not be reproduced without written consent.

AIRPORT TERMINAL BUILDING9019 BC-22ATrail, BC

project name

sheet title

drawing file

project no. SOA-1509

MS

s . o . aS t a n l e y O f f i c e of A r c h i t e c t u r e

709 Gore St. Nelson BC Canada V1L5C7tel. 250.777.2328 eml. [email protected]

web. www.soahome.ca

shown

NOT FORCONSTRUCTION

GENERAL NOTES:

1. THESE DRAWINGS TO BE READ IN CONJUNCTION WITH THE ARCHITECTURAL SPECIFICATIONS, GEOTECHNICAL, CIVIL, STRUCTURAL, PRE-ENGINEERED BUILDING, MECHANICAL AND ELECTRICAL DOCUMENTS.

2. ALL WORK SHALL MEET ALL APPLICABLE BC BUILDING CODE, FIRE CODE, TRANSPORT CANADA REGULATIONS AND BYLAWS OF THE REGIONAL DISTRICT OF KOOTENAY BOUNDARY.

3. ALL DIMENSIONS INDICATED ARE TO CENTRE LINE OF STRUCTURE, FACE OF GIRTS OR FACE OF FRAMING, UNLESS NOTED OTHERWISE.

4. ADVISE ARCHITECT OF DISCREPANCIES, INACCURACIES AND CONFLICTS IN THE DRAWINGS.

5. ALL CONSTRUCTION EQUIPMENT TO REMAIN BELOW THE FOLLOWING ELEVATIONS*:

- EL 448m when working 112 to 132m from runway centerline- EL 450m when working 132 to 152m from runway centerline- EL 452m when working greater than 152m from runway centerline* Operation of equipment above those elevations must be requested 72 hours in advance, and approved by the City of Trail.

Pre-Tender Coordination 17/01/09